Fixed wheel overhauling tool and method for large gate of hydropower station

By designing the fixed wheel maintenance tooling for large gates of hydropower stations, using high-strength I-steel structures and step-by-step methods, the difficulty and safety risks of fixed wheel maintenance are solved, and an efficient and safe maintenance process is achieved.

CN119077676APending Publication Date: 2024-12-06CHINA YANGTZE POWER
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411093571.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-09
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The maintenance of large gate fixed wheels is difficult, especially due to the corrosion problems caused by the press-in assembly method of bearings, which increases the maintenance difficulty, and the weight and size of the fixed wheels make it difficult to move and lay them smoothly.

Method used

A large-scale gate fixed wheel maintenance tool for hydropower stations was designed, including base, connecting column, top beam, support column and jack. The fixed wheel placement space was set through the vertical jack and support column, combined with the high-strength I-steel structure, and the steps were adopted. The method of disassembly and installation ensures the safe disassembly and installation of the fixed wheel.

Benefits of technology

It improves maintenance efficiency, reduces safety risks, ensures simplicity and safety of operation, adapts to different types of gate fixed wheels, reduces time and manpower consumption, and enhances operability and stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119077676A_ABST
    Figure CN119077676A_ABST
Patent Text Reader

Abstract

The invention discloses a hydropower station large gate fixed wheel overhauling tool and method. The tool comprises a base, a connecting column, a top beam, a supporting column and a jack. The lower ends of the connecting columns are connected with two ends of the base; the upper ends of the connecting columns are connected with two ends of the top beam; the two supporting columns are located between the two connecting columns and connected with the base. One end of the jack contacts with the lower side of the top beam; a fixed wheel placing space is arranged in the vertical direction of the jack and the supporting column; the fixed wheel is placed at the upper ends of the two supporting columns, the upper side face of the fixed wheel faces the telescopic end of the jack, the inner ring and the outer ring of the fixed wheel are separated through pressure applied by stretching of the jack, dismounting is safe, operation is easy, safety and efficiency are achieved, and universality is high. By means of the method, the overhauling efficiency is improved, and meanwhile the safety risk in fixed wheel overhauling is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of gate fixed wheel maintenance, and relates to a large-scale gate fixed wheel maintenance tool and method for a hydropower station. Background Art

[0002] The function of the power station gate is to completely or partially close and open the water orifice as needed to perform generator maintenance or adjust the upstream and downstream water levels, discharge flow, etc. Generally, the fixed wheel of a large gate weighs about 800KG and has a diameter of 1000mm. It is difficult to move and cannot be laid flat. It is difficult to dismantle and repair it with general tools. At the same time, its bearings generally adopt the press-in assembly method. The bearing press-in assembly method is an installation method that presses the bearing into the bearing seat hole, which is often used for interference fit bearings. When there is rust in the bearing, the combination between the bearing and the fixed wheel will be tighter, which increases the difficulty of maintenance. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide a large-scale gate fixed wheel maintenance tool and method for a hydropower station, which is used for the installation, disassembly and reinstallation of the large-scale gate fixed wheel.

[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is: a fixed wheel maintenance tool and method for a large gate of a hydropower station, which includes a base, a connecting column, a top beam, a supporting column and a jack; the lower end of the connecting column is connected to the two ends of the base, and the upper end of the connecting column is connected to the two ends of the top beam; the two supporting columns are located between the two connecting columns and connected to the base; one end of the jack is in contact with the lower side of the top beam; and a fixed wheel placement space is set in the vertical direction between the jack and the supporting column.

[0005] The base and top beam shall be I-beams no smaller than No. 20.

[0006] A plurality of diagonal braces are arranged on both sides of the base.

[0007] The vertical distance between the jack and the support column is controlled by the telescopic end of the jack.

