Method for producing building wall

Through the prefabricated building wall method, multiple production lines and tooling are used for casting and assembly, the problem of high resource and labor costs in traditional cast-in-place technology is solved, efficient and low-cost building wall production is achieved, and prefabricated buildings is promoted. Technology promotion.

CN119077932APending Publication Date: 2024-12-06SHANGHAI HENGXU CONSTRUCTION TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411190004.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2021-06-24
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

Traditional cast-in-place technology consumes a lot of wood resources and labor costs in construction. With the shortage of workers, it is difficult to maintain the sustainable development of the construction industry.

Method used

The prefabricated building wall method is adopted, and the wall panels connected by multiple pulling parts are enclosed into a cavity, and the wall structure steel bars are installed inside. Multiple production lines and tooling are used for casting and assembly, reducing on-site artificial mold support and plastering operations .

Benefits of technology

It improves the production efficiency of building walls, reduces costs, promotes prefabricated construction technology, and reduces labor intensity and material consumption at the construction site.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119077932A_ABST
    Figure CN119077932A_ABST
Patent Text Reader

Abstract

The invention discloses a method for producing a building wall, which comprises the following steps of: S1, conveying a first mold table on a first production line, and conveying the first mold table to a primary pouring station; s2, a first mold table where a building material for forming a first wallboard is poured is conveyed to a primary combination station; s3, a tool for forming a second wallboard is conveyed on a second production line, and one end of the first pulling piece extends into a second mold table cavity of a second mold table from the bottom wall of the second mold table cavity of the second mold table; s4, the tool located at the hoisting station is hoisted, the other end of the first tying piece is inserted into the building material which is not solidified and forms the first wallboard, and an empty mold table is formed; s5, an empty mold table is conveyed on a third production line, and a building material is poured into a second mold table cavity of the second mold table at a secondary pouring station; and S6, the empty mold table is conveyed to the mold removal station on the third production line. The building wall can be prefabricated, and the manufacturing efficiency is high.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] This application is a divisional application of the invention patent application with the invention name “A method for producing building walls”. The parent application number is 202110705620.5 and the application date is June 24, 2021. Technical Field

[0002] The invention relates to the technical field of construction, and in particular to a method for producing a building wall. Background Art

[0003] At present, cast-in-place technology is generally used in construction in my country, which requires manual formwork and formwork removal operations. After the main structure is cast and formed, manual plastering and other operations are still required. Every year, my country consumes a large amount of wood resources and labor costs in construction. With the fading of China's demographic dividend, there are fewer and fewer construction workers, and labor costs are getting higher and higher. The traditional cast-in-place technology is difficult to maintain the sustainable development of China's construction industry. Summary of the invention

[0004] The purpose of the present invention is to solve the inconvenience of on-site wall casting. The present invention provides a method for producing building walls, which can prefabricate building walls, has high production efficiency, can effectively reduce costs, and is more conducive to the promotion of prefabricated building technology.

[0005] To solve the above technical problems, the embodiment of the present invention discloses a method for producing a building wall, wherein the building wall comprises a first wall panel and a second wall panel connected by a plurality of anchors, wherein the first wall panel and the second wall panel form a cavity, and wall structural steel bars are arranged in the cavity; the method comprises the following steps:

[0006] Step S1: a first mold platform is transferred on a first production line, and the first mold platform is transferred to a primary casting station, and a building material is cast into a first mold platform cavity of the first mold platform at the primary casting station to form an unsolidified first wall panel;

[0007] Step S2: transporting the first mold platform on which the building material forming the first wall panel is poured to a primary combining station;

[0008] Step S3: a tool for forming a second wall panel is transmitted on a second production line, the tool is used for processing a building wall, the structure of the tool is different from the structure of the building wall, the tool is transmitted to a hoisting station, the tool comprises a wall structure steel bar located in a cavity of the tool, and a second mold platform located on an upper side of the tool, a plurality of first anchors are fixed on the tool, and one end of the first anchor extends from a bottom wall of the second mold platform mold cavity of the second mold platform into the second mold platform mold cavity of the second mold platform;

[0009] Step S4: hoisting the tooling located at the hoisting station to place the lower side of the tooling on the first formwork platform, and inserting the other end of the first anchor into the unsolidified building material forming the first wall panel to form an empty formwork platform;

[0010] Step S5: the empty mold platform is transported on a third production line, and the empty mold platform is transported to a secondary casting station, and building materials are cast into the second mold platform cavity of the second mold platform at the secondary casting station to form an unsolidified second wall panel, wherein one end of the first anchor is located in the unsolidified building material forming the second wall panel;

[0011] Step S6: After the first wall panel and the second wall panel are solidified, the empty formwork table is transferred to a demolding station on the third production line, and the second formwork table and the tooling are removed at the demolding station to form a finished component, which is a building wall having a first anchor and a second anchor.

[0012] By adopting the above technical solution, building walls can be prefabricated with high production efficiency, which can effectively reduce costs and is more conducive to the promotion of prefabricated building technology.

[0013] According to another specific embodiment of the present invention, the first wall panel is parallel to the second wall panel, that is, the building wall is in a "straight line" shape.

[0014] According to another specific embodiment of the present invention, a ferry station is provided on the third production line, and after the empty mold platform is formed at the primary combining station, the empty mold platform is hoisted to the ferry station on the third production line.

[0015] According to another specific embodiment of the present invention, a curing kiln is provided on the third production line, and the empty mold table is transferred to the curing kiln on the third production line. After the first wall panel and the second wall panel are solidified, the empty mold table is transferred from the curing kiln to the demolding station.

[0016] According to another specific embodiment of the present invention, in step S3, the specific steps of transmitting the tooling for forming the second wall panel on the second production line include:

[0017] Step S31: transporting a frame on the second production line, the frame having a frame cavity penetrating up and down along a first direction, and the lower side of the frame in the first direction is used to be placed on the first mold platform;

[0018] Step S32: installing the lower layer of steel bars of the wall structure steel bars in the frame cavity;

[0019] Step S33: installing an anchor fixing assembly in the frame cavity, wherein at least a portion of the anchor fixing assembly is located in the frame cavity and connected to the frame, and a plurality of the first anchors are fixed to the anchor fixing assembly;

[0020] Step S34: installing the upper layer of the wall structure steel bars in the frame cavity, wherein the upper layer of the steel bars is located above the anchor fixing assembly, and tying the lower layer of the steel bars to the upper layer of the steel bars;

[0021] Step S35: installing the second mold platform on the upper side of the frame in the first direction.

[0022] According to another specific embodiment of the present invention, the framework includes:

[0023] A first crossbeam and a second crossbeam are arranged at intervals along the second direction, the first crossbeam and the second crossbeam extend along the third direction respectively, and the first direction, the second direction and the third direction are perpendicular to each other;

[0024] A first longitudinal beam and a second longitudinal beam are arranged at intervals along the third direction, and the first longitudinal beam and the second longitudinal beam extend along the second direction respectively; wherein,

[0025] The first cross beam, the first longitudinal beam, the second cross beam and the second longitudinal beam are sequentially connected to enclose the frame cavity.

[0026] According to another specific embodiment of the present invention, the step S33 further includes the following steps:

[0027] Step S331: fixing a plurality of second anchors on the anchor fixing assembly;

[0028] In the step S4, after placing the lower side of the tool on the first mold platform, one end of the second anchor is inserted into the unsolidified building material forming the first wall panel;

[0029] The other end of the second anchor is used to insert the unsolidified building material of the first wall panel formed by precasting of another building wall, the two first wall panels are perpendicular to each other, the other building wall also includes a second wall panel and a first wall panel connected by a plurality of first anchors, and the second wall panel and the first wall panel of the other building wall form a cavity. The formed building wall includes the first anchor and the second anchor, and the building wall can be spliced ​​with the above-mentioned "I-shaped" building wall to form an "L-shaped" building wall.

[0030] According to another specific embodiment of the present invention, the tooling further includes:

[0031] A first end positioning tooling beam and a second end positioning tooling beam are arranged at intervals along the second direction, the first end positioning tooling beam and the second end positioning tooling beam are installed in the frame cavity and extend along the third direction respectively;

[0032] A plurality of first end positioning blocks are mounted on a surface of the first end positioning tooling beam facing the second end positioning tooling beam and are spaced apart along the third direction;

[0033] A plurality of second end positioning blocks are mounted on a surface of the second end positioning tooling beam facing the first end positioning tooling beam and are arranged at intervals along the third direction, and each of the first end positioning blocks corresponds to each of the second end positioning blocks one by one along the second direction;

[0034] In the step S33, the specific steps of installing the anchor fixing assembly in the frame cavity include:

[0035] Step S331: installing a plurality of fixing parts on a plurality of the first end positioning blocks and a plurality of the second end positioning blocks, each of the fixing parts respectively extending along the second direction, both ends of each of the fixing parts in the second direction corresponding to a first end positioning block and a second end positioning block, and respectively positioned at the first end positioning block and the second end positioning block, and fixing a plurality of the first anchors spaced apart along the second direction on each of the fixing parts; or,

[0036] A plurality of second anchors spaced apart along the second direction are fixed to at least one of the fixing parts, and a plurality of first anchors spaced apart along the second direction are fixed to each of the remaining fixing parts.

[0037] According to another specific embodiment of the present invention, each of the fixing parts comprises:

[0038] A mounting portion extending along the second direction, the mounting portion having a mounting surface, the mounting surface being located on one side of the mounting portion in the third direction and being used to fit with the first anchor or the second anchor;

[0039] A plurality of groups of first positioning parts are arranged on the mounting surface at intervals along the second direction, each group of the first positioning parts comprises at least two protrusions, all the protrusions of each group are on the same straight line, the angle between the connecting line of all the protrusions of each group and the second direction is a set angle, and the protrusions of each group are used to pass through the through holes of the first anchor or the second anchor when the first anchor or the second anchor is attached to the mounting surface along the third direction;

[0040] The second positioning portion includes a clamping strip and at least two clamping portions, and the at least two clamping portions are arranged on the mounting surface at intervals along the second direction. The clamping strip is used to respectively abut against the first anchor and the clamping portion along the first direction after the through hole of the first anchor or the second anchor is sleeved on the protrusion and fits against the mounting surface, so that the movement of the first anchor in the first direction is restricted, so that the first anchor is fixed to the fixing portion; or, respectively abut against the second anchor and the clamping portion along the first direction, so that the movement of the second anchor in the first direction is restricted, so that the second anchor is fixed to the fixing portion.

[0041] According to another specific embodiment of the present invention, when the mounting surface is in contact with the first anchor, the angle between the connecting line of each group of protrusions on the mounting surface in contact with the first anchor and the second direction is 90°, and the first anchor extends along the first direction.

[0042] According to another specific embodiment of the present invention, when the mounting surface is in contact with the second anchor, the angle between the line connecting each group of protrusions on the mounting surface in contact with the second anchor and the second direction is an obtuse angle, and the second anchor extends along a fourth direction, and the angle between the fourth direction and the second direction is the obtuse angle.

[0043] According to another specific embodiment of the present invention, along the third direction, the plurality of second anchors are located between the plurality of first anchors and the first longitudinal beam, and the second anchors extend toward the upper side of the first longitudinal beam along the fourth direction.

[0044] According to another specific embodiment of the present invention, the mounting portion is a rectangular square tube, the first end positioning block and the second end positioning block are respectively provided with grooves, and the two ends of the rectangular square tube are respectively positioned in the grooves on the first end positioning block and the second end positioning block.

[0045] According to another specific embodiment of the present invention, the two ends of the first end positioning tooling beam in the third direction are respectively provided with first push-pull handles, and the two ends of the second end positioning tooling beam in the third direction are respectively provided with second push-pull handles;

[0046] The two ends of the first longitudinal beam in the second direction are respectively provided with first moving grooves, and the two ends of the second longitudinal beam in the second direction are respectively provided with second moving grooves;

[0047] The first push-pull handle extends out of the first moving groove and the second moving groove respectively, and is capable of moving relative to the first moving groove and the second moving groove to a set position along the second direction, and the first push-pull handle is fixed relative to the first longitudinal beam and the second longitudinal beam respectively by a first positioning assembly;

[0048] The second push-pull handles extend out of the first moving groove and the second moving groove respectively, and are capable of moving to a set position relative to the first moving groove and the second moving groove along the second direction. Each of the second push-pull handles is fixed relative to the first longitudinal beam and the second longitudinal beam by a second positioning assembly.

[0049] According to another specific embodiment of the present invention, the tooling further includes:

[0050] a first pallet support plate and a second pallet support plate arranged at intervals along the third direction, wherein the first pallet support plate and the second pallet support plate are respectively mounted on upper sides of the first longitudinal beam and the second longitudinal beam in the first direction and extend respectively along the second direction;

[0051] In the step S35, the step of installing the second mold platform on the upper side of the frame in the first direction specifically includes the following steps:

[0052] Step S351: installing a plurality of pallets spaced apart along the second direction on the first pallet support plate and the second pallet support plate, and installing the second mold platform on the plurality of pallets; wherein,

[0053] Each of the pallets extends along the third direction, and both ends of each of the pallets are respectively supported on the first pallet support plate and the second pallet support plate, and each of the pallets is located on each of the anchor fixing components along the first direction.

[0054] According to another specific embodiment of the present invention, a first supporting groove for accommodating one end of the pallet is provided on the first pallet supporting plate, and a second supporting groove for accommodating the other end of the pallet is provided on the second pallet supporting plate.

[0055] According to another specific embodiment of the present invention, a pad is provided on a surface of each fixing portion facing the support plate, and each of the pads extends along the second direction to support the support plate.

[0056] According to another specific embodiment of the present invention, the first pallet support plate can slide to a set position relative to the first longitudinal beam along the third direction, and then be fixed relative to the first longitudinal beam by a third positioning assembly; the second pallet support plate can slide to a set position relative to the second longitudinal beam along the third direction, and then be fixed relative to the second longitudinal beam by a fourth positioning assembly.

[0057] According to another specific embodiment of the present invention, the tooling further includes:

[0058] A first end template positioning plate and a second end template positioning plate are arranged at intervals along the second direction, the first end template positioning plate and the second end template positioning plate extend along the third direction respectively, the first end template positioning plate is installed on the upper side of the first end positioning tooling beam in the first direction, and the second end template positioning plate is installed on the upper side of the second end positioning tooling beam in the first direction;

[0059] In the step S351, the step of installing the second mold platform on the plurality of the support plates includes:

[0060] Install multiple templates, each template extends along the second direction, two ends of each template are respectively positioned on the first end template positioning plate and the second end template positioning plate, two adjacent templates are butted and bonded along the third direction to form the bottom wall of the second mold platform cavity, and one end of the first anchor extends from between two adjacent templates into the second mold platform cavity;

[0061] Installing top side molds spaced apart along the second direction, each of the top side molds extending along the third direction, and having two ends respectively installed on the first pallet support plate and the second pallet support plate, and being supported on the template;

[0062] Install side molds spaced apart along the third direction, each of the side molds extending along the second direction, and two ends of the side molds are respectively installed on the top mold;

[0063] The plurality of mold plates, the top mold plate and the side mold plate form the second mold platform cavity.

[0064] According to another specific embodiment of the present invention, a rubber strip is provided on at least one of the two sides of the third direction of the template, and the rubber strips of two adjacent templates are butt-jointed along the third direction, and one end of the first anchor can extend into the second mold platform cavity from the butt joint of the rubber strips between the two adjacent templates.

[0065] According to another specific embodiment of the present invention, the rubber strips of two adjacent templates are interference fit along the third direction.

[0066] According to another specific embodiment of the present invention, the top mold can slide relative to the first pallet support plate and the second pallet support plate along the second direction, and the side mold can slide relative to the top mold along the third direction.

[0067] According to another specific embodiment of the present invention, at least three side molds are arranged at intervals along the third direction, and a plurality of the mold plates, the top mold and the side molds enclose at least two second mold platform cavities.

