Galvanized square tube mist support
By designing the galvanized square tube mist supporter, the staggered cross bars and vertical bars, planting rings and elastic parts are used to solve the problems of low durability and poor fixation effect of existing support tools, and the stable support for bamboo is achieved and Adaptive growth, suitable for a variety of environments.
Patent Information
- Application Number
- CN202411431192.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-14
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-10-14
AI Technical Summary
Existing support tools have low durability, are prone to corrosion, and have poor fixation and growth effects on bamboo under high-rise buildings and low soil thickness.
A galvanized square tube mist supporter is designed, including support frames, staggered cross-bars and vertical rods, planting rings, transverse and vertical ropes, reels and elastic parts, through deformation of planting rings and curved plates. Designed to provide support and cushioning to bamboo, ensuring vertical growth and adaptation to different soil conditions.
It improves the growth support effect of bamboo, reduces the problems of bending and uneven growth caused by natural factors such as wind, and is suitable for high-rise buildings and environments with low soil thickness, and extends the service life of support tools.
Smart Images

Figure CN119073157A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of supporting equipment, and in particular to a galvanized square tube mist support. Background Art
[0002] "Bamboo" is a fast-growing plant belonging to the subfamily Bambusoideae under the Poaceae family. It is mainly distributed in tropical and subtropical regions, and some species are distributed in temperate and cold zones. From the perspective of technical encyclopedia, bamboo has important applications in materials science, construction engineering, environmental protection technology, and landscape. For example, bamboo can be used as a sustainable building material because of its fast growth rate, high strength and easy processing; bamboo can also be used to make furniture, paper, and various handicrafts; in addition, bamboo also has great potential in environmental protection. For example, bamboo forests can effectively absorb carbon dioxide and release oxygen, which helps to slow down global warming. During the growth of bamboo, in order to ensure the healthy growth and beautiful shape of bamboo, support tools are often needed. These tools not only help the bamboo stay upright, but also prevent it from tilting or lodging due to wind or other external factors.
[0003] However, some supporting tools in the prior art are easily corroded due to long-term exposure to the outdoors, and have low durability and a short service life. In addition, for high-rise buildings, the existing supporting tools are not effective in fixing and growing bamboo in low soil thickness. Summary of the invention
[0004] In order to improve the supporting effect on bamboo, the present application provides a galvanized square tube mist support.
[0005] The galvanized square tube fog support provided in this application adopts the following technical solution: A galvanized square tube mist support comprises a support frame, wherein a plurality of horizontal bars and vertical bars are arranged in the support frame, wherein the horizontal bars and vertical bars are located in the same parallel and staggered with each other, wherein the length direction of the horizontal bars is perpendicular to the length direction of the vertical bars, wherein the horizontal bars and vertical bars divide the support frame into a plurality of planting frames, wherein a plurality of horizontal ropes and vertical ropes are arranged in the planting frames, wherein the length direction of the horizontal ropes is perpendicular to the length direction of the vertical ropes and are located in the same plane, wherein planting rings are arranged at the staggered connection points of the horizontal ropes and the vertical ropes, and the planting bamboos are located in the planting rings.
[0006] Optionally, the ends of the transverse rope and the vertical rope close to the planting frame are located in the planting frame, and a winding shaft is provided in the planting frame. The length direction of the winding shaft is parallel to the length direction of the frame body of the planting frame. The winding shaft is rotatably arranged in the planting frame, and the ends of the transverse rope and the vertical rope located in the planting frame are wound on the winding shaft. An elastic member is also provided in the planting frame, and the elastic member is used to drive the winding shaft to rotate reciprocatingly to wind up or release the transverse rope and the vertical rope.
[0007] Optionally, the elastic member includes a coil spring disposed in the planting frame, the coil spring is sleeved on the winding shaft, one side of the coil spring is fixedly disposed on the winding shaft, and the other side of the coil spring is fixedly disposed in the planting frame.
[0008] Optionally, the planting ring is an elastic ring, and a plurality of even-numbered arc plates are arranged inside the planting ring. The arc plates are evenly arranged along the axis of the planting ring, and two of the arc plates form a group and are symmetrically arranged along the axis of the planting ring. The arc plates are separated from the planting bamboo, and when the planting bamboo deviates to one side, the planting bamboo abuts against the corresponding arc plates, thereby driving the planting ring to become an ellipse. The planting ring drives the arc plates to move toward the planting bamboo and abut against the planting bamboo.
