House building project construction safety management device

By carrying a camera and an ultrasonic probe, combined with a flight control module and a security inspection and processing module, automatic safety monitoring of the building construction area is achieved, and the problems of insufficient use flexibility and security management loopholes in the existing technology are solved. Improve the effectiveness of construction safety management.

CN119071434APending Publication Date: 2024-12-03SHANDONG YIFANGDA CONSTR PROJECT MANAGEMENT CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411095342.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-09
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

When existing housing construction safety management devices are distributed in large areas and have high site complexity, they lack flexibility in use, and relying on positioning chips leads to loopholes in safety management, making it difficult to effectively monitor the safe location of construction personnel.

Method used

Using a drone equipped with a camera and an ultrasonic probe, combined with a flight control module and a security inspection and processing module, it automatically plans and monitors the drone's flight trajectory, collects and analyzes the construction site video and ultrasonic array point information in real time, and conducts safety analysis and comparison. , improve safety management effect.

Benefits of technology

It improves the flexibility of using when the construction area is distributed in many ways and the complexity is high. Through the surprise patrol method, the location safety and operation safety of construction personnel can be effectively analyzed, the safety management effect is enhanced, and human resource consumption is reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119071434A_ABST
    Figure CN119071434A_ABST
Patent Text Reader

Abstract

The housing building project construction safety management device comprises a seat plate, a mounting box is arranged on the seat plate, a storage battery is arranged in the mounting box, a protection top box is mounted at the top of the mounting box, a development board is arranged in the protection top box, and an unmanned aerial vehicle is arranged on the protection top box; a camera is arranged on a lower disc of the unmanned aerial vehicle, supports are arranged on the lower disc of the unmanned aerial vehicle and located on the side of the camera, and an ultrasonic probe is arranged between the supports. The protection top box is internally provided with a development board, and the development board is provided with a flight control module and a security check processing module. When more construction areas are distributed and the complexity of a construction site is higher, the use flexibility is high; and a sudden patrol mode is adopted, so that the safety of the construction position of the constructor and the operation safety can be analyzed and compared, and the safety management effect is good.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building construction safety management, and in particular relates to a construction safety management device for a building construction project. Background Art

[0002] During the construction of building projects, in addition to using the BIM model for full-cycle construction management, due to the complexity of construction personnel, a certain number of safety management personnel are required to conduct on-site safety management. Since some construction projects take a long time and the construction areas are widely distributed, it not only causes difficulties for safety management personnel, but also increases the consumption of a lot of human resources.

[0003] The invention patent with the authorization announcement number: CN113971867B discloses a safety management device and system for building construction projects, including a device body, multiple identification and positioning chips and multiple positioning terminals. A management terminal is arranged inside the device body, and a display screen, an image collector and a communication base are arranged outside the device body. The management terminal is electrically connected to the display screen, the image collector and the communication base; the image collector is used to collect real-time images of construction personnel, the management terminal is used to detect the clothing of construction personnel according to the real-time images and generate detection information, and the display screen is used to display the detection information; the communication base is connected to the positioning terminal, and the positioning terminal It is set up in the construction room of the building construction project, and each construction room is equipped with two positioning terminals, and the positioning terminal is equipped with an indoor positioning module and a laser detection module; wherein, multiple identification and positioning chips are correspondingly arranged on the work badges of multiple construction personnel and multiple construction equipment, the indoor positioning module is used to detect the position of the identification and positioning chip in the construction room, and the laser detection module is used to detect the spatial layout of the construction room. The positioning terminal sends the position information of the positioning chip and the spatial layout information of the construction room to the management terminal through the communication base, and the management terminal is also used to determine whether the position of the positioning chip is at the preset position of the construction room according to the spatial layout information of the construction room.

[0004] It can be seen that through the setting of the indoor positioning module, it is possible to locate the positions of construction personnel and construction equipment in the complex environment of building construction, and cooperate with the laser detection module to scan the construction environment. The management terminal can compare the positions of construction personnel and construction equipment in the construction environment to see if they comply with the construction safety management regulations, thereby realizing the monitoring and management of construction safety throughout the construction process and improving the safety of construction.

[0005] However, this type of safety management device needs to be installed in the construction area, and lacks flexibility in use when there are many construction areas and the construction site is complex. As for the management of personnel activity areas, it relies too much on the positioning chips worn by personnel, and neglects the handling of the positioning chips by construction personnel. If the construction personnel place their work badges and multiple construction equipment in the construction safety area, but they themselves are in the construction non-safe area, this will create loopholes in safety management and is not conducive to safety supervision. Summary of the invention

[0006] The purpose of the present invention is to provide a construction safety management device for a building construction project to solve the problems existing in the prior art.

