Method for analyzing rationality of procurement budget of instruments and equipment
By comprehensively considering multiple indicators, this method solves the problem of unreasonable budgets in traditional procurement decisions, achieves scientific equipment selection and cost control, and ensures the rationality of procurement budgets and the efficient use of equipment.
Patent Information
- Application Number
- CN202411260623.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-10
- Publication Date
- 2024-12-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Traditional instrument and equipment procurement decisions mainly rely on price and performance, neglecting important indicators such as maintenance costs, service life, environmental protection, and compatibility. This can lead to unreasonable procurement budgets and problems such as cost overruns, substandard equipment performance, or excessively high maintenance costs.
An analytical approach that comprehensively considers performance, price, maintenance costs, service life, environmental protection, and compatibility is adopted. The weights of indicators are determined through the analytic hierarchy process and the entropy method. A comprehensive evaluation model is constructed to quantify the overall score of each piece of equipment and provide a scientific basis for procurement decisions.
It improves the comprehensiveness and accuracy of procurement budget analysis, ensures that equipment meets needs and maximizes economic and social benefits within the budget, provides strong procurement support, and reasonably controls costs.
Smart Images

Figure CN119067577A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of instrument and equipment procurement management, in particular to an analysis method for the rationality of instrument and equipment procurement budget. Background Art
[0002] Instruments and equipment are indispensable and important tools in scientific research and inspection and testing work, and play a vital role in ensuring the smooth progress of related work. With the continuous advancement of technology, the types of instruments and equipment are becoming more and more diverse, and their functions are becoming more and more powerful. However, this also brings great challenges to procurement decisions. On the one hand, different instruments and equipment have significant differences in performance, price, maintenance cost, service life, environmental protection and compatibility. For example, some high-performance equipment may be expensive, but may bring significant efficiency and quality improvements in long-term use; while some lower-priced equipment may have deficiencies in performance or compatibility, and require additional investment for upgrading or transformation. On the other hand, procurement budgets are often limited. Units and enterprises need to choose instruments and equipment that best suit their needs within a limited budget. If the procurement decision is unreasonable, it may lead to budget overruns, substandard equipment performance or excessive subsequent maintenance costs, which will affect the normal operation and development of the organization.
[0003] Traditional instrument and equipment purchasing decisions often rely mainly on two factors: price and performance, while ignoring other important indicators, such as maintenance costs, service life, environmental protection, and compatibility. This single-dimensional decision-making method can easily lead to various problems in the actual use of the purchased equipment, increasing the organization's operating costs and risks. In addition, there is a lack of scientific and effective analysis methods when determining the rationality of the procurement budget. The budget is often determined based on past experience or simple estimates without comprehensive consideration of the full life cycle cost of the equipment. This may lead to the selection of equipment with poor quality and performance in pursuit of low prices during the procurement process, or exceeding the budget for high performance, which will bring economic pressure to the organization.
[0004] To solve these problems, a comprehensive and scientific method for analyzing the rationality of instrument and equipment procurement budget is needed. This method should comprehensively consider multiple indicators, including performance, price, maintenance cost, service life, environmental protection and compatibility, and provide an accurate basis for procurement decisions through reasonable weight calculation and data analysis. At the same time, the rationality of the budget should be analyzed and evaluated in combination with actual conditions to ensure that the purchased instruments and equipment can not only meet the needs of the organization, but also maximize economic and social benefits within the budget. Summary of the invention
[0005] To overcome the above problems, the purpose of the present invention is to provide an analysis method for the rationality of the instrument and equipment procurement budget. By comprehensively considering factors such as equipment performance, price, and maintenance cost, a scientific basis is provided for procurement decisions to ensure the rationality of the procurement budget.