[0068] According to another specific embodiment of the present invention, both ends of the top side mold are slidably connected to the first pallet support plate and the second pallet support plate through a first side mold connector respectively;

[0069] The first side mold connecting member comprises: a first slot and a first slide groove connected to each other, along the first direction, the first slot is located above the first slide groove, the first slot extends along the third direction, and the first slide groove extends along the second direction;

[0070] The two ends of the top side mold are respectively inserted into the first slots of the corresponding first side mold connecting parts, and the first pallet support plate and the second pallet support plate are respectively provided with slide rails extending along the second direction, and the first slide groove and the corresponding slide rail cooperate with each other, and the first slide groove and the slide rail can produce relative sliding in the second direction.

[0071] According to another specific embodiment of the present invention, both ends of the side mold are slidably connected to the top mold through a second side mold connector;

[0072] The second side mold connecting member comprises: a second slide groove and a plug-in portion connected to each other, wherein along the second direction, the plug-in portion is located on a side of the second slide groove, the second slide groove extends along the third direction, and the plug-in portion extends along the second direction;

[0073] The two ends of the side mold are respectively plugged into the plug-in parts of the corresponding second side mold connecting piece, and the top side mold passes through the second slide groove of the corresponding second side mold connecting piece. The second slide groove and the corresponding top side mold cooperate with each other, and the second slide groove and the top side mold can produce relative sliding in the third direction.

[0074] According to another specific embodiment of the present invention, two groups of production lines are included, and each group of production lines includes the first production line, the third production line and the second production line which are sequentially arranged in parallel with each other.

[0075] According to another specific embodiment of the present invention, the following steps are also included:

[0076] Step S7: providing an unsolidified third wallboard;

[0077] Step S8: hoist the finished component, and insert the first wall panel and the second wall panel of the finished component into the unsolidified building material forming the third wall panel, the first wall panel and the second wall panel are respectively perpendicular to the third wall panel, and after the third wall panel solidifies, a frame beam is formed. That is, the "I-shaped" building wall formed above is spliced ​​with another prefabricated straight wall panel to form a frame beam. Exemplarily, the prefabricated straight wall panel closes one end of the cavity of the "I-shaped" building wall.

[0078] According to another specific embodiment of the present invention, in step S7, the specific step of providing an unsolidified third wall panel includes: transferring a third mold platform on the first production line, transferring the third mold platform to the primary casting station, and casting building materials into the third mold platform cavity of the third mold platform at the primary casting station to form the unsolidified third wall panel.

[0079] The present application also provides a method for producing a building wall, wherein the building wall comprises a first component and a second component, wherein the first component comprises a first wall panel and a second wall panel connected by a plurality of anchors, wherein the first wall panel and the second wall panel of the first component enclose a cavity, wherein the cavity of the first component is provided with wall structural steel bars; the second component comprises a first wall panel and a second wall panel connected by a plurality of anchors, wherein the first wall panel and the second wall panel of the second component enclose a cavity, wherein the cavity of the second component is provided with wall structural steel bars; the first component is perpendicular to the second component, and the cavity of the first component is connected to the cavity of the second component;

[0080] The method comprises the following steps:

[0081] Step S10: providing a pre-produced first component, wherein the first component includes a first sub-component and a second sub-component, wherein the first sub-component is a finished component (a building wall having a second anchor) formed by using any of the above methods, and the second sub-component is a finished component (a "straight-line" building wall) formed by using any of the above methods;

[0082] Step S1: a first mold platform for forming the second component is transferred on a first production line, and the first mold platform of the second component is transferred to a primary casting station, and a building material is cast into a first mold platform cavity of the first mold platform of the second component at the primary casting station to form an unsolidified first wallboard of the second component;

[0083] Step S2: transporting the first mold platform on which the building material for the first wall panel forming the second component is poured to a primary combining station;

[0084] Step S3: a tool for forming a second wall panel of the second component is transferred on a second production line, and the tool for forming the second component is transferred to a hoisting station, wherein the tool comprises a wall structure steel bar located in a cavity of the tool, and a second die table located on an upper side of the tool, and a plurality of first anchors are fixed on the tool, and one end of the first anchor of the second component extends from a bottom wall of the second die table cavity of the second die table into the second die table cavity of the second die table;

[0085] Step S4: hoisting the tooling for forming the second component located at the hoisting station, so as to place the lower side of the tooling on the first mold platform, and inserting the other end of the first anchor in the tooling into the unsolidified building material of the first wallboard forming the second component;

[0086] Hoist the first sub-component, insert the other end of the second anchor of the first sub-component into the unsolidified building material of the first wall panel forming the second component, the first wall panel of the first sub-component is vertically connected to the first wall panel of the second component, the second wall panel of the first sub-component is vertically connected to the end of the tooling forming the second wall panel of the second component, so as to form a first empty mold platform, and the second mold platform cavity of the second mold platform is located on the side of the second wall panel of the first sub-component; or,

[0087] Hoisting the second sub-component, the first wall panel and the second wall panel of the second sub-component are vertically connected to the tooling forming the second wall panel of the second component to form a second empty mold platform, and the second sub-component has second mold platform cavities of the second mold platform on opposite sides respectively;

[0088] Step S5: The first empty mold platform or the second empty mold platform is transferred on the third production line, and the first empty mold platform or the second empty mold platform is transferred to a secondary casting station, and building materials are cast into the second mold platform cavity of the second mold platform at the secondary casting station to form an unsolidified second wallboard of the second component, and the building materials in the second mold platform cavity of the second mold platform are connected to the side of the first wallboard of the first sub-component, or the building materials in the second mold platform cavity of the second mold platform are connected to the side of the first wallboard of the second sub-component and the side of the second wallboard;

[0089] Step S6: after the first wall panel and the second wall panel of the second component are solidified, the first empty mold platform or the second empty mold platform is transferred to a demolding station on the third production line, and the second mold platform and the tooling are removed at the demolding station to form a finished component.

[0090] According to another specific embodiment of the present invention, the method further includes step S20: transmitting the first subcomponent or the second subcomponent on the first production line, transmitting the first subcomponent or the second subcomponent to the secondary combination station, and then transmitting the first subcomponent or the second subcomponent from the secondary combination station to the third production line or the second production line. That is, the first subcomponent or the second subcomponent is transmitted to the second production line or the third production line through the first production, and after the tooling is assembled with the first mold platform, it is assembled with the first subcomponent or the second subcomponent to form the first empty mold platform or the second empty mold platform.

[0091] According to another specific embodiment of the present invention, the first empty mold stage or the second empty mold stage is formed at a secondary bonding station on the first production line, and the secondary bonding station is located in front of the primary bonding station in the transmission direction.

[0092] According to another specific embodiment of the present invention, the finished component includes a T-shaped building wall and an L-shaped building wall. That is, the L-shaped building wall is formed by splicing the first sub-component with the second component, and the T-shaped building wall is formed by splicing the second sub-component with the second component.

[0093] According to another specific embodiment of the present invention, the third production line is provided with a ferry station, and after the first empty mold platform or the second empty mold platform is formed, the first empty mold platform or the second empty mold platform is hoisted to the ferry station on the third production line. Exemplarily, the first empty mold platform or the second empty mold platform is formed at the primary bonding station or the secondary bonding station.

[0094] According to another specific embodiment of the present invention, a curing kiln is provided on the third production line, and the first empty mold table or the second empty mold table is transferred to the curing kiln on the third production line, and after the first wall panel and the second wall panel are solidified, the first empty mold table or the second empty mold table is transferred from the curing kiln to the demolding station.

[0095] According to another specific embodiment of the present invention, in step S3, the specific steps of transmitting the tooling for forming the second wall panel on the second production line include:

[0096] Step S31: transporting a frame on the second production line, the frame having a frame cavity penetrating up and down along a first direction, and the lower side of the frame in the first direction is used to be placed on the first mold platform;

[0097] Step S32: installing the lower layer of steel bars of the wall structure steel bars in the frame cavity;

[0098] Step S33: installing an anchor fixing assembly in the frame cavity, wherein at least a portion of the anchor fixing assembly is located in the frame cavity and connected to the frame, and a plurality of the first anchors are fixed to the anchor fixing assembly;

[0099] Step S34: installing the upper layer of the wall structure steel bars in the frame cavity, wherein the upper layer of the steel bars is located above the anchor fixing assembly, and tying the lower layer of the steel bars to the upper layer of the steel bars;

[0100] Step S35: installing the second mold platform on the upper side of the frame in the first direction.

[0101] According to another specific embodiment of the present invention, the framework includes:

[0102] A first crossbeam and a second crossbeam are arranged at intervals along the second direction, the first crossbeam and the second crossbeam extend along the third direction respectively, and the first direction, the second direction and the third direction are perpendicular to each other;

[0103] A first longitudinal beam and a second longitudinal beam are arranged at intervals along the third direction, and the first longitudinal beam and the second longitudinal beam extend along the second direction respectively; wherein,

[0104] The first cross beam, the first longitudinal beam, the second cross beam and the second longitudinal beam are sequentially connected to enclose the frame cavity.

[0105] According to another specific embodiment of the present invention, the tooling further includes:

[0106] A first end positioning tooling beam and a second end positioning tooling beam are arranged at intervals along the second direction, the first end positioning tooling beam and the second end positioning tooling beam are installed in the frame cavity and extend along the third direction respectively;

[0107] A plurality of first end positioning blocks are mounted on a surface of the first end positioning tooling beam facing the second end positioning tooling beam and are spaced apart along the third direction;

[0108] A plurality of second end positioning blocks are mounted on a surface of the second end positioning tooling beam facing the first end positioning tooling beam and are arranged at intervals along the third direction, and each of the first end positioning blocks corresponds to each of the second end positioning blocks one by one along the second direction;

[0109] In the step S33, the specific steps of installing the anchor fixing assembly in the frame cavity include:

[0110] Step S331: Install multiple fixing parts on multiple first end positioning blocks and multiple second end positioning blocks, each of the fixing parts extends along the second direction respectively, and the two ends of each of the fixing parts in the second direction correspond to a first end positioning block and a second end positioning block, and are respectively positioned on the first end positioning block and the second end positioning block, and multiple first anchors spaced apart along the second direction are fixed on each of the fixing parts.

[0111] According to another specific embodiment of the present invention, each of the fixing parts comprises:

[0112] A mounting portion extending along the second direction, the mounting portion having a mounting surface, the mounting surface being located on one side of the mounting portion in the third direction and being adapted to be fitted with the first anchor;

[0113] A plurality of groups of first positioning portions are arranged on the mounting surface at intervals along the second direction, each group of the first positioning portions comprises at least two protrusions, all the protrusions of each group are on the same straight line, the angle between the connecting line of all the protrusions of each group and the second direction is a set angle, and the protrusions of each group are used to pass through the through hole of the first anchor when the first anchor is attached to the mounting surface along the third direction;

[0114] The second positioning portion includes a clamping strip and at least two clamping portions, and the at least two clamping portions are arranged on the mounting surface at intervals along the second direction. The clamping strip is used to respectively abut against the first anchor and the clamping portions along the first direction after the through hole of the first anchor is sleeved on the protrusion and fits with the mounting surface. The movement of the first anchor in the first direction is restricted, so as to fix the first anchor on the fixing portion.

[0115] According to another specific embodiment of the present invention, when the mounting surface is in contact with the first anchor, the angle between the connecting line of each group of protrusions on the mounting surface in contact with the first anchor and the second direction is 90°, and the first anchor extends along the first direction.

[0116] According to another specific embodiment of the present invention, the mounting portion is a rectangular square tube, the first end positioning block and the second end positioning block are respectively provided with grooves, and the two ends of the rectangular square tube are respectively positioned in the grooves on the first end positioning block and the second end positioning block.

[0117] According to another specific embodiment of the present invention, the two ends of the first end positioning tooling beam in the third direction are respectively provided with first push-pull handles, and the two ends of the second end positioning tooling beam in the third direction are respectively provided with second push-pull handles;

[0118] The two ends of the first longitudinal beam in the second direction are respectively provided with first moving grooves, and the two ends of the second longitudinal beam in the second direction are respectively provided with second moving grooves;

[0119] The first push-pull handle extends out of the first moving groove and the second moving groove respectively, and is capable of moving relative to the first moving groove and the second moving groove to a set position along the second direction, and the first push-pull handle is fixed relative to the first longitudinal beam and the second longitudinal beam respectively by a first positioning assembly;

[0120] The second push-pull handles extend out of the first moving groove and the second moving groove respectively, and are capable of moving to a set position relative to the first moving groove and the second moving groove along the second direction. Each of the second push-pull handles is fixed relative to the first longitudinal beam and the second longitudinal beam by a second positioning assembly.

[0121] According to another specific embodiment of the present invention, the tooling further includes:

[0122] a first pallet support plate and a second pallet support plate arranged at intervals along the third direction, wherein the first pallet support plate and the second pallet support plate are respectively mounted on upper sides of the first longitudinal beam and the second longitudinal beam in the first direction and extend respectively along the second direction;

[0123] In the step S35, the step of installing the second mold platform on the upper side of the frame in the first direction specifically includes the following steps:

[0124] Step S351: installing a plurality of pallets spaced apart along the second direction on the first pallet support plate and the second pallet support plate, and installing the second mold platform on the plurality of pallets; wherein,

[0125] Each of the pallets extends along the third direction, and both ends of each of the pallets are respectively supported on the first pallet support plate and the second pallet support plate, and each of the pallets is located on each of the anchor fixing components along the first direction.

[0126] According to another specific embodiment of the present invention, a first supporting groove for accommodating one end of the pallet is provided on the first pallet supporting plate, and a second supporting groove for accommodating the other end of the pallet is provided on the second pallet supporting plate.

[0127] According to another specific embodiment of the present invention, a pad is provided on a surface of each fixing portion facing the support plate, and each pad extends along the second direction to support the support plate.

[0128] According to another specific embodiment of the present invention, the first pallet support plate can slide to a set position relative to the first longitudinal beam along the third direction, and then be fixed relative to the first longitudinal beam by a third positioning assembly; the second pallet support plate can slide to a set position relative to the second longitudinal beam along the third direction, and then be fixed relative to the second longitudinal beam by a fourth positioning assembly.

[0129] According to another specific embodiment of the present invention, the tooling further includes:

[0130] A first end template positioning plate and a second end template positioning plate are arranged at intervals along the second direction, the first end template positioning plate and the second end template positioning plate extend along the third direction respectively, the first end template positioning plate is installed on the upper side of the first end positioning tooling beam in the first direction, and the second end template positioning plate is installed on the upper side of the second end positioning tooling beam in the first direction;

[0131] In the step S351, the step of installing the second mold platform on the plurality of the support plates includes:

[0132] Install multiple templates, each template extends along the second direction, two ends of each template are respectively positioned on the first end template positioning plate and the second end template positioning plate, two adjacent templates are butted and bonded along the third direction to form the bottom wall of the second mold platform cavity, and one end of the first anchor extends from between two adjacent templates into the second mold platform cavity;

[0133] Installing top side molds spaced apart along the second direction, each of the top side molds extending along the third direction, and having two ends respectively installed on the first pallet support plate and the second pallet support plate, and being supported on the template;

[0134] Install side molds spaced apart along the third direction, each of the side molds extending along the second direction, and two ends of the side molds are respectively installed on the top mold;

[0135] The plurality of mold plates, the top mold plate and the side mold plate form the second mold platform cavity.

[0136] According to another specific embodiment of the present invention, a rubber strip is provided on at least one of the two sides of the third direction of the template, and the rubber strips of two adjacent templates are butt-jointed along the third direction, and one end of the first anchor can extend into the second mold platform cavity from the butt joint of the rubber strips between the two adjacent templates.

[0137] According to another specific embodiment of the present invention, the rubber strips of two adjacent templates are interference fit along the third direction.

[0138] According to another specific embodiment of the present invention, the top mold can slide relative to the first pallet support plate and the second pallet support plate along the second direction, and the side mold can slide relative to the top mold along the third direction.

[0139] According to another specific embodiment of the present invention, at least three side molds are arranged at intervals along the third direction, and a plurality of the mold plates, the top mold and the side molds enclose at least two second mold platform cavities.