[0009] Optionally, a mounting rod is hingedly provided on the inner wall of the planting ring, and the mounting rod corresponds one-to-one to the arc plate. The arc plate is fixedly provided on the end of the mounting rod, and the hinge axis of the mounting rod is parallel to the plane of the planting ring. The mounting rod also includes a balancing member for driving the mounting rod to be in a state perpendicular to the inner wall of the mounting ring.
[0010] Optionally, the inner wall of the planting ring is hingedly provided with a mounting shaft, the mounting rod is fixedly provided on the mounting shaft, the balancing member includes a torsion spring sleeved on the mounting shaft and a balancing block provided on the inner wall of the planting ring, one side of the torsion spring is fixedly provided on the mounting shaft, and the other side is fixedly provided on the inner wall of the planting ring, the balancing block is located below the mounting shaft, parallel to the mounting rod and abutting against the side wall of the mounting rod.
[0011] Optionally, the support device further includes support legs arranged at the bottom of the support frame, wherein the support legs are provided in plurality and are located at the corners of the support frame, and the support legs are retractable structures.
[0012] Optionally, the planting ring includes a first arc ring and a second arc ring, the first arc ring and the second arc ring are hingedly connected, the horizontal rope and the vertical rope are in a staggered state with the hinged end and the closed end of the first arc ring and the second arc ring, and also includes a fixing part, which is used to fix the first arc ring and the second arc ring after the first arc ring and the second arc ring are buckled with each other; the horizontal rope and the vertical rope are detachably connected to the first arc ring and the second arc ring.
[0013] Optionally, the outer rings of the first arc ring and the second arc ring are both provided with circular rings, and the horizontal rope and the vertical rope are provided with hanging rings, and the hanging rings are hung on the circular rings.
[0014] Optionally, water pipes are provided on the horizontal rods and the vertical rods, and a plurality of atomizing nozzles are provided on the water pipes, and the atomizing nozzles are directed toward the planting bamboo.
[0015] In summary, the present application includes at least one of the following beneficial technical effects: 1. When the bamboo is growing, the bamboo is placed in the planting ring. Under the action of the horizontal rope and the vertical rope, the position of the planting ring is limited, thereby supporting the growth of the bamboo, thereby reducing the influence of natural environmental factors such as wind on the growth of the bamboo, and facilitating the vertical growth of the bamboo; and under the action of the horizontal rod and the vertical rod, the support frame is divided into multiple planting frames, which is convenient for supporting the planting bamboo in batches, so that the batches of bamboo can grow in an orderly manner; 2. Under the action of the horizontal ropes and the vertical ropes, a certain gap is left between adjacent planting rings, so that there is a certain space between the planted bamboos, which in turn facilitates the natural production of the planted bamboos. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a schematic diagram of the overall structure of a galvanized square tube mist supporter according to an embodiment of the present application; Figure 2 It is a cross-sectional view of a support frame in a galvanized square tube mist supporter according to an embodiment of the present application; Figure 3 yes Figure 2 A magnified schematic diagram of part A; Figure 4 A schematic diagram of the structure of a planting ring in a galvanized square tube mist supporter according to an embodiment of the present application; Figure 5 A side view of a planting ring in a galvanized square tube mist support in an embodiment of the present application.
[0017] Description of reference numerals: 1, support frame; 2, horizontal bar; 3, vertical bar; 4, planting frame; 5, horizontal rope; 6, vertical rope; 7, planting ring; 71, first arc ring; 72, second arc ring; 73, plug-in block; 74, plug-in groove; 75, latch; 76, round ring; 77, hanging ring; 8. Reel; 9. Coil spring; 10. Arc plate; 11. Mounting rod; 12. Torsion spring; 13. Support leg; 14. Water pipe; 15. Atomizing nozzle. DETAILED DESCRIPTION
[0018] The following is combined with Figure 1-5 This application is described in further detail.