[0008] The method for disassembling and installing the fixed wheel of the large-scale gate fixed wheel maintenance tool of the hydropower station as described above comprises the following steps: Step 1: Remove the shaft end pressure plates at both ends of the fixed wheel pin shaft; Step 2: Use an 18-pound hammer to strike the pin to vibrate the debris in the bearing gap, and spray bolt loosening agent into the gap to assist in loosening. Step 3: Deploy a 400T jack inside the pin shaft, and then install a 400mm diameter steel pipe support and a 500mm wide square thick steel plate at the end of the jack; Step 4: Install 400mm diameter steel pipes, thick steel plates and 32T mechanical jacks in each door grid on the same floor; adjust the height of the support, jack and thick steel plate to ensure that their action points are on the same horizontal line as the pin shaft, and all action points are connected in a straight line to effectively disperse the pressure on the door grid facade and avoid deformation of the accident door body; Step 5: gradually increase the pressure, and use an 18-pound hammer to knock and vibrate the outer side of the pin during the pressure increase process to relieve the pin blocking phenomenon; in this step, a dedicated person is required to monitor the pressure increase during the pressure increase process. Once an abnormal or unstable factor is found, the pressure increase operation should be stopped immediately; Step 6: During the pin extension process, continuously measure the extension length in the four directions of up, down, left and right to ensure uniform extension and prevent the pin from getting stuck; Step 7: When the pin is halfway extended, stop boosting; use a sling to firmly lift the pin to ensure that it remains horizontal to avoid being stuck, and ensure that it will not fall suddenly after being fully withdrawn; Step 8. After the pin is removed, conduct a detailed inspection of its surface for wear and corrosion to assess its feasibility for continued use and whether it needs to be replaced. At the same time, thoroughly clean and inspect the positioning holes to remove dirt and rust to ensure that the new pin can be installed smoothly and achieve a tight fit. Step 9: Before reinstallation, polish and clean the pin shaft and positioning hole to remove oil, rust and impurities, evenly apply grease, and wrap with plastic film; Step 10: lift the emergency door to the edge of the door garage, and pull the fixed wheel along the track tooling to the dam surface; Step 11: After the fixed wheel is pushed into the door, use a jack and a shoulder pole to lift the fixed wheel to a specified height and fix it with a pad; Step 12: After the fixed wheel is disassembled, inspected and assembled, push the fixed wheel into the door along the track, use the sling to lift the pin and the jack respectively, and use the level to level them to ensure that the two are in the same straight line; in this step, due to the special design of the diameters of the two ends of the pin are 180mm and 190mm respectively, the pin needs to be pushed in from the opposite direction during assembly; Step 13: After the pin shaft is fully in place, install the shaft end pressure plate to complete the installation of the fixed wheel on the gate body.

[0009] The fixed wheel reinstallation method of the fixed wheel maintenance tooling for a large gate of a hydropower station as described above comprises the following steps: Step 1: Remove all the sealing screws on both sides of the fixed wheel to expose the internal bearing; Step 2: Push the fixed wheel into the oil collecting basin and use a cleaning agent to thoroughly remove all the grease inside; Step 3: Use the sealed fixing screw holes of the fixed wheel as lifting points, flip the fixed wheel to a horizontal state with the help of special tooling, and lift the fixed wheel to a certain height; Step 4: Place the fixed wheel steadily on the dismantling tooling and secure it with a hand chain hoist; Step 5: Place a thick steel plate at the center of the bearing and install a hydraulic jack at the center of the steel plate; Step 6: Gradually increase the pressure of the jack to gradually extend the bearing. During this process, continuously measure the depth of the bearing in the front, rear, left, and right directions to ensure that the bearing extends evenly and avoids jamming, thereby avoiding wear of the bearing and the fixed wheel body and damage to the fixed wheel body. Step 7: After the bearing is fully extended, conduct a detailed inspection of the inner wall of the fixed wheel, assess the degree of damage and make necessary repairs; after disassembly, thoroughly clean the bearing and fixed wheel to remove oil and impurities; use sandpaper to remove rust from the inside of the fixed wheel to ensure a smooth surface; Step 8: Use the fixed wheel disassembly tool to horizontally hoist the new bearing onto the tool, and use a jack to press it horizontally into the predetermined position; Step 9: Apply grease inside the bearing, use the press-fit assembly method, use a jack, and slowly press the bearing into the fixed wheel to ensure that the bearing is installed in place; Step 10, install the new sealing ring, tighten the cover with new screws, and the fixed cycle installation is completed.

[0010] The main beneficial effects of the present invention are: The entire structural frame adopts high-strength large-scale I-beams, which improves the stability and load-bearing capacity of the overall structure and can meet the installation and disassembly of fixed wheels weighing nearly 1,000 kilograms.

[0011] The fixed wheel is placed at the upper end of the two supporting columns, with the upper side of the fixed wheel facing the telescopic end of the jack. The pressure applied by the telescopic jack separates the inner and outer rings of the fixed wheel, making it safe to disassemble.