[0140] According to another specific embodiment of the present invention, both ends of the top side mold are slidably connected to the first pallet support plate and the second pallet support plate through a first side mold connector respectively;

[0141] The first side mold connecting member comprises: a first slot and a first slide groove connected to each other, along the first direction, the first slot is located above the first slide groove, the first slot extends along the third direction, and the first slide groove extends along the second direction;

[0142] The two ends of the top side mold are respectively inserted into the first slots of the corresponding first side mold connecting parts, and the first pallet support plate and the second pallet support plate are respectively provided with slide rails extending along the second direction, and the first slide groove and the corresponding slide rail cooperate with each other, and the first slide groove and the slide rail can produce relative sliding in the second direction.

[0143] According to another specific embodiment of the present invention, both ends of the side mold are slidably connected to the top mold through a second side mold connector;

[0144] The second side mold connecting member comprises: a second slide groove and a plug-in portion connected to each other, wherein along the second direction, the plug-in portion is located on a side of the second slide groove, the second slide groove extends along the third direction, and the plug-in portion extends along the second direction;

[0145] The two ends of the side mold are respectively plugged into the plug-in parts of the corresponding second side mold connecting piece, and the top side mold passes through the second slide groove of the corresponding second side mold connecting piece. The second slide groove and the corresponding top side mold cooperate with each other, and the second slide groove and the top side mold can produce relative sliding in the third direction.

[0146] According to another specific embodiment of the present invention, two groups of production lines are included, and each group of production lines includes the first production line, the third production line and the second production line which are sequentially arranged in parallel with each other. BRIEF DESCRIPTION OF THE DRAWINGS

[0147] Figure 1 A three-dimensional diagram showing a building wall according to an embodiment of the present invention;

[0148] Figure 2 A three-dimensional diagram showing an anchor in a building wall according to an embodiment of the present invention;

[0149] Figure 3 A three-dimensional diagram showing a tool for producing a building wall according to an embodiment of the present invention Figure 1 ;

[0150] Figure 4 A top view of a tooling for a building wall according to an embodiment of the present invention is shown;

[0151] Figure 5 Schematic diagram showing the production of building walls according to an embodiment of the present invention Figure 1 ;

[0152] Figure 6 Schematic diagram showing the production of building walls according to an embodiment of the present invention Figure 2 ;

[0153] Figure 7 A side view showing a building wall according to an embodiment of the present invention Figure 1 ;

[0154] Figure 8 Schematic diagram showing the production of building walls according to an embodiment of the present invention Figure 3 ;

[0155] Fig. 9 Schematic diagram showing the production of building walls according to an embodiment of the present invention Figure 4 ;

[0156] Fig.10 A side view showing a building wall according to an embodiment of the present invention Figure 2 ;

[0157] Fig.11 Schematic diagram showing the production of building walls according to an embodiment of the present invention Figure 5 ;

[0158] Fig.12 Schematic diagram showing the production of building walls according to an embodiment of the present invention Figure 6 ;

[0159] Fig.13 A side view showing a building wall according to an embodiment of the present invention Figure 3 ;

[0160] Fig.14 A three-dimensional diagram showing a tool for producing a building wall according to an embodiment of the present invention Figure 2 ;

[0161] Fig.15 A three-dimensional diagram showing a tool for producing a building wall according to an embodiment of the present invention Figure 3 ;

[0162] Fig.16A three-dimensional diagram showing a tool for producing a building wall according to an embodiment of the present invention Figure 4 ;

[0163] Fig.17 A three-dimensional diagram showing a tool for producing a building wall according to an embodiment of the present invention Figure 5 ;

[0164] Fig.18 yes Fig.17 A magnified view of part A;

[0165] Fig.19 A three-dimensional diagram showing a tool for producing a building wall according to an embodiment of the present invention Figure 6 ;

[0166] Fig. 20 A three-dimensional diagram showing an anchor fixing assembly in a tooling for producing a building wall according to an embodiment of the present invention Figure 1 ;

[0167] Fig.21 yes Fig. 20 A magnified view of part D in the middle;

[0168] Fig. 22 A three-dimensional diagram showing an anchor fixing assembly in a tooling for producing a building wall according to an embodiment of the present invention Figure 2 ;

[0169] Fig.23 yes Fig. 22 A magnified view of part A;

[0170] Fig.24 A side view showing an anchor fixing assembly in a tooling for producing a building wall according to an embodiment of the present invention Figure 1 ;

[0171] Fig.25 A side view showing an anchor fixing assembly in a tooling for producing a building wall according to an embodiment of the present invention Figure 2 ;

[0172] Fig.26 A side view showing an anchor fixing assembly in a tooling for producing a building wall according to an embodiment of the present invention Figure 3 ;

[0173] Fig. 27 A three-dimensional diagram showing a tool for producing a building wall according to an embodiment of the present invention Figure 7 ;

[0174] Fig.28 A three-dimensional diagram showing the wall structure steel bars in the tooling for producing building walls according to an embodiment of the present invention;

[0175] Fig.29 A three-dimensional diagram showing an end positioning tooling beam in a tooling for producing a building wall according to an embodiment of the present invention;

[0176] Fig.30 A three-dimensional diagram showing a support plate in a tooling for producing a building wall according to an embodiment of the present invention;

[0177] Fig.31 A three-dimensional diagram showing a mold platform for tooling for producing building walls according to an embodiment of the present invention;

[0178] Fig.32 A three-dimensional diagram showing a side mold connector of a tooling middle mold platform for producing a building wall according to an embodiment of the present invention;

[0179] Fig.33 A three-dimensional diagram showing a support plate in a tooling for producing a building wall according to an embodiment of the present invention;

[0180] Fig.34 yes Fig.33 A magnified view of part B;

[0181] Fig.35 yes Figure 4 Cross-sectional view of the AA section;

[0182] Fig.36 yes Fig.35 Enlarged view of part C;

[0183] Fig.37 Schematic diagram of a production line for producing building walls according to an embodiment of the present invention Figure 1 ;

[0184] Fig.38 Schematic diagram of a production line for producing building walls according to an embodiment of the present invention Figure 2 ;

[0185] Fig.39 Schematic diagram showing the production of building walls according to an embodiment of the present invention Figure 7 ;

[0186] Fig.40 Schematic diagram showing the production of building walls according to an embodiment of the present invention Figure 8 ;

[0187] Fig.41 A three-dimensional diagram showing the side mold connector of the tooling middle mold platform for producing a building wall according to an embodiment of the present invention Figure 2 . DETAILED DESCRIPTION

[0188] The following specific embodiments illustrate the implementation of the present invention, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. Although the description of the present invention will be introduced in conjunction with the preferred embodiment, this does not mean that the features of this invention are limited to this implementation. On the contrary, the purpose of introducing the invention in conjunction with the implementation is to cover other options or modifications that may extend based on the claims of the present invention. In order to provide a deep understanding of the present invention, the following description will include many specific details. The present invention can also be implemented without using these details. In addition, in order to avoid confusion or blurring the focus of the present invention, some specific details will be omitted in the description. It should be noted that the embodiments of the present invention and the features in the embodiments can be combined with each other without conflict.

[0189] It should be noted that in this specification, similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings.

[0190] In order to make the objectives, technical solutions and advantages of the present invention more clear, the embodiments of the present invention will be further described in detail below with reference to the accompanying drawings.

[0191] refer to Figure 1 and Figure 2 The present application provides a building wall 1, comprising: Figure 1 The first wall panel 10 and the second wall panel 20 are arranged opposite to each other (as shown in the Z direction). This is equivalent to: Figure 1 The building wall 1 shown is a "straight" wall. Optionally, there is no steel bar structure in the first wall panel 10 and the second wall panel 20, and they are formed of concrete or other cement-based materials. The second wall panel 20 is connected to the first wall panel 10 through a plurality of first anchors 40, and forms a cavity with the first wall panel 10, in which a wall structure steel bar 300 is arranged. Exemplarily, the wall structure steel bar 300 includes a hidden column steel bar and a wall body steel bar, and hidden column steel bars are arranged on both sides of the wall body steel bar to form a structural functional area of ​​the building wall 1.

[0192] The building wall 1 is a prefabricated component of a cavity structure, and the cavity integrates the hidden column steel bars and wall body steel bars of the building wall 1, and does not require manual steel bar tying on site, saving a lot of labor and material costs. The building wall 1 is produced in a factory by the tooling 100 described later, and the structural steel bars of the building wall 1 are integrated, eliminating the manual formwork and demoulding operations on the construction site, and even eliminating the manual plastering operations in the later stage.

[0193] The first wall panel 10 and the second wall panel 20 are the templates for the building wall 1 that do not need to be disassembled. After the building wall 1 is hoisted in place, concrete is poured into the cavity to fill the cavity. The first wall panel 10 and the second wall panel 20 are the templates for pouring concrete. Before pouring concrete, the cavity openings at both ends of the building wall 1 can be sealed with templates, so that the wall body and the hidden column part of the building wall 1 are cast and formed at one time, and there is no staggered situation of cast-in-place and prefabrication. The poured concrete on both sides of the concrete and the structural steel bars integrated in the cavity together form a shear wall that bears the structural force. After the concrete reaches the strength, the first wall panel 10 and the second wall panel 20 are used as the plaster layer or decorative layer of the shear wall and do not need to be removed. Compared with the traditional on-site cast wall, the cavity building wall 1 has a lighter weight, lower production cost and higher production efficiency. It can effectively reduce costs and is more conducive to the promotion of prefabricated building technology.

[0194] Optionally, refer to Figure 2 The first anchor 40 includes a first direction ( Figure 2 The first main body portion 43 extends in the Z direction. Optionally, the first main body portion 43 is in the shape of an elongated strip, and the length direction of the first main body portion 43 is larger than the width direction ( Figure 2 The first body portion 43 has a front face 46 and a back face along a second direction perpendicular to the first direction; illustratively, one end 44 of the first body portion 43 is processed into a concave-convex shape, and the other end 45 of the first body portion 43 is processed into a concave-convex shape. This arrangement allows the two ends of the first anchor 40 to better match the first wall panel 10 and the second wall panel 20, respectively, and can improve the gripping force of the first anchor 40 in the first wall panel 10 and the second wall panel 20, thereby enhancing the first wall panel 10 and the second wall panel 20 to jointly resist the lateral pressure during the concrete pouring process. An inner concave surface 48 is formed on the front face 46 of the first body portion 43, and the inner concave surface 48 protrudes from the back face of the first body portion 43.

[0195] Each first anchor 40 is vertically connected to the first wall panel 10 and the second wall panel 20, respectively, and the first body parts 43 of adjacent first anchors 40 are arranged parallel and face to face. Figure 2 At least two through holes 49 are provided at the bottom of the inner concave surface 48. The at least two through holes 49 play a positioning function. When the first anchor 40 is installed into the first wall panel 10 and the second wall panel 20, the first anchor 40 and the first wall panel 10 and the second wall panel 20 at both ends thereof are kept in a relatively vertical state through the corresponding tooling 100 (described in detail below), and the insertion depth of the first anchor 40 into the first wall panel 10 and the second wall panel 20 is ensured to be accurate.

[0196] The tooling 100 for processing the above-mentioned building wall 1 will be described in detail below with reference to the accompanying drawings.

[0197] refer to Figures 3 to 5 The tool 100 of the present application includes: a frame 200 having a first direction ( Figure 3 and Figure 5 a frame cavity 200a extending from top to bottom (as shown in the Z direction); an anchor fixing assembly 7, at least a portion of which is located in the frame cavity 200a and connected to the frame 200, and a plurality of the above-mentioned first anchors 40 are fixed on the anchor fixing assembly 7; wall structural steel bars 300, which are located in the frame cavity 200a; a second mold platform 400, which is supported on the upper side of the frame 200 in the first direction and has a second mold platform cavity 400a, and one end 44 of the first anchor 40 extends from the bottom wall of the second mold platform cavity 400a into the second mold platform cavity 400a, and building materials (such as concrete or other cement-based materials) for forming the second wall panel 20 are cast in the second mold platform cavity 400a; the lower side of the frame 200 in the first direction is used to be placed on the pre-cast first wall panel 10, so that the other end 45 of the first anchor 40 is inserted into the unsolidified building materials (such as concrete or other cement-based materials) for forming the first wall panel 10.

[0198] Equivalently, when the tooling 100 is used in the present application to process the building wall 1, the first wall panel 10 is first made by the first mold platform, specifically, the building material is poured into the first mold platform cavity of the first mold platform, and the building material in the first mold platform cavity is not solidified; then the tooling 100 and the first mold platform are overlapped, and the other end of the first tie piece 40 in the tooling 100 is inserted into the unsolidified building material forming the first wall panel 10; then, as Figure 6 As shown, the building material forming the second wall panel 20 is poured in the second mold cavity 400a. Since one end of the first anchor 40 is located in the second mold cavity 400a, after the building material is poured in the second mold cavity 400a, one end of the first anchor 40 is also located in the building material in the second mold cavity 400a. Then, the two ends of the first anchor 40 are connected to the building materials forming the first wall panel 10 and the second wall panel 20 respectively. Figure 7 After the building materials forming the first wall panel 10 and the second wall panel 20 are solidified, the tooling 100 is removed to form a finished component. Figure 1 The building wall 1 is shown.

[0199] The building wall 1 is produced in a factory by the tooling 100, and the structural steel bars of the building wall 1 are integrated, eliminating the manual formwork and demoulding operations at the construction site, and even eliminating the manual plastering operations in the later stage. The building wall 1 can be prefabricated, with high production efficiency, which can effectively reduce costs and is more conducive to the promotion of prefabricated building technology.

[0200] Exemplarily, the first mold stage and the second mold stage 400 described above have the same structure.

[0201] The specific shape of the frame 200 of the tooling 100 of the present application is not limited, and any shape that can support the various structural members in the tooling 100 belongs to the protection scope of the present application. Figure 3 and Figure 4 , the frame 200 includes: along the second direction ( Figure 3 and Figure 4 The first beam 201 and the second beam 203 are spaced apart from each other along the third direction ( Figure 3 and Figure 4 The first direction, the second direction and the third direction are perpendicular to each other; and the first longitudinal beam 202 and the second longitudinal beam 204 are arranged in intervals along the third direction, and the first longitudinal beam 202 and the second longitudinal beam 204 extend along the second direction respectively; wherein the first cross beam 201, the first longitudinal beam 202, the second cross beam 203 and the second longitudinal beam 204 are connected in sequence to enclose the frame cavity 200a. Exemplarily, the frame 200 is square in shape as a whole. In addition, the material of the frame 200 is not limited, for example, it is steel.

[0202] The tool 100 in the above embodiment can produce a "straight-shaped" wall. In some possible implementations, the tool 100 can also produce an "L-shaped" wall. Figure 8 ,and Figure 5 The difference of the tooling 100 shown is that the anchor fixing assembly 7 on the tooling 100 also fixes a plurality of second anchors 41, one end of the second anchor 41 is inserted into the unsolidified building material forming the first wall panel 10, and the other end 411 of the second anchor 41 is used to insert the unsolidified building material pre-cast to form the first wall panel 10 of another building wall 1, the two first wall panels 10 are perpendicular to each other, and the other building wall 1 also includes a second wall panel 20 and a first wall panel 10 connected by a plurality of first anchors 40, and the second wall panel 20 and the first wall panel 10 of the other building wall 1 enclose a cavity. Exemplarily, the structure of the first anchor 40 is the same as the structure of the second anchor 41.

[0203] That is, through Figure 8 The tooling 100 shown first produces a building wall 1, such as Fig. 9 and Fig.10 As shown, a first wall panel 10 of a building wall 1 is also manufactured by using a first mold platform. Specifically, the building material is poured into a first mold platform cavity of the first mold platform, and the building material in the first mold platform cavity is not solidified. Then Figure 8The tooling 100 shown in the figure is overlapped with the first mold platform, and the other end 45 of the first anchor 40 and the one end 412 of the second anchor 41 in the tooling 100 are inserted into the uncured building material forming the first wall panel 10; then, as shown in FIG. Fig. 9 As shown, the building material for forming the second wall panel 20 is poured into the second mold cavity 400a. Fig.10 After the building materials of the first wall panel 10 and the second wall panel 20 forming one of the building walls 1 are solidified, the tooling 100 is removed to form a finished component. Fig.10 The building wall 1 shown has a first anchor 40 and a second anchor 41 .

