Assembly type big tree transplanting device and method based on machine vision

Through the prefabricated large tree transplanting device based on machine vision, using assembled tic-tac beams and support tubes, combined with data calculations from cameras and processors, the problem that traditional devices cannot adapt to soil balls of different sizes is solved, and the transplant success is improved Rate and safety enable accurate load-bearing weight calculation and platform adjustment.

CN119073185AActive Publication Date: 2024-12-06GUANGZHOU LANDSCAPE ARCHITECTURE CO
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202411409267.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-10
Publication Date
2024-12-06
Estimated Expiration
2044-10-10

AI Technical Summary

Technical Problem

Traditional large tree transplanting devices cannot adapt to soil balls of different sizes, resulting in low transplant success rate and safety risks. Fixed-size platforms are prone to structural unstable when carrying large trees, and even lead to accidents.

Method used

Using a prefabricated large tree transplant device based on machine vision, the support frame is constructed through assembled tic-tac beams and support tubes, and the safe load bearing weight of the support platform is calculated using the camera and processor, and the overall load is estimated based on the volume of the large tree and soil ball. Weight, generate adaptation mode and notify construction personnel to adjust the assembly through an alarm to ensure the safety and efficiency of the platform.

Benefits of technology

It improves the success rate and safety of large tree transplantation, reduces artificial errors, and can accurately calculate the safe load bearing weight of the support platform, adapt to the needs of soil balls of different sizes, and avoid structural instability or accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119073185A_ABST
    Figure CN119073185A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of big tree transplanting, in particular to an assembly type big tree transplanting device and method based on machine vision. The supporting frame is constructed by adopting the assembled #-shaped beam, the size of the supporting frame is conveniently changed by adjusting the assembled connecting points on the #-shaped beam, so that the supporting frame is suitable for soil balls of different sizes, firstly, the camera installed on the hanging beam platform is used for shooting an image of the current supporting platform, and then the image of the current supporting platform is obtained; calculating the safety bearing weight of the current supporting platform according to the image data and a preset #-shaped beam parameter; secondly, estimating the volume of the big tree and the soil ball thereof through the big tree image, and estimating the overall weight according to the preset density; then the safe bearing weight is compared with the overall weight of the big tree, and if the overall weight of the big tree exceeds the safe bearing weight, a new assembly mode is generated and constructors are notified; finally, the assembly mode is transmitted to constructors to guide the constructors to reassemble the supporting frame and the supporting platform, and therefore the big tree transplanting success rate is increased.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of large tree transplantation, and in particular to an assembled large tree transplantation device and a transplantation method based on machine vision. Background Art

[0002] Transplanting a large tree is a complex project. In order to ensure the survival rate of the transplanted tree, it is usually necessary to transplant the soil around the tree together to form a soil ball. However, due to the different sizes and shapes of the trees, the size of the soil ball also varies, which puts higher requirements on the transplantation platform. Traditional transplantation platforms are often fixed and cannot adapt to soil balls of different sizes, which can easily lead to damage to the tree or transplantation failure during the transplantation process.

[0003] In the prior art, most large tree transplanting devices use a fixed-size support platform. Although it can meet the transplanting needs of small trees to a certain extent, for large trees, especially those with large soil balls, the fixed-size support platform is not flexible enough and difficult to adapt to different transplanting needs, which reduces the transplanting efficiency. In addition, the fixed platform may cause safety accidents due to insufficient load-bearing during actual use, thereby affecting the success rate of large tree transplanting. This situation needs to be further improved. Summary of the invention

[0004] In order to solve the problem of low transplantation success rate of existing large tree transplantation devices, the present application provides an assembled large tree transplantation device and transplantation method based on machine vision, which adopts the following technical solutions: In a first aspect, the present application provides an assembled tree transplanting device based on machine vision, comprising: Assembleable crisscross beams, which can be assembled to form a support frame; A plurality of support tubes are arranged on the support frame to form a support platform for carrying the transplanted tree and soil ball; A hanging beam platform, the lower end of which is connected to the supporting frame by ropes, and the upper end of which is used to connect the lifting equipment; Wherein, a plurality of assembly connection points are arranged on the cross-shaped beam, which are used to change the size of the support frame by adjusting the assembly position; The hanging beam platform is provided with a processor, a camera and an alarm, and the processor performs the following steps: Obtaining a current support platform image captured by a camera, and calculating the safe bearing weight of the current support platform according to the current support platform image, preset cross-shaped beam parameter data and current support pipe parameter data; Obtain an image of a tree taken by a camera, estimate the volume of the tree and the volume of a soil ball according to the image of the tree, and estimate the overall weight of the tree according to the volume of the tree, the volume of the soil ball and the corresponding preset density; Comparing the safe bearing weight with the overall weight of the tree, if the overall weight of the tree is greater than the safe bearing weight, generating an assembly mode that satisfies the overall weight of the tree according to the comparison result, and sending an alarm signal through the alarm, wherein the assembly mode includes the assembly position of the cross-shaped beam, the size and quantity of the support pipe; The assembly mode is communicated to the construction personnel according to a preset mode, so that the construction personnel can reassemble the support frame and the support platform according to the assembly mode.

