Preparation device and grouting method of multi-component polyurethane slurry for repairing pavement cracks
By designing a preparation device for multi-component polyurethane slurry, and using dual reaction chambers and ultrasonic stirring technology, the problems of poor material dispersion and multiple sets of equipment in road crack construction were solved, and the uniformity of material performance and construction efficiency were improved.
Patent Information
- Application Number
- CN202411384897.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-30
- Publication Date
- 2024-12-06
AI Technical Summary
In the construction of road cracks, traditional modified polyurethane slurry has poor material dispersion, resulting in uneven material properties, and different materials are required for different types of cracks. However, the existing technology requires the preparation of multiple sets of equipment and the material waste is serious.
A multi-component polyurethane slurry preparation device is designed, including a dual reaction chamber, an ultrasonic probe and a stirring system. Accurate weighing and stirring are controlled through weight sensors and electric valves to ensure uniform dispersion of materials, and through grouting flow control device Achieve flexible grouting operations.
It improves material dispersion, adapts to the needs of different types of pavement cracks, reduces equipment preparation and material waste, and expands the preparation efficiency and scope of application.
Smart Images

Figure CN119075893A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of grouting engineering, and in particular to a preparation device and a grouting method of a multi-component polyurethane slurry for repairing road cracks. Background Art
[0002] When traditional modified polyurethane slurry is used for on-site construction of pavement cracks, a stirring method is usually used to prepare nanocomposite slurry materials. Although this method is simple to operate, it cannot fully guarantee the dispersibility of nanomaterials. Poor nanodispersibility will also lead to uneven internal structure of the material, further leading to differences in spatial distribution of material properties. At the same time, pavement cracks are divided into dynamic cracks and static cracks according to the development of the cracks. High-toughness materials are required for dynamic cracks, and high-strength materials are required for static cracks. At present, multiple sets of equipment are often used to hold grouting materials during construction. In order to ensure the continuous progress of construction, the amount of materials held often exceeds the required amount of the operation. The excess materials will deteriorate due to long-term storage, resulting in waste. Therefore, there is an urgent need for a preparation device and grouting method for a multi-component polyurethane slurry for repairing pavement cracks. Summary of the invention
[0003] The purpose of the present application is to provide a preparation device and grouting method of a multi-component polyurethane slurry for repairing pavement cracks, so as to solve the technical problems in the prior art that different materials need to be prepared for the characteristics of crack damage, and multiple sets of grouting equipment are required, and the material dispersion is poor.
[0004] The present application provides a preparation device for a multi-component polyurethane slurry for repairing road cracks, the preparation device comprising:
[0005] Reaction bin 1, the top of which is connected to weighing bin 1 via feeding pipe 1, and the top of which is connected to raw material bin 1 via feeding pipe 2;
[0006] Reaction bin 2, which is arranged outside reaction bin 1, the top of which is connected to weighing bin 2 via feeding pipe 4, and the top of which is connected to raw material bin 2 via feeding pipe 3;
[0007] Preferably, two output ports are provided at the bottom of reaction chamber one, output port one and output port two, one side of output port two enters reaction chamber two through a pipeline, and output port three is provided at the bottom of reaction chamber two, and output port one or output port three is connected to the grouting flow control device.
[0008] Preferably, each weighing bin 1 and weighing bin 2 is provided with a weight sensor, each weight sensor is electrically connected to an electric valve, each electric valve is respectively arranged at the bottom of each weighing bin 2 and weighing bin 1, and each weight sensor and each electric valve are electrically connected to a computer.
[0009] Preferably, a bottom plate is fixedly provided at the bottom of reaction chamber one, a partition plate is provided at the top of reaction chamber two, and reaction chamber two is separated from reaction chamber one by the bottom plate and the partition plate.
[0010] Preferably, the inner wall and the outer wall of reaction chamber 2 and reaction chamber 1 are respectively provided with an ultrasonic probe and an ultrasonic generator, and the bottom of reaction chamber 2 and reaction chamber 1 are respectively provided with a heating plate and a temperature sensor, the top wall of reaction chamber 1 is provided with a first motor, the output end of the first motor is provided with a first stirring rod, the top of the partition is provided with a second motor, the output end of the second motor is provided with a second stirring rod, and the computer is electrically connected to the first motor, the second motor, the ultrasonic probe, the ultrasonic generator, the temperature sensor and the heating plate, respectively.