[0019] The present application embodiment discloses a galvanized square tube mist support. Figure 1The galvanized square tube mist support includes a support frame 1, in which a plurality of horizontal bars 2 and vertical bars 3 are arranged. The support frame 1, the horizontal bars 2 and the vertical bars 3 are all galvanized square steels, and the ends of the horizontal bars 2 and the vertical bars 3 are welded to the inner wall of the support frame 1, the horizontal bars 2 and the vertical bars 3 are located in the same parallel and staggered with each other, the length direction of the horizontal bar 2 is perpendicular to the length direction of the vertical bar 3, the horizontal bar 2 and the vertical bar 3 divide the support frame 1 into a plurality of planting frames 4, and a plurality of horizontal ropes 5 and vertical ropes 6 are arranged in the planting frame 4, the length direction of the horizontal rope 5 is perpendicular to the length direction of the vertical rope 6 and is located in the same plane, and a planting ring 7 is arranged at the staggered connection of the horizontal rope 5 and the vertical rope 6, and the planting bamboo is located in the planting ring 7.
[0020] When the planting bamboo grows, the planting bamboo is placed in the planting ring 7. Under the action of the horizontal rope 5 and the vertical rope 6, the position of the planting ring 7 is limited, thereby supporting the growth of the bamboo, thereby reducing the impact of natural environmental factors such as wind on the growth of the bamboo, and facilitating the vertical growth of the bamboo; and under the action of the horizontal rod 2 and the vertical rod 3, the support frame 1 is divided into a plurality of planting frames 4, which is convenient for supporting batches of planting bamboo, so that the batches of bamboo can grow in an orderly manner.
[0021] Reference Figure 2 and Figure 3 When wind acts on bamboo, bamboo deviates and abuts against the inner wall of planting ring 7. The inner wall of planting ring 7 supports bamboo and easily causes bamboo to bend. Therefore, in the embodiment of the present application, the ends of transverse rope 5 and vertical rope 6 close to planting frame 4 are located in planting frame 4, and winding shaft 8 is arranged in planting frame 4. The length direction of winding shaft 8 is parallel to the length direction of the frame body of planting frame 4, and winding shaft 8 is rotatably arranged in planting frame 4. The ends of transverse rope 5 and vertical rope 6 located in planting frame 4 are wound on winding shaft 8. An elastic member is provided, which is used to drive the reel 8 to rotate back and forth to reel in or release the transverse rope 5 and the vertical rope 6; when the bamboo is deflected by wind, the bamboo drives the planting ring 7 to move to one side, and the planting ring 7 drives the transverse rope 5 or the vertical rope 6 to drive the reel 8 to rotate, and the reel 8 rotates to reel in and release the transverse rope 5 or the vertical rope 6, and under the action of the elastic member, the rotation trend of the reel 8 is limited, thereby buffering the movement of the planting ring 7 and the deviation of the bamboo, thereby reducing the possibility of the bamboo bending.
[0022] Reference Figure 2 and Figure 3In the embodiment of the present application, the elastic member includes a coil spring 9 arranged in the planting frame 4, the coil spring 9 is sleeved on the winding shaft 8, one side of the coil spring 9 is fixedly arranged on the winding shaft 8, and the other side is fixedly arranged in the planting frame 4; when the planting ring 7 drives the horizontal rope 5 and the vertical rope 6 to move, the horizontal rope 5 and the vertical rope 6 drive the winding shaft 8 to rotate, and the rotation of the winding shaft 8 pulls the coil spring 9 to accumulate a certain potential energy, thereby driving the winding shaft 8 to have a tendency to rotate.
[0023] Reference Figure 3 and Figure 4 When wind acts on the bamboo, the bamboo deviates and acts on the inner wall of the planting ring 7. At this time, only the inner wall of the planting ring 7 supports the bamboo, which causes the bamboo to still have the possibility of bending in other directions. Therefore, in the embodiment of the present application, the planting ring 7 is an elastic ring, and a plurality of even-numbered arc plates 10 are arranged in the planting ring 7. The arc plates 10 are evenly arranged along the axis of the planting ring 7. Two arc plates 10 form a group and are symmetrically arranged along the axis of the planting ring 7. The arc plates 10 are separated from the planting bamboo. When the planting bamboo deviates to one side, the planting bamboo abuts against the corresponding arc plate 10, which drives the planting ring 7 to become an ellipse. The deformation of the planting ring 7 drives the arc plate 10 to move toward the planting bamboo and abut against the planting bamboo.