[0005] By adopting the above technical solution, due to the different sizes of trees, the sizes of soil balls also vary greatly. The existing fixed-size transplanting platforms are often unable to meet the load-bearing requirements of soil balls of different sizes in practical applications. For example, when transplanting a large tree with a large diameter and a well-developed root system, due to the large volume of the soil ball, the fixed-size platform may be unstable due to insufficient load-bearing capacity, and may even tilt or break during the lifting process, seriously affecting the transplanting effect. The present application adopts an assembled tic-tac-toe beam to construct a support frame. By adjusting the assembled connection points on the tic-tac-toe beam, the size of the support frame can be easily changed to suit different sizes. For a small soil ball, first, the camera installed on the hanging beam platform is used to capture the image of the current support platform. The processor calculates the safe bearing weight of the current support platform based on the image data and the preset criss-cross beam parameters. Secondly, the volume of the tree and its soil ball is estimated by capturing the image of the tree, and the overall weight is estimated based on the preset density. The safe bearing weight is then compared with the overall weight of the tree. If the overall weight of the tree exceeds the safe bearing weight, the processor generates a new assembly mode and notifies the construction personnel through an alarm. Finally, the assembly mode is communicated to the construction personnel to guide them to reassemble the support frame and support platform, thereby increasing the success rate of tree transplantation.

[0006] Optionally, obtaining a current support platform image captured by a camera, and calculating the safe bearing weight of the current support platform according to the current support platform image, preset cross-shaped beam parameter data and current support pipe parameter data, specifically includes the following steps: Acquire a current support platform image captured by a camera, input the current support platform image into a preset structural analysis model, and generate structural data of the current support platform based on the current support platform image; Based on the structural data, the preset cross-shaped beam parameter data and the current support tube parameter data, the safe bearing weight of the current support platform is calculated by a mechanical formula.

[0007] By adopting the above-mentioned technical solution, the present application uses a camera installed on the hanging beam platform to capture an image of the current support platform to obtain the actual configuration of the current support platform, and inputs the captured image of the current support platform into a preset structural analysis model. The model generates structural data of the current support platform based on the image data, including structural layout information and structural dimension information, and then calculates the safe load-bearing weight of the current support platform through mechanical formulas based on the generated structural data, the preset criss-cross beam parameter data and the current support tube parameter data. Therefore, the safe load-bearing weight of the current support platform can be accurately calculated, human errors can be reduced, and the reliability and efficiency of the transplantation process can be improved.

[0008] Optionally, based on the structural data, the preset cross-shaped beam parameter data and the current support tube parameter data, the safe bearing weight of the current support platform is calculated by a mechanical formula, which specifically includes the following steps: Processing the structural data, the preset cross-shaped beam parameter data and the current support tube parameter data based on a preset structural strength mapping rule to obtain first relationship information between the structural strength and the assembly position of the cross-shaped beam, and second relationship information between the structural strength and the size of the support tube; Based on the first relationship information and the second relationship information, the safe bearing weight of the current supporting platform is calculated.

[0009] By adopting the above technical scheme, since the assembly position of the criss-cross beam directly affects the structural strength distribution of the entire support platform, the assembly at different positions will affect the stress state of the entire platform, and thus affect the safe bearing capacity of the platform; on the other hand, the size of the support tube directly affects the bearing capacity of the support platform, and support tubes of different sizes can withstand different loads. Therefore, it is necessary to adjust the size of the support tube according to actual needs to ensure the safe bearing capacity of the platform; the present application processes the structural data, the criss-cross beam parameter data and the support tube parameter data based on the structural strength mapping rule to obtain the first relationship information between the structural strength and the assembly position of the criss-cross beam, and the second relationship information between the structural strength and the size of the support tube. By obtaining the first relationship information, the contribution degree of the criss-cross beam to the structural strength of the platform at different assembly positions can be determined, and by obtaining the second relationship information, the contribution degree of the support tube to the structural strength of the platform at different sizes can be determined, thereby finding the optimal size of the support tube; finally, the safe bearing weight of the current support platform is calculated to ensure the safety and effectiveness of the transplantation process.

[0010] Optionally, the structural data includes structural layout information and structural size information, and the structural analysis model is generated in the following manner: Collecting images of the support platform under different configurations and corresponding structural data, wherein the structural data includes structural layout information and structural size information; Design and implement a series of structural tests to record structural performance data under different configurations; Based on the support platform images under different configurations and the corresponding structural performance data, the preset machine learning model is trained to generate a structural analysis model.

[0011] By adopting the above-mentioned technical scheme, the present application uses a camera to capture images of the support platform under different configurations, and records the structural data under each configuration, including structural layout information and structural size information, and then pre-designs a series of structural tests to simulate the stress conditions of the support platform under different configuration conditions, and records the structural performance data under different configurations, such as bearing capacity and deformation. The collected support platform images and their corresponding structural data and structural performance data are input into a preset machine learning model for training to obtain a structural analysis model; thereby, the trained structural analysis model can generate the structural data of the current support platform based on the current support platform image.

[0012] Optionally, comparing the safe bearing weight with the overall weight of the tree, if the overall weight of the tree is greater than the safe bearing weight, generating an assembly mode that satisfies the overall weight of the tree according to the comparison result, specifically includes the following steps: Comparing the safe bearing weight with the entire weight of the tree; If the overall weight of the tree is greater than the safe bearing weight, obtaining a target bearing weight according to the overall weight of the tree; Determine an assembly mode set that meets the target load-bearing weight according to the target load-bearing weight, preset cross-shaped beam parameter data and all support pipe parameter data in the candidate library; In the assembly pattern set, according to a preset sorting rule, an assembly pattern that satisfies the overall weight of the tree is finally generated.