[0204] Then, refer to Fig.11 ,Will Fig.10 The building wall 1 ( Fig.11 The wall extending in the Z direction) and Figure 5 The tooling 100 shown in the figure is overlapped, and the other end 411 of the second anchor 41 is inserted into Figure 5 Another building wall 1 ( Fig.11 The unsolidified building materials of the first wall panels 10 are pre-cast to form the walls extending along the Y direction. The first wall panels 10 of the two walls are perpendicular to each other, and the second wall panels 20 of the two walls are perpendicular to each other.

[0205] Repeat the above Figure 6 The process, reference Fig.12 , that is, pouring the building material of the second wall panel 20 of another building wall 1 into the second mold cavity 400a of the building wall 1. Fig.13 After the building materials of the first wall panel 10 and the second wall panel 20 forming another building wall 1 are solidified, the tooling 100 is removed to form a finished component. Fig.13 The "L-shaped" building wall 1 is shown.

[0206] refer to Figures 15 to 19 The tool 100 described in any of the above embodiments further includes: Figures 15 to 17 as well as Fig.19 The first end positioning tooling beam 2011 and the second end positioning tooling beam 2031 are arranged at intervals, and the first end positioning tooling beam 2011 and the second end positioning tooling beam 2031 are installed in the frame cavity 200a and are respectively arranged along the third direction ( Figures 15 to 17 as well as Fig.19The plurality of first end positioning blocks 20112 are installed on the surface of the first end positioning tooling beam 2011 facing the second end positioning tooling beam 2031, and are spaced apart along the third direction; the plurality of second end positioning blocks 20312 are installed on the surface of the second end positioning tooling beam 2031 facing the first end positioning tooling beam 2011, and are spaced apart along the third direction, and each first end positioning block 20112 corresponds to each second end positioning block 20312 one by one along the second direction.

[0207] The above-mentioned anchor fixing assembly 7 comprises: a plurality of fixing parts, each of which extends along the second direction, and both ends of each fixing part in the second direction correspond to a first end positioning block 20112 and a second end positioning block 20312, and are respectively positioned at the first end positioning block 20112 and the second end positioning block 20312. In other words, the first end positioning block 20112 and the second end positioning block 20312 are used to support the fixing part.

[0208] A plurality of first anchors 40 spaced apart along the second direction are fixed to each fixing portion, so as to form the above-mentioned "I-shaped" wall. Alternatively, a plurality of second anchors 41 spaced apart along the second direction are fixed to at least one fixing portion, and a plurality of first anchors 40 spaced apart along the second direction are fixed to each of the remaining fixing portions, so as to form the above-mentioned "L-shaped" wall.

[0209] Specifically, refer to Figure 20 to Figure 26 Each fixing portion includes: a mounting portion 70, along the second direction ( Fig. 20 and Fig.21 As shown in the Y direction, Fig. 22 , Fig.23 and Fig.26 The mounting portion 70 extends in the direction of E in the middle, and the mounting portion 70 has a mounting surface 71, which is located on one side of the mounting portion in the third direction and is used to fit with the first anchor 40 or the second anchor 41. The specific shape of the mounting surface 71 is not limited, and it only needs to fit with the first anchor 40. Optionally, the mounting surface 71 is a plane, which fits with the first body portion 43 of the first anchor 40 or the second body portion of the second anchor 41 (the same structure as the first body portion 43 of the first anchor 40). This is equivalent to the first anchor 40 or the second anchor 41 in multiple rows in the tooling 100, and the anchors in each row are arranged at intervals along the second direction.

[0210] The specific shape of the mounting portion 70 is not limited, and it only needs to have a mounting surface 71 that can fit with the first anchor 40 or the second anchor 41. Optionally, the mounting portion 70 is a rectangular tube. The first end positioning block 20112 and the second end positioning block 20312 are respectively provided with grooves, and the two ends of the rectangular tube are respectively positioned in the grooves on the first end positioning block 20112 and the second end positioning block 20312. In some possible implementations, the mounting portion 70 is a polygonal tube, a round tube, etc.

[0211] A plurality of groups of first positioning portions 72 are arranged on the mounting surface 71 at intervals along the second direction, and each group of first positioning portions 72 includes a plurality of first positioning portions 72 arranged along the width direction ( Figure 23 to Figure 26 At least two protrusions 721 are arranged at intervals (as shown in the F direction in the figure), all the protrusions 721 of each group are on the same straight line, the angle between the connecting line of all the protrusions 721 of each group and the second direction is a set angle, and the protrusions 721 of each group are used to pass through the through hole 49 on the first anchor 40 or the second anchor 41 when the first anchor 40 or the second anchor 41 is attached to the mounting surface 71 along the third direction. That is, a group of first positioning parts 72 corresponds to one first anchor 40 or one second anchor 41, and is used to position the first anchor 40 or the second anchor 41.

[0212] Each fixing portion further includes a second positioning portion 73, the second positioning portion 73 includes a clamping strip 732 and at least two clamping portions 731, at least two clamping portions 731 are arranged on the mounting surface 71 along the second direction, and the clamping strip 732 is used to be arranged on the protrusion 721 and fit the mounting surface 71 after the through hole 49 of the first anchor 40 or the second anchor 41 is sleeved on the protrusion 721 and fits the mounting surface 71. Figures 23 to 25 The first anchor 40 and the clamping portion 731 are respectively abutted against each other in the first direction (as shown in the G direction), and the movement of the first anchor 40 in the first direction is restricted, so that the first anchor 40 is installed on the fixed portion of the anchor fixing assembly 7. Alternatively, the second anchor 41 and the clamping portion (with the same structure as the clamping portion 731) are respectively abutted against each other in the first direction, and the movement of the second anchor 41 in the first direction is restricted, so that the second anchor 41 is fixed on the fixed portion of the anchor fixing assembly 7.

[0213] This is equivalent to fitting all the first anchors 40 or the second anchors 41 to be installed to the installation surface 71, and after all the multiple through holes 49 of the first anchors 40 or the second anchors 41 are respectively sleeved on the corresponding protrusions 721, placing the clamping strip 732 in the clamping portion 731, so that the clamping strip 732 and the first anchor 40 and the clamping portion 731 are abutted against each other in the thickness direction (or the clamping strip 732 and the second anchor and the clamping portion 731 are abutted against each other in the thickness direction). The number of the clamping strips 732 can be multiple, and the number of the clamping strips 732 can be selected according to the gap between the clamping portion 731 and the first anchor 40 or the second anchor 41 in the thickness direction, so as to compact the first anchor 40 or the second anchor 41, so that the movement of the first anchor 40 or the second anchor 41 in the thickness direction is restricted, so that the first anchor 40 or the second anchor 41 is installed on the fixing portion of the anchor fixing assembly 7.

[0214] Optionally, when the mounting surface 71 is fitted with the first anchor 40, the angle between the connecting line of each group of protrusions 721 on the mounting surface 71 fitted with the first anchor 40 and the second direction is set to 90°, and the first anchor 40 extends along the first direction to be respectively perpendicular to the first wall panel 10 and the second wall panel 20. The specific value of the setting angle between the connecting line of all protrusions 721 and the length direction is not limited, and the following conditions are met: the angle between the connecting line of all through holes 49 on the first anchor 40 and the first direction is consistent with the above-mentioned setting angle, the first anchor 40 is fitted on the mounting surface 71, and the through holes 49 on the first anchor 40 are sleeved on the corresponding protrusions 721.

[0215] Optionally, when the mounting surface 71 is in contact with the second anchor 41, the angle between the connecting line of each group of protrusions 721 on the mounting surface 71 in contact with the second anchor 41 and the second direction is an obtuse angle ( Figure 8 α in the figure), the second anchor 41 is along the fourth direction ( Figure 8 The fourth direction extends in the third direction (as shown in the M direction), and the angle between the fourth direction and the second direction is an obtuse angle. Exemplarily, along the third direction, the plurality of second anchors 41 are located between the plurality of first anchors 40 and the first longitudinal beam 202, and the second anchors 41 extend along the fourth direction toward the upper side of the first longitudinal beam 202. That is, with reference to Figure 3 , a plurality of second anchors 41 are located on the far right side of the tooling 100 .

[0216] Optionally, at least two clamping parts 731 are arranged at intervals along the second direction and are located on the same straight line. Optionally, the connecting line of all the clamping parts 731 extends along the second direction. Correspondingly, the clamping strip 732 also extends along the second direction. In some possible embodiments, all the clamping parts 731 may not be located on the same straight line, and the first anchor 40 or the second anchor 41 can be pressed against the mounting surface 71 by the clamping strip 732.

[0217] Optionally, refer to Fig.23 and Fig.24 Each clamping portion 731 forms a notch 733 with the mounting surface 71, for the clamping strip 732 to be clamped into the notch 733. After all the first anchors 40 or the second anchors 41 are sleeved on the protrusions 721 of the mounting surface 71, the clamping strip 732 is inserted into the notch 733 between the clamping portion 731 and the mounting surface 71, so as to facilitate the installation of the first anchor 40 or the second anchor 41 on the anchor fixing assembly 7. At the same time, after all the first anchors 40 or the second anchors 41 are connected to the wall panels at both ends, the clamping strip 732 is removed from the notch 733, so as to facilitate the separation of the protrusion 721 of the mounting portion 70 from the through hole 49 of the first anchor 40 or the second anchor 41, so as to facilitate the removal of the anchor fixing assembly 7 from the first anchor 40 or the second anchor 41.

[0218] Optionally, the opening direction of each notch 733 is the same, which also facilitates inserting the clamping strip 732 into the notch 733 between the clamping portion 731 and the mounting surface 71 .

[0219] Optionally, refer to Fig.24 , each clamping portion 731 is in a Z-shape. Each clamping portion 731 includes a first portion 7311, a second portion 7312 and a third portion 7313 connected in sequence; wherein the first portion 7311 is attached to and fixed to the mounting surface 71, and the first portion 7311 can be fixed to the mounting surface 71 by bolts, the second portion 7312 is perpendicular to the mounting surface 71, and the third portion 7313 is parallel to the mounting surface 71 and is spaced in the thickness direction to form a notch 733. When fixing the first anchor 4040, after the clamping strip 732 is inserted into the notch 733, it abuts against the first anchor 40 and the third portion 7313 respectively to compress the first anchor 40. Alternatively, after the clamping strip 732 is inserted into the notch 733, it abuts against the second anchor 41 and the third portion 7313 respectively to compress the second anchor 41.

[0220] Those skilled in the art will appreciate that the shape of the clamping portion 731 is not limited thereto, and a clamping strip 732 may be inserted between the clamping portion 731 and the first anchor 40 or the second anchor 41 to compress the first anchor 40 or the second anchor 41 .

[0221] In some possible implementations, reference Fig. 27 and Fig.28 The wall structure steel bars 300 in the frame cavity 200a include a lower steel bar 301 and an upper steel bar 302 along a first direction. The upper steel bar 302 is located above the anchor fixing assembly 7, and the lower steel bar 301 and the upper steel bar 302 are tied and fixed.

[0222] refer to Fig.29Combined with Figure 3 As shown, the first end positioning tooling beam 2011 of the present application is provided with first push-pull handles 20111 at both ends of the third direction, and the second end positioning tooling beam 2031 is provided with second push-pull handles 20311 at both ends of the third direction; the first longitudinal beam 202 is provided with first moving grooves at both ends of the second direction, and the second longitudinal beam 204 is provided with second moving grooves 2042 at both ends of the second direction. Exemplarily, the structure of the first moving groove is the same as the structure of the second moving groove 2042.

[0223] Along the third direction ( Figure 3 The first push-pull handle 20111 extends out of the first moving groove and the second moving groove 2042 respectively, and can move in the second direction ( Figure 3 After the first push-pull handle 20111 is moved to a set position relative to the first moving slot and the second moving slot 2042 (shown in the Y direction), the first push-pull handle 20111 is fixed to the first longitudinal beam 202 and the second longitudinal beam 204 respectively by the first positioning assembly. After the second push-pull handles 20311 extend out of the first moving slot and the second moving slot 2042 respectively and are able to move to a set position relative to the first moving slot and the second moving slot 2042 along the second direction, each second push-pull handle 20311 is fixed to the first longitudinal beam 202 and the second longitudinal beam 204 by the second positioning assembly.

[0224] After such arrangement, it is convenient for the user to operate the first end positioning tooling beam 2011 through the first push-pull handle 20111, and to operate the second end positioning tooling beam 2031 through the second push-pull handle 20311. It is convenient to adjust the relative positions of the first end positioning tooling beam 2011 and the second end positioning tooling beam 2031 in the second direction to adapt to the size of the processed building wall 1. After the first end positioning tooling beam 2011 and the second end positioning tooling beam 2031 have completed the adjustment of the relative positions in the second direction, the first end positioning tooling beam 2011 and the second end positioning tooling beam 2031 are fixed to the first longitudinal beam 202 and the second longitudinal beam 204 through the first positioning assembly and the second positioning assembly.

[0225] In addition, after the building wall 1 (for example, the above-mentioned "I-shaped" wall or "L-shaped" wall) is completed by the tooling 100, the first positioning assembly and the second positioning assembly can be removed to allow the first end positioning tooling beam 2011 and the second end positioning tooling beam 2031 to move relative to the first longitudinal beam 202 and the second longitudinal beam 204, thereby removing the tooling 100.

[0226] refer to Fig.18 and Fig.29The first positioning assembly of the present application includes: a first positioning pin and a first positioning hole 201111 provided on the first push-pull handle 20111, the first longitudinal beam 202 and the second longitudinal beam 204. After the first push-pull handle 20111 at one end of the first end positioning tooling beam 2011 and the first positioning hole 201111 on the first longitudinal beam 202 are opposite in the first direction, the first positioning pin is inserted into the first positioning hole; after the first push-pull handle 20111 at the other end of the first end positioning tooling beam 2011 and the first positioning hole 201111 on the second longitudinal beam 204 are opposite in the first direction, the first positioning pin is inserted into the first positioning hole. Thus, the first push-pull handle 20111 is fixed relative to the first longitudinal beam 202 and the second longitudinal beam 204 respectively through the first positioning assembly.

[0227] The second positioning assembly includes: a second positioning pin 2043 (with the same structure as the first positioning pin) and a second positioning hole (with the same structure as the first positioning hole 201111) provided on the second push-pull handle 20311, the first longitudinal beam 202 and the second longitudinal beam 204. After the second push-pull handle 20311 at one end of the second end positioning tooling beam 2031 and the second positioning hole on the first longitudinal beam 202 are opposite in the first direction, the second positioning pin 2043 is inserted into the second positioning hole; after the second push-pull handle 20311 at the other end of the second end positioning tooling beam 2031 and the second positioning hole on the second longitudinal beam 204 are opposite in the first direction, the second positioning pin 2043 is inserted into the second positioning hole. Thus, the second push-pull handle 20311 is fixed to the first longitudinal beam 202 and the second longitudinal beam 204 respectively through the second positioning assembly.

[0228] The present application is not limited to the structure of the first positioning assembly and the second positioning assembly. Structures that can fix the first push-pull handle 20111 relative to the first longitudinal beam 202 and the second longitudinal beam 204 and the second push-pull handle 20311 relative to the first longitudinal beam 202 and the second longitudinal beam 204 all fall within the protection scope of the present application.

[0229] refer to Figure 3 , Figure 4 and Fig.14 The tooling 100 described in any of the above embodiments further includes: Figure 3 , Figure 4 and Fig.14 The first pallet support plate 2021 and the second pallet support plate 2041 are spaced apart from each other in the first direction (shown in the X direction in the middle), and the first pallet support plate 2021 and the second pallet support plate 2041 are respectively installed on the upper side of the first longitudinal beam 202 and the second longitudinal beam 204 in the first direction, and extend in the second direction respectively. That is, the first pallet support plate 2021 is installed on the upper side of the first longitudinal beam 202 in the first direction, and the second pallet support plate 2041 is installed on the upper side of the second longitudinal beam 204 in the first direction. It also includes: a plurality of pallet support plates along the second direction ( Figure 3 , Figure 4 and Fig.14 The second mold platform 400 is supported on a plurality of pallets 500, wherein the first pallet 500 is provided with spaced apart portions (as shown in the Y direction), each pallet 500 extends along the third direction, and both ends of each pallet 500 are respectively supported on the first pallet support plate 2021 and the second pallet support plate 2041, and each pallet 500 is located on each anchor fixing assembly 7 along the first direction; the second mold platform 400 is supported on a plurality of pallets 500.

