Tower crane safety monitoring device and working method

Through the design of the tower crane safety monitoring device, the infrared vertical alignment is achieved using electric hoist ropes and sliding seats. Combined with the heat dissipation protection mechanism, the problems of low monitoring accuracy and sunlight interference at high altitude are solved, and the safety and monitoring accuracy of the tower crane are improved.

CN119079846APending Publication Date: 2024-12-06CHINA MCC17 GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411181014.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-27
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The existing tower crane skew monitoring device has low monitoring accuracy at high altitudes, and external sunlight during the day affects infrared transmission, resulting in poor monitoring effect.

Method used

A tower crane safety monitoring device is designed, including a monitoring mechanism, an installation mechanism and a protective mechanism. The monitoring mechanism realizes vertical alignment of the infrared transmitter and receiver through the electric hoist rope and the sliding seat, and the alarm light indicates a non-vertical state; the installation mechanism facilitates the installation and removal of the height sensor; the protection mechanism uses heat dissipation holes and heat conductors to prevent sunlight from affecting infrared rays.

Benefits of technology

It improves the accuracy and safety of tower crane verticality monitoring, ensures the accuracy of monitoring at high altitudes, and simplifies the installation and disassembly of sensors, avoiding the impact of sunlight interference on infrared accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119079846A_ABST
    Figure CN119079846A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of tower crane monitoring, and discloses a tower crane safety monitoring device and a working method.The tower crane safety monitoring device comprises a tower crane body, a monitoring mechanism is arranged outside the tower crane body, a mounting mechanism is arranged outside the tower crane body, a protection mechanism is arranged outside the monitoring mechanism, and the monitoring mechanism comprises a connecting shell; the inner side of the connecting shell is slidably connected with a sliding seat, one end of the sliding seat is fixedly connected with a measuring seat, the top of the measuring seat is fixedly connected with a vertical plate, one end of the vertical plate is fixedly connected with a parallel plate, the bottom of the parallel plate is provided with an infrared emitter, and the top of the parallel plate is provided with a lifting assembly. According to the safety monitoring device for the tower crane, a worker can observe the position of the measuring seat through the monitoring mechanism, so that a non-vertical point can be known, the perpendicularity monitoring operation is completed, and the effect of improving the safety is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tower crane monitoring, and in particular to a tower crane safety monitoring device and a working method. Background Art

[0002] Tower crane is also called tower crane, which is a rotating crane with boom mounted on the top of a tall tower. It has a large working space and is mainly used for vertical and horizontal transportation of materials and installation of building components in house construction. It consists of three parts: metal structure, working mechanism and electrical system. The metal structure includes the tower body, boom and base. The working mechanism has four parts: lifting, luffing, rotation and travel. The electrical system includes motors, controllers, distribution cabinets, connecting lines, signals and lighting devices, etc.

[0003] According to a tower crane deflection monitoring device disclosed in Chinese patent publication number CN215666703U, the device includes an infrared transmitter, an infrared receiver, a controller and an alarm, wherein the infrared transmitter is connected to a first mounting seat, the first mounting seat is used to connect to the upper end of the tower body; the infrared receiver is connected to a second mounting seat, the second mounting seat is used to connect to the lower end of the tower body; the controller is connected to both the infrared receiver and the alarm. Once the tower crane deflects, the infrared receiver cannot receive the infrared rays emitted by the infrared transmitter, and the controller controls the alarm to sound an alarm.

[0004] However, when the device is in use, due to the limited transmission distance of infrared rays, the monitoring accuracy is not high when the tower crane is at a high height. Moreover, when used during the day, the outside sunlight is likely to affect the infrared rays, resulting in poor monitoring results. Summary of the invention

[0005] In view of the above technical deficiencies, the purpose of the present invention is to provide a tower crane safety monitoring device to solve the problems mentioned in the above background technology that when the device is in use, the transmission distance of infrared rays is limited, and when the height of the tower crane is high, the monitoring accuracy is not high; when used during the day, the external sunlight is likely to affect the infrared light, resulting in poor monitoring effect.