[0007] To achieve the above object, the present invention provides the following technical solution: a construction safety management device for a building project, comprising a seat plate, a mounting box is arranged on the seat plate, a battery is arranged in the mounting box, a protective top box is installed on the top of the mounting box, a development board is arranged in the protective top box, and a drone is arranged on the protective top box;

[0008] The lower plate of the drone is provided with a camera, the lower plate of the drone is provided with a bracket at the side of the camera, and an ultrasonic probe is provided between the brackets;

[0009] A viewing frame is provided on one side of the seat plate, and an industrial computer is embedded on one side of the top of the viewing frame, and a transceiver antenna is provided on the other side of the seat plate;

[0010] A development board is provided in the protection top box, and a flight control module and a security inspection processing module are respectively provided on the development board. The flight control module is used for receiving the spatial model of the construction area and the positioning information of the model points issued by the industrial computer, planning the flight trajectory and formulating flight control instructions, and automatically controlling the operation of the UAV according to the set time period. The flight control module is also used for monitoring the real-time flight trajectory of the UAV; the security inspection processing module is used for receiving the video captured by the camera in real time and the ultrasonic array point information obtained by the ultrasonic probe in real time, combining with the spatial model of the construction area, performing superimposed safety analysis, and feeding back the analysis results to the industrial computer.

[0011] Preferably, at least three transformers are further provided at the rear of the installation box, the power output end of the battery is connected to the power input end of the transformer through a cable, and the power output end of the transformer is respectively connected to the power input pin of the development board, the power input end of the transceiver antenna and the power input end of the industrial computer through cables;

[0012] The power input terminal of the battery is also connected to the power output terminal of the charger through a cable.

[0013] Preferably, the development board is fixed with insulating pad screws in the protection box, and heat dissipation holes are provided at the rear of the protection box.

[0014] Preferably, the flight control module includes a space model input module, the space model input module is used to receive the space model of the construction area input by the industrial computer; the space model input module is connected to a flight trajectory planning module, the flight trajectory planning module is used to analyze the space model of the construction area, and obtain the simulated space channel, optimize and connect the simulated space channel, and obtain the trajectory information to be flown; the flight trajectory planning module is connected to a key mark module, the key mark module places the personnel concentration point mark and the construction danger area mark attached to the space model of the construction area in the trajectory information to be flown, and sets the hovering position of the drone;

[0015] The key marking module is connected to a flight control information analysis module, which is used to calculate and analyze the pending flight trajectory information with the flight area positioning information and the UAV self-positioning information to obtain the UAV control information; the flight control information analysis module is connected to a delayed flight control module, which sends flight instructions to the UAV at a set flight time interval; the delayed flight control module is connected to a wireless signal output module, which is used to input control information to the UAV wireless control signal receiving unit with the help of a transceiver antenna.

[0016] Preferably, the flight trajectory planning module is connected to a flight monitoring module, and the flight monitoring module is used to receive the simulated space channel obtained by the flight trajectory planning module, receive the real-time positioning information of the UAV with the help of a transceiver antenna, monitor the flight position of the UAV in real time, and load the monitoring information to the industrial computer in real time.

[0017] Preferably, the security inspection processing module includes a wireless signal receiving module, which is connected to a video receiving module and an ultrasonic array point receiving module. The wireless signal receiving module is used to receive video information from a wireless output unit of the drone captured in real time by a camera and ultrasonic array point information obtained in real time by an ultrasonic probe by means of a transceiver antenna, and input the video information and ultrasonic array point information to the video receiving module and the ultrasonic array point receiving module respectively;

[0018] The video receiving module and the ultrasonic array point receiving module are connected to a pair-fitting synthesis module, and the pair-fitting synthesis module is also connected to a spatial model input module. The pair-fitting synthesis module is used to simulate and overlay the video information and the ultrasonic array point information to obtain overlay space segments, and fit each overlay space segment to the corresponding area of ​​the construction area spatial model to obtain an overlay model.

[0019] The fitting module is connected to the boundary analysis module, which is used to segment the area where people appear in the superimposed model, perform data comparison and analysis on the segmented positions, and highlight the unconventional areas; the boundary analysis module is connected to the feedback module, which is used to input the information of the highlighted area in the superimposed model into the industrial control computer in real time according to the UAV cruising period.