[0024] When wind acts on the planting ring 7, the wind drives the bamboo to deviate toward the planting ring 7 and abut against the inner wall of the planting ring 7, and then the planting ring 7 is shaped into an elliptical shape. During this process, the arc plates 10 on both sides of the arc plates 10 in contact with the bamboo move toward the bamboo, and the end edges of the arc plates 10 contact the bamboo and abut against the side walls of the bamboo, so that the bamboo is supported by the arc plates 10 in multiple directions, thereby reducing the possibility of bending of the bamboo; at the same time, the initial position of the arc plates 10 is separated from the bamboo, which reduces the restriction of the arc plates 10 on the bamboo and facilitates the normal growth of the bamboo; at the same time, after the arc plates 10 come into contact with the bamboo, the bamboo is prone to abnormal production of the contact surface between the bamboo and the arc plates 10 during its growth, which makes it difficult for the bamboo to grow naturally.
[0025] Reference Figure 3 , Figure 4 and Figure 5, because bamboo grows very fast and has multiple branches and leaves, when the bamboo grows, after the branches and leaves come into contact with the arc plate 10, the arc plate 10 restricts the growth of the branches and leaves and easily causes the branches and leaves to break. Therefore, in the embodiment of the present application, a mounting rod 11 is hingedly provided on the inner wall of the planting ring 7, and a mounting shaft is hingedly provided on the inner wall of the planting ring 7. The mounting shaft is perpendicular to the axis of the planting ring 7, and the mounting rod 11 is fixedly provided on the mounting shaft. The mounting rod 11 corresponds to the arc plate 10 one by one. The arc plate 10 is fixedly provided at the end of the mounting rod 11. The mounting rod 11 is located between the planting ring 7 and the arc plate 10. The hinge axis of the mounting rod 11 is parallel to the plane of the planting ring 7, and also includes a balancing member for driving the mounting rod 11 to be in a state perpendicular to the inner wall of the mounting ring; Reference Figure 3 , Figure 4 and Figure 5 The balancing member includes a torsion spring 12 sleeved on the mounting shaft and a balancing block arranged on the inner wall of the planting ring 7. One side of the torsion spring 12 is fixed on the mounting shaft, and the other side is fixed on the inner wall of the planting ring 7. The balancing block is located below the mounting shaft, parallel to the mounting rod 11 and abuts against the side wall of the mounting rod 11.
[0026] When the bamboo grows, the bamboo drives the branches and leaves to move upward. When the branches and leaves pass through the planting ring 7, the branches and leaves drive the mounting rod 11 to rotate upward, and the mounting rod 11 drives the arc plate 10 to rotate. After the mounting rod 11 and the arc plate 10 rotate, it is convenient for the bamboo to grow upward, thereby reducing the obstruction of the arc plate 10 and the mounting rod 11 to the growth of the bamboo; when the branches and leaves pass through the planting ring 7, under the action of the torsion spring 12, the mounting shaft is driven to rotate, and the mounting shaft drives the mounting rod 11 to restore the initial position, so as to facilitate the support of the bamboo.
[0027] Reference Figure 1 and Figure 2 In order to adjust the position of the support frame 1 and facilitate the support frame 1 to adapt to the appropriate angle of the bamboo, the support device also includes a support leg 13 arranged at the bottom of the support frame 1, and the support leg 13 is provided with multiple and is located at the corner of the support frame 1. The support leg 13 is a retractable structure. Further, the support leg 13 includes a plurality of mutually sleeved tubes, the sleeved tubes are fixedly arranged on the support frame 1 and the ground, and an electric push rod is arranged between adjacent sleeved tubes; when adjusting the height of the support frame 1, the corresponding electric push rod is started, and the electric push rod drives the sleeved tube to slide to increase the height of the support leg 13, so that the support frame 1 can support the bamboo.