[0230] refer to Figure 3 , Figure 4 and Fig.14 Combined with Fig.30 As shown, the first pallet support plate 2021 is provided with a first support groove 20211 for accommodating one end of the pallet 500, and the second pallet support plate 2041 is provided with a second support groove (with the same structure as the first support groove 20211) for accommodating the other end of the pallet 500.

[0231] Continue to refer Fig.21 Each fixing portion is provided with a pad 7a on the surface facing the support plate 500, and each pad 7a is provided along the second direction ( Fig.21 The support plate 500 is extended in the Y direction to support the support plate 500. In other words, the support plate 500 is perpendicular to the cushion block 7a and supported on the cushion block 7a.

[0232] In this application, reference Figure 3 , Figure 4 and Fig.14 The first pallet support plate 2021 can slide to a set position relative to the first longitudinal beam 202 along the third direction, and then be fixed relative to the first longitudinal beam 202 by a third positioning assembly; the second pallet support plate 2041 can slide to a set position relative to the second longitudinal beam 204 along the third direction, and then be fixed relative to the second longitudinal beam 204 by a fourth positioning assembly.

[0233] After such arrangement, it is convenient for the user to adjust the relative positions of the first pallet support plate 2021 and the second pallet support plate 2041 in the third direction to adapt to the size of the processed building wall 1. After the relative positions of the first pallet support plate 2021 and the second pallet support plate 2041 in the third direction are adjusted, the first pallet support plate 2021 and the second pallet support plate 2041 are fixed to the first longitudinal beam 202 and the second longitudinal beam 204 by the third positioning assembly and the fourth positioning assembly.

[0234] In addition, after the building wall 1 (such as the above-mentioned "I-shaped" wall or "L-shaped" wall) is completed by the tooling 100, the third positioning assembly and the fourth positioning assembly can be removed to allow the first pallet support plate 2021 and the second pallet support plate 2041 to move relative to the first longitudinal beam 202 and the second longitudinal beam 204, thereby removing the tooling 100.

[0235] Exemplarily, the third positioning assembly includes: a third positioning pin and a third positioning hole provided on the first pallet support plate 2021 and the first longitudinal beam 202. After the first pallet support plate 2021 and the third positioning hole on the first longitudinal beam 202 are opposite to each other along the first direction, the third positioning pin is inserted into the third positioning hole. Thus, the first pallet support plate 2021 is fixed relative to the first longitudinal beam 202 by the third positioning assembly.

[0236] The fourth positioning assembly includes: a fourth positioning pin and a fourth positioning hole provided on the second pallet support plate 2041 and the second longitudinal beam 204. After the second pallet support plate 2041 and the fourth positioning hole on the second longitudinal beam 204 are aligned along the first direction, the fourth positioning pin is inserted into the third positioning hole. Thus, the second pallet support plate 2041 is fixed relative to the second longitudinal beam 204 through the fourth positioning assembly.

[0237] refer to Figure 3 , Fig.16 , Fig.19 , Fig. 27 The tooling 100 described in any of the above embodiments also includes: a first end template positioning plate 2012 and a second end template positioning plate 2032 spaced apart along the second direction, the first end template positioning plate 2012 and the second end template positioning plate 2032 respectively extend along the third direction, the first end template positioning plate 2012 is installed on the upper side of the first end positioning tooling beam 2011 in the first direction, and the second end template positioning plate 2032 is installed on the upper side of the second end positioning tooling beam 2031 in the first direction.

[0238] refer to Figure 3 , Figure 4 , Fig.14 Combined with Fig.31 As shown, the second mold platform 400 of the tooling 100 described in any of the above embodiments includes: a plurality of templates 401 ( Figure 4 and Fig.14 Two templates 401 are shown in the figure, each template 401 extends along the second direction, and the two ends of each template 401 are respectively positioned on the first end template positioning plate 2012 and the second end template positioning plate 2032, and the two adjacent templates 401 are butt-jointed along the third direction to form the bottom wall of the second mold platform cavity 400a, and one end of the first anchor 40 extends into the second mold platform cavity 400a from between the two adjacent templates 401; and top side templates 402 are arranged at intervals along the second direction, each top side template 402 extends along the third direction, and the two ends are respectively installed on the first pallet support plate 2021 and the second pallet support plate 2041, and are fitted and supported on the template 401; side templates 403 are arranged at intervals along the third direction, each side template 403 extends along the second direction, and the two ends are respectively installed on the top side template 402.

[0239] That is, the plurality of templates 401, the top mold 402 and the side mold 403 surround the second mold cavity 400a. After the building materials for forming the second wall panel 20 are poured into the second mold cavity 400a, the building materials are in contact with the plurality of templates 401, the fixed edge mold and the side mold 403 respectively. The shape of the second mold cavity 400a surrounded by the plurality of templates 401, the top mold 402 and the side mold 403 is the shape of the second wall panel 20 to be poured, for example, a square shape or a rectangular shape.

[0240] refer to Figure 33 to Figure 36 , the third direction of the template 401 of this application ( Fig.34 At least one of the two sides (shown in the X direction) is provided with a rubber strip 4011, Fig.34 4 shows that a rubber strip 4011 is provided on one side of the third direction of the template 401. The rubber strips 4011 of two adjacent templates 401 are butt-jointed along the third direction (eg Fig.36 As shown), one end 44 of the first anchor 40 can extend into the second mold cavity 400a from the joint of the rubber strip 4011 between two adjacent mold plates 401.

[0241] The rubber strips 4011 of two adjacent templates 401 are continuous and interference fit along the third direction. Under the support of the multiple support plates 500 at the bottom of the template 401, the building materials to be poured to form the second wallboard 20 can be carried.

[0242] Continue to refer Figure 3 , Figure 4 and Fig.31 , the top mold 402 can slide relative to the first pallet support plate 2021 and the second pallet support plate 2041 along the second direction, and the side mold 403 can slide relative to the top mold 402 along the third direction. After such arrangement, the shape of the second mold stage cavity 400a surrounded by the plurality of mold plates 401, the top mold 402 and the side mold 403 can be adjusted. For example, by moving the top mold 402 and the side mold 403, a square or rectangular second mold stage cavity 400a can be formed.

[0243] In addition, the side mold 403 can also be moved according to the type of wall to be processed. For example, when processing a "I-shaped" wall, the side mold 403 is moved so that one end of all the first anchors 40 extends from the joint of the rubber strip 4011 between two adjacent templates 401 into the second mold cavity 400a. For example, when processing an "L-shaped" wall, the side mold 403 is moved so that one end of all the first anchors 40 extends from the joint of the rubber strip 4011 between two adjacent templates 401 into the second mold cavity 400a, leaving a portion of space to expose the second anchor 41 (such as Figure 8As shown), the other end of the second anchor 41 can be inserted into the uncured building material of the first wall panel 10 that is precast to form another building wall 1.

[0244] In addition, the second mold platform 400 of the present application is provided with at least three side molds 403 spaced apart along the third direction, and the plurality of mold plates 401, the top mold 402 and the side molds 403 enclose at least two second mold platform cavities 400a. In this way, at least two second wall panels 20 can be formed simultaneously, and the processing efficiency is high.

[0245] Continue to refer Figure 3 and Figure 4 as well as Fig.31 and Fig.41 The two ends of the top side mold 402 of the present application are respectively connected to the first support plate 2021 and the second support plate 2041 by sliding through the first side mold connector 4021. The first side mold connector 4021 includes: a first slot 40212 and a first slide groove 40211 connected to each other, along the first direction ( Fig.41 The first slot 40212 is located above the first slide groove 40211, and the first slot 40212 is along the third direction ( Fig.31 and Fig.41 The first slide groove 40211 extends along the second direction ( Fig.31 and Fig.41 The two ends of the top side mold 402 are respectively inserted into the first slots 40212 of the corresponding first side mold connector 4021, and the first pallet support plate 2021 and the second pallet support plate 2041 are respectively provided with slide rails extending along the second direction, and the first slide groove 40211 and the corresponding slide rail cooperate with each other, and the first slide groove 40211 and the slide rail can slide relative to each other in the second direction. Thus, the two ends of the top side mold 402 slide relative to the first pallet support plate 2021 and the second pallet support plate 2041 along the second direction through the first slide groove 40211.

[0246] Exemplarily, a slide rail is provided at the outer edge of the upper side of the first pallet support plate 2021, and a slide rail is provided at the outer edge of the upper side of the second pallet support plate 2041. This arrangement will not interfere with the arrangement of the structural parts other than the second mold platform 400 on the tooling 100. In addition, the length of the top mold 402 is extended, so that the adjustment distance of the side mold 403 on the top mold 402 becomes longer, which is conducive to adjusting the shape of the second mold platform cavity 400a.

[0247] Continue to refer Figure 3 and Figure 4 as well as Fig.32 The two ends of the side mold 403 of the present application are respectively connected to the top mold 402 by sliding through the second side mold connector 4022. Fig.32As shown, the second side mold connecting member 4022 includes: a second slide groove 40221 and a plug-in portion 40222 connected to each other. Along the second direction, the plug-in portion 40222 is located on the side of the second slide groove 40221. The second slide groove 40221 is connected to the second side mold connecting member 40221 along the third direction ( Fig.32 The plug-in portion 40222 extends along the second direction ( Fig.32 The two ends of the side mold 403 are respectively plugged into the plug-in portion 40222 of the corresponding second side mold connector 4022, and the top mold 402 passes through the second slide groove 40221 of the corresponding second side mold connector 4022. The second slide groove 40221 and the corresponding top mold 402 cooperate with each other, and the second slide groove 40221 and the top mold 402 can slide relative to each other in the third direction. Thus, the two ends of the side mold 403 slide relative to the top mold 402 at the two ends along the third direction through the second slide groove 40221.

[0248] Exemplarily, the second end of the side mold 403 in the second direction is provided with a second slot, and the plug-in portion 40222 is inserted into the second slot. That is, the second slots at both ends of the side mold 403 are respectively plugged with the corresponding plug-in portions 40222 to achieve the connection between the side mold 403 and the second side mold connector 4022.

[0249] The present application also provides a method for producing a building wall 1 using the tooling 100 described in any of the above embodiments.

[0250] refer to Fig.37 Combined with Figures 1 to 36 As shown, the method for producing a building wall 1 of the present application includes the following steps:

[0251] Step S1: transport the first die table on the first production line L1 ( Fig.37 The first mold platform is transported to a primary casting station, where building materials are cast into a first mold platform cavity of the first mold platform to form an unsolidified first wall panel 10.

[0252] The shape and structure of the first mold platform may be the same as the shape and structure of the second mold platform 400 in the above embodiment (including the mold plate 401, the top mold 402 and the side mold 403). The building material is formed of, for example, concrete or other cement-based materials.

[0253] Step S2: The first mold platform on which the building material for forming the first wall panel 10 is poured is transferred to a primary combining station.

[0254] Exemplarily, at the primary combining station, the first mold platform and the tooling 100 are overlapped, so that the other end of the first anchor 40 in the tooling 100 is inserted into the uncured building material forming the first wall panel 10 .

[0255] Step S3: The tool 100 ( Fig.37 The tooling 100 is transported to the hoisting station, and the tooling 100 includes a wall structural steel bar 300 located in the cavity of the tooling 100, and a second mold platform 400 located on the upper side of the tooling 100. A plurality of the above-mentioned first anchors 40 are fixed on the tooling 100, and one end of the first anchor 40 extends from the bottom wall of the second mold platform cavity 400a of the second mold platform 400 into the second mold platform cavity 400a of the second mold platform 400.

[0256] The tool 100 transported on the second production line L2 is the tool 100 described in the above embodiment. Exemplarily, the frame 200 of the tool 100 is placed on a mold trolley (not shown), and the frame 200 is transported by the mold trolley.

[0257] Step S4: hoisting the tool 100 at the hoisting station to place the lower side of the tool 100 on the first formwork platform, and inserting the other end of the first anchor 40 into the unsolidified building material forming the first wall panel 10 to form an empty formwork platform.

[0258] After the tooling 100 is transferred to the primary lifting station, the tooling 100 is lifted by a lifting device (such as a truss) to place the lower side of the tooling 100 on the first mold platform (such as Figure 5 The third production line L3 is provided with a ferry station. After the empty mold table is formed at the first combination station, the empty mold table is hoisted to the ferry station on the third production line L3. Step S5: Transfer the empty mold table on the third production line L3 ( Fig.37 The empty mold platform is transported to the secondary pouring station, where building materials are poured into the second mold platform cavity 400a of the second mold platform 400 to form an unsolidified second wall panel 20.

[0259] like Figure 6 As shown, the building material for forming the second wall panel 20 is poured in the second mold cavity 400a. Since one end of the first anchor 40 is located in the second mold cavity 400a, after the building material is poured in the second mold cavity 400a, one end of the first anchor 40 is also located in the building material in the second mold cavity 400a. Then, the two ends of the first anchor 40 are connected to the building materials forming the first wall panel 10 and the second wall panel 20 respectively.

[0260] Step S6: After the first wall panel 10 and the second wall panel 20 are solidified, the empty mold platform is transferred to the demolding station on the third production line L3, and the second mold platform 400 and the tooling 100 are removed at the demolding station to form a finished component.

[0261] Exemplarily, after the tooling 100 is transferred to a primary lifting station and the tooling 100 on the mold trolley is lifted onto the first mold platform, the empty mold trolley can be transferred from the second production line to the third production line, and then from the third production line to the second production line to transport the new tooling 100.

[0262] refer to Figure 7 After the building materials forming the first wall panel 10 and the second wall panel 20 are solidified, the tooling 100 is removed to form a finished component. Figure 1 The building wall 1 (“I-shaped” wall) is shown. Exemplarily, the first wall panel 10 is parallel to the second wall panel 20 .

[0263] The building wall 1 is produced in a factory by the tooling 100, and the structural steel bars of the building wall 1 are integrated, eliminating the manual formwork and demoulding operations at the construction site, and even eliminating the manual plastering operations in the later stage. The building wall 1 can be prefabricated, with high production efficiency, which can effectively reduce costs and is more conducive to the promotion of prefabricated building technology.

[0264] It should be noted that the tooling 100 for forming the second wall panel 20 on the second production line L2 may be directly transporting the pre-made tooling 100, or the tooling 100 may be manufactured on the second production line L2, that is, the tooling 100 is transported while being manufactured.

[0265] This application takes the production of the tooling 100 completed on the second production line L2 as an example. In step S3 of this application, the specific steps of transmitting the tooling 100 to form the second wallboard 20 on the second production line L2 include:

[0266] Step S31: The frame 200 is transferred on the second production line L2, wherein the frame 200 has a frame cavity 200a penetrating up and down along a first direction, and the lower side of the frame 200 in the first direction is used to be placed on the first mold platform.

[0267] At this time, if Fig.17 As shown, the anchor fixing assembly 7 , the wall structure reinforcement 300 and the second formwork platform 400 are not installed on the frame 200 .

[0268] Step S32: installing the lower layer of steel bars 301 of the wall structure steel bars 300 in the frame cavity 200a.

[0269] Step S33 : installing the anchor fixing assembly 7 in the frame cavity 200 a , wherein at least a portion of the anchor fixing assembly 7 is located in the frame cavity 200 a and connected to the frame 200 , and a plurality of first anchors 40 are fixed to the anchor fixing assembly 7 .

[0270] refer to Fig.16 and Fig.19, an anchor fixing assembly 7 is installed in the frame cavity 200a.

[0271] Step S34: installing the upper steel bars 302 of the wall structure steel bars 300 in the frame cavity 200a, the upper steel bars 302 being located above the anchor fixing assembly 7, and tying the lower steel bars 301 and the upper steel bars 302 together.

[0272] refer to Fig. 27 The installation of the lower steel bars 301, the anchor fixing assembly 7 and the upper steel bars 302 is completed in the frame cavity 200a, and the lower steel bars 301 and the upper steel bars 302 are tied to form the wall structure steel bars 300.