[0006] In order to solve the above technical problems, the present invention provides the following technical solutions: a tower crane safety monitoring device, comprising a tower crane body, a monitoring mechanism is arranged outside the tower crane body, a mounting mechanism is arranged outside the tower crane body, and a protection mechanism is arranged outside the monitoring mechanism;

[0007] The monitoring mechanism comprises a connecting shell, a sliding seat is slidably connected to the inner side of the connecting shell, a measuring seat is fixedly connected to one end of the sliding seat, a vertical plate is fixedly connected to the top of the measuring seat, a parallel plate is fixedly connected to one end of the vertical plate, an infrared emitter is installed at the bottom of the parallel plate, a lifting assembly is provided at the top of the parallel plate, and an alarm light is installed at the top of the parallel plate;

[0008] Through the above technical scheme, the connecting shell is fixedly connected to the outer wall of the tower crane body, and the length of the connecting shell is consistent with the length of the tower crane body. Then, it is connected to the top of the parallel plate through the rope of the electric hoist, and then slidably connected to the connecting shell through the sliding seat, and the sliding seat is limited by the limit rod to keep the sliding seat stable. Then the measuring seat is perpendicular to the ground, and then the vertical plate is parallel to the connecting shell through the set vertical plate, so that the vertical plate is parallel to the tower body of the tower crane body, and then the parallel plate is parallel to the measuring seat, and the infrared light is irradiated by the set infrared transmitter, and received by the infrared receiver on the top of the measuring seat, and then the parallel plate is driven up by the electric hoist to retract the rope, and then the measuring seat is driven up to measure the verticality. When the infrared receiver does not receive the light reaching the infrared transmitter, it means that the tower crane body is not in a vertical state, and then the alarm light sounds, and the electric hoist stops retracting, so that the staff can observe the position of the measuring seat, and can know the non-vertical point, thereby completing the verticality monitoring operation and achieving the effect of improving safety.

[0009] The mounting mechanism comprises a mounting plate, the inner side of the mounting plate is threadedly connected with a threaded column, one end of the threaded column is fixedly connected with a mounting shell, and one end of the threaded column is provided with a starting assembly;

[0010] Through the above technical scheme, when it is necessary to install other height sensors or gravity sensors, the mounting plate is fixedly installed on the tower crane body, and then the sensor is installed inside the mounting shell, and then threadedly connected to the mounting plate through a threaded column, so that the mounting shell is initially fixed on the mounting plate, and then the threaded column enters the mounting plate, and then the motor is started to drive the bidirectional screw rod to rotate, and then drive the two moving blocks to move toward each other, so that the two fixed plates move toward each other until one end of the two fixed plates is engaged with one end of the mounting shell, and then the battery power is disconnected, thereby completing the sensor installation operation. When disassembling, it can be disassembled by simply reversing the motor to release the fixation, so as to achieve the effect of easy disassembly and assembly.

[0011] The protection mechanism comprises a protection plate, a heat dissipation hole is opened on the outside of the protection plate, a heat conducting sheet is arranged on the outside of the heat dissipation hole, the outside of the protection plate is fixedly connected to a heat dissipation shell, a rotating shaft is installed inside the heat dissipation shell, and a heat dissipation fan is installed on the rotating shaft;

[0012] Through the above technical scheme, the protective plate is fixedly connected to the outside of the parallel plate, thereby blocking the lamp of the infrared transmitter to prevent external sunlight from affecting the infrared irradiation, and then the heat generated can be discharged into the bottom heat dissipation shell through the provided heat dissipation holes and heat conductive sheets. Then, when the measuring seat rises, the rising airflow from the outside enters the heat dissipation shell, thereby driving the heat dissipation fan outside the shaft to rotate, and then discharging the heat to the outside, completing the heat dissipation protection operation and avoiding affecting the accuracy of infrared irradiation.

[0013] The lifting assembly comprises a lifting seat and a limiting rod. An electric hoist is installed on the top of the lifting seat, and one end of the lifting seat is fixedly connected to a limiting block.

[0014] The lifting seat is fixedly connected to the outside of the tower crane body, the limiting rod is installed inside the connecting shell, and the inner side of the limiting block is arranged in an arc shape.

[0015] The connecting shell is fixedly connected to the outside of the tower crane body, and the sliding seat is configured to be convex.

[0016] The starting assembly comprises a motor, a bidirectional screw rod is installed at one end of the motor, a moving block is connected to the external thread of the bidirectional screw rod, and a fixed plate is fixedly connected to one end of the moving block.

[0017] The motor is fixedly connected to the outer surface of the mounting plate, and the bidirectional lead screw is rotatably connected to one end of the mounting plate.

[0018] The mounting plate is fixedly connected to the outside of the tower crane body, and a storage battery is installed on the inner side of the mounting shell.