[0012] The maintenance efficiency is improved, and the safety risk in the maintenance of the fixed wheel is also reduced. The designed maintenance tooling is simple to operate, safe and efficient, and has strong versatility.

[0013] The tooling design is stable and reliable. The bearing is hoisted with a sling to avoid direct contact between the bearing and the ground, reducing the risk of bearing damage and ensuring safety during operation.

[0014] Customized mobile tooling makes the bearing removal and installation process more convenient, saving time and manpower.

[0015] The tooling can handle different types of gate fixed wheels, has high adaptability, provides a basis for similar maintenance operations, and has good versatility. The tooling design takes into account the size and shape of the fixed wheel, making it easy to operate. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0017] Figure 1 It is a schematic diagram of disassembly and assembly of the fixed wheel of the present invention.

[0018] Figure 2 for Figure 1 Side view of.

[0019] Figure 3 This is a schematic diagram of disassembling the fixed wheel of the present invention in the door garage.

[0020] Figure 4 It is a schematic diagram of the fixed wheel of the present invention when it is moved out of the gate body after being disassembled.

[0021] Figure 5 It is a schematic diagram of the fixed wheel lifting of the present invention.

[0022] In the figure: base 1; diagonal brace 11; connecting column 2; top beam 3; supporting column 4; jack 5. DETAILED DESCRIPTION

[0023] like Figure 1~Figure 5 A tool and method for inspecting and repairing a fixed wheel of a large gate of a hydropower station is disclosed, which comprises a base 1, a connecting column 2, a top beam 3, a supporting column 4 and a jack 5; the lower end of the connecting column 2 is connected to both ends of the base 1, and the upper end of the connecting column 2 is connected to both ends of the top beam 3; two supporting columns 4 are located between the two connecting columns 2 and connected to the base 1; one end of the jack 5 is in contact with the lower side of the top beam 3; a fixed wheel placement space is set between the jack 5 and the supporting column 4 in the vertical direction. When in use, the fixed wheel is placed on the upper ends of the two supporting columns 4, the outer ring of the fixed wheel is in contact with the upper ends of the supporting columns 4, the telescopic end of the jack 5 faces the inner ring of the fixed wheel, and the inner ring of the fixed wheel is pushed downward during the telescopic process of the jack 5 to separate the inner ring and the outer ring of the fixed wheel, which is convenient to disassemble, safe and reliable, and labor-saving.

[0024] In the preferred solution, the base 1 and the top beam 3 are I-beams of not less than No. 20. During production, the frame structure formed by the base 1, the top beam 3 and the connecting column 2 is made of high-strength large-scale I-beams, which improves the stability and load-bearing capacity of the overall structure and can meet the installation and disassembly of the fixed wheel of nearly 1,000 kilograms.

[0025] In a preferred embodiment, a plurality of diagonal braces 11 are provided on both sides of the base 1. When in use, the base 1 contacts the ground, and the diagonal braces 11 on both sides of the base 1 increase the contact area with the ground, thereby improving the overall stability.

[0026] In a preferred solution, the distance between the jack 5 and the support column 4 in the vertical direction is controlled by the telescopic end of the jack 5. When in use, the fixed wheel has models with different thickness specifications, and the space between the jack 5 and the support column 4 is convenient for the placement of the fixed wheel during the lifting process; the telescopic end of the jack 5 can control the size or distance of the space, and adapt to or meet the requirements of fixed wheels with various thickness specifications.

[0027] Preferably, a steel plate is provided between the telescopic end of the jack 5 and the contact surface of the fixed wheel to prevent the fixed wheel from being damaged when being pushed.

[0028] The method for disassembling and installing the fixed wheel of the large-scale gate fixed wheel maintenance tool of the hydropower station as described above comprises the following steps: Step 1: Remove the shaft end pressure plates at both ends of the fixed wheel pin shaft; Step 2: Use an 18-pound hammer to strike the pin to vibrate the debris in the bearing gap, and spray bolt loosening agent into the gap to assist in loosening. Step 3: Deploy a 400T jack inside the pin shaft, and then install a 400mm diameter steel pipe support and a 500mm wide square thick steel plate at the end of the jack. Figure 3 , This thick steel plate acts directly on the door grid facade, aiming to increase the effective area and prevent the door grid facade from deformation.