[0273] Step S35 : installing the second mold stage 400 on the upper side of the frame 200 in the first direction.

[0274] like Figure 3 As shown, after the installation of the anchor fixing assembly 7 and the wall structure reinforcement 300 is completed in the frame cavity 200a, the second mold platform 400 is installed on the upper side of the frame 200 in the first direction.

[0275] Exemplarily, the above step S33 further includes the following steps:

[0276] Step S331 : a plurality of second anchors 41 are also fixed on the anchor fixing assembly 7 .

[0277] like Figure 8 As shown, Figure 5 The difference of the tooling 100 shown is that the anchor fixing assembly 7 on the tooling 100 also fixes a plurality of the above-mentioned second anchors 41, one end of the second anchor 41 is inserted into the unsolidified building material forming the first wall panel 10, and the other end of the second anchor 41 is used to be inserted into the pre-cast unsolidified building material of another building wall 1 forming the first wall panel 10.

[0278] Such a tool 100 can produce an “L-shaped” wall. Specifically, in step S4 , after the lower side of the tool 100 is placed on the first mold platform, one end of the second anchor 41 is inserted into the uncured building material forming the first wall panel 10 .

[0279] That is, through Figure 8 The tooling 100 shown first produces a building wall 1, such as Fig. 9 and Fig.10 As shown, a first wall panel 10 of a building wall 1 is also manufactured by using a first mold platform. Specifically, the building material is poured into a first mold platform cavity of the first mold platform, and the building material in the first mold platform cavity is not solidified. Then Figure 8The tooling 100 shown in the figure is overlapped with the first mold platform, and the other end of the first anchor 40 and one end of the second anchor 41 in the tooling 100 are inserted into the uncured building material forming the first wall panel 10; then, as shown in FIG. Fig. 9 As shown, the building material for forming the second wall panel 20 is poured into the second mold cavity 400a. Fig.10 After the building materials forming the first wall panel 10 and the second wall panel 20 of one of the building walls 1 are solidified, the tooling 100 is removed to form a finished component (first component). Fig.10 The building wall 1 shown has a first anchor 40 and a second anchor 41 .

[0280] Then, refer to Fig.11 , pick up the first component, then turn it 90 degrees, Fig.10 The building wall 1 ( Fig.11 The wall extending in the Z direction) and Figure 5 The tooling 100 shown is overlapped, and the other end of the second anchor 41 is inserted into Figure 5 Another building wall 1 ( Fig.11 The unsolidified building materials of the first wall panels 10 are pre-cast to form the walls extending along the Y direction. The first wall panels 10 of the two walls are perpendicular to each other, and the second wall panels 20 of the two walls are perpendicular to each other.

[0281] Repeat the above Figure 6 The process, reference Fig.12 , that is, pouring the building material of the second wall panel 20 of another building wall 1 into the second mold cavity 400a of the building wall 1. Fig.13 After the building materials of the first wall panel 10 and the second wall panel 20 forming another building wall 1 are solidified, the tooling 100 is removed to form a finished component. Fig.13 The "L-shaped" building wall 1 is shown.

[0282] Exemplarily, in step S33, the specific steps of installing the anchor fixing assembly 7 in the frame cavity 200a include:

[0283] Step S331: Install multiple fixing parts described in any of the above embodiments on multiple first end positioning blocks 20112 and multiple second end positioning blocks 20312, each fixing part extends along the second direction respectively, and the two ends of each fixing part in the second direction correspond to a first end positioning block 20112 and a second end positioning block 20312, and are respectively positioned on the first end positioning block 20112 and the second end positioning block 20312, and each fixing part is fixed with multiple first anchors 40 spaced apart along the second direction; or, multiple second anchors 41 spaced apart along the second direction are fixed to at least one fixing part, and multiple first anchors 40 spaced apart along the second direction are fixed to each of the remaining fixing parts.

[0284] That is, Fig. 20 The two ends of the mounting portion of the anchor fixing assembly 7 are respectively positioned at the first end positioning block 20112 and the second end positioning block 20312. The mounting portion of the anchor fixing assembly 7 is fixed with the first anchor 40 or the second anchor 41.

[0285] Exemplarily, when the mounting surface is in contact with the first anchor 40, the first anchor 40 extends in the first direction in the frame cavity 200a. When the mounting surface is in contact with the second anchor 41, the second anchor 41 extends in the fourth direction in the frame cavity 200a, and the angle between the fourth direction and the second direction is an obtuse angle. That is, the second anchor 41 is obliquely arranged in the frame cavity 200a to achieve connection with the first wallboard 10 of another building wall 1.

[0286] Exemplarily, in the above step S35, installing the second mold platform 400 on the upper side of the frame 200 in the first direction specifically includes the following steps:

[0287] Step S351: Install a plurality of pallets 500 spaced apart along the second direction on the first pallet support plate 2021 and the second pallet support plate 2041 , and install the second mold platform 400 on the plurality of pallets 500 .

[0288] like Fig.15 As shown, each pallet 500 extends along the third direction, and both ends of each pallet 500 are supported on the first pallet support plate 2021 and the second pallet support plate 2041, respectively, and each pallet 500 is located on each anchor fixing assembly 7 along the first direction. That is, after the installation of the anchor fixing assembly 7 is completed, a plurality of pallets 500 for supporting the second mold platform 400 are installed on the frame 200.

[0289] In addition, according to the size of the building wall 1 to be processed, after the first pallet support plate 2021 slides to a set position relative to the first longitudinal beam 202 along the third direction, it is fixed relative to the first longitudinal beam 202 by a third positioning assembly; after the second pallet support plate 2041 slides to a set position relative to the second longitudinal beam 204 along the third direction, it is fixed relative to the second longitudinal beam 204 by a fourth positioning assembly.

[0290] Exemplarily, in the above step S351, installing the second mold platform 400 on the plurality of pallets 500 includes:

[0291] like Fig.14 As shown, multiple templates 401 are installed on multiple pallets 500, each template 401 extends along the second direction, and the two ends of each template 401 are respectively positioned on the first end template positioning plate 2012 and the second end template positioning plate 2032, and two adjacent templates 401 are butt-jointed along the third direction to form the bottom wall of the second mold platform cavity 400a, and one end of the first anchor 40 extends into the second mold platform cavity 400a from between the two adjacent templates 401; top side molds 402 arranged at intervals along the second direction are installed on multiple templates 401, each top side mold 402 extends along the third direction, and the two ends are respectively installed on the first pallet support plate 2021 and the second pallet support plate 2041, and are supported on the template 401; side molds 403 arranged at intervals along the third direction are installed on the fixed edge mold, each side mold 403 extends along the second direction, and the two ends are respectively installed on the top side mold 402.

[0292] During the installation of the template 401 , the rubber strips 4011 of two adjacent templates 401 are butted together along the third direction, and one end of the first anchor 40 can extend into the second mold platform cavity 400 a from the butt joint of the rubber strips 4011 between the two adjacent templates 401 .

[0293] At the same time, according to the size of the building wall 1 to be processed, the top side mold 402 slides along the second direction relative to the first pallet support plate 2021 and the second pallet support plate 2041, and the side mold 403 slides along the third direction relative to the top side mold 402. Specifically, the two ends of the top side mold 402 are slidably connected to the first pallet support plate 2021 and the second pallet support plate 2041 through the first side mold connector 4021, and the two ends of the side mold 403 are slidably connected to the top side mold 402 through the second side mold connector 4022.

[0294] It should be noted that the present application includes two groups of production lines, and each group of production lines includes a first production line L1, a third production line L3 and a second production line L2 which are arranged in parallel with each other. Fig.37 One set of production lines is shown in FIG. In some possible embodiments, reference Fig.38, the two production lines are symmetrically arranged. A material channel is arranged between the second production line L2 and the second production line L2 to provide the second production line L2 with materials (such as the frame 200, steel bars, etc.) required for producing the tooling 100. For example, Fig.37 In the group of production lines shown, a material channel is also provided on the side of the second production line L2 to provide the second production line L2 with materials (such as the frame 200, steel bars, etc.) required for producing the tooling 100.

[0295] As mentioned above, the above embodiment provides a tool 100 for producing an "L-shaped" wall, and the tool 100 can be used to produce an "L-shaped" wall. In addition, the tool 100 for producing a building wall in the above embodiment (excluding the second anchor 41) can also produce a "T-shaped" wall. Fig.13 As shown, the "L-shaped" wall includes a first sub-component ( Fig.13 A member extending vertically in the middle) and a second member ( Fig.13 (B member extending transversely in the middle). Fig.40 As shown in (d), the "T-shaped" wall includes a second sub-component ( Fig.40 The vertically extending C member shown in (d)) and the second member ( Fig.40 The laterally extending B member shown in (d)).

[0296] The first sub-component includes a first wall panel 10 and a second wall panel 20 connected by a plurality of anchors (including a first anchor 40 and a second anchor 41), the first wall panel 10 and the second wall panel 20 of the first sub-component enclose a cavity, and a wall structure steel bar 300 is arranged in the cavity of the first sub-component. The second sub-component includes a first wall panel 10 and a second wall panel 20 connected by a plurality of anchors (including a first anchor 40), the first wall panel 10 and the second wall panel 20 of the second sub-component enclose a cavity, and a wall structure steel bar (not shown) is arranged in the cavity of the first sub-component. It is equivalent to that the first sub-component has a first anchor 40 and a second anchor 41, and the second sub-component has a first anchor 40. The second component includes a first wall panel 10 and a second wall panel 20 connected by a first anchor 40. The first wall panel 10 and the second wall panel 20 of the second component form a cavity, and a wall structure steel bar 300 is arranged in the cavity of the second component. The first sub-component and the second sub-component are both perpendicular to the second component, and the cavities of the first sub-component and the second sub-component are both connected with the cavity of the second component.

[0297] Therefore, the present application also provides a method for producing a building wall, the method comprising the following steps:

[0298] Step S10: providing a pre-produced first component, the first component comprising the first sub-component and the second sub-component; the first sub-component is a tooling 100 ( Figure 8 The first sub-component is a finished component produced by using the tooling 100 (shown in the figure) described in any of the above embodiments without the second anchor 41. Figure 5 The second sub-component is a finished component produced by the tooling shown in FIG. 4 , that is, the second sub-component is a "straight-shaped" building wall having a first anchor 40. Exemplarily, the first wall panel 10 of the first sub-component is longer than the second wall panel 20.

[0299] When the first subcomponent is produced in advance, such as Figures 8 to 10 As shown, the first wall panel 10 of the first sub-component is manufactured by a first mold platform, specifically, the building material is poured into the first mold platform cavity of the first mold platform, and the building material in the first mold platform cavity is not solidified; Figure 8 The tooling 100 shown in the figure is overlapped with the first mold platform, and the other end of the first anchor 40 and one end of the second anchor 41 in the tooling 100 are inserted into the uncured building material forming the first wall panel 10; then, as shown in FIG. Fig. 9 As shown, the building material of the second wall panel 20 forming the first sub-component is poured into the second mold cavity 400a. Fig.10 After the building materials of the first wall panel 10 and the second wall panel 20 of the building wall 1 forming the first sub-component are solidified, the above-mentioned tooling 100 is removed to form a finished component (first sub-component), that is, Fig.10 The building wall 1 shown has a first anchor 40 and a second anchor 41. This completes the first sub-component of the prefabricated "L" shaped wall.

[0300] When the second sub-component is produced in advance, the process of forming the second sub-component is the same as the process described in the previous embodiment (forming Figure 1 For details, please refer to the Figure 6 and Figure 7 The description of the above is omitted here. This completes the prefabrication of the second sub-component of the "T"-shaped wall.

[0301] Step S1: The first mold platform for forming the second component is transferred on the first production line L1, and the first mold platform of the second component is transferred to the primary casting station, and the building material is cast into the first mold platform cavity of the first mold platform of the second component at the primary casting station to form the unsolidified first wallboard 10 of the second component. This step is the same as step S1 in the above embodiment.

[0302] Step S2: The first mold platform on which the building material of the first wall panel 10 forming the second component is poured is transferred to the primary combining station. This step is the same as step S2 in the above embodiment.

[0303] Step S3: The tool 100 for forming the second wall panel 20 of the second component is transferred on the second production line L2, and the tool 100 for forming the second component is transferred to the hoisting station, the tool 100 includes the wall structure steel bars 300 located in the cavity of the tool 100, and the second die table 400 located on the upper side of the tool 100, and a plurality of first anchors 40 are fixed on the tool 100, and one end of the first anchor 40 of the second component extends from the bottom wall of the second die table cavity 400a of the second die table 400 into the second die table cavity 40a of the second die table 400. This step is the same as step S3 in the above embodiment.

[0304] Step S4: hoisting the tool 100 for forming the second component at the hoisting station, placing the lower side of the tool 100 on the first mold platform, and inserting the other end of the first anchor 40 in the tool 100 into the unsolidified building material of the first wall panel 10 forming the second component;

[0305] At the same time, when producing "L" shaped walls, refer to Fig.11 , hoist the first sub-component, insert the other end of the second anchor 41 of the first sub-component into the unsolidified building material of the first wall panel 10 forming the second component, the first wall panel 10 of the first sub-component is vertically connected to the first wall panel 10 of the second component, and the second wall panel 20 of the first sub-component is vertically connected to the end of the tooling 100 forming the second wall panel 20 of the second component, so as to form a first empty formwork platform. Fig.11 As shown, the second mold cavity 400a of the second mold stage 400 is located on the side of the second wall panel 20 of the first sub-component ( Fig.11 The left side is shown in the figure). Fig.11 , grab the first subcomponent, then turn it 90 degrees, Fig.10 The building wall 1 ( Fig.11 The wall extending in the Z direction) and Figure 5 The tooling 100 shown is overlapped, and the other end of the second anchor 41 is inserted into Figure 5 Another building wall 1 ( Fig.11 The unsolidified building materials of the first wall panels 10 are pre-cast to form the walls extending along the Y direction. The first wall panels 10 of the two walls are perpendicular to each other, and the second wall panels 20 of the two walls are perpendicular to each other.

[0306] When producing "T" shaped walls, refer to Fig.40In (a) and (b), the second sub-component is hoisted, and the first wall panel 10 and the second wall panel 20 of the second sub-component are vertically connected to the tooling 100 forming the second wall panel of the second component to form a second empty mold platform. Fig.40 As shown in (a) and (b), the second sub-component has a second mold stage cavity 400a of the second mold stage 400 on opposite sides thereof.

[0307] That is, the tool 100 for forming the second wall panel of the second component has two second die table cavities 400a. Figure 3 , Figure 4 and Fig.31 , the second mold platform 400 is provided with four side molds 403 at intervals along the third direction, and the multiple templates 401 on the left and right sides, the top mold 402 and the side molds 403 surround two second mold platform cavities 400a. The positions of the two middle side molds 403 are used to place the above-mentioned second sub-components, so that the second sub-component is located between the two second mold platform cavities 400a of the tooling 100 that forms the second wall panel of the second component. Exemplarily, the templates 401 are not placed at the positions of the two middle side molds 403, so that the cavity of the second sub-component is connected to the cavity of the tooling 100, and then after the processing of the "T-shaped" wall is completed and the tooling 100 is removed, the cavity of the second sub-component is connected to the cavity of the second component.

[0308] refer to Fig.40 In (a) and (b), the second sub-component is picked up and then turned over 90 degrees, and the tooling 100 shown in (a) of 40 is overlapped with the second sub-component, and the side surface of the first wall panel 10 of the second sub-component is vertically connected to the corresponding second mold platform cavity 400a, and the side surface of the second wall panel 20 of the second sub-component is vertically connected to the corresponding second mold platform cavity 400a.

[0309] Step S5: The first empty mold platform or the second empty mold platform is transferred on the third production line L3, and the first empty mold platform or the second empty mold platform is transferred to the secondary casting station, and the building material is cast into the second mold platform cavity 400a of the second mold platform 400 at the secondary casting station to form an unsolidified second wall panel 20 of the second component, and the building material in the second mold platform cavity 400a of the second mold platform 400 is connected to the side of the first wall panel 10 of the first sub-component (refer to Fig.12 ), or, the building material in the second mold cavity 400a of the second mold 400 is connected to the side of the first wall panel 10 of the second sub-component and the side of the second wall panel 20 (refer to Fig.40 (as shown in (c)).