[0011] Preferably, valve one, valve two and valve three are respectively provided on output port one, output port two and output port three, and the computer is electrically connected to valve one, valve two and valve three.
[0012] The present application provides a grouting method for repairing road cracks with a multi-component polyurethane slurry. When the polyurethane slurry to be configured is a single component, all the raw materials are added into a raw material bin one or a raw material bin two, the valve is opened first, and the required raw materials are passed from the raw material bin one or the raw material bin two into the weighing bin one and the weighing bin two. After the weight sensor receives a signal, the valve is closed and the electric valve is opened, so that the weighed raw materials pass from the weighing bin into the reaction bin one or the reaction bin two. The motor drives the stirring rod to rotate, and the ultrasonic generator starts to work. After the raw materials are evenly stirred, the output port one or the output port three is connected to the grouting flow control device to perform grouting.
[0013] Preferably, when the polyurethane slurry to be configured is multi-component, the raw materials are added to raw material bin one and raw material bin two respectively, the valve is opened, and the required raw materials are passed from the raw material bin into the weighing bin. After the weight sensor receives the signal, the valve is closed and the electric valve is opened, so that the weighed raw materials enter the reaction bin one and the reaction bin two respectively from the weighing bin. The motors in the reaction bin one and the reaction bin two drive the stirring rod to rotate, and the ultrasonic generator starts working. After the raw materials are evenly stirred, the mixed component raw materials in the reaction bin one enter the reaction bin two from the second output port, and are stirred and mixed with the other component raw materials stirred in the reaction bin two. After the two components of the raw materials are mixed, the output port three is connected to the grouting flow control device for grouting.
[0014] Therefore, the present application adopts the above-mentioned preparation device and grouting method of a multi-component polyurethane slurry for repairing road cracks, which has the following beneficial effects:
[0015] (1) By setting up an ultrasonic probe and an ultrasonic generator, the dispersion of the material in the slurry is made more uniform.
[0016] (2) The setting of dual reaction chambers can adapt to different fixed preparation methods, and can prepare more types of modified polyurethane slurries, which has a wider range of applications and improves the preparation efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a schematic diagram of the structure of the preparation device of the present application.
[0018] Reference numerals
[0019] 1. Reaction chamber 1; 2. Reaction chamber 2; 3. Feed pipe 1; 4. Weighing chamber 1; 5. Feed pipe 2; 6. Raw material chamber 1; 7. Weight sensor; 8. Electric valve; 9. Raw material chamber 2; 10. Feed pipe 3; 11. Weighing chamber 2; 12. Feed pipe 4; 13. Heating plate; 14. Output port 1; 15. Output port 2; 16. Valve 1; 17. Valve 2; 18. Valve 3; 19. Bottom plate; 20. Partition plate; 21. Motor housing; 22. First stirring rod; 23. Ultrasonic probe; 24. Ultrasonic generator; 25. Temperature sensor; 26. Valve; 27. Second motor housing; 28. Second stirring rod. DETAILED DESCRIPTION
[0020] Example 1
[0021] A preparation device for a multi-component polyurethane slurry for repairing road cracks comprises a reaction chamber 1 and a reaction chamber 2 arranged outside the reaction chamber 1, the top of the reaction chamber 1 is connected to the bottom of a weighing chamber 4 through a feeding pipe 3, the top of the weighing chamber 4 is fixedly connected to a raw material chamber 6 through a feeding pipe 5, a valve 26 is arranged at the bottom of each raw material chamber 6, each raw material can be placed in each raw material chamber 6 respectively, and a weight sensor 7 is arranged in each weighing chamber 4, each weight sensor 7 is electrically connected to an electric valve 8, each electric valve 8 is arranged at a position where each weighing chamber 4 is connected to the feeding pipe 3, each weight sensor 7, each electric valve 8 and each valve 26 are electrically connected to a computer, during weighing, the computer receives a signal from each weight sensor 7 to control the opening and closing of each electric valve 8 and each valve 26, so as to realize fixed weight weighing, when the weight sensor 7 receives a signal from the computer, the valve 26 is closed to stop feeding, the electric valve 8 is opened, so that each raw material enters the reaction chamber 1 through the feeding pipe 3.