[0019] Two protective plates are provided, and the two protective plates are respectively fixedly connected to two sides of the parallel plate.

[0020] Two heat dissipation shells are provided, and through holes are formed on the tops and bottoms of the two heat dissipation shells.

[0021] A working method of a tower crane safety monitoring device comprises the following steps:

[0022] Step 1: The connecting shell is fixedly connected to the outer wall of the tower crane body, and the length of the connecting shell is consistent with the length of the tower crane body;

[0023] Step 2, connect the rope of the electric hoist to the top of the parallel plate;

[0024] The sliding seat is slidably connected to the connecting shell, and the sliding seat is limited by a limiting rod to keep the sliding seat stable;

[0025] Step 3: The measuring seat is perpendicular to the ground, and the vertical plate is arranged to be parallel to the connecting shell, so that the vertical plate is parallel to the tower body of the tower crane;

[0026] Step 4: The parallel plate is parallel to the measuring seat, and infrared rays are irradiated by the set infrared transmitter, and received by the infrared receiver on the top of the measuring seat. Then, the parallel plate is driven up by the electric hoist to retract the rope, and then the measuring seat is driven up to measure the verticality.

[0027] When the infrared receiver does not receive the light reaching the infrared transmitter, it means that the tower crane body is not in a vertical state, and then the alarm light sounds, and the electric hoist stops retracting, so that the staff can observe the position of the measuring seat and know the non-vertical point, thus completing the verticality monitoring operation;

[0028] Step 5: The protective plate is fixedly connected to the outside of the parallel plate to shield the light of the infrared transmitter and prevent the external sunlight from affecting the infrared irradiation;

[0029] Step 6: The heat generated can be discharged into the bottom heat dissipation shell through the heat dissipation holes and heat conductive sheet;

[0030] Step 7: When the measuring seat rises, the rising airflow from the outside enters the heat dissipation shell, thereby driving the heat dissipation fan outside the shaft to rotate, thereby dissipating the heat to the outside, completing the heat dissipation protection operation.

[0031] Compared with the prior art, the beneficial effects achieved by the present invention are:

[0032] First, the connecting shell of the present invention is fixedly connected to the outer wall of the tower crane body, and the length of the connecting shell is consistent with the length of the tower crane body. Then, it is connected to the top of the parallel plate through the rope of the electric hoist, and then slidably connected to the connecting shell through the sliding seat, and the sliding seat is limited by the limit rod to keep the sliding seat stable. Then the measuring seat is perpendicular to the ground, and the vertical plate is parallel to the connecting shell through the vertical plate, so that the vertical plate is parallel to the tower body of the tower crane body; then the parallel plate is parallel to the measuring seat, and the infrared light is irradiated by the infrared transmitter, and received by the infrared receiver on the top of the measuring seat, and then the parallel plate is driven up by the electric hoist to retract the rope, and then the measuring seat is driven up to measure the verticality. When the infrared receiver does not receive the light reaching the infrared transmitter, it means that the tower crane body is not in a vertical state, and then the alarm light sounds, and the electric hoist stops retracting, so that the staff can observe the position of the measuring seat, and then they can know the non-vertical point, thereby completing the verticality monitoring operation and achieving the effect of improving safety.

[0033] Second, when the present invention installs other height sensors or gravity sensors, the mounting plate is fixedly installed on the tower crane body, and then the sensor is installed inside the mounting shell, and then the mounting shell is initially fixed on the mounting plate through a threaded column. After the threaded column enters the mounting plate, the motor is started to drive the bidirectional screw rod to rotate, thereby driving the two moving blocks to move toward each other, so that the two fixed plates move toward each other until one end of the two fixed plates is engaged with one end of the mounting shell, and then the battery power is disconnected, thereby completing the sensor installation operation. When disassembling, the motor only needs to be reversed to release the fixation to achieve the effect of easy disassembly and assembly.