[0029] Step 4: Install 400mm diameter steel pipes, thick steel plates and 32T mechanical jacks in each door grid on the same floor; adjust the height of the support, jack and thick steel plate to ensure that their action points are on the same horizontal line as the pin shaft, and all action points are connected in a straight line to effectively disperse the pressure on the door grid facade and avoid deformation of the accident door body; Step 5: gradually increase the pressure, and use an 18-pound hammer to knock and vibrate the outer side of the pin during the pressure increase process to relieve the pin blocking phenomenon; in this step, a dedicated person is required to monitor the pressure increase during the pressure increase process. Once an abnormal or unstable factor is found, the pressure increase operation should be stopped immediately; Step 6: During the pin extension process, continuously measure the extension length in the four directions of up, down, left and right to ensure uniform extension and prevent the pin from getting stuck; Step 7: When the pin is halfway extended, stop boosting; use a sling to firmly lift the pin to ensure that it remains horizontal to avoid being stuck, and ensure that it will not fall suddenly after being fully withdrawn; Step 8. After the pin is removed, conduct a detailed inspection of its surface for wear and corrosion to assess its feasibility for continued use and whether it needs to be replaced. At the same time, thoroughly clean and inspect the positioning holes to remove dirt and rust to ensure that the new pin can be installed smoothly and achieve a tight fit. Step 9: Before reinstallation, polish and clean the pin shaft and positioning hole to remove oil, rust and impurities, evenly apply grease, and wrap with plastic film; Step 10: Lift the emergency door to the edge of the door garage and pull the fixed wheel along the track tooling to the dam surface; see Figure 4 .

[0030] Step 11: After the fixed wheel is pushed into the door, use the jack and the shoulder beam to lift the fixed wheel to the specified height and fix it with a pad; see Figure 5 .

[0031] Step 12: After the fixed wheel is disassembled, inspected and assembled, push the fixed wheel into the door along the track, use the sling to lift the pin and the jack respectively, and use the level to level them to ensure that the two are in the same straight line; in this step, due to the special design of the diameters of the two ends of the pin are 180mm and 190mm respectively, the pin needs to be pushed in from the opposite direction during assembly; Step 13: After the pin shaft is fully in place, install the shaft end pressure plate to complete the installation of the fixed wheel on the gate body.

[0032] It is important to note that: Due to the special design of the pin with diameters of 180mm and 190mm at both ends, it must be disassembled from the inside out, such as Figure 3 .

[0033] If the pin shaft gap is stuck, a 400T hydraulic jack is needed to push it out. In order to prevent the jack from potentially damaging the steel plate of the emergency door grille facade, we adopted a strategy of combining thick steel plates with steel pipes to make the grille integrated, thereby ensuring that the jack's force is transmitted through the steel pipe to avoid deformation of the emergency door body.

[0034] When performing the boosting operation, be sure to follow the principle of slowness and use an 18-pound hammer to knock on the other side of the pin. This vibration helps the stuck pin to gradually loosen, making it easier to disengage from the positioning hole. In addition, in order to ensure the safety of the operation, the operator must comply with the relevant safety operating procedures and assign a special person to monitor the pressure condition of the jack and the overall situation of the work site. Once any abnormal or unstable factors are found, the boosting operation should be suspended immediately and appropriate safety precautions should be taken.

[0035] At the critical moment when the pin is about to be ejected, you must pay close attention to its movement trajectory to ensure that the pin can slide out smoothly and avoid bouncing or deviating from the intended direction due to the sudden release of stress, which may cause harm to personnel or equipment. At this time, you should quickly use a sling to lift the pin firmly to ensure that it is in a horizontal state to prevent it from getting stuck and to ensure that the pin will not fall suddenly after it is completely ejected.

[0036] Once the pin is successfully removed, a detailed inspection of the surface wear and corrosion should be carried out immediately to assess whether it is still suitable for continued use or needs to be replaced. At the same time, the locating holes should be thoroughly cleaned and inspected to remove all dirt and rust to ensure that the new pin can be installed smoothly and achieve a tight fit.