[0022] The bottom of the raw material bin 2 9 is connected to the weighing bin 2 11 through the feeding pipe 3 10, and the bottom of the weighing bin 2 11 is connected to the reaction bin 2 2 through the feeding pipe 4 12. Two output ports are arranged at the bottom of the reaction bin 1, one side of the output port 14 is directly grouting through the grouting pipe through the pipeline, and one side of the output port 2 15 enters the reaction bin 2 2 through the pipeline. A valve 26 is arranged at the bottom of each raw material bin 2 9, and the raw materials can also be arranged in each raw material bin 2 9 respectively. A weight sensor 7 is also arranged in each weighing bin 2 11, and each weight sensor 7 is electrically connected to an electric valve 8. Each electric valve 8 is arranged at the position where each weighing bin 2 11 is connected to the feeding pipe 4 12. Each weight sensor 7, each electric valve 8 and each valve 26 are electrically connected to a computer. When weighing, first open the valve 26 to allow each raw material to enter the weighing bin 2 11 from the raw material bin 2 9. After receiving the signal of each weight sensor 7, the computer controls the valve 26 to be closed, and each electric valve 8 is opened to allow each raw material to enter the reaction bin 2 through the feeding pipe 4 12.
[0023] A bottom plate 19 is fixedly provided at the bottom of reaction chamber 1, a partition plate 20 is provided at the top of reaction chamber 2, and reaction chamber 2 2 is separated from reaction chamber 1 by the bottom plate 19 and the partition plate 20.
[0024] The inner and outer walls of the reaction chamber 2 and the reaction chamber 1 are respectively provided with an ultrasonic probe 23 and an ultrasonic generator 24, and the bottoms thereof are both provided with a heating plate 13 and a temperature sensor 25. The top wall of the reaction chamber 1 is provided with a first motor, a motor placement shell 21 is provided on the outer side of the first motor, a first stirring rod 22 is provided through the first motor placement shell 21 at the output end of the first motor, and a stirring blade is provided on the first stirring rod 22. A second motor is provided on the top of the partition 20, a second motor placement shell 27 is provided on the outer side of the second motor, a second stirring rod 28 is provided through the second motor placement shell 27 at the output end of the second motor, and a stirring blade is provided on the second stirring rod 28. The computer is respectively electrically connected to the first motor, the second motor, the ultrasonic probe 23, the ultrasonic generator 24, the temperature sensor 25 and the heating plate 13. By providing the temperature sensor 25 and the heating plate 13, it is convenient to heat each raw material, so that the raw materials are mixed more evenly.
[0025] In order to facilitate the control of discharging, valve one 16, valve two 17 and valve three 18 are respectively provided on output port one 14, output port two 15 and output port three, and the computer is electrically connected to valve one 16, valve two 17 and valve three 18.
[0026] When the polyurethane slurry to be configured is a single component, the raw materials can be added to the raw material bin 1 or the raw material bin 2. When the raw materials are added to the raw material bin 6, the valve 26 is opened first, and the required raw materials are passed from the raw material bin 6 through the feed pipe 25 into the weighing bin 4. When the weight sensor 7 at the bottom of the weighing bin 4 receives the signal, the valve 26 is closed and the electric valve 8 is opened, so that the weighed raw materials pass from the weighing bin 4 through the feed pipe 3 into the reaction bin 1. At this time, the first motor of the reaction bin 1 drives the first stirring rod 22 to rotate, the ultrasonic generator 24 starts to work, and the heating plate 13 starts to heat up. When the temperature sensor 25 detects that the temperature is too high, the heating plate 13 stops working. After the raw materials are evenly stirred, the output port 1 is connected to the grouting flow control device for grouting.