[0034] Third, the present invention is fixedly connected to the outside of the parallel plate by a protective plate, thereby shielding the lamp of the infrared transmitter to prevent external sunlight from affecting the infrared irradiation, and then the generated heat can be discharged into the bottom heat dissipation shell through the provided heat dissipation holes and heat conductive sheets. Then, when the measuring seat rises, the rising airflow from the outside enters the heat dissipation shell, thereby driving the heat dissipation fan outside the rotating shaft to rotate, and then discharging the heat to the outside, completing the heat dissipation protection operation and avoiding affecting the accuracy of infrared irradiation. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] Figure 1 It is an overall stereogram of the present invention;

[0036] Figure 2 A three-dimensional diagram of the measuring seat of the present invention;

[0037] Figure 3 A three-dimensional diagram of a lifting assembly of the present invention;

[0038] Figure 4 It is a cross-sectional view of the monitoring mechanism of the present invention;

[0039] Figure 5 It is a three-dimensional diagram of the installation mechanism of the present invention;

[0040] Figure 6 It is a cross-sectional view of the installation mechanism of the present invention;

[0041] Figure 7 It is a front view of the mounting plate of the present invention (fixing plate is not shown);

[0042] Figure 8 It is a cross-sectional view of the protection mechanism of the present invention;

[0043] Among them: 1. Tower crane body; 2. Monitoring mechanism; 3. Installation mechanism; 4. Protection mechanism; 21. Connecting shell; 22. Sliding seat; 23. Measuring seat; 24. Vertical plate; 25. Parallel plate; 26. Infrared transmitter; 27. Lifting assembly; 28. Alarm light; 29. ​​Lifting seat; 201. Limit rod; 202. Electric hoist; 203. Limit block; 31. Mounting plate; 32. Threaded column; 33. Mounting shell; 34. Starting assembly; 37. Motor; 38. Bidirectional screw; 39. Moving block; 310. Battery; 301. Fixed plate; 41. Protection plate; 42. Heat dissipation hole; 43. Heat conductive sheet; 44. Heat dissipation shell; 45. Rotating shaft; 46. Cooling fan. DETAILED DESCRIPTION

[0044] The specific implementation modes of the present invention will be further described in detail below with reference to the accompanying drawings.

[0045] Example 1

[0046] See also Figure 1-4 A tower crane safety monitoring device comprises a tower crane body 1, a monitoring mechanism 2 is arranged outside the tower crane body 1, a mounting mechanism 3 is arranged outside the tower crane body 1, and a protection mechanism 4 is arranged outside the monitoring mechanism 2;

[0047] The monitoring mechanism 2 comprises a connecting shell 21, a sliding seat 22 is slidably connected to the inner side of the connecting shell 21, a measuring seat 23 is fixedly connected to one end of the sliding seat 22, a vertical plate 24 is fixedly connected to the top of the measuring seat 23, a parallel plate 25 is fixedly connected to one end of the vertical plate 24, an infrared emitter 26 is installed at the bottom of the parallel plate 25, a lifting assembly 27 is provided at the top of the parallel plate 25, and an alarm light 28 is installed at the top of the parallel plate 25;

[0048] Through the above technical solution, the connecting shell 21 is fixedly connected to the outer wall of the tower crane body 1, and the length of the connecting shell 21 is consistent with the length of the tower crane body 1. Then, it is connected to the top of the parallel plate 25 through the rope of the electric hoist 202, and then the sliding seat 22 is slidably connected to the connecting shell 21, and the sliding seat 22 is limited by the limiting rod 201 to keep the sliding seat 22 stable, and then the measuring seat 23 is perpendicular to the ground, and the vertical plate 24 is set to be parallel to the connecting shell 21, so that the vertical plate 24 is parallel to the tower body of the tower crane body 1, and then the parallel plate 25 is parallel to the measuring seat 23, and through the setting The infrared transmitter 26 irradiates infrared rays, which are received by the infrared receiver on the top of the measuring seat 23, and then the parallel plate 25 is driven up by the electric hoist 202 to retract the rope, thereby driving the measuring seat 23 to rise, and then starting to measure the verticality. When the infrared receiver does not receive the light reaching the infrared transmitter 26, it means that the tower crane body 1 is not in a vertical state, and then the alarm light 28 sounds, and the electric hoist 202 stops retracting, so that the staff can observe the position of the measuring seat 23 and know the non-vertical point, thereby completing the verticality monitoring operation and achieving the effect of improving safety.

[0049] The lifting assembly 27 includes a lifting seat 29 and a limiting rod 201 . An electric hoist 202 is installed on the top of the lifting seat 29 . One end of the lifting seat 29 is fixedly connected to a limiting block 203 .

[0050] Through the above technical solution, the measuring seat 23 can be driven to move up and down stably.

[0051] The lifting seat 29 is fixedly connected to the outside of the tower crane body 1, the limiting rod 201 is installed inside the connecting shell 21, and the inner side of the limiting block 203 is set to be arc-shaped.