[0037] The method for disassembling and reinstalling the fixed wheel of the large-scale gate fixed wheel maintenance tooling of the hydropower station as described above comprises the following steps: Step 1: Remove all the sealing screws on both sides of the fixed wheel to expose the internal bearing; Step 2: Push the fixed wheel into the oil collecting basin and use a cleaning agent to thoroughly remove all the grease inside; Step 3: Use the sealed fixing screw holes of the fixed wheel as lifting points, flip the fixed wheel to a horizontal state with the help of special tooling, and lift the fixed wheel to a certain height; Step 4: Place the fixed wheel steadily on the dismantling tooling and secure it with a hand chain hoist; see Figure 1~Figure 2 .

[0038] Step 5: Place a thick steel plate at the center of the bearing and install a hydraulic jack at the center of the steel plate; Step 6: Gradually increase the pressure of the jack to gradually extend the bearing. During this process, continuously measure the depth of the bearing in the front, rear, left, and right directions to ensure that the bearing extends evenly and avoids jamming, thereby avoiding wear of the bearing and the fixed wheel body and damage to the fixed wheel body. Step 7: After the bearing is fully extended, conduct a detailed inspection of the inner wall of the fixed wheel, assess the degree of damage and make necessary repairs; after disassembly, thoroughly clean the bearing and fixed wheel to remove oil and impurities; use sandpaper to remove rust from the inside of the fixed wheel to ensure a smooth surface; Step 8: Use the fixed wheel disassembly tool to horizontally hoist the new bearing onto the tool, and use a jack to press it horizontally into the predetermined position; Step 9: Apply grease inside the bearing, use the press-fit assembly method, use a jack, and slowly press the bearing into the fixed wheel to ensure that the bearing is installed in place; Step 10, install the new sealing ring, tighten the cover with new screws, and the fixed cycle installation is completed.

[0039] In the above method, it is important to note that: Operators must comply with relevant safety operating procedures and use equipment that is strong enough to meet the lifting requirements of the working weight to ensure stability and safety during the lifting process.

[0040] The tooling base is designed as an open frame to enable easy movement and positioning of the fixed wheel; considering the weight and size of the fixed wheel, the tooling base should have sufficient strength and stability.

[0041] When dismantling the fixed wheel, two jacks should be set up at both ends of the bearing to ensure synchronization during operation.

[0042] During the disassembly of the fixed wheel, use a sling to hang the bearing to ensure that the bearing does not fall directly to the ground and damage the ground or the bearing body.

[0043] When removing rust from the inside of the stator wheel, it is strictly forbidden to use mechanical grinding to prevent the gap between the stator wheel and the bearing from increasing.

[0044] The above-mentioned embodiments are only preferred technical solutions of the present invention and should not be regarded as limitations of the present invention. The embodiments and features in the embodiments of the present application can be arbitrarily combined with each other without conflict. The protection scope of the present invention shall be the technical solutions recorded in the claims, including the equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.

Claims

1. A large gate fixed wheel maintenance tool for a hydropower station. Its characteristics are: It comprises a base (1), a connecting column (2), a top beam (3), a supporting column (4) and a jack (5); the lower end of the connecting column (2) is connected to the two ends of the base (1), and the upper end of the connecting column (2) is connected to the two ends of the top beam (3); two supporting columns (4) are located between the two connecting columns (2) and connected to the base (1); one end of the jack (5) is in contact with the lower side of the top beam (3); and a fixed wheel placement space is provided between the jack (5) and the supporting column (4) in a vertical direction.

2. The large gate fixed wheel maintenance tool for a hydropower station according to claim 1, Its characteristics are: The base (1) and the top beam (3) are I-beams of no less than No.

20.

3. The large gate fixed wheel maintenance tool for a hydropower station according to claim 1, Its characteristics are: A plurality of diagonal braces (11) are arranged on both sides of the base (1).

4. The large-scale gate fixed wheel maintenance tool for a hydropower station according to claim 1, Its characteristics are: The distance between the jack (5) and the support column (4) in the vertical direction is controlled by the telescopic end of the jack (5).