[0027] When the raw materials are added to the raw material bin 2 9, first open the valve 26, and let the required raw materials enter the weighing bin 2 11 from the raw material bin 2 9 through the feed pipe 3 10. When the weight sensor 7 at the bottom of the weighing bin 11 receives the signal, the valve 26 is closed and the electric valve 8 is opened, so that the weighed raw materials enter the reaction bin 2 2 from the weighing bin 2 11 through the feed pipe 4 12. At this time, the second motor of the reaction bin 2 2 drives the second stirring rod 28 to rotate, the ultrasonic generator 24 starts to work, and the heating plate 13 starts to heat up. When the temperature sensor 25 detects that the temperature is too high, the heating plate 13 stops working. After the raw materials are evenly stirred, the output port 3 is connected to the grouting flow control device for grouting.
[0028] When the polyurethane slurry to be prepared is multi-component, for example, when the polyurethane slurry includes two components A and B, first calculate the weight of each raw material of the required A component and each raw material of the B component according to the formula, then open the valve 26 at the bottom of the raw material bin 1 6 and the raw material bin 2 9, and let the required raw materials of the A component enter the weighing bin 1 4 from the raw material bin 1 6 through the feed pipe 2 5, and let the raw materials of the B component enter the weighing bin 2 11 from the raw material bin 2 9 through the feed pipe 3 10. When the weight sensor 7 at the bottom of the weighing bin 4 receives the signal, the valve 26 is closed and the electric valve 8 is opened, so that the weighed raw materials enter the reaction bin 1 from the weighing bin 4 through the feed pipe 3. At this time, the first motor of the reaction bin 1 drives the first stirring rod 22 to rotate, the ultrasonic generator 24 starts to work, and the heating plate 13 starts to heat up. When the temperature sensor 7 at the bottom of the weighing bin 4 receives the signal, the valve 26 is closed and the electric valve 8 is opened, so that the weighed raw materials enter the reaction bin 1 from the weighing bin 4 through the feed pipe 3. At this time, the first motor of the reaction bin 1 drives the first stirring rod 22 to rotate, the ultrasonic generator 24 starts to work, and the heating plate 13 starts to heat up. When the device 25 detects that the temperature is too high, the heating plate 13 stops working. After the raw materials are evenly stirred, they enter the reaction chamber 2 2 from the output port 2 15. At this time, in the reaction chamber 2, when the weight sensor 7 at the bottom of the weighing chamber 11 receives the signal, the valve 26 is closed and the electric valve 8 is opened, so that the weighed raw materials enter the reaction chamber 2 2 from the weighing chamber 11 through the feed pipe 4 12. At this time, the second motor of the reaction chamber 2 drives the second stirring rod 28 to rotate, the ultrasonic generator 24 starts working, and the heating plate 13 starts to heat up. When the temperature sensor 25 detects that the temperature is too high, the heating plate 13 stops working. After the stirred raw materials of component A enter the reaction chamber 2, they are stirred again with the stirred raw materials of component B through the second stirring rod 28 and the ultrasonic generator 24 to ensure that the device is stirred evenly. When the polyurethane slurry includes other components in addition to components A and B, the raw materials of the other components can be added into the weighing bin 2 11. After the other raw materials are weighed according to the above method, they are continued to be mixed evenly with the mixed components of the two components AB that have been stirred. After mixing, they are connected to the grouting flow control device through the output port 3 for grouting.
[0029] The device of the present application can adapt to production needs of different scales and types. If the prepared modified polyurethane slurry has a short coagulation time, it can be prepared in the reaction chamber 1 and then directly output. If the prepared modified polyurethane slurry has a long coagulation time or needs to be added with some raw materials such as modifiers, it can be reacted in the reaction chamber 1 first, and then the modifier is added through the raw material chamber 2 and then transported to the reaction chamber 2 2 for reaction, and then output. The multiple functions of the two reaction chambers can adapt to different preparation methods and have strong flexibility and scalability.
[0030] Therefore, the present application provides a preparation device and grouting method for a multi-component polyurethane slurry for repairing pavement cracks, which solves the technical problem that different materials need to be prepared for the characteristics of crack damage during crack repair construction, and multiple sets of grouting equipment must be prepared, and the material dispersion is poor.
[0031] In the description of this specification, the description with reference to the terms "an experimental example", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the experimental example or example are included in at least one experimental example or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same experimental example or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more experimental examples or examples in a suitable manner.
[0032] Finally, it should be noted that the above experimental examples are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred experimental examples, those skilled in the art should understand that they can still modify or replace the technical solution of the present invention with equivalents, and these modifications or equivalent replacements cannot cause the modified technical solution to deviate from the spirit and scope of the technical solution of the present invention.