[0020] Compared with the prior art, the present invention has the following beneficial effects:

[0021] The construction safety management device for this building project has high flexibility in use when there are many construction areas and the construction site is very complex. The surprise inspection method can analyze and compare the safety of the construction positions and operations of the construction workers, and the safety management effect is good. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a front view schematic diagram of the present invention;

[0023] Figure 2 for Figure 1 A partial cutaway diagram of

[0024] Figure 3 This is a schematic diagram of the connection of each module in the flight control module of the present invention;

[0025] Figure 4 It is a schematic diagram of the connection of each module in the security inspection processing module of the present invention.

[0026] In the figure: 1 base plate, 2 installation box, 3 battery, 4 top plate, 5 protection top box, 6 development board, 7 drone, 8 camera, 9 bracket, 10 ultrasonic probe, 11 transceiver antenna, 12 viewing frame, 13 industrial computer. DETAILED DESCRIPTION

[0027] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0028] See also Figure 1 and Figure 2 A construction safety management device for a building project comprises a base plate 1, a mounting box 2 is fixed with bolts on the base plate 1, a battery 3 is fixed in the mounting box 2 by a battery bracket, a protective top box 5 is fixed with screws on the top of the mounting box 2, a development board 6 is arranged in the protective top box 5, and a drone 7 is placed on the protective top box 5;

[0029] A camera 8 is installed on the lower plate of the drone 7. A bracket 9 is screwed fixed to the lower plate of the drone 7 and located at the side of the camera 8. An ultrasonic probe 10 is screwed fixed between the brackets 9. The signal output lines of the camera 8 and the ultrasonic probe 10 are connected to the signal access terminal of the wireless output unit of the drone 7. Both are powered by the auxiliary power supply of the drone 7.

[0030] The left side of the seat plate 1 is fixed with a viewing frame 12 by bolts, and the top left side of the viewing frame 12 is embedded with an industrial computer 13, and the right side of the seat plate 1 is fixed with a transceiver antenna 11 by screws;

[0031] Among them, the signal access end of the industrial computer 13 is connected to the signal access pins of the flight control module, the flight monitoring module and the space model input module through a signal line; and the signal transceiver access end of the transceiver antenna 11 is connected to the signal access ends of the wireless signal output module and the wireless signal receiving module through transmission lines.

[0032] A development board 6 is provided in the protection top box 5, and a flight control module and a security inspection processing module are provided on the development board 6 respectively. The flight control module is used to receive the spatial model of the construction area and the positioning information of the model points sent by the industrial control computer 13, plan the flight trajectory and formulate flight control instructions, and automatically control the operation of the drone 7 according to the set time period. The flight control module is also used to monitor the real-time flight trajectory of the drone 7; the security inspection processing module is used to receive the video captured by the camera 8 in real time and the ultrasonic array point information obtained by the ultrasonic probe 10 in real time, combine the spatial model of the construction area, perform superimposed safety analysis, and feed back the analysis results to the industrial control computer 13.

[0033] Under such a setting, the UAV 7 can cruise all construction areas according to the automatically planned route, conduct real-time safety analysis of the construction positions of construction workers in the construction areas, and obtain the final results.

[0034] Three transformers are also screwed to the rear of the installation box 2. The power output end of the battery 3 is connected to the power input end of the transformer through a cable. The power output end of the transformer is connected to the power input pin of the development board 6, the power input end of the transceiver antenna 11 and the power input end of the industrial computer 13 through cables.

[0035] The power input terminal of the storage battery 3 is also connected to the power output terminal of the charger through a cable.

[0036] Therefore, the battery 3 can provide power for the development board 6, the transceiver antenna 11 and the industrial computer 13, and can be charged when the battery 3 is out of power.

[0037] See also Figure 2 The development board 6 is fixed in the protection box 5 by using insulating pad screws, and a heat dissipation hole is set at the rear of the protection box 5.

[0038] When the safety management device is actually installed, it can be placed at a location relatively close to all construction areas to reduce the power consumption of the UAV 7 during flight.

[0039] See also Figure 3 The flight control module includes a space model input module, which is used to receive the space model of the construction area input by the industrial computer 13. The space model of the construction area is the space model of the construction area to be planned using the BIM model; the space model input module is connected to a flight trajectory planning module, which is used to analyze the space model of the construction area and obtain a simulated space channel. The delineation rule of the simulated space channel is based on: it can effectively cover the construction point position and there is no building obstruction. Finally, the simulated space channel is optimized and connected to form a complete path trajectory, so as to obtain the trajectory information to be flown; the flight trajectory planning module is connected to a key marking module, which places the personnel concentration point mark and the construction danger area mark attached to the space model of the construction area in the trajectory information to be flown. The personnel concentration point mark is based on the currently designated concentrated construction point, and the construction danger area is an area where personnel cannot enter, and these positions are set as the hovering position of the drone 7, and the drone 7 hovers over these areas for 2 weeks;