[0006] The present invention is implemented by the following scheme: a method for analyzing the rationality of instrument and equipment procurement budget, the method comprising the following steps:
[0007] Step 1: Collect data information of the instruments and equipment to be purchased;
[0008] Step 2: Determine the index system used to evaluate the rationality of the instrument and equipment procurement budget. The index system includes: performance index, price index, maintenance cost index, service life index, environmental protection index, and compatibility index;
[0009] Step 3: Use the analytic hierarchy process to construct a hierarchical model, set the rationality of the instrument and equipment procurement budget as the target layer, set equipment of different brands and models as the solution layer, set equipment performance indicators, price indicators, maintenance cost indicators, service life indicators, environmental protection indicators, and compatibility indicators as the criterion layer, and perform hierarchical division; combine the entropy weight method to determine the subjective weight and objective weight of each indicator, and finally use the linear weighting method to determine the comprehensive weight of each indicator;
[0010] Step 4: Use the weighted summation method to construct a comprehensive evaluation model based on the comprehensive weight to obtain the comprehensive score of each instrument and equipment;
[0011] Step 5: Sort the instruments and equipment according to the comprehensive scores, and select the instruments and equipment with high comprehensive scores as candidate instruments and equipment.
[0012] Furthermore, the data information includes the technical specifications, performance parameters, price range, brand reputation, and supplier evaluation of the equipment; research on market prices, maintenance costs, and service life data of similar equipment; and obtaining demand information for instruments and equipment within the organization, which includes: frequency of use, functional requirements, and compatibility requirements.
[0013] Furthermore, the performance indicators include: accuracy, resolution, stability, and reliability; the price indicators include: purchase price, transportation costs, and installation and commissioning costs; the maintenance cost indicators include: repair costs, consumables costs, and maintenance cycles; the service life indicators include: the expected service life of the equipment; the environmental protection indicators include: energy consumption and emission environmental performance of the equipment; the compatibility indicators include: compatibility with existing equipment and scalability.
[0014] Furthermore, the step 3 is further specifically as follows:
[0015] Step 3.1 Determination of subjective weights:
[0016] Through expert scoring, the factors of the criterion layer are compared pairwise to establish a judgment matrix. The judgment matrix is a square matrix, in which the element a ij Indicates the importance of the i-th factor relative to the j-th factor; according to the judgment matrix, the weight is determined in the following way:
[0017] Calculate the product M of each row of the judgment matrix i :
[0018]
[0019] Among them, a ij is the element in the judgment matrix, and n is the order of the judgment matrix;
[0020] Raising the product to the power of n gives vector W':
[0021]
[0022] Normalize the vector W':
[0023]
[0024] The obtained vector W is the subjective weight of each indicator;
[0025] Step 3.2 Determination of objective weights:
[0026] For the collected data information of each brand and model of equipment under different indicators, a data matrix is constructed. It is assumed that there are m devices and n indicators. Then the data matrix is X=(x ij )m×n;
[0027] The data matrix is standardized and the range standardization method is used to convert the index values in the matrix into specific values in the interval [0,1], as follows:
[0028] Standardize the positive indicators, including performance indicators, service life indicators, environmental protection indicators, and compatibility indicators:
[0029]
[0030] Standardize the reverse indicators, including price indicators and maintenance cost indicators:
[0031]
[0032] Among them, X ij is the normalized value of the jth indicator of the ith device, x ijis the jth index value of the ith device, x j represents the jth index of any device among all devices, max(x j ) and min(x j ) are the maximum and minimum values of the jth indicator in all devices respectively;
[0033] The weights of each indicator for each brand and model of equipment are determined by the following method:
[0034] Calculate the numerical weight p of the i-th item of the j-th indicator ij :
[0035]
[0036] Calculate the entropy value e of the jth indicator j ; m is the number of devices;
[0037]
[0038] in,
[0039] Then the entropy weight w of the jth indicator is j for:
[0040] n is the total number of indicators;
[0041] Step 3.3 Determination of comprehensive weight:
[0042] The subjective weight and objective weight are calculated comprehensively using the linear weighting method to obtain the comprehensive weight of the indicator.
[0043] Assume the subjective weight is The objective weight is The comprehensive weight for:
[0044]
[0045] Among them, α+β=1, and the values of α and β are determined according to actual conditions.
[0046] Furthermore, the calculation formula for obtaining the comprehensive score of each instrument and equipment is:
[0047]
[0048] Among them, S i is the comprehensive score of the ith instrument, is the comprehensive weight of the jth indicator, X ij is the standardized value of the jth indicator of the ith instrument, and n is the total number of indicators.