[0028] Reference Figure 3 , Figure 4 and Figure 5When the diameter of the bamboo increases, the planting ring 7 limits the growth of the bamboo. Therefore, when the diameter of the bamboo increases, the planting ring 7 needs to be replaced. Therefore, in the embodiment of the present application, the planting ring 7 includes a first arc ring 71 and a second arc ring 72, the first arc ring 71 and the second arc ring 72 are hingedly connected, and the hinged ends and closed ends of the horizontal rope 5 and the vertical rope 6 are in a staggered state with the first arc ring 71 and the second arc ring 72. It also includes a fixing member, which is used to fix the first arc ring 71 and the second arc ring 72 after the first arc ring 71 and the second arc ring 72 are buckled with each other. The fixing member includes a plug-in block 73 arranged at the end of the first arc ring 71 and a plug-in groove 74 opened at the end of the second arc ring 72, the plug-in block 73 is plugged into the plug-in groove 74, and the fixing member also includes a latch 75, and a slot connected to the plug-in groove 74 is opened on the second arc ring 72; Reference Figure 3 , Figure 4 and Figure 5 The horizontal rope 5 and the vertical rope 6 are detachably connected to the first arc ring 71 and the second arc ring 72. The outer rings of the first arc ring 71 and the second arc ring 72 are fixed with circular rings 76. The horizontal rope 5 and the vertical rope 6 are provided with hanging rings 77, and the hanging rings 77 are hung on the circular rings 76.
[0029] When replacing the planting ring 7, first remove the hanging ring 77 from the circular ring 76, then remove the pin 75 from the second arc ring 72, and then rotate the first arc ring 71 and the second arc ring 72 to separate them from the bamboo; when installing the planting ring 7, rotate the first arc ring 71 and the second arc ring 72 to buckle the bamboo, then insert the pin 75 into the slot, and then hang the hanging ring 77 on the circular ring 76.
[0030] Reference Figure 2 and Figure 3 In the embodiment of the present application, a water pipe 14 is provided on the horizontal bar 2 and the vertical bar 3, and a plurality of atomizing nozzles 15 are provided on the water pipe 14, and the atomizing nozzles 15 are directed toward the planted bamboo; the water pipe 14 is connected to a water source, and the water source is sprayed out through the water pipe 14 and the atomizing nozzles 15, and the sprayed water source supplies water to the bamboo and improves the overall spatial atmosphere of the bamboo.
[0031] The implementation principle of a galvanized square tube mist supporter in the embodiment of the present application is: When the planting bamboo grows, the planting bamboo is placed in the planting ring 7. Under the action of the horizontal rope 5 and the vertical rope 6, the position of the planting ring 7 is limited, thereby supporting the growth of the bamboo, thereby reducing the impact of natural environmental factors such as wind on the growth of the bamboo, and facilitating the vertical growth of the bamboo; and under the action of the horizontal rod 2 and the vertical rod 3, the support frame 1 is divided into a plurality of planting frames 4, which is convenient for supporting batches of planting bamboo, so that the batches of bamboo can grow in an orderly manner.
[0032] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A galvanized square tube fog support, characterized in that: The invention comprises a support frame (1), wherein a plurality of horizontal bars (2) and vertical bars (3) are arranged in the support frame (1), wherein the horizontal bars (2) and vertical bars (3) are located in the same parallel and staggered with each other, wherein the length direction of the horizontal bars (2) is perpendicular to the length direction of the vertical bars (3), wherein the horizontal bars (2) and vertical bars (3) divide the support frame (1) into a plurality of planting frames (4), wherein a plurality of horizontal ropes (5) and vertical ropes (6) are arranged in the planting frames (4), wherein the length direction of the horizontal ropes (5) is perpendicular to the length direction of the vertical ropes (6) and are located in the same plane, wherein a planting ring (7) is arranged at the staggered connection of the horizontal ropes (5) and the vertical ropes (6), and the planting bamboo is located in the planting ring (7).
2. A galvanized square tube mist support according to claim 1, characterized in that: The ends of the transverse rope (5) and the vertical rope (6) close to the planting frame (4) are located in the planting frame (4); a winding shaft (8) is arranged in the planting frame (4); the length direction of the winding shaft (8) is parallel to the length direction of the frame body of the planting frame (4); the winding shaft (8) is rotatably arranged in the planting frame (4); the ends of the transverse rope (5) and the vertical rope (6) located in the planting frame (4) are wound on the winding shaft (8); an elastic member is also arranged in the planting frame (4); the elastic member is used to drive the winding shaft (8) to rotate back and forth to wind up or release the transverse rope (5) and the vertical rope (6).