[0013] By adopting the above technical solution, in the actual transplantation process, if the overall weight of the tree and its soil ball exceeds the safe bearing weight of the existing support platform, the existing platform cannot automatically adjust the assembly mode to adapt to different bearing requirements, which may lead to structural instability or insufficient bearing during the transplantation process. The present application obtains the target bearing weight according to the overall weight of the tree, combines the preset criss-cross beam parameter data and all the support tube parameter data in the alternative library, determines the set of assembly modes that meet the target bearing weight, and finally generates an assembly mode that meets the overall weight of the tree according to the preset sorting rules, so that the assembly mode can be adjusted in time to avoid structural instability or accidents.

[0014] Optionally, in the assembly pattern set, according to a preset sorting rule, finally generating an assembly pattern that satisfies the overall weight of the tree, specifically includes the following steps: Evaluate each assembly mode in the assembly mode set, wherein evaluation factors include material utilization, required time, and structural stability; Obtaining current backup materials, urgency and safety level, and determining the evaluation weights corresponding to various evaluation factors according to the current backup materials, urgency and safety level; Each evaluation factor is weighted according to its corresponding evaluation weight to obtain a comprehensive score for each assembly mode; The assembly mode with the highest comprehensive score is determined as the final assembly mode.

[0015] By adopting the above-mentioned technical scheme, the present application evaluates each assembly mode in the assembly mode set, wherein the evaluation factors include material utilization rate, required time and structural stability, obtains the current spare materials, urgency and safety level, determines the evaluation weights corresponding to each evaluation factor according to the current spare materials, urgency and safety level, performs weighted processing on each evaluation factor according to the evaluation weights corresponding to each evaluation factor, obtains a comprehensive score for each assembly mode, determines the assembly mode with the highest comprehensive score as the final assembly mode, thereby making the assembly mode more in line with the current large tree transplantation project situation.

[0016] In a second aspect, the present application provides a large tree transplanting method based on machine vision, using the above-mentioned assembled large tree transplanting device based on machine vision, comprising the following steps: Obtaining a current support platform image captured by a camera, and calculating the safe bearing weight of the current support platform according to the current support platform image, preset cross-shaped beam parameter data and current support pipe parameter data; Obtain an image of a tree taken by a camera, estimate the volume of the tree and the volume of a soil ball according to the image of the tree, and estimate the overall weight of the tree according to the volume of the tree, the volume of the soil ball and the corresponding preset density; Comparing the safe bearing weight with the overall weight of the tree, if the overall weight of the tree is greater than the safe bearing weight, generating an assembly mode that satisfies the overall weight of the tree according to the comparison result, and sending an alarm signal through the alarm, wherein the assembly mode includes the assembly position of the cross-shaped beam, the size and quantity of the support pipe; The assembly mode is communicated to the construction personnel according to a preset mode, so that the construction personnel can reassemble the support frame and the support platform according to the assembly mode.

[0017] Optionally, obtaining a current support platform image captured by a camera, and calculating the safe bearing weight of the current support platform according to the current support platform image, preset cross-shaped beam parameter data and current support pipe parameter data, specifically includes the following steps: Acquire a current support platform image captured by a camera, input the current support platform image into a preset structural analysis model, and generate structural data of the current support platform based on the current support platform image; Based on the structural data, the preset cross-shaped beam parameter data and the current support tube parameter data, the safe bearing weight of the current support platform is calculated by a mechanical formula.

[0018] Optionally, based on the structural data, the preset cross-shaped beam parameter data and the current support tube parameter data, the safe bearing weight of the current support platform is calculated by a mechanical formula, which specifically includes the following steps: Processing the structural data, the preset cross-shaped beam parameter data and the current support tube parameter data based on a preset structural strength mapping rule to obtain first relationship information between the structural strength and the assembly position of the cross-shaped beam, and second relationship information between the structural strength and the size of the support tube; Based on the first relationship information and the second relationship information, the safe bearing weight of the current supporting platform is calculated.

[0019] Optionally, the structural data includes structural layout information and structural size information, and the structural analysis model is generated in the following manner: Collecting images of the support platform under different configurations and corresponding structural data, wherein the structural data includes structural layout information and structural size information; Design and implement a series of structural tests to record structural performance data under different configurations; Based on the support platform images under different configurations and the corresponding structural performance data, the preset machine learning model is trained to generate a structural analysis model.