[0310] exist Fig.11 and Fig.12After the building material of the second component is poured into the second mold cavity 400a, the building material in the second mold cavity 400a of the second mold 400 is connected to the first wallboard 10 of the first sub-component. After the building material in the second mold cavity 400a of the second mold 400 solidifies, it can be fixedly connected to the first wallboard 10 of the first sub-component.

[0311] Or, in Fig.40 After the building materials of the second component are poured into the two second mold cavities 400a shown in (b) and (c), the building materials in the second mold cavity 400a of the second mold 400 are respectively connected to the side of the first wall panel 10 and the side of the second wall panel 20 of the second sub-component. After the building materials in the second mold cavity 400a of the second mold 400 are solidified, they can be fixedly connected to the first wall panel 10 and the second wall panel 20 of the second sub-component.

[0312] Step S6: After the first wall panel 10 and the second wall panel 20 of the second component are solidified, the first empty mold platform or the second empty mold platform is transferred to the demolding station on the third production line L3, and the second mold platform 400 and the tooling 100 are removed at the demolding station to form a finished component, that is, a "T"-shaped wall or an "L"-shaped wall is formed.

[0313] The first empty formwork table or the second empty formwork table is also transferred to the curing kiln on the third production line L3. After curing in the curing kiln, the uncured building materials of the first wall panel 10 and the second wall panel 20 forming the second component in the first empty formwork table or the second empty formwork table are cured. After the first wall panel 10 and the second wall panel 20 of the second component are cured, the first empty formwork table or the second empty formwork table is transferred from the curing kiln to the demoulding station. Fig.13 After the building materials of the first wall panel 10 and the second wall panel 20 forming the second component are solidified, the tooling 100 is removed to form a finished component. Fig.13 The "L-shaped" building wall shown. Fig.40 As shown in (d), after the building materials of the first wall panel 10 and the second wall panel 20 forming the second component are solidified, the tooling 100 is removed to form a finished component. Fig.40 The “T-shaped” building wall shown in (d).

[0314] In some possible implementations, the production method further includes step S20: the first subcomponent or the second subcomponent is transferred on the first production line L1, the first subcomponent or the second subcomponent is transferred to the secondary combination station, and then transferred from the secondary combination station to the third production line L3 or the second production line L2. After the tooling to form the second component is assembled with the first mold platform at the primary combination station and transferred to the secondary combination station of the first production line L1 or the ferry station of the third production line L3, it is assembled with the first subcomponent or the second subcomponent to form the above-mentioned first empty mold platform or the second empty mold platform.

[0315] Exemplarily, the first empty mold table or the second empty mold table is formed at the secondary combination station on the first production line, and the secondary combination station is located in front of the transmission direction of the primary combination station. Exemplarily, the first subcomponent or the second subcomponent is transmitted from the secondary combination station to the secondary ferry station on the third production line L3, and the secondary ferry station is located behind the transmission direction of the ferry station. Alternatively, the first subcomponent or the second subcomponent is transmitted from the secondary combination station to the secondary hoisting station on the second production line L2, and the secondary hoisting station is located in front of the transmission direction of the primary hoisting station. After the first subcomponent or the second subcomponent is transmitted to the second production line L2 or the third production line L3, after the tooling for forming the second component is transmitted to the secondary combination station, the first subcomponent or the second subcomponent is hoisted to the secondary combination station and assembled with the tooling for forming the second component to form the above-mentioned first empty mold table or the second empty mold table.

[0316] It should be noted that the first subcomponent or the second subcomponent provided in the present application is not limited to being transmitted on the first production line L1, and may also be transmitted on the second production line L2. For example, the first subcomponent or the second subcomponent is transmitted to the secondary lifting station on the second production line L2.

[0317] In addition, in some possible embodiments, the tooling for forming the second component is assembled with the first mold platform at a ferry station on the third production line L3, and the first sub-component and the second sub-component are hoisted to the ferry station and assembled with the tooling for forming the second component to form the above-mentioned first empty mold platform or second empty mold platform.

[0318] refer to Fig.39 As shown in (a) and (b), the present application also provides a method for producing a building wall, comprising the following steps:

[0319] Step S7: Fig.39 As shown in (a), an uncured third wall panel 10a is provided.

[0320] Exemplarily, the specific steps of providing the unsolidified third wall panel 10a include: transmitting the third mold platform on the first production line L1, the third mold platform is transmitted to the primary casting station, and the building material is cast into the third mold platform cavity of the third mold platform at the primary casting station to form the unsolidified third wall panel 10a. Exemplarily, the shape and structure of the third mold platform can be the same as the shape and structure of the second mold platform 400 in the above embodiment (including the mold plate 401, the top mold 402 and the side mold 403). The building material is formed, for example, of concrete or other cement-based materials. Exemplarily, the structure of the third wall panel 10a is the same as the structure of the first wall panel 10.

[0321] Step S8: hoist the finished component (i.e., the "I-shaped" building wall, excluding the second anchor 41) formed in the above embodiment, and insert the first wall panel 10 and the second wall panel 20 of the finished component into the unsolidified building material forming the third wall panel 10a. The first wall panel 10 and the second wall panel 20 are respectively perpendicular to the third wall panel 10a. After the third wall panel 10a solidifies, a frame beam is formed. That is, the "I-shaped" building wall formed above and another prefabricated straight wall panel are spliced ​​to form a frame beam. Exemplarily, the prefabricated straight wall panel closes one end of the cavity of the "I-shaped" building wall.

[0322] For example, after the "I-shaped" building wall is spliced ​​with another prefabricated straight wall panel ( Fig.39 The structure shown in (b) is transferred to the curing kiln on the third production line L3. After being cured in the curing kiln, the unsolidified building materials forming the third wall panel 10a solidify. After the third wall panel 10a solidifies, the third wall panel 10a is fixedly connected to the first wall panel 10 and the second wall panel, respectively.

[0323] Although the present invention has been illustrated and described with reference to certain preferred embodiments of the present invention, it should be understood by those skilled in the art that the above is a further detailed description of the present invention in conjunction with specific embodiments, and it cannot be determined that the specific implementation of the present invention is limited to these descriptions. Those skilled in the art may make various changes in form and details, including making several simple deductions or substitutions, without departing from the spirit and scope of the present invention.

Claims

1. A method for producing a building wall, the building wall comprising a first wall panel and a second wall panel connected by a plurality of anchors, the first wall panel and the second wall panel enclosing a cavity, the cavity being provided with wall structural steel bars; characterized in that: The following steps are involved: Step S1: a first mold platform is transferred on a first production line, and the first mold platform is transferred to a primary casting station, and a building material is cast into a first mold platform cavity of the first mold platform at the primary casting station to form an unsolidified first wall panel; Step S2: transporting the first mold platform on which the building material forming the first wall panel is poured to a primary combining station; Step S3: a tool for forming a second wall panel is transmitted on a second production line, the tool is used for processing a building wall, the structure of the tool is different from the structure of the building wall, the tool is transmitted to a hoisting station, the tool comprises a wall structure steel bar located in a cavity of the tool, and a second mold platform located on an upper side of the tool, a plurality of first anchors are fixed on the tool, and one end of the first anchor extends from a bottom wall of the second mold platform mold cavity of the second mold platform into the second mold platform mold cavity of the second mold platform; Step S4: hoisting the tooling located at the hoisting station to place the lower side of the tooling on the first formwork platform, and inserting the other end of the first anchor into the unsolidified building material forming the first wall panel to form an empty formwork platform; Step S5: the empty mold platform is transported on a third production line, and the empty mold platform is transported to a secondary casting station, and building materials are cast into the second mold platform cavity of the second mold platform at the secondary casting station to form an unsolidified second wall panel, wherein one end of the first anchor is located in the unsolidified building material forming the second wall panel; Step S6: After the first wall panel and the second wall panel are solidified, the empty formwork table is transferred to a demolding station on the third production line, and the second formwork table and the tooling are removed at the demolding station to form a finished component, which is a building wall having a first anchor and a second anchor.

2. The method according to claim 1, characterized in that The first wall panel is parallel to the second wall panel.

3. The method according to claim 1, characterized in that The third production line is provided with a ferry station. After the empty mold platform is formed at the primary combining station, the empty mold platform is hoisted to the ferry station on the third production line.

4. The method according to claim 1, characterized in that The third production line is provided with a curing kiln, and the empty formwork table is transferred to the curing kiln on the third production line. After the first wall panel and the second wall panel are solidified, the empty formwork table is transferred from the curing kiln to the demolding station.

5. The method according to any one of claims 1 to 4, characterized in that: In step S3, the specific steps of transmitting the tooling for forming the second wall panel on the second production line include: Step S31: transporting a frame on the second production line, the frame having a frame cavity penetrating up and down along a first direction, and the lower side of the frame in the first direction is used to be placed on the first mold platform; Step S32: installing the lower layer of steel bars of the wall structure steel bars in the frame cavity; Step S33: installing an anchor fixing assembly in the frame cavity, wherein at least a portion of the anchor fixing assembly is located in the frame cavity and connected to the frame, and a plurality of the first anchors are fixed to the anchor fixing assembly; Step S34: installing the upper layer of the wall structure steel bars in the frame cavity, wherein the upper layer of the steel bars is located above the anchor fixing assembly, and tying the lower layer of the steel bars to the upper layer of the steel bars; Step S35: installing the second mold platform on the upper side of the frame in the first direction.

6. The method according to claim 5, characterized in that The framework includes: A first crossbeam and a second crossbeam are arranged at intervals along the second direction, the first crossbeam and the second crossbeam extend along the third direction respectively, and the first direction, the second direction and the third direction are perpendicular to each other; A first longitudinal beam and a second longitudinal beam are arranged at intervals along the third direction, and the first longitudinal beam and the second longitudinal beam extend along the second direction respectively; wherein, The first cross beam, the first longitudinal beam, the second cross beam and the second longitudinal beam are sequentially connected to enclose the frame cavity.

7. The method according to claim 6, characterized in that The step S33 further includes the following steps: Step S331: fixing a plurality of second anchors on the anchor fixing assembly; In the step S4, after placing the lower side of the tool on the first mold platform, one end of the second anchor is inserted into the unsolidified building material forming the first wall panel; The other end of the second anchor is used to insert the unsolidified building materials of the pre-cast first wall panel of another building wall, the two first wall panels are perpendicular to each other, and the other building wall also includes a second wall panel and a first wall panel connected by multiple first anchors, and the second wall panel and the first wall panel of the other building wall form a cavity.

8. The method according to claim 6 or 7, characterized in that The tooling also includes: A first end positioning tooling beam and a second end positioning tooling beam are arranged at intervals along the second direction, the first end positioning tooling beam and the second end positioning tooling beam are installed in the frame cavity and extend along the third direction respectively; A plurality of first end positioning blocks are mounted on a surface of the first end positioning tooling beam facing the second end positioning tooling beam and are spaced apart along the third direction; A plurality of second end positioning blocks are mounted on a surface of the second end positioning tooling beam facing the first end positioning tooling beam and are arranged at intervals along the third direction, and each of the first end positioning blocks corresponds to each of the second end positioning blocks one by one along the second direction; In the step S33, the specific steps of installing the anchor fixing assembly in the frame cavity include: Step S331: installing a plurality of fixing parts on a plurality of the first end positioning blocks and a plurality of the second end positioning blocks, each of the fixing parts respectively extending along the second direction, both ends of each of the fixing parts in the second direction corresponding to a first end positioning block and a second end positioning block, and respectively positioned at the first end positioning block and the second end positioning block, and fixing a plurality of the first anchors spaced apart along the second direction on each of the fixing parts; or, A plurality of second anchors spaced apart along the second direction are fixed to at least one of the fixing parts, and a plurality of first anchors spaced apart along the second direction are fixed to each of the remaining fixing parts.

9. The method according to claim 8, characterized in that Each of the fixing parts comprises: A mounting portion extending along the second direction, the mounting portion having a mounting surface, the mounting surface being located on one side of the mounting portion in the third direction and being used to fit with the first anchor or the second anchor; A plurality of groups of first positioning parts are arranged on the mounting surface at intervals along the second direction, each group of the first positioning parts comprises at least two protrusions, all the protrusions of each group are on the same straight line, the angle between the connecting line of all the protrusions of each group and the second direction is a set angle, and the protrusions of each group are used to pass through the through holes of the first anchor or the second anchor when the first anchor or the second anchor is attached to the mounting surface along the third direction; The second positioning portion includes a clamping strip and at least two clamping portions, and the at least two clamping portions are arranged on the mounting surface at intervals along the second direction. The clamping strip is used to respectively abut against the first anchor and the clamping portion along the first direction after the through hole of the first anchor or the second anchor is sleeved on the protrusion and fits against the mounting surface, so that the movement of the first anchor in the first direction is restricted, so that the first anchor is fixed to the fixing portion; or, respectively abut against the second anchor and the clamping portion along the first direction, so that the movement of the second anchor in the first direction is restricted, so that the second anchor is fixed to the fixing portion.

10. The method according to claim 9, characterized in that When the mounting surface is in contact with the first anchor, the angle between the connecting line of each group of protrusions on the mounting surface in contact with the first anchor and the second direction is 90°, and the first anchor extends along the first direction.

11. The method according to claim 9, characterized in that When the mounting surface is in contact with the second anchor, the angle between the connecting line of each group of protrusions on the mounting surface in contact with the second anchor and the second direction is an obtuse angle, the second anchor extends along a fourth direction, and the angle between the fourth direction and the second direction is the obtuse angle.

12. The method according to claim 8, characterized in that The two ends of the first end positioning tooling beam in the third direction are respectively provided with first push-pull handles, and the two ends of the second end positioning tooling beam in the third direction are respectively provided with second push-pull handles; The two ends of the first longitudinal beam in the second direction are respectively provided with first moving grooves, and the two ends of the second longitudinal beam in the second direction are respectively provided with second moving grooves; The first push-pull handle extends out of the first moving groove and the second moving groove respectively, and is capable of moving relative to the first moving groove and the second moving groove to a set position along the second direction, and the first push-pull handle is fixed relative to the first longitudinal beam and the second longitudinal beam respectively by a first positioning assembly; The second push-pull handles extend out of the first moving groove and the second moving groove respectively, and are capable of moving to a set position relative to the first moving groove and the second moving groove along the second direction. Each of the second push-pull handles is fixed relative to the first longitudinal beam and the second longitudinal beam by a second positioning assembly.

13. The method according to any one of claims 6 to 12, characterized in that: The tooling also includes: a first pallet support plate and a second pallet support plate arranged at intervals along the third direction, wherein the first pallet support plate and the second pallet support plate are respectively mounted on upper sides of the first longitudinal beam and the second longitudinal beam in the first direction and extend respectively along the second direction; In the step S35, the step of installing the second mold platform on the upper side of the frame in the first direction specifically includes the following steps: Step S351: installing a plurality of pallets spaced apart along the second direction on the first pallet support plate and the second pallet support plate, and installing the second mold platform on the plurality of pallets; wherein, Each of the pallets extends along the third direction, and both ends of each of the pallets are respectively supported on the first pallet support plate and the second pallet support plate, and each of the pallets is located on each of the anchor fixing components along the first direction.

14. The method according to claim 13, characterized in that The first pallet support plate can slide to a set position relative to the first longitudinal beam along the third direction, and then be fixed relative to the first longitudinal beam by a third positioning assembly; the second pallet support plate can slide to a set position relative to the second longitudinal beam along the third direction, and then be fixed relative to the second longitudinal beam by a fourth positioning assembly.