3. A galvanized square tube mist support according to claim 2, characterized in that: The elastic member comprises a coil spring (9) arranged in the planting frame (4), the coil spring (9) being sleeved on the winding shaft (8), one side of the coil spring (9) being fixedly arranged on the winding shaft (8), and the other side of the coil spring (9) being fixedly arranged in the planting frame (4).
4. A galvanized square tube mist support according to claim 1, characterized in that: The planting ring (7) is an elastic ring. A plurality of even-numbered arc plates (10) are arranged inside the planting ring (7). The arc plates (10) are evenly arranged along the axis of the planting ring (7). Two arc plates (10) form a group and are symmetrically arranged along the axis of the planting ring (7). The arc plates (10) are separated from the planting bamboo. When the planting bamboo deviates to one side, the planting bamboo abuts against the corresponding arc plate (10), thereby driving the planting ring (7) to deform into an elliptical shape. The deformation of the planting ring (7) drives the arc plate (10) to move toward the planting bamboo and abut against the planting bamboo.
5. A galvanized square tube mist support according to claim 4, characterized in that: The inner wall of the planting ring (7) is hingedly provided with a mounting rod (11), the mounting rod (11) corresponds one-to-one to the arc plate (10), the arc plate (10) is fixedly provided at the end of the mounting rod (11), the hinge axis of the mounting rod (11) is parallel to the plane of the planting ring (7), and also includes a balancing member for driving the mounting rod (11) to be in a state perpendicular to the inner wall of the mounting ring.
6. A galvanized square tube mist support according to claim 5, characterized in that: The inner wall of the planting ring (7) is hingedly provided with a mounting shaft, the mounting rod (11) is fixedly provided on the mounting shaft, the balancing member comprises a torsion spring (12) sleeved on the mounting shaft and a balancing block provided on the inner wall of the planting ring (7), one side of the torsion spring (12) is fixedly provided on the mounting shaft, and the other side is fixedly provided on the inner wall of the planting ring (7), the balancing block is located below the mounting shaft, parallel to the mounting rod (11) and abuts against the side wall of the mounting rod (11).
7. The galvanized square tube fog support according to claim 1, characterized in that: The support device also includes a support leg (13) arranged at the bottom of the support frame (1), a plurality of the support legs (13) are provided and located at the corners of the support frame (1), and the support legs (13) are a retractable structure.
8. The galvanized square tube fog support according to claim 1, characterized in that: The planting ring (7) comprises a first arc-shaped ring (71) and a second arc-shaped ring (72), wherein the first arc-shaped ring (71) and the second arc-shaped ring (72) are hingedly connected, and the hinged ends and closed ends of the transverse rope (5) and the vertical rope (6) are in a staggered state with the first arc-shaped ring (71) and the second arc-shaped ring (72), and further comprises a fixing member, wherein the fixing member is used to fix the first arc-shaped ring (71) and the second arc-shaped ring (72) after the first arc-shaped ring (71) and the second arc-shaped ring (72) are mutually buckled; the transverse rope (5) and the vertical rope (6) are detachably connected with the first arc-shaped ring (71) and the second arc-shaped ring (72).
9. A galvanized square tube mist support according to claim 8, characterized in that: The outer rings of the first arc-shaped ring (71) and the second arc-shaped ring (72) are both provided with circular rings (76), and the transverse rope (5) and the vertical rope (6) are provided with hanging rings (77), and the hanging rings (77) are hung on the circular rings (76).
10. The galvanized square tube fog support according to claim 1, characterized in that: The horizontal bar (2) and the vertical bar (3) are provided with a water pipe (14), and the water pipe (14) is provided with a plurality of atomizing nozzles (15), and the atomizing nozzles (15) are directed toward the planting bamboo.
Citation Information
Patent Citations
Nursery stock fixing device that plants
CN205030275U
Square frame pin hinge type sapling wood strutting arrangement
CN206641108U
General bamboo strutting arrangement
CN208387449U
The utility model discloses a multi-directional anti-tilting supporting structure for ornamental bamboo cultivation
CN208891312U
Landscape bamboo forest supporting and fixing structure
CN210630318U