[0040] The key marking module is connected to a flight control information analysis module, which is used to calculate and analyze the pending flight trajectory information with the flight area positioning information and the self-positioning information of the drone 7 to obtain the control information of the drone 7. During the calculation process, the positioning information of the drone 7 is first compared and calculated with the positioning information of each component reference point in the safety management area space model to obtain the required turning and flight distance information of the drone 7, and list them item by item in the control information table. Since the flight speed of the drone 7 is known, its total planned flight time is within the planning error range; the flight control information analysis module is connected to a delayed flight control module, which sends flight instructions to the drone 7 at a set flight time interval; the delayed flight control module is connected to a wireless signal output module, which is used to input control information to the wireless control signal receiving unit of the drone 7 with the help of the transceiver antenna 11.

[0041] Under such a setting, the UAV 7 can automatically and regularly perform constant speed cruise flight in all construction areas and hover cruise in key areas.

[0042] See also Figure 3 The flight trajectory planning module is connected to the flight monitoring module, which is used to receive the simulated space channel obtained by the flight trajectory planning module, receive the real-time positioning information of the UAV 7 with the help of the transceiver antenna 11, monitor the flight position of the UAV 7 in real time, and load the monitoring information to the industrial computer 13 in real time.

[0043] Under such a setting, when the drone 7 deviates from the set flight route, the manager can control the drone 7 to return to the original route and continue execution through the drone remote control, which is convenient for correction when the drone 7 makes errors while flying in a complex area.

[0044] See also Figure 4 The security inspection processing module includes a wireless signal receiving module, which is connected to a video receiving module and an ultrasonic array point receiving module. The wireless signal receiving module is used to receive the video information from the wireless output unit of the drone 7 captured in real time by the camera 8 and the ultrasonic array point information obtained in real time by the ultrasonic probe 10 by means of a transceiver antenna 11, and input the video information and the ultrasonic array point information to the video receiving module and the ultrasonic array point receiving module respectively;

[0045] The video receiving module and the ultrasonic array point receiving module are connected to a pair-fitting synthesis module, and the pair-fitting synthesis module is also connected to a spatial model input module. The pair-fitting synthesis module is used to simulate and overlay the video information and the ultrasonic array point information to obtain overlay space segments, and fit each overlay space segment to the corresponding area of ​​the construction area spatial model to obtain an overlay model.

[0046] The double-synthesized model is conducive to the analysis of small loads of the fitted modules, and because the ultrasonic array points and videos are superimposed according to the actual area of ​​the spatial model, the construction dynamics of the area during that period can be reflected in real time.

[0047] The fitting module transmission is connected with a boundary analysis module, which is used to segment the area where people appear in the superimposed model, and perform data comparison and analysis on the segmented positions, and highlight the unconventional areas. During the data comparison and analysis process, when the location of the personnel concentration point is a construction danger area and there is a dangerous situation in the construction operation, the matching fragments in the big data will be quickly selected to match it, and the fragments will be identified. When the similarity exceeds 60%, it will be marked. The boundary analysis module transmission is connected with a feedback module, which is used to input the highlighted area information in the superimposed model into the industrial control computer 13 in real time according to the cruise period of the drone 7. Since the superimposed model contains the positioning information of each reference point in the spatial area, the video information of the highlighted position and the unconventional dynamic ultrasonic array point information are loaded together with the positioning information, which is conducive to guiding management personnel to arrive at the site for safety supervision.

[0048] The working principle of this embodiment is as follows: under the control of the flight control module, the drone 7 can automatically and regularly perform fixed-speed cruise flight in all construction areas, and hover and cruise in key areas. The camera 8 and ultrasonic probe 10 installed at the bottom of the drone 7 collect construction site video information and ultrasonic array information, and the security inspection processing module performs a pseudo-big data analysis on the two, highlights unconventional areas, and inputs them into the industrial control computer 13 in real time to guide management personnel to arrive at the site for safety supervision. It has high flexibility in use when the construction areas are distributed more and the construction site is more complex. The use of surprise inspection methods can analyze and compare the safety of the construction position and operation safety of the construction personnel, and the safety management effect is good.

[0049] The above description is only a preferred embodiment of the present invention and is not intended to limit the protection scope of the present invention.