[0049] Furthermore, step 5 is further specified as follows: obtaining the total budget of the candidate equipment, including the purchase price, transportation costs, installation and commissioning costs, and maintenance costs; comparing the total budget with the purchase budget given by the organization. If the total budget is within the purchase budget, the budget is considered reasonable; if the total budget exceeds the purchase budget, it is necessary to readjust the purchase budget, or readjust the equipment selection, and lower the index requirements to ensure the rationality of the budget.
[0050] The beneficial effects of the present invention are: (1) comprehensive consideration of multiple factors of instruments and equipment improves the comprehensiveness and accuracy of budget analysis;
[0051] (2) The scientific indicator weight determination method and data standardization processing method are adopted to ensure the objectivity and reliability of the evaluation results;
[0052] (3) By constructing a comprehensive evaluation model, it is possible to quantitatively compare equipment of different brands and models, providing strong support for purchasing decisions;
[0053] (4) It helps organizations to reasonably control costs and improve capital utilization during the procurement process of instruments and equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0054] Figure 1 It is a schematic flow chart of the method of the present invention.
[0055] Figure 2 It is a schematic diagram of the hierarchical structure model of the present invention. DETAILED DESCRIPTION
[0056] The present invention will be further described below in conjunction with the accompanying drawings.
[0057] See also Figure 1 and Figure 2 As shown, a method for analyzing the rationality of an instrument equipment procurement budget of the present invention comprises the following steps:
[0058] Step 1: Collect data information of the instruments and equipment to be purchased;
[0059] The data information includes the technical specifications, performance parameters, price range, brand reputation, and supplier evaluation of the equipment; research on the market price, maintenance cost, and service life data of similar equipment; and obtaining the internal demand information for instruments and equipment in the organization, which includes: frequency of use, functional requirements, and compatibility requirements.
[0060] Step 2: Determine the index system used to evaluate the rationality of the instrument and equipment procurement budget. The index system includes: performance index, price index, maintenance cost index, service life index, environmental protection index, and compatibility index;
[0061] The performance indicators include: accuracy, resolution, stability, and reliability; the price indicators include: purchase price, transportation costs, and installation and commissioning costs; the maintenance cost indicators include: repair costs, consumables costs, and maintenance cycles; the service life indicators include: the expected service life of the equipment; the environmental protection indicators include: the energy consumption and emission environmental performance of the equipment; the compatibility indicators include: compatibility with existing equipment and scalability.
[0062] Step 3: Use the analytic hierarchy process to construct a hierarchical model, set the rationality of the instrument and equipment procurement budget as the target layer, set equipment of different brands and models as the solution layer, set equipment performance indicators, price indicators, maintenance cost indicators, service life indicators, environmental protection indicators, and compatibility indicators as the criterion layer, and perform hierarchical division; combine the entropy weight method to determine the subjective weight and objective weight of each indicator, and finally use the linear weighted method to determine the comprehensive weight of each indicator; to improve the scientificity and accuracy of the indicator weight determination.
[0063] 3.1 Determination of subjective weight
[0064] Through expert scoring, the factors of the criterion layer are compared pairwise to establish a judgment matrix. The judgment matrix is a square matrix, in which the element a ij Indicates the importance of the i-th factor relative to the j-th factor. For example, for the two factors of performance and price, the expert gives a numerical judgment based on their relative importance. If performance is slightly more important than price, then a 12 =3, If both are equally important, then the value is 1, i.e. 12 =1, a 21 =1.
[0065] According to the judgment matrix, the weights are determined by the following method.
[0066] Calculate the product M of each row of the judgment matrix i
[0067]
[0068] Among them, a ij is the element in the judgment matrix, and n is the order of the judgment matrix.
[0069] Raise the product to the power of n to get vector W'
[0070]
[0071] Normalize the vector W'
[0072]
[0073] The obtained vector W is the subjective weight of each indicator.
[0074] 3.2 Determination of objective weights
[0075] For the specific data collected for each brand and model of equipment under different indicators, a data matrix is constructed. Assuming there are m devices and n indicators, the data matrix is X = (xij)m×n.
[0076] 3.2.1 The data matrix is standardized and the range standardization method is used to convert the index values in the matrix into specific values in the interval [0,1], as follows.