[0052] Through the above technical solution, when the rope is raised or lowered, the limit block 203 with an arc-shaped inner side can prevent the rope from being worn at the corner.

[0053] The connection shell 21 is fixedly connected to the outside of the tower crane body 1, and the sliding seat 22 is configured to be convex.

[0054] Through the above technical solution, the sliding seat 22 can be better connected to the measuring seat 23.

[0055] When in use, the connecting shell 21 is fixedly connected to the outer wall of the tower crane body 1, and the length of the connecting shell 21 is consistent with the length of the tower crane body 1. Then, it is connected to the top of the parallel plate 25 through the rope of the electric hoist 202, and then it is slidably connected to the connecting shell 21 through the sliding seat 22, and the sliding seat 22 is limited by the limiting rod 201 to keep the sliding seat 22 stable, and then the measuring seat 23 is perpendicular to the ground, and then the vertical plate 24 is set to be parallel to the connecting shell 21, so that the vertical plate 24 is parallel to the tower body of the tower crane body 1, and then the parallel plate 25 is parallel to the measuring seat 23, and through the set red The external transmitter 26 irradiates infrared rays, which are received by the infrared receiver on the top of the measuring seat 23. Then, the parallel plate 25 is driven up by the electric hoist 202 through contraction of the rope, thereby driving the measuring seat 23 up, and then starting to measure the verticality. When the infrared receiver does not receive the light reaching the infrared transmitter 26, it means that the tower crane body 1 is not in a vertical state, and then the alarm light 28 sounds, and the electric hoist 202 stops contracting, so that the staff can observe the position of the measuring seat 23 and know the non-vertical point, thereby completing the verticality monitoring operation and achieving the effect of improving safety.

[0056] Example 2

[0057] like Figure 5-7 As shown, it is another implementation scheme of the present invention. On the basis of Example 1, a mounting mechanism 3 of a tower crane safety monitoring device under this implementation scheme includes a mounting plate 31, the inner side of the mounting plate 31 is threadedly connected with a threaded column 32, one end of the threaded column 32 is fixedly connected with a mounting shell 33, and one end of the threaded column 32 is provided with a starting assembly 34; specifically, the starting assembly 34 includes a motor 37, one end of the motor 37 is installed with a bidirectional screw rod 38, the external thread of the bidirectional screw rod 38 is threadedly connected with a moving block 39, and one end of the moving block 39 is fixedly connected with a fixed plate 301.

[0058] Through the above technical solution, the motor 37 can drive the bidirectional screw rod 38 to rotate, so that the two fixing plates 301 can fix the two sides of the installation shell 33, making the installation more stable.

[0059] The motor 37 is fixedly connected to the outer surface of the mounting plate 31 , and the bidirectional screw rod 38 is rotatably connected to one end of the mounting plate 31 .

[0060] Through the above technical solution, the mounting plate 31 can support the motor 37 and thus conveniently drive the bidirectional screw rod 38 to rotate.

[0061] The mounting plate 31 is fixedly connected to the outside of the tower crane body 1 , and a storage battery 310 is installed inside the mounting shell 33 .

[0062] Through the above technical solution, the battery 310 can provide power for the motor 37 .

[0063] Through the above technical scheme, when it is necessary to install other height sensors or gravity sensors, the mounting plate 31 is fixedly installed on the tower crane body 1, and then the sensor is installed inside the mounting shell 33, and then the mounting shell 33 is initially fixed on the mounting plate 31 through the threaded column 32, and then the threaded column 32 enters the mounting plate 31, and then the motor 37 is started to drive the bidirectional screw rod 38 to rotate, and then drive the two moving blocks 39 to move toward each other, so that the two fixed plates 301 move toward each other, until one end of the two fixed plates 301 is engaged with one end of the mounting shell 33, and then the battery 310 is disconnected, thereby completing the sensor installation operation. When disassembling, the motor 37 only needs to be reversed to release the fixation to achieve the effect of easy disassembly and assembly.

[0064] Example 3

[0065] like Figure 8 As shown, another implementation scheme of the present invention is shown. On the basis of Example 1, a protection mechanism 4 of a tower crane safety monitoring device under this implementation scheme includes a protection plate 41, a heat dissipation hole 42 is opened on the outside of the protection plate 41, a heat conducting plate 43 is arranged on the outside of the heat dissipation hole 42, the outside of the protection plate 41 is fixedly connected to a heat dissipation shell 44, a rotating shaft 45 is installed inside the heat dissipation shell 44, and a cooling fan 46 is installed on the rotating shaft 45; wherein, two protection plates 41 are provided, and the two protection plates 41 are respectively fixedly connected to the two sides of the parallel plate 25.