15. The method according to claim 13, characterized in that The tooling also includes: A first end template positioning plate and a second end template positioning plate are arranged at intervals along the second direction, the first end template positioning plate and the second end template positioning plate extend along the third direction respectively, the first end template positioning plate is installed on the upper side of the first end positioning tooling beam in the first direction, and the second end template positioning plate is installed on the upper side of the second end positioning tooling beam in the first direction; In the step S351, the step of installing the second mold platform on the plurality of the support plates includes: Install multiple templates, each template extends along the second direction, two ends of each template are respectively positioned on the first end template positioning plate and the second end template positioning plate, two adjacent templates are butted and bonded along the third direction to form the bottom wall of the second mold platform cavity, and one end of the first anchor extends from between two adjacent templates into the second mold platform cavity; Installing top side molds spaced apart along the second direction, each of the top side molds extending along the third direction, and having two ends respectively installed on the first pallet support plate and the second pallet support plate, and being supported on the template; Install side molds spaced apart along the third direction, each of the side molds extending along the second direction, and two ends of the side molds are respectively installed on the top mold; The plurality of mold plates, the top mold plate and the side mold plate form the second mold platform cavity.

16. The method according to claim 15, characterized in that At least one of the two sides of the third direction of the template is provided with a rubber strip, and the rubber strips of two adjacent templates are butted together along the third direction. One end of the first anchor can extend into the second mold platform cavity from the butt joint of the rubber strips between the two adjacent templates.

17. The method according to claim 15, characterized in that The top side mold can slide relative to the first pallet support plate and the second pallet support plate along the second direction, and the side mold can slide relative to the top side mold along the third direction.

18. The method according to claim 17, characterized in that The two ends of the top side mold are respectively slidably connected to the first pallet support plate and the second pallet support plate through the first side mold connecting piece; The first side mold connecting member comprises: a first slot and a first slide groove connected to each other, along the first direction, the first slot is located above the first slide groove, the first slot extends along the third direction, and the first slide groove extends along the second direction; The two ends of the top side mold are respectively inserted into the first slots of the corresponding first side mold connecting parts, and the first pallet support plate and the second pallet support plate are respectively provided with slide rails extending along the second direction, and the first slide groove and the corresponding slide rail cooperate with each other, and the first slide groove and the slide rail can produce relative sliding in the second direction.

19. The method according to claim 17, characterized in that The two ends of the side mold are respectively slidably connected to the top mold through the second side mold connecting pieces; The second side mold connecting member comprises: a second slide groove and a plug-in portion connected to each other, wherein along the second direction, the plug-in portion is located on a side of the second slide groove, the second slide groove extends along the third direction, and the plug-in portion extends along the second direction; The two ends of the side mold are respectively plugged into the plug-in parts of the corresponding second side mold connecting piece, and the top side mold passes through the second slide groove of the corresponding second side mold connecting piece. The second slide groove and the corresponding top side mold cooperate with each other, and the second slide groove and the top side mold can produce relative sliding in the third direction.

20. The method according to any one of claims 1 to 6, 8 to 10, 12 to 19, characterized in that The following steps are also included: Step S7: providing an unsolidified third wallboard; Step S8: hoist the finished component, and insert the first wall panel and the second wall panel of the finished component into the unsolidified building materials forming the third wall panel, the first wall panel and the second wall panel are respectively perpendicular to the third wall panel, and after the third wall panel solidifies, a frame beam is formed.

21. The method of claim 20, wherein: In step S7, the specific steps of providing the unsolidified third wall panel include: transferring the third mold platform on the first production line, transferring the third mold platform to the primary casting station, and casting building materials into the third mold platform cavity of the third mold platform at the primary casting station to form the unsolidified third wall panel.

22. A method for producing a building wall, characterized in that: The building wall comprises a first component and a second component, wherein the first component comprises a first wall panel and a second wall panel connected by a plurality of anchors, the first wall panel and the second wall panel of the first component enclose a cavity, and a wall structure steel bar is arranged in the cavity of the first component; the second component comprises a first wall panel and a second wall panel connected by a plurality of anchors, the first wall panel and the second wall panel of the second component enclose a cavity, and a wall structure steel bar is arranged in the cavity of the second component; The first member is perpendicular to the second member, and the cavity of the first member is connected to the cavity of the second member; The method comprises the following steps: Step S10: providing a pre-produced first component, the first component comprising a first sub-component and a second sub-component, the first sub-component being a finished component formed by the method according to any one of claims 7 to 19, and the second sub-component being a finished component formed by the method according to any one of claims 1 to 6, 8 to 10, and 12 to 19; Step S1: a first mold platform for forming the second component is transferred on a first production line, and the first mold platform of the second component is transferred to a primary casting station, and a building material is cast into a first mold platform cavity of the first mold platform of the second component at the primary casting station to form an unsolidified first wallboard of the second component; Step S2: transporting the first mold platform on which the building material for the first wall panel forming the second component is poured to a primary combining station; Step S3: a tool for forming a second wall panel of the second component is transferred on a second production line, and the tool for forming the second component is transferred to a hoisting station, wherein the tool comprises a wall structure steel bar located in a cavity of the tool, and a second die table located on an upper side of the tool, and a plurality of first anchors are fixed on the tool, and one end of the first anchor of the second component extends from a bottom wall of the second die table cavity of the second die table into the second die table cavity of the second die table; Step S4: hoisting the tooling for forming the second component located at the hoisting station, so as to place the lower side of the tooling on the first mold platform, and inserting the other end of the first anchor in the tooling into the unsolidified building material of the first wallboard forming the second component; Hoist the first sub-component, insert the other end of the second anchor of the first sub-component into the unsolidified building material of the first wall panel forming the second component, the first wall panel of the first sub-component is vertically connected to the first wall panel of the second component, the second wall panel of the first sub-component is vertically connected to the end of the tooling forming the second wall panel of the second component, so as to form a first empty mold platform, and the second mold platform cavity of the second mold platform is located on the side of the second wall panel of the first sub-component; or, Hoisting the second sub-component, the first wall panel and the second wall panel of the second sub-component are vertically connected to the tooling forming the second wall panel of the second component to form a second empty mold platform, and the second sub-component has second mold platform cavities of the second mold platform on opposite sides respectively; Step S5: The first empty mold platform or the second empty mold platform is transferred on the third production line, and the first empty mold platform or the second empty mold platform is transferred to a secondary casting station, and building materials are cast into the second mold platform cavity of the second mold platform at the secondary casting station to form an unsolidified second wallboard of the second component, and the building materials in the second mold platform cavity of the second mold platform are connected to the side of the first wallboard of the first sub-component, or the building materials in the second mold platform cavity of the second mold platform are connected to the side of the first wallboard of the second sub-component and the side of the second wallboard; Step S6: after the first wall panel and the second wall panel of the second component are solidified, the first empty mold platform or the second empty mold platform is transferred to a demolding station on the third production line, and the second mold platform and the tooling are removed at the demolding station to form a finished component.

23. The method of claim 22, wherein: The method further includes step S20: transferring the first subcomponent or the second subcomponent on the first production line, transferring the first subcomponent or the second subcomponent to a secondary combining station, and then transferring the first subcomponent or the second subcomponent from the secondary combining station to the third production line or the second production line.

24. The method of claim 22, wherein: The first empty mold stage or the second empty mold stage is formed at a secondary bonding station on the first production line, and the secondary bonding station is located in front of the primary bonding station in a transmission direction.

25. The method of claim 22, wherein: The finished components include T-shaped building walls and L-shaped building walls.

26. The method according to claim 22 or 24, characterized in that The third production line is provided with a ferry station. After the first empty mold platform or the second empty mold platform is formed, the first empty mold platform or the second empty mold platform is hoisted to the ferry station on the third production line.

27. The method of claim 22, wherein: The third production line is provided with a curing kiln, and the first empty mold table or the second empty mold table is transferred to the curing kiln on the third production line. After the first wall panel and the second wall panel are solidified, the first empty mold table or the second empty mold table is transferred from the curing kiln to the demolding station.

28. The method according to any one of claims 22 to 27, characterized in that In step S3, the specific steps of transmitting the tooling for forming the second wall panel on the second production line include: Step S31: transporting a frame on the second production line, the frame having a frame cavity penetrating up and down along a first direction, and the lower side of the frame in the first direction is used to be placed on the first mold platform; Step S32: installing the lower layer of steel bars of the wall structure steel bars in the frame cavity; Step S33: installing an anchor fixing assembly in the frame cavity, wherein at least a portion of the anchor fixing assembly is located in the frame cavity and connected to the frame, and a plurality of the first anchors are fixed to the anchor fixing assembly; Step S34: installing the upper layer of the wall structure steel bars in the frame cavity, wherein the upper layer of the steel bars is located above the anchor fixing assembly, and tying the lower layer of the steel bars to the upper layer of the steel bars; Step S35: installing the second mold platform on the upper side of the frame in the first direction.

29. The method of claim 28, wherein: The framework includes: A first crossbeam and a second crossbeam are arranged at intervals along the second direction, the first crossbeam and the second crossbeam extend along the third direction respectively, and the first direction, the second direction and the third direction are perpendicular to each other; A first longitudinal beam and a second longitudinal beam are arranged at intervals along the third direction, and the first longitudinal beam and the second longitudinal beam extend along the second direction respectively; wherein, The first cross beam, the first longitudinal beam, the second cross beam and the second longitudinal beam are sequentially connected to enclose the frame cavity.

30. The method of claim 29, wherein: The tooling also includes: A first end positioning tooling beam and a second end positioning tooling beam are arranged at intervals along the second direction, the first end positioning tooling beam and the second end positioning tooling beam are installed in the frame cavity and extend along the third direction respectively; A plurality of first end positioning blocks are mounted on a surface of the first end positioning tooling beam facing the second end positioning tooling beam and are spaced apart along the third direction; A plurality of second end positioning blocks are mounted on a surface of the second end positioning tooling beam facing the first end positioning tooling beam and are arranged at intervals along the third direction, and each of the first end positioning blocks corresponds to each of the second end positioning blocks one by one along the second direction; In the step S33, the specific steps of installing the anchor fixing assembly in the frame cavity include: Step S331: Install multiple fixing parts on multiple first end positioning blocks and multiple second end positioning blocks, each of the fixing parts extends along the second direction respectively, and the two ends of each of the fixing parts in the second direction correspond to a first end positioning block and a second end positioning block, and are respectively positioned on the first end positioning block and the second end positioning block, and multiple first anchors spaced apart along the second direction are fixed on each of the fixing parts.

31. The method of claim 30, wherein: Each of the fixing parts comprises: A mounting portion extending along the second direction, the mounting portion having a mounting surface, the mounting surface being located on one side of the mounting portion in the third direction and being adapted to be fitted with the first anchor; A plurality of groups of first positioning portions are arranged on the mounting surface at intervals along the second direction, each group of the first positioning portions comprises at least two protrusions, all the protrusions of each group are on the same straight line, the angle between the connecting line of all the protrusions of each group and the second direction is a set angle, and the protrusions of each group are used to pass through the through hole of the first anchor when the first anchor is attached to the mounting surface along the third direction; The second positioning portion includes a clamping strip and at least two clamping portions, and the at least two clamping portions are arranged on the mounting surface at intervals along the second direction. The clamping strip is used to respectively abut against the first anchor and the clamping portions along the first direction after the through hole of the first anchor is sleeved on the protrusion and fits with the mounting surface. The movement of the first anchor in the first direction is restricted, so as to fix the first anchor on the fixing portion.

32. The method of claim 31, wherein: When the mounting surface is in contact with the first anchor, the angle between the connecting line of each group of protrusions on the mounting surface in contact with the first anchor and the second direction is 90°, and the first anchor extends along the first direction.

33. The method of claim 30, wherein: The two ends of the first end positioning tooling beam in the third direction are respectively provided with first push-pull handles, and the two ends of the second end positioning tooling beam in the third direction are respectively provided with second push-pull handles; The two ends of the first longitudinal beam in the second direction are respectively provided with first moving grooves, and the two ends of the second longitudinal beam in the second direction are respectively provided with second moving grooves; The first push-pull handle extends out of the first moving groove and the second moving groove respectively, and is capable of moving relative to the first moving groove and the second moving groove to a set position along the second direction, and the first push-pull handle is fixed relative to the first longitudinal beam and the second longitudinal beam respectively by a first positioning assembly; The second push-pull handles extend out of the first moving groove and the second moving groove respectively, and are capable of moving to a set position relative to the first moving groove and the second moving groove along the second direction. Each of the second push-pull handles is fixed relative to the first longitudinal beam and the second longitudinal beam by a second positioning assembly.

34. The method according to any one of claims 29 to 33, characterized in that The tooling also includes: a first pallet support plate and a second pallet support plate arranged at intervals along the third direction, wherein the first pallet support plate and the second pallet support plate are respectively mounted on upper sides of the first longitudinal beam and the second longitudinal beam in the first direction and extend respectively along the second direction; In the step S35, the step of installing the second mold platform on the upper side of the frame in the first direction specifically includes the following steps: Step S351: installing a plurality of pallets spaced apart along the second direction on the first pallet support plate and the second pallet support plate, and installing the second mold platform on the plurality of pallets; wherein, Each of the pallets extends along the third direction, and both ends of each of the pallets are respectively supported on the first pallet support plate and the second pallet support plate, and each of the pallets is located on each of the anchor fixing components along the first direction.

35. The method of claim 34, wherein: The first pallet support plate can slide to a set position relative to the first longitudinal beam along the third direction, and then be fixed relative to the first longitudinal beam by a third positioning assembly; the second pallet support plate can slide to a set position relative to the second longitudinal beam along the third direction, and then be fixed relative to the second longitudinal beam by a fourth positioning assembly.

36. The method of claim 34, wherein: The tooling also includes: A first end template positioning plate and a second end template positioning plate are arranged at intervals along the second direction, the first end template positioning plate and the second end template positioning plate extend along the third direction respectively, the first end template positioning plate is installed on the upper side of the first end positioning tooling beam in the first direction, and the second end template positioning plate is installed on the upper side of the second end positioning tooling beam in the first direction; In the step S351, the step of installing the second mold platform on the plurality of the support plates includes: Install multiple templates, each template extends along the second direction, two ends of each template are respectively positioned on the first end template positioning plate and the second end template positioning plate, two adjacent templates are butted and bonded along the third direction to form the bottom wall of the second mold platform cavity, and one end of the first anchor extends from between two adjacent templates into the second mold platform cavity; Installing top side molds spaced apart along the second direction, each of the top side molds extending along the third direction, and having two ends respectively installed on the first pallet support plate and the second pallet support plate, and being supported on the template; Install side molds spaced apart along the third direction, each of the side molds extending along the second direction, and two ends of the side molds are respectively installed on the top mold; The plurality of mold plates, the top mold plate and the side mold plate form the second mold platform cavity.

37. The method of claim 36, wherein: At least one of the two sides of the third direction of the template is provided with a rubber strip, and the rubber strips of two adjacent templates are butted together along the third direction. One end of the first anchor can extend into the second mold platform cavity from the butt joint of the rubber strips between the two adjacent templates.

38. The method of claim 36, wherein: The top side mold can slide relative to the first pallet support plate and the second pallet support plate along the second direction, and the side mold can slide relative to the top side mold along the third direction.

39. The method of claim 38, wherein: The two ends of the top side mold are respectively slidably connected to the first pallet support plate and the second pallet support plate through the first side mold connecting piece; The first side mold connecting member comprises: a first slot and a first slide groove connected to each other, along the first direction, the first slot is located above the first slide groove, the first slot extends along the third direction, and the first slide groove extends along the second direction; The two ends of the top side mold are respectively inserted into the first slots of the corresponding first side mold connecting parts, and the first pallet support plate and the second pallet support plate are respectively provided with slide rails extending along the second direction, and the first slide groove and the corresponding slide rail cooperate with each other, and the first slide groove and the slide rail can produce relative sliding in the second direction.

40. The method of claim 38, wherein: The two ends of the side mold are respectively slidably connected to the top mold through the second side mold connecting pieces; The second side mold connecting member comprises: a second slide groove and a plug-in portion connected to each other, wherein along the second direction, the plug-in portion is located on a side of the second slide groove, the second slide groove extends along the third direction, and the plug-in portion extends along the second direction; The two ends of the side mold are respectively plugged into the plug-in parts of the corresponding second side mold connecting piece, and the top side mold passes through the second slide groove of the corresponding second side mold connecting piece. The second slide groove and the corresponding top side mold cooperate with each other, and the second slide groove and the top side mold can produce relative sliding in the third direction.