[0077] For positive indicators (the larger the indicator value, the better the evaluation, including performance indicators, service life indicators, environmental protection indicators, and compatibility indicators), standardization is performed:
[0078]
[0079] Standardize the reverse indicators (the smaller the indicator value, the better the evaluation, including price indicators and maintenance cost indicators):
[0080]
[0081] Among them, X ij is the normalized value of the jth indicator of the ith device, x ij is the jth index value of the ith device, x j represents the jth index of any device among all devices, max(x j ) and min(x j ) are the maximum and minimum values of the jth indicator in all devices respectively.
[0082] 3.2.2 Determine the weight of each indicator for each brand and model of equipment through the following method.
[0083] Calculate the numerical weight p of the i-th item of the j-th indicator ij .
[0084]
[0085] Calculate the entropy value e of the jth indicator j ; m is the number of devices.
[0086]
[0087] in,
[0088] Then the entropy weight w of the jth indicator is j for:
[0089] n is the total number of indicators;
[0090] 3.3 Determination of comprehensive weight
[0091] The subjective weight and objective weight are calculated comprehensively using the linear weighting method to obtain the comprehensive weight of the indicator.
[0092] Assume the subjective weight is The objective weight is The comprehensive weight for:
[0093]
[0094] Among them, α+β=1, and the values of α and β are determined according to actual conditions. For example, α=0.6 and β=0.4 can be taken, which means that the subjective weight accounts for a larger proportion, but the objective weight is also fully considered.
[0095] Step 4: Use the weighted summation method to construct a comprehensive evaluation model based on the comprehensive weight to obtain the comprehensive score of each instrument and equipment;
[0096] The calculation formula for obtaining the comprehensive score of each instrument and equipment is:
[0097]
[0098] Among them, S i is the comprehensive score of the ith instrument, is the comprehensive weight of the jth indicator, X ij is the standardized value of the jth indicator of the ith instrument, and n is the total number of indicators.
[0099] Step 5: Sort the instruments and equipment according to the comprehensive scores, and select the instruments and equipment with high comprehensive scores as candidate instruments and equipment.
[0100] The step 5 is further specified as follows: obtaining the total budget of the candidate equipment, including the purchase price, transportation cost, installation and commissioning cost, and maintenance cost; comparing the total budget with the purchase budget given by the organization. If the total budget is within the purchase budget, the budget is considered reasonable; if the total budget exceeds the purchase budget, it is necessary to readjust the purchase budget, or readjust the equipment selection, and lower the index requirements to ensure the rationality of the budget.
[0101] The present invention will be further described below in conjunction with a specific embodiment:
[0102] Suppose a laboratory of a certain unit plans to purchase an analytical instrument, and there are three different types of equipment A, B, and C to choose from. After data collection and indicator system construction, the following six indicators are determined: performance indicator, price indicator, maintenance cost indicator, service life indicator, environmental protection indicator, and compatibility indicator.
[0103] An analysis method for the rationality of an instrument and equipment procurement budget, the analysis method comprising:
[0104] 1. Data Collection
[0105] Equipment A: Excellent performance, can analyze 90 samples per hour, priced at RMB 1.5 million, with an annual maintenance cost of RMB 80,000, an estimated service life of 12 years, good environmental performance (set to 0.8), and excellent compatibility with existing supporting equipment (set to 0.9).
[0106] Equipment B: Good performance, can analyze 80 samples per hour, priced at RMB 1.3 million, with an annual maintenance cost of RMB 70,000, an estimated service life of 10 years, average environmental performance (set to 0.6), and good compatibility with existing supporting equipment (set to 0.8).
[0107] Equipment C: medium performance, can analyze 70 samples per hour, priced at RMB 1.1 million, with annual maintenance costs of RMB 90,000, and an estimated service life of 8 years. It has poor environmental performance (set to 0.4) and general compatibility with existing supporting equipment (set to 0.7).
[0108] 2. Clarify the hierarchy and establish a judgment matrix
[0109] The target layer is the rationality of the instrument and equipment procurement budget; the criterion layer is performance indicators, price indicators, maintenance cost indicators, service life indicators, environmental protection indicators, and compatibility indicators; the solution layer is equipment of different brands and models.