Claims
1. A preparation device for a multi-component polyurethane slurry for repairing road cracks, characterized in that: The preparation device includes: Reaction bin 1, the top of which is connected to weighing bin 1 via feeding pipe 1, and the top of which is connected to raw material bin 1 via feeding pipe 2; Reaction bin 2 is arranged outside reaction bin 1, the top of reaction bin 2 is connected with weighing bin 2 through feeding pipe 4, and the top of weighing bin 2 is connected with raw material bin 2 through feeding pipe 3.
2. The device for preparing a multi-component polyurethane slurry for repairing road cracks according to claim 1, characterized in that: Two output ports are arranged at the bottom of reaction chamber one, output port one and output port two. One side of output port two enters reaction chamber two through a pipeline. Output port three is arranged at the bottom of reaction chamber two. Output port one or output port three is connected to the grouting flow control device.
3. The device for preparing a multi-component polyurethane slurry for repairing road cracks according to claim 1, characterized in that: A weight sensor is provided in each weighing bin 1 and weighing bin 2, each weight sensor is electrically connected to an electric valve, each electric valve is respectively provided at the bottom of each weighing bin 2 and weighing bin 1, and each weight sensor and each electric valve is electrically connected to a computer.
4. The device for preparing a multi-component polyurethane slurry for repairing road cracks according to claim 3, characterized in that: A bottom plate is fixedly arranged at the bottom of the reaction chamber 1, a partition plate is arranged at the top of the reaction chamber 2, and the reaction chamber 2 is separated from the reaction chamber 1 by the bottom plate and the partition plate.
5. The device for preparing a multi-component polyurethane slurry for repairing road cracks according to claim 4, characterized in that: The inner and outer walls of reaction chamber 2 and reaction chamber 1 are respectively provided with ultrasonic probes and ultrasonic generators, and the bottoms of reaction chamber 2 and reaction chamber 1 are respectively provided with heating plates and temperature sensors, the top wall of reaction chamber 1 is provided with a first motor, the output end of the first motor is provided with a first stirring rod, the top of the partition is provided with a second motor, the output end of the second motor is provided with a second stirring rod, and the computer is electrically connected to the first motor, the second motor, the ultrasonic probe, the ultrasonic generator, the temperature sensor and the heating plate, respectively.
6. The device for preparing a multi-component polyurethane slurry for repairing road cracks according to claim 5, characterized in that: The output port 1, the output port 2 and the output port 3 are respectively provided with valve 1, valve 2 and valve 3, and the computer is electrically connected with valve 1, valve 2 and valve 3.
7. A grouting method for repairing road cracks with a multi-component polyurethane slurry according to claims 1-6, characterized in that: When the polyurethane slurry to be configured is a single component, all the raw materials are added into raw material bin one or raw material bin two, the valve is opened first, and the required raw materials are passed from raw material bin one or raw material bin two into the weighing bin, after the weight sensor receives the signal, the valve is closed, and the electric valve is opened, so that the weighed raw materials pass from the weighing bin into the reaction bin one or reaction bin two, the motor drives the stirring rod to rotate, and the ultrasonic generator starts to work, and when the raw materials are evenly stirred, the output port one or output port three is connected to the grouting flow control device for grouting.
8. A grouting method for repairing road cracks with a multi-component polyurethane slurry according to claims 1-6, characterized in that: When the polyurethane slurry to be configured is multi-component, the raw materials are added to the raw material bin one and the raw material bin two respectively, the valve is opened, and the required raw materials are passed from the raw material bin into the weighing bin one and the weighing bin two. After the weight sensor receives the signal, the valve is closed and the electric valve is opened, so that the weighed raw materials enter the reaction bin one and the reaction bin two respectively from the weighing bin. The motors in the reaction bin one and the reaction bin two drive the stirring rod to rotate, and the ultrasonic generator starts to work. After the raw materials are evenly stirred, the mixed component raw materials in the reaction bin one enter the reaction bin two from the second output port, and are stirred and mixed with the other component raw materials stirred in the reaction bin two. After the two components of the raw materials are mixed, the output port three is connected to the grouting flow control device for grouting.