5. The method for disassembling and installing the fixed wheel of a large-scale gate fixed wheel maintenance tool for a hydropower station according to any one of claims 1 to 4, Its characteristics are: It includes the following steps: Step 1: Remove the shaft end pressure plates at both ends of the fixed wheel pin shaft; Step 2: Use a pounding hammer to knock the pin shaft to vibrate the debris in the bearing gap, and spray bolt loosening agent into the gap to assist in loosening; Step 3: Deploy the jack inside the pin shaft, and then install the steel pipe support and the square thick steel plate at the tail end of the jack in sequence; Step 4: Install steel pipes, thick steel plates and mechanical jacks in each door grid on the same floor; adjust the height of the supports, jacks and thick steel plates to ensure that their action points are on the same horizontal line as the pins, and all action points are connected in a straight line to effectively disperse the pressure on the door grid facade and avoid deformation of the accident door body; Step 5: gradually increase the pressure, and use a pounding hammer to knock and vibrate the outer side of the pin during the pressure increase process to relieve the pin blocking phenomenon; in this step, a dedicated person is required to monitor the pressure increase during the pressure increase process. Once an abnormal or unstable factor is found, the pressure increase operation should be stopped immediately; Step 6: During the pin extension process, continuously measure the extension length in the four directions of up, down, left and right to ensure uniform extension and prevent the pin from getting stuck; Step 7: When the pin is halfway extended, stop boosting; use a sling to firmly lift the pin to ensure that it remains horizontal to avoid being stuck, and ensure that it will not fall suddenly after being fully withdrawn; Step 8. After the pin is removed, conduct a detailed inspection of its surface for wear and corrosion to assess its feasibility for continued use and whether it needs to be replaced. At the same time, thoroughly clean and inspect the positioning holes to remove dirt and rust to ensure that the new pin can be installed smoothly and achieve a tight fit. Step 9: Before reinstallation, polish and clean the pin shaft and positioning hole to remove oil, rust and impurities, evenly apply grease, and wrap with plastic film; Step 10: lift the emergency door to the edge of the door garage, and pull the fixed wheel along the track tooling to the dam surface; Step 11: After the fixed wheel is pushed into the door, use a jack and a shoulder pole to lift the fixed wheel to a specified height and fix it with a pad; Step 12: After the fixed wheel is disassembled, inspected and assembled, push the fixed wheel into the door along the track, use the sling to lift the pin and the jack respectively, and use the level to level them to ensure that the two are in the same straight line; in this step, due to the special design of the diameters of the two ends of the pin are 180mm and 190mm respectively, the pin needs to be pushed in from the opposite direction during assembly; Step 13: After the pin shaft is fully in place, install the shaft end pressure plate to complete the installation of the fixed wheel on the gate body.

6. A method for reinstalling a fixed wheel of a large-scale gate fixed wheel maintenance tool for a hydropower station according to any one of claims 1 to 4, Its characteristics are: It includes the following steps: Step 1: Remove all the sealing screws on both sides of the fixed wheel to expose the internal bearing; Step 2: Push the fixed wheel into the oil collecting basin and use a cleaning agent to thoroughly remove all the grease inside; Step 3: Use the sealed fixing screw holes of the fixed wheel as lifting points, flip the fixed wheel to a horizontal state with the help of special tooling, and lift the fixed wheel to a certain height; Step 4: Place the fixed wheel steadily on the dismantling tooling and secure it with a hand chain hoist; Step 5: Place a thick steel plate at the center of the bearing and install a hydraulic jack at the center of the steel plate; Step 6: Gradually increase the pressure of the jack to gradually extend the bearing. During this process, continuously measure the depth of the bearing in the front, rear, left, and right directions to ensure that the bearing extends evenly and avoids jamming, thereby avoiding wear of the bearing and the fixed wheel body and damage to the fixed wheel body. Step 7: After the bearing is fully extended, conduct a detailed inspection of the inner wall of the fixed wheel, assess the degree of damage and make necessary repairs; after disassembly, thoroughly clean the bearing and fixed wheel to remove oil and impurities; Use sandpaper to remove rust from the inside of the fixed wheel to ensure a smooth surface; Step 8: Use the fixed wheel disassembly tool to horizontally hoist the new bearing onto the tool, and use a jack to press it horizontally into the predetermined position; Step 9: Apply grease inside the bearing, use the press-fit assembly method, use a jack, and slowly press the bearing into the fixed wheel to ensure that the bearing is installed in place; Step 10, install the new sealing ring, tighten the cover with new screws, and the fixed cycle installation is completed.

Citation Information

Patent Citations

  • Dismounting method, mounting method and dismounting and mounting device for hydroelectric gate wheel shaft sleeves

    CN108422379A

  • Equipment pin shaft penetrating and disassembling device and operation method thereof

    CN116352414A

  • Gate round pin axle dismouting support

    CN204982803U

  • Disassembling, assembling and maintaining device for gate main wheel of pump station entrance access gate

    CN218201873U