[0020] In summary, the present application includes at least one of the following beneficial technical effects: 1. This application uses an assembled tic-tac-toe beam to construct a support frame. By adjusting the assembled connection points on the tic-tac-toe beam, the size of the support frame can be easily changed to suit soil balls of different sizes. First, the image of the current support platform is captured by a camera installed on the beam platform, and the processor calculates the safe load-bearing weight of the current support platform based on the image data and the preset tic-tac-toe beam parameters; secondly, the volume of the tree and its soil ball is estimated by capturing the image of the tree, and the overall weight is estimated based on the preset density; then the safe load-bearing weight is compared with the overall weight of the tree. If the overall weight of the tree exceeds the safe load-bearing weight, the processor generates a new assembly mode and notifies the construction personnel through an alarm; finally, the assembly mode is communicated to the construction personnel to guide them to reassemble the support frame and the support platform, thereby improving the success rate of tree transplantation; 2. This application uses a camera installed on the hanging beam platform to capture an image of the current support platform to obtain the actual configuration of the current support platform, and inputs the captured image of the current support platform into a preset structural analysis model. The model generates structural data of the current support platform based on the image data, including structural layout information and structural dimension information, and then calculates the safe bearing weight of the current support platform through a mechanical formula based on the generated structural data, the preset cross-shaped beam parameter data and the current support tube parameter data. Therefore, the safe bearing weight of the current support platform can be accurately calculated, which reduces human errors and improves the reliability and efficiency of the transplantation process. 3. In the actual transplantation process, if the overall weight of the tree and its soil ball exceeds the safe bearing weight of the existing support platform, the existing platform cannot automatically adjust the assembly mode to adapt to different bearing requirements, which may lead to structural instability or insufficient bearing during the transplantation process. This application obtains the target bearing weight according to the overall weight of the tree, combines the preset criss-cross beam parameter data and all support tube parameter data in the alternative library, determines the set of assembly modes that meet the target bearing weight, and finally generates an assembly mode that meets the overall weight of the tree according to the preset sorting rules, so that the assembly mode can be adjusted in time to avoid structural instability or accidents. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a structural schematic diagram of an assembled large tree transplanting device based on machine vision according to an embodiment of the present application; Figure 2 It is a flowchart of a large tree transplantation method based on machine vision executed by a processor in an embodiment of the present application; Figure 3 is a flowchart of step S210 in the large tree transplantation method based on machine vision executed by the processor in an embodiment of the present application; Figure 4 It is a flowchart of step S212 in the large tree transplantation method based on machine vision executed by the processor in an embodiment of the present application; Figure 5 is a flowchart of step S230 in the large tree transplantation method based on machine vision executed by the processor in an embodiment of the present application; Figure 6 is a flowchart of step S234 in the large tree transplantation method based on machine vision executed by the processor in an embodiment of the present application; Figure 7 It is a diagram of the internal structure of an electronic device according to an embodiment of the present application.

[0022] Explanation of the reference numerals: 1. cross-shaped beam; 11. assembled connection point; 12. main beam; 121. connection hole; 13. secondary beam; 14. stiffening rib; 2. support pipe; 3. hanging beam platform; 4. rope; 5. sleeve. DETAILED DESCRIPTION

[0023] The terms used in the following embodiments of the present application are only for the purpose of describing specific embodiments, and are not intended to be used as limitations to the present application. As used in the specification and appended claims of the present application, the singular expressions "one", "a kind of", "said", "above", "the" and "this" are intended to also include plural expressions, unless there is a clear indication to the contrary in the context. It should also be understood that the term "and / or" used in the present application refers to any or all possible combinations comprising one or more listed items.

[0024] In the following, the terms "first" and "second" are used for descriptive purposes only and are not to be understood as suggesting or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features, and in the description of the embodiments of the present application, unless otherwise specified, "plurality" means two or more.

[0025] The embodiments of the present application are further described in detail below in conjunction with the drawings in the specification.

[0026] In the first aspect, the present application provides an assembled tree transplanting device based on machine vision, referring to Figure 1 , including an assembleable criss-cross beam 1, a plurality of support tubes 2 and a beam hanging platform 3, wherein the criss-cross beam 1 can be assembled to form a support frame, a plurality of support tubes 2 are arranged on the support frame to form a support platform for carrying transplanted trees and soil balls; the lower end of the beam hanging platform 3 is connected to the support frame by a rope 4, and the upper end is used to connect the lifting equipment.

[0027] In this embodiment, the cross-shaped beam 1 includes two main beams 12 and two secondary beams 13. The main beams 12 and the secondary beams 13 are both H-shaped steel I-beams. In order to improve the strength of the main beam 12, stiffening ribs 14 are arranged on both sides of the H-shaped steel. A plurality of assembled connection points 11 are arranged on the opposite side of the two main beams 12. Both ends of the secondary beams 13 are provided with connection holes 121 that match the assembled connection points 11. The main beams 12 and the secondary beams 13 are connected by bolts to form a support frame, and the size of the support frame can be changed by adjusting the assembly position. The support pipe 2 is arranged on the support frame, and the two ends of the support pipe 2 are connected with sleeves 5 that match the support pipe 2. Multiple sleeves 5 are fixedly connected, and multiple support pipes 2 are spliced ​​into a support surface, and fixed to the support frame by iron chains or other methods to form a support platform.

[0028] Further, see Figure 2 ,A processor, a camera and an alarm are set at the lower end of the ,beam platform. The processor executes the following tree transplantation method based on ,machine vision: S210, obtaining the current support platform image captured by the camera, and calculating the safe bearing weight of the current support platform according to the current support platform image, preset cross-shaped beam parameter data and current support pipe parameter data.

[0029] In this embodiment, a camera is provided at the lower end of the hanging beam platform for capturing an image of the current supporting platform. The camera may be a high-definition camera capable of capturing all details of the supporting platform. The processor receives the image captured by the camera and calculates the safe bearing weight of the current supporting platform based on the image data, the preset cross-shaped beam parameter data, and the current supporting tube parameter data.

[0030] Specifically, the image data includes the layout and size information of the support platform. The processor uses image processing algorithms to identify key components of the support platform, such as the position of the crisscross beam and the number and size of the support tubes. The preset crisscross beam parameter data includes the material properties, cross-sectional dimensions and length information of the beam. The current support tube parameter data includes the material properties, diameter and wall thickness information of the support tube. The processor uses mechanical formulas and structural analysis models to calculate the safe load-bearing weight of the current support platform based on the image data and parameter data. For example, through the finite element analysis method, the processor can calculate the stress distribution of the support platform under different load conditions, thereby deriving the safe load-bearing weight.