[0066] Through the above technical solution, the protective plate 41 can better block the external sunlight to avoid affecting the infrared emitter 26.

[0067] There are two heat dissipation shells 44 , and through holes are formed on the tops and bottoms of the two heat dissipation shells 44 .

[0068] Through the above technical solution, the external airflow can enter the heat dissipation shell 44 through the through hole, thereby driving the heat dissipation fan 46 to rotate, thereby improving the heat dissipation effect.

[0069] Through the above technical solution, the protective plate 41 is fixedly connected to the outside of the parallel plate 25, so as to block the light of the infrared emitter 26 and prevent the external sunlight from affecting the infrared irradiation. Then, the heat generated can be discharged to the bottom heat dissipation shell 44 through the provided heat dissipation holes 42 and heat conductive sheets 43. Then, when the measuring seat 23 rises, the rising airflow from the outside enters the heat dissipation shell 44, thereby driving the heat dissipation fan 46 outside the rotating shaft 45 to rotate, thereby discharging the heat to the outside, completing the heat dissipation protection operation and avoiding affecting the accuracy of infrared irradiation.

[0070] Although specific embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit thereof, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A tower crane safety monitoring device, comprising a tower crane body (1), Features: A monitoring mechanism (2) is arranged outside the tower crane body (1), and a protection mechanism (4) is arranged outside the monitoring mechanism (2); The monitoring mechanism (2) comprises a connecting shell (21), the inner side of which is slidably connected to a sliding seat (22), the end of the sliding seat (22) away from the connecting shell (21) being fixedly connected to a measuring seat (23), the top of the measuring seat (23) being fixedly connected to a vertical plate (24), the end of the vertical plate (24) away from the measuring seat (23) being fixedly connected to a parallel plate (25), the bottom of the parallel plate (25) being provided with an infrared transmitter (26), the top of the parallel plate (25) being provided with a lifting assembly (27) and an alarm light (28); an infrared receiver being installed on the top of the measuring seat (23); The protective mechanism (4) is installed on both sides of the parallel plate (25), and the protective mechanism (4) includes a protective plate (41), a heat dissipation hole (42) is opened on the outside of the protective plate (41), a heat conducting sheet (43) is arranged on the outside of the heat dissipation hole (42), the outside of the protective plate (41) is fixedly connected to a heat dissipation shell (44), a rotating shaft (45) is installed inside the heat dissipation shell (44), and a heat dissipation fan (46) is installed on the rotating shaft (45).

2. A tower crane safety monitoring device according to claim 1, Features: The lifting assembly (27) comprises a lifting seat (29) and a limiting rod (201); an electric hoist (202) is installed on the top of the lifting seat (29); and one end of the lifting seat (29) is fixedly connected to a limiting block (203); A rope is installed at the output end of the electric hoist (202), and the bottom end of the rope is connected to the top of the parallel plate (25).

3. A tower crane safety monitoring device according to claim 2, Features: The lifting seat (29) is fixedly connected to the top of the tower crane body (1) and is arranged on the same side as the sliding seat (22); The limiting rod (201) is installed inside the connecting shell (21), and the inner side of the limiting block (203) is arranged in a circular ring shape; The connecting shell (21) is fixedly connected to the outside of the tower crane body (1), and the length of the connecting shell (21) is adapted to the length of the tower crane body (1); The vertical plate (24) is parallel to the connecting shell (21), and the parallel plate (25) is parallel to the measuring seat (23).

4. A tower crane safety monitoring device according to claim 1, Features: The sliding seat (22) is arranged in a T-shape, and one protruding end is fixedly connected to the measuring seat (23).

5. A tower crane safety monitoring device according to claim 1, Features: The tower crane body (1) is provided with a mounting mechanism (3) on the outside, the mounting mechanism (3) comprising a mounting plate (31), the inner side of the mounting plate (31) being threadedly connected to a threaded column (32), the end of the threaded column (32) being fixedly connected to a mounting shell (33), and one end of the threaded column (32) being provided with a starting assembly (34).

6. A tower crane safety monitoring device according to claim 1, Features: The starting assembly (34) comprises a motor (37), one end of which is mounted a bidirectional screw rod