Claims

1. A construction safety management device for a building construction project, Features: The invention comprises a seat plate (1), a mounting box (2) is arranged on the seat plate (1), a storage battery (3) is arranged in the mounting box (2), a protective top box (5) is installed on the top of the mounting box (2), a development board (6) is arranged in the protective top box (5), and a drone (7) is arranged on the protective top box (5); The lower plate of the drone (7) is provided with a camera (8), the lower plate of the drone (7) is provided with a bracket (9) located at the side of the camera (8), and an ultrasonic probe (10) is provided between the brackets (9); A viewing frame (12) is provided on one side of the seat plate (1), and an industrial computer (13) is embedded on one side of the top of the viewing frame (12), and a transceiver antenna (11) is provided on the other side of the seat plate (1); A development board (6) is arranged inside the protection top box (5), and a flight control module and a security inspection processing module are arranged on the development board (6), respectively. The flight control module is used to receive the construction area space model and the positioning information of the model points sent by the industrial control computer (13), plan the flight trajectory and formulate flight control instructions, and automatically control the operation of the unmanned aerial vehicle (7) according to the set time period. The flight control module is also used to monitor the real-time flight trajectory of the unmanned aerial vehicle (7); the security inspection processing module is used to receive the video captured by the camera (8) in real time and the ultrasonic array point information obtained by the ultrasonic probe (10) in real time, and combine the construction area space model to perform superimposed safety analysis, and feed back the analysis results to the industrial control computer (13).

2. A building construction project construction safety management device according to claim 1, Features: At least three transformers are also arranged at the rear of the installation box (2); the power output end of the storage battery (3) is connected to the power input end of the transformer through a cable; the power output end of the transformer is respectively connected to the power input pin of the development board (6), the power input end of the transceiver antenna (11) and the power input end of the industrial computer (13) through cables; The power input end of the storage battery (3) is also connected to the power output end of the charger via a cable.

3. A building construction project construction safety management device according to claim 2, Features: The development board (6) is fixed in the protection box (5) by using insulating pad screws, and a heat dissipation hole is arranged at the rear of the protection box (5).

4. A construction safety management device for a building construction project according to any one of claims 1 to 3, Features: The flight control module comprises a space model input module, the space model input module is used to receive the space model of the construction area input by the industrial control computer (13); the space model input module is connected to a flight trajectory planning module, the flight trajectory planning module is used to analyze the space model of the construction area, obtain simulated space channels, optimize and connect the simulated space channels, and obtain the flight trajectory information to be flown; the flight trajectory planning module is connected to a key point marking module, the key point marking module places the personnel concentration point mark and the construction danger area mark attached to the space model of the construction area in the flight trajectory information to be flown, and sets the hovering position of the drone (7); The key marking module is connected to a flight control information analysis module, which is used to calculate and analyze the pending flight trajectory information with the flight area positioning information and the self-positioning information of the unmanned aerial vehicle (7) to obtain the control information of the unmanned aerial vehicle (7); the flight control information analysis module is connected to a delayed flight control module, which sends flight instructions to the unmanned aerial vehicle (7) at a set flight time interval; the delayed flight control module is connected to a wireless signal output module, which is used to input control information to the wireless control signal receiving unit of the unmanned aerial vehicle (7) by means of a transceiver antenna (11).

5. A building construction project construction safety management device according to claim 4, Features: The flight trajectory planning module is connected to a flight monitoring module, and the flight monitoring module is used to receive the simulated space channel obtained by the flight trajectory planning module, receive the real-time positioning information of the unmanned aerial vehicle (7) by means of a transceiver antenna (11), monitor the flight position of the unmanned aerial vehicle (7) in real time, and load the monitoring information to an industrial computer (13) in real time.

6. A construction safety management device for a building construction project according to claim 4, Features: The security inspection processing module comprises a wireless signal receiving module, which is connected to a video receiving module and an ultrasonic array point receiving module. The wireless signal receiving module is used to receive video information captured in real time by a camera (8) and ultrasonic array point information acquired in real time by an ultrasonic probe (10) from a wireless output unit of a drone (7) by means of a transceiver antenna (11), and input the video information and ultrasonic array point information into the video receiving module and the ultrasonic array point receiving module respectively. The video receiving module and the ultrasonic array point receiving module are connected to a pair-fitting synthesis module, and the pair-fitting synthesis module is also connected to a spatial model input module. The pair-fitting synthesis module is used to simulate and overlay the video information and the ultrasonic array point information to obtain overlay space segments, and fit each overlay space segment to the corresponding area of ​​the construction area spatial model to obtain an overlay model. The fitting module is connected to a boundary analysis module, which is used to segment the area where people appear in the superimposed model, perform data comparison and analysis on the segmented positions, and highlight the unconventional areas; the boundary analysis module is connected to a feedback module, which is used to input the information of the highlighted area in the superimposed model into the industrial control computer (13) in real time according to the cruise period of the unmanned aerial vehicle (7).

Citation Information

Patent Citations

  • A safety management device and system for building construction projects

    CN113971867B