[0031] S220, obtaining an image of the tree taken by a camera, estimating the volume of the tree and the volume of the soil ball according to the image of the tree, and estimating the overall weight of the tree according to the volume of the tree, the volume of the soil ball and the corresponding preset density.

[0032] In this embodiment, the camera on the hanging beam platform is also used to capture images of the tree and its soil ball, which are used to estimate the volume of the tree and its soil ball; the processor receives the tree image and estimates the volume of the tree and the soil ball based on the image data.

[0033] Specifically, the tree image is analyzed by an image processing algorithm to identify the shape and size of the tree's trunk, branches and leaves, and soil ball. The volume of the tree and the soil ball can be estimated through the size ratio in the image and known reference sizes such as ground markers. The total volume of the tree and its soil ball is then estimated based on preset density data such as the average density of trees and soil, and the overall weight of the tree is calculated.

[0034] It is understandable that when the weight of the tree is obtained by the camera placed on the hanging beam platform, if the tree has been transplanted to the criss-cross beam, if it is found that the size of the device is not suitable at this time, it will be difficult to readjust the device. Therefore, the camera needs to take an image of the tree and its soil ball before the tree is transplanted to the criss-cross beam. The supporting platform can be photographed at the same time. At this time, the known main beam size can be used as a reference size to estimate the volume of the tree and the soil ball.

[0035] S230, comparing the safe bearing weight and the overall weight of the tree. If the overall weight of the tree is greater than the safe bearing weight, generating an assembly mode that meets the overall weight of the tree according to the comparison result, and sending an alarm signal through an alarm. The assembly mode includes the assembly position of the criss-cross beam, the size and quantity of the support pipes.

[0036] In this embodiment, the processor compares the calculated safe bearing weight with the overall weight of the tree. If the overall weight of the tree is greater than the safe bearing weight, the processor generates a new assembly mode and sends an alarm signal through the alarm.

[0037] Specifically, the comparison result will determine whether the assembly mode of the support platform needs to be adjusted. If it is found that the current platform is not sufficient to bear the overall weight of the tree, the processor will generate a new assembly mode, which includes adjusting the assembly position of the criss-cross beam, increasing or decreasing the number of support tubes, and adjusting the size of the support tubes. The alarm reminds the construction personnel through sound or light signals, and displays specific adjustment suggestions when conditions permit, such as when there is a display screen.

[0038] S240: convey the assembly mode to the construction personnel according to the preset mode, so that the construction personnel can reassemble the support frame and the support platform according to the assembly mode.

[0039] In this embodiment, the processor conveys the generated assembly pattern to the construction personnel in a preset format, and the construction personnel reassemble the support frame and the support platform according to the assembly pattern.

[0040] Specifically, the assembly mode is communicated to the construction personnel through display screens, printing or other communication means. This information includes the new assembly position of the crisscross beam, the new size and number of the support tubes. The construction personnel adjust the position of the crisscross beam and replace or add support tubes of corresponding sizes according to the received information to ensure that the support platform can bear the overall weight of the tree. Furthermore, in order to facilitate the construction personnel's understanding, the assembly mode can include detailed graphics and text instructions to ensure that the construction personnel can perform the adjustment operation correctly.

[0041] In one embodiment, referring to Figure 3In step S210, the current support platform image captured by the camera is obtained, and the safe bearing weight of the current support platform is calculated according to the current support platform image, the preset cross-shaped beam parameter data and the current support pipe parameter data, which specifically includes the following steps: S211 . Acquire a current support platform image captured by a camera, input the current support platform image into a preset structural analysis model, and generate structural data of the current support platform based on the current support platform image.

[0042] Among them, the structural analysis model is generated in the following way: first, the support platform images and corresponding structural data under different configurations are collected, and the structural data includes structural layout information and structural size information; according to a series of structural tests designed and implemented in advance, the structural performance data under different configurations are recorded; then, based on the support platform images under different configurations and the corresponding structural performance data, the preset machine learning model is trained to generate the structural analysis model.

[0043] S212. Based on the structural data, the preset cross-shaped beam parameter data and the current support pipe parameter data, the safe bearing weight of the current support platform is calculated by a mechanical formula.

[0044] In this embodiment, the processor calculates the safe load-bearing weight of the current support platform through mechanical formulas based on the generated structural data, the preset criss-cross beam parameter data and the current support tube parameter data; wherein the preset criss-cross beam parameter data include the material properties, cross-sectional dimensions and length information of the beam, and the current support tube parameter data include the material properties, diameter and wall thickness information of the support tube.

[0045] In one embodiment, referring to Figure 4 In step S212, based on the structural data, the preset cross-shaped beam parameter data and the current support pipe parameter data, the safe bearing weight of the current support platform is calculated by a mechanical formula, which specifically includes the following steps: S2121. Process the structural data, the preset crisscross beam parameter data and the current support tube parameter data based on the preset structural strength mapping rules to obtain the first relationship information between the structural strength and the assembly position of the crisscross beam, and the second relationship information between the structural strength and the support tube size.

[0046] Among them, since the assembly position of the criss-cross beam directly affects the structural strength distribution of the entire support platform, assembly at different positions will affect the stress state of the entire platform, and thus affect the safe bearing capacity of the platform; on the other hand, the size of the support tube directly affects the bearing capacity of the support platform. Support tubes of different sizes can withstand different loads. Therefore, the size of the support tube needs to be adjusted according to actual needs to ensure the safe bearing capacity of the platform.