[0110] Establish a judgment matrix. Invite experts in related fields to compare each indicator of the criterion layer in pairs and give judgment values according to the degree of importance. Assume that the judgment matrix A obtained is as follows Table 1:
[0111] Table 1
[0112]
[0113]
[0114] 3. Determine subjective weight
[0115] 3.1 Calculate the product M of each row of the judgment matrix i
[0116] Performance index row product: M1 = 1 × 3 × 2 × 4 × 3 × 3 = 216
[0117] Price indicator row product: Maintenance cost indicator row product: Product of service life indicators: The product of environmental indicators: Compatibility index row product:
[0118] 3.2 Calculate the nth root to obtain the vector W'. In this embodiment, n = 6
[0119] Performance indicators: Price Index: Maintenance cost indicators: Service life indicators: Environmental indicators: Compatibility indicators:
[0120] 3.3 Normalized calculation to obtain subjective weight
[0121] 2.4495+0.6177+1.5131+0.3891+1.2599+0.8909=7.1202Then the subjective weight of each indicator is:
[0122]
[0123] 4. Create a data matrix
[0124] According to the data collection situation, the data matrix X is established, as shown in Table 2:
[0125] Table 2
[0126]
[0127] 5. Determine objective weights
[0128] 5.1 Data Standardization
[0129] For positive indicators (performance indicators, service life indicators, environmental indicators, compatibility indicators), the calculation formula is used:
[0130]
[0131] For reverse indicators (price indicators, maintenance cost indicators), the calculation formula is:
[0132]
[0133] The calculation results in:
[0134] Take performance as an example:
[0135] max(x性能 )=90min(x 性能 )=70
[0136] Device A:
[0137] Device B:
[0138] Device C:
[0139] By analogy, the standardized processing results of the remaining five indicator data of equipment A, equipment B, and equipment C are obtained in the same way. The standardized data matrix X is shown in Table 3:
[0140] Table 3
[0141]
[0142] 5.2 Calculate the entropy value of the jth indicator
[0143] Using calculation formula Determine the numerical weight p of the jth indicator of each device ij , taking performance as an example:
[0144] Using calculation formula Determine the k value, where m is the number of devices. In this embodiment, m = 3, so
[0145] Using calculation formula Determine the entropy value, taking performance as an example:
[0146] e 性能 =-k×(p A性能 ln(p A性能 )+p B性能 ln(p B性能 )+p C性能 ln(p C性能 ))≈0.5794 And so on, the entropy values of the remaining five indicators of device A, device B, and device C are obtained in the same way.
[0147] e 价格 ≈0.5794
[0148] e 维护成本 ≈0.5794
[0149] e 使用寿命 ≈0.5794
[0150] e 环保 ≈0.5794
[0151] e 兼容性 ≈0.5794
[0152] 5.3 Calculate the entropy weight of the jth indicator
[0153] In this embodiment, n=6
[0154] Take performance as an example:
[0155]
[0156] By analogy, the entropy weights of the remaining five indicators of device A, device B, and device C are obtained.
[0157]
[0158] 6. Determine the comprehensive weight
[0159] Assume that the subjective weight ratio α=0.4 and the objective weight ratio β=0.6.
[0160] Using calculation formula Determine the comprehensive weight of each indicator.
[0161] w 性能 =0.6×0.3440+0.4×0.0295≈0.2182
[0162] w 价格 =0.6×0.0868+0.4×0.0295≈0.0638
[0163] w 维护成本 =0.6×0.2125+0.4×0.0295≈0.1393
[0164] w 使用寿命 =0.6×0.0547+0.4×0.0295≈0.0446
[0165] w 环保 =0.6×0.1769+0.4×0.0295≈0.1180
[0166] w 兼容性 =0.6×0.1251+0.4×0.0295≈0.0869
[0167] 7. Determine the comprehensive score of each device
[0168] The weighted summation method is used to construct a comprehensive evaluation model and calculate the comprehensive score of each device.
[0169] Using calculation formula Determine the comprehensive score of the device, taking device A as an example:
[0170]
[0171] S A =0.5374
[0172] And so on, the comprehensive scores of device B and device C are obtained in the same way.