[0047] Specifically, by processing the structural data, the cross-shaped beam parameter data and the support tube parameter data based on the structural strength mapping rule, the first relationship information between the structural strength and the assembly position of the cross-shaped beam and the second relationship information between the structural strength and the support tube size are obtained. S2122. Calculate the safe bearing weight of the current supporting platform based on the first relationship information and the second relationship information.

[0048] Specifically, by obtaining the first relationship information, the contribution degree of the criss-cross beam to the structural strength of the platform in different assembly positions can be determined. By obtaining the second relationship information, the contribution degree of the support tube to the structural strength of the platform in different sizes can be determined, thereby finding the optimal support tube size. Finally, the safe load-bearing weight of the current support platform is calculated to ensure the safety and effectiveness of the transplantation process.

[0049] In one embodiment, referring to Figure 5 In step S230, the safe bearing weight and the overall weight of the tree are compared. If the overall weight of the tree is greater than the safe bearing weight, an assembly mode that satisfies the overall weight of the tree is generated according to the comparison result, which specifically includes the following steps: S231. Compare the safe load-bearing weight and the overall weight of the tree.

[0050] In this embodiment, the processor compares the acquired overall weight of the tree with the previously calculated safe bearing weight of the current support platform to confirm whether the current support platform can safely bear the tree to be transplanted and its soil ball.

[0051] S232: If the overall weight of the tree is greater than the safe bearing weight, a target bearing weight is obtained according to the overall weight of the tree.

[0052] In this embodiment, if the processor finds that the overall weight of the tree is greater than the safe load-bearing weight of the current support platform, a new target load-bearing weight needs to be obtained based on the overall weight of the tree. The target load-bearing weight refers to the minimum safe load-bearing capacity that can bear the overall weight of the tree and leave a safe weight threshold.

[0053] Specifically, the target bearing weight is usually slightly higher than the overall weight of the tree to ensure a certain safety margin. For example, the target bearing weight is set to 1.1 times or higher than the overall weight of the tree. The setting of the target bearing weight also takes into account the long-term stability of the support platform and construction conditions. For example, in actual operation, the target bearing weight may be appropriately increased to take into account possible additional loads in the future.

[0054] S233, determining a set of assembly modes that meet the target load-bearing weight according to the target load-bearing weight, the preset cross-shaped beam parameter data, and all the support pipe parameter data in the alternative library.

[0055] In this embodiment, the processor generates an assembly pattern set that meets the target load-bearing weight based on the target load-bearing weight, the preset criss-cross beam parameter data and all the support tube parameter data in the alternative library. The assembly pattern set includes a variety of possible adjustment schemes to ensure that the support platform can meet the new load-bearing requirements.

[0056] Specifically, the processor generates multiple possible assembly modes based on the target load-bearing weight requirements and the parameter data of the crisscross beam and the parameter data of the support tubes. For example, the position of the crisscross beam is adjusted, the number of support tubes is increased or decreased, or the size of the support tubes is changed to ensure that the support platform can bear the target load-bearing weight. The processor searches for all qualified support tube parameter data in the candidate library and tries different combinations to generate multiple possible assembly modes.

[0057] S234. In the assembly pattern set, according to a preset sorting rule, an assembly pattern that satisfies the overall weight of the tree is finally generated.

[0058] In this embodiment, after generating multiple possible assembly modes, the processor needs to select an optimal assembly mode according to a preset sorting rule.

[0059] Specifically, the sorting rules can be set according to multiple factors, such as cost, material utilization, structural stability, etc. For example, the processor can select the assembly mode with the lowest cost while ensuring that its structural stability meets the requirements. This can save costs and ensure safety. In addition, the processor can also consider the convenience of construction and select the assembly mode that is easiest to construct. For example, if a certain assembly mode only requires a small amount of adjustment to meet the target load-bearing weight requirements, then this mode may be given priority. The final generated assembly mode will be notified to the construction personnel through an alarm and communicated to the construction personnel through a display screen or printing, so that they can reassemble the support frame and support platform according to the new assembly mode.

[0060] In one embodiment, referring to Figure 6 In step S234, in the assembly pattern set, according to the preset sorting rules, an assembly pattern that satisfies the overall weight of the tree is finally generated, which specifically includes the following steps: S2341. Evaluate each assembly mode in the assembly mode set, wherein the evaluation factors include material utilization, required time, and structural stability.

[0061] In this embodiment, the evaluation factors mainly include material utilization, required time and structural stability.

[0062] Specifically, material utilization refers to the ratio of the amount of material required for an assembly mode to the existing material, which helps reduce waste and lower costs. The time required refers to the duration required to complete the assembly mode, which directly affects the project schedule. Structural stability measures whether the assembly mode can safely support the overall weight of the tree, which is the most basic and important evaluation criterion. For example, the evaluation of material utilization can be achieved by calculating the ratio of the amount of material required for each assembly mode to the total amount of material; the evaluation of the required time can be achieved by estimating the number of working hours required for each assembly mode; and the evaluation of structural stability can be completed by simulating the load-bearing conditions under various assembly modes using simulation software.

[0063] S2342. Obtain current backup materials, urgency level, and safety level, and determine the evaluation weights corresponding to various evaluation factors based on the current backup materials, urgency level, and safety level.

[0064] In this embodiment, the system collects the current backup material information, the urgency of the project, and the safety level to determine which factors should be given a higher weight during the evaluation process.

[0065] Specifically, the information of current spare materials is used to determine the importance of material utilization. If the existing materials are limited, the weight of material utilization is increased, otherwise it can be reduced. The degree of urgency reflects the time pressure of the project. If the project is under time pressure, the weight of the evaluation factor of required time will increase. The safety level determines the importance of structural stability. For projects with high safety levels, structural stability will become the most important evaluation factor. For example, if there are few spare materials at present, the system may give a higher weight to material utilization; if the project is in an emergency, the weight of required time will also increase accordingly; and for projects with high safety levels, the weight of structural stability is naturally the highest.

[0066] S2343. Perform weighted processing on each evaluation factor according to its corresponding evaluation weight to obtain a comprehensive score for each assembly mode.

[0067] Specifically, after the weights of the various evaluation factors are determined, these evaluation factors are weighted to calculate the comprehensive score of each assembly mode.

[0068] S2344. Determine the assembly mode with the highest comprehensive score as the final assembly mode.

[0069] Specifically, the system will compare the calculated comprehensive scores of all assembly modes, find the one with the highest score, mark it as the final choice, and generate corresponding instructions to guide the construction team to work according to this assembly mode. For example, if the comprehensive score of a certain assembly mode reaches 8.5 points after calculation, and the others are all below 8 points, then this assembly mode will be selected as the final assembly mode. The construction team will receive the specific details of this assembly mode, including the required material list, assembly steps, and any special precautions to ensure that the assembly task can be completed smoothly.

[0070] It should be understood that the size of the serial numbers of the steps in the above embodiments does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.

[0071] In a second aspect, the present application provides a large tree transplantation method based on machine vision, which is applied to the above-mentioned assembled large tree transplantation device based on machine vision. The method is used to execute the steps executed by the processor of the above-mentioned assembled large tree transplantation device based on machine vision.

[0072] In one embodiment, the present application provides an electronic device, which is arranged on a hanging beam platform of a large tree transplanting device. The internal structure diagram of the electronic device can be as follows: Figure 7 As shown. The electronic device includes a processor, a memory and a network interface connected via a system bus. The processor of the electronic device is used to provide computing and control capabilities. The memory of the electronic device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the electronic device is used to store data. The network interface of the electronic device is used to communicate with an external terminal via a network connection. When the computer program is executed by the processor, a large tree transplantation method based on machine vision is implemented.

[0073] Those skilled in the art will understand that Figure 7 The structure shown in the figure is merely a block diagram of a partial structure related to the scheme of the present application, and does not constitute a limitation on the electronic device to which the scheme of the present application is applied. The specific electronic device may include more or fewer components than shown in the figure, or combine certain components, or have a different arrangement of components.

[0074] In one embodiment, an electronic device is also provided, which is arranged on a hanging beam platform of a large tree transplanting device, and includes a memory and a processor. A computer program is stored in the memory, and the processor implements the steps in the above-mentioned method embodiments when executing the computer program.

[0075] Those of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the above-mentioned computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), tape, floppy disk, flash memory or optical memory, etc. Volatile memory can include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM).

[0076] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A machine vision-based assembled tree transplanting device. It is characterized in that include: An assemblable crisscross beam (1), wherein the crisscross beam (1) can be assembled to form a supporting frame; A plurality of support tubes (2) are arranged on the support frame to form a support platform for carrying the transplanted tree and the soil ball; A hanging beam platform (3), the lower end of which is connected to the supporting frame via a rope (4), and the upper end of which is used to connect to the hanging equipment; Wherein, the cross-shaped beam (1) is provided with a plurality of assembly connection points (11) for changing the size of the support frame by adjusting the assembly position; The hanging beam platform (3) is provided with a processor, a camera and an alarm, and the processor performs the following steps: Obtaining a current support platform image captured by a camera, and calculating the safe bearing weight of the current support platform according to the current support platform image, preset cross-shaped beam parameter data and current support pipe parameter data; Obtain an image of a tree taken by a camera, estimate the volume of the tree and the volume of a soil ball according to the image of the tree, and estimate the overall weight of the tree according to the volume of the tree, the volume of the soil ball and the corresponding preset density; Comparing the safe bearing weight with the overall weight of the tree, if the overall weight of the tree is greater than the safe bearing weight, generating an assembly mode that satisfies the overall weight of the tree according to the comparison result, and sending an alarm signal through the alarm, wherein the assembly mode includes the assembly position of the cross-shaped beam, the size and quantity of the support pipe; The assembly mode is communicated to the construction personnel according to a preset mode, so that the construction personnel can reassemble the support frame and the support platform according to the assembly mode.

2. The assembled tree transplanting device based on machine vision according to claim 1, It is characterized in that The current support platform image captured by the camera is obtained, and the safe bearing weight of the current support platform is calculated according to the current support platform image, the preset cross-shaped beam parameter data and the current support pipe parameter data, which specifically includes the following steps: Acquire a current support platform image captured by a camera, input the current support platform image into a preset structural analysis model, and generate structural data of the current support platform based on the current support platform image; Based on the structural data, the preset cross-shaped beam parameter data and the current support tube parameter data, the safe bearing weight of the current support platform is calculated by a mechanical formula.