[0173] S B =0.4051
[0174] S C =0.0638
[0175] 8. Budget rationality analysis
[0176] In this embodiment, S is calculated. A =0.5374, S B =0.4051, S C =0.0638, the comprehensive score is ranked S A >S B >S C , indicating that device A and device B can be used as candidate devices.
[0177] The total budget for equipment A is RMB 1.5 million + RMB 80,000 × 12 years = RMB 2.46 million.
[0178] The total budget for Equipment B is RMB 1.3 million + RMB 70,000 × 10 years = RMB 2 million.
[0179] The total budget for Equipment C is RMB 1.1 million + RMB 90,000 × 8 years = RMB 1.82 million.
[0180] Assume that the unit's given procurement budget is 1.6 million yuan.
[0181] analyze:
[0182] The total budget of the three types of equipment exceeds the procurement budget. At this time, it is necessary to readjust the equipment selection or lower certain indicator requirements to ensure the rationality of the budget.
[0183] For device A:
[0184] You can consider negotiating with suppliers to lower prices, or looking for alternative products with slightly lower performance but more reasonable prices. At the same time, you can consider optimizing the maintenance plan of the equipment to reduce maintenance costs.
[0185] For example, the price can be reduced to 1.25 million yuan through negotiation with suppliers, and the annual maintenance cost can be reduced to 65,000 yuan by optimizing the maintenance process. At this time, the total budget is 1.25+6.5×12=2.03 million yuan, which is still over budget, but lower than before.
[0186] For device B:
[0187] The performance and compatibility of equipment B can be re-evaluated to see if some performance requirements can be reduced without affecting the main production needs, thereby reducing the price. At the same time, the maintenance plan of the equipment can be optimized to reduce maintenance costs.
[0188] For example, by negotiating with suppliers to reduce some less critical performance indicators, the price can be reduced to 1.1 million yuan, and the annual maintenance cost can be reduced to 60,000 yuan by optimizing the maintenance process. At this time, the total budget is 1.1 million + 6 × 10 = 1.7 million yuan, which is closer to the budget.
[0189] For device C:
[0190] You can consider upgrading device C to improve its performance and compatibility, negotiate with the supplier to lower the price, and consider optimizing the equipment maintenance plan to reduce maintenance costs.
[0191] For example, spend 100,000 yuan to partially upgrade device C to improve its performance and compatibility, and negotiate with the supplier to reduce the price to 1 million yuan. And by optimizing the maintenance process, the annual maintenance cost can be reduced to 70,000 yuan. At this time, the total budget is 100+7×8=1.56 million yuan, which can be achieved within the budget.
[0192] In summary, through comprehensive evaluation of the three types of equipment and budget rationality analysis, we can choose appropriate equipment or take corresponding adjustment measures according to the actual situation of the unit to ensure the rationality of the procurement budget.
[0193] The above description is only a preferred embodiment of the present invention. All equivalent changes and modifications made according to the scope of the patent application of the present invention should fall within the scope of the present invention.
Claims
1. A method for analyzing the rationality of instrument and equipment procurement budget, characterized by: The analytical method comprises the following steps: Step 1: Collect data information of the instruments and equipment to be purchased; Step 2: Determine the index system used to evaluate the rationality of the instrument and equipment procurement budget. The index system includes: performance index, price index, maintenance cost index, service life index, environmental protection index, and compatibility index; Step 3: Use the analytic hierarchy process to construct a hierarchical model, set the rationality of the instrument and equipment procurement budget as the target layer, set equipment of different brands and models as the solution layer, set equipment performance indicators, price indicators, maintenance cost indicators, service life indicators, environmental protection indicators, and compatibility indicators as the criterion layer, and perform hierarchical division; combine the entropy weight method to determine the subjective weight and objective weight of each indicator, and finally use the linear weighting method to determine the comprehensive weight of each indicator; Step 4: Use the weighted summation method to construct a comprehensive evaluation model based on the comprehensive weight to obtain the comprehensive score of each instrument and equipment; Step 5: Sort the instruments and equipment according to the comprehensive scores, and select the instruments and equipment with high comprehensive scores as candidate instruments and equipment.