3. The machine vision-based assembled tree transplanting device according to claim 2, It is characterized in that Based on the structural data, the preset cross-shaped beam parameter data and the current support tube parameter data, the safe bearing weight of the current support platform is calculated by a mechanical formula, which specifically includes the following steps: Processing the structural data, the preset cross-shaped beam parameter data and the current support tube parameter data based on a preset structural strength mapping rule to obtain first relationship information between the structural strength and the assembly position of the cross-shaped beam, and second relationship information between the structural strength and the size of the support tube; Based on the first relationship information and the second relationship information, the safe bearing weight of the current supporting platform is calculated.

4. The assembled tree transplanting device based on machine vision according to claim 2, It is characterized in that The structural data includes structural layout information and structural dimension information, and the structural analysis model is generated in the following manner: Collecting images of the support platform under different configurations and corresponding structural data, wherein the structural data includes structural layout information and structural size information; Design and implement a series of structural tests to record structural performance data under different configurations; Based on the support platform images under different configurations and the corresponding structural performance data, the preset machine learning model is trained to generate a structural analysis model.

5. The assembled tree transplanting device based on machine vision according to claim 1, It is characterized in that The safe bearing weight and the overall weight of the tree are compared. If the overall weight of the tree is greater than the safe bearing weight, an assembly mode that satisfies the overall weight of the tree is generated according to the comparison result, which specifically includes the following steps: Comparing the safe bearing weight with the entire weight of the tree; If the overall weight of the tree is greater than the safe bearing weight, obtaining a target bearing weight according to the overall weight of the tree; Determine an assembly mode set that meets the target load-bearing weight according to the target load-bearing weight, preset cross-shaped beam parameter data and all support pipe parameter data in the candidate library; In the assembly pattern set, according to a preset sorting rule, an assembly pattern that satisfies the overall weight of the tree is finally generated.

6. The assembled tree transplanting device based on machine vision according to claim 5, It is characterized in that In the assembly pattern set, according to the preset sorting rules, an assembly pattern that satisfies the overall weight of the tree is finally generated, which specifically includes the following steps: Evaluate each assembly mode in the assembly mode set, wherein evaluation factors include material utilization, required time, and structural stability; Obtaining current backup materials, urgency and safety level, and determining the evaluation weights corresponding to various evaluation factors according to the current backup materials, urgency and safety level; Each evaluation factor is weighted according to its corresponding evaluation weight to obtain a comprehensive score for each assembly mode; The assembly mode with the highest comprehensive score is determined as the final assembly mode.

7. A large tree transplantation method based on machine vision, applied to the assembled large tree transplantation device based on machine vision as claimed in claim 1, It is characterized in that The steps include: Obtaining a current support platform image captured by a camera, and calculating the safe bearing weight of the current support platform according to the current support platform image, preset cross-shaped beam parameter data and current support pipe parameter data; Obtain an image of a tree taken by a camera, estimate the volume of the tree and the volume of a soil ball according to the image of the tree, and estimate the overall weight of the tree according to the volume of the tree, the volume of the soil ball and the corresponding preset density; Comparing the safe bearing weight with the overall weight of the tree, if the overall weight of the tree is greater than the safe bearing weight, generating an assembly mode that satisfies the overall weight of the tree according to the comparison result, and sending an alarm signal through the alarm, wherein the assembly mode includes the assembly position of the cross-shaped beam, the size and quantity of the support pipe; The assembly mode is communicated to the construction personnel according to a preset mode, so that the construction personnel can reassemble the support frame and the support platform according to the assembly mode.

8. The large tree transplantation method based on machine vision according to claim 7, It is characterized in that The current support platform image captured by the camera is obtained, and the safe bearing weight of the current support platform is calculated according to the current support platform image, the preset cross-shaped beam parameter data and the current support pipe parameter data, which specifically includes the following steps: Acquire a current support platform image captured by a camera, input the current support platform image into a preset structural analysis model, and generate structural data of the current support platform based on the current support platform image; Based on the structural data, the preset cross-shaped beam parameter data and the current support tube parameter data, the safe bearing weight of the current support platform is calculated by a mechanical formula.

9. The large tree transplantation method based on machine vision according to claim 8, It is characterized in that Based on the structural data, the preset cross-shaped beam parameter data and the current support tube parameter data, the safe bearing weight of the current support platform is calculated by a mechanical formula, which specifically includes the following steps: Processing the structural data, the preset cross-shaped beam parameter data and the current support tube parameter data based on a preset structural strength mapping rule to obtain first relationship information between the structural strength and the assembly position of the cross-shaped beam, and second relationship information between the structural strength and the size of the support tube; Based on the first relationship information and the second relationship information, the safe bearing weight of the current supporting platform is calculated.

10. The large tree transplantation method based on machine vision according to claim 8, It is characterized in that The structural data includes structural layout information and structural dimension information, and the structural analysis model is generated in the following manner: Collecting images of the support platform under different configurations and corresponding structural data, wherein the structural data includes structural layout information and structural size information; Design and implement a series of structural tests to record structural performance data under different configurations; Based on the support platform images under different configurations and the corresponding structural performance data, the preset machine learning model is trained to generate a structural analysis model.

Citation Information

Patent Citations

  • Novel platform integral hoisting and launching method

    CN110356980A

  • Lightering-free mounting device and method for single blade

    CN112299231A

  • Tower crane clamp material matching identification method and device based on image feature analysis

    CN113763369A

  • Intelligent engineering supervision method, system and equipment based on image acquisition system

    CN117274909A

  • Load control system and method based on crane hoisting

    CN117923331A