2. The method for analyzing the rationality of the instrument and equipment procurement budget according to claim 1 is characterized by: The data information includes the technical specifications, performance parameters, price range, brand reputation, and supplier evaluation of the equipment; Research the market price, maintenance cost, and service life of similar equipment; Obtain the organization's internal demand information for instruments and equipment, including: frequency of use, functional requirements, and compatibility requirements.
3. The method for analyzing the rationality of the instrument and equipment procurement budget according to claim 1 is characterized by: The performance indicators include: accuracy, resolution, stability, and reliability; the price indicators include: purchase price, transportation costs, and installation and commissioning costs; the maintenance cost indicators include: repair costs, consumables costs, and maintenance cycles; the service life indicators include: the expected service life of the equipment; the environmental protection indicators include: the energy consumption and emission environmental performance of the equipment; the compatibility indicators include: compatibility with existing equipment and scalability.
4. The method for analyzing the rationality of the instrument and equipment procurement budget according to claim 1 is characterized by: The step 3 is further specifically as follows: Step 3.1 Determination of subjective weights: Through expert scoring, the factors of the criterion layer are compared pairwise to establish a judgment matrix. The judgment matrix is a square matrix, in which the element a ij Indicates the importance of the i-th factor relative to the j-th factor; According to the judgment matrix, the weights are determined in the following way: Calculate the product M of each row of the judgment matrix i : Among them, a ij is the element in the judgment matrix, and n is the order of the judgment matrix; Raising the product to the power of n gives vector W': Normalize the vector W': The obtained vector W is the subjective weight of each indicator; Step 3.2 Determination of objective weights: For the collected data information of each brand and model of equipment under different indicators, a data matrix is constructed. It is assumed that there are m devices and n indicators. Then the data matrix is X=(x ij )m×n; The data matrix is standardized and the range standardization method is used to convert the index values in the matrix into specific values in the interval [0,1], as follows: Standardize the positive indicators, including performance indicators, service life indicators, environmental protection indicators, and compatibility indicators: Standardize the reverse indicators, including price indicators and maintenance cost indicators: Among them, X ij is the normalized value of the jth indicator of the ith device, x ij is the jth index value of the ith device, x j represents the jth index of any device among all devices, max(x j ) and min(x j ) are the maximum and minimum values of the jth indicator in all devices respectively; The weights of each indicator for each brand and model of equipment are determined by the following method: Calculate the numerical weight p of the i-th item of the j-th indicator ij : Calculate the entropy value e of the jth indicator j ; m is the number of devices; in, Then the entropy weight w of the jth indicator is j for: n is the total number of indicators; Step 3.3 Determination of comprehensive weight: The subjective weight and objective weight are calculated comprehensively using the linear weighting method to obtain the comprehensive weight of the indicator. The subjective weight is set as The objective weight is The comprehensive weight for: Among them, α+β=1, and the values of α and β are determined according to actual conditions.
5. The method for analyzing the rationality of the instrument and equipment procurement budget according to claim 4 is characterized by: The calculation formula for obtaining the comprehensive score of each instrument and equipment is: Among them, S i is the comprehensive score of the ith instrument, is the comprehensive weight of the jth indicator, X ij is the standardized value of the jth indicator of the ith instrument, and n is the total number of indicators.
6. The method for analyzing the rationality of the instrument and equipment procurement budget according to claim 1 is characterized by: The step 5 is further specified as follows: obtaining the total budget of the candidate equipment, including the purchase price, transportation cost, installation and commissioning cost, and maintenance cost; comparing the total budget with the purchase budget given by the organization. If the total budget is within the purchase budget, the budget is considered reasonable; if the total budget exceeds the purchase budget, it is necessary to readjust the purchase budget, or readjust the equipment selection, and lower the index requirements to ensure the rationality of the budget.
Citation Information
Patent Citations
Method for determining supplier quota, processor, device and storage medium
CN115965278A
Tool inventory classification comprehensive evaluation method based on combined empowerment-ABC
CN117422373A
Equipment procurement method and system
US20020087419A1
Cited By
Scientific instrument purchasing type selection method and device based on artificial intelligence
CN121119782A
Artificial intelligence-based scientific instrument procurement selection method and device
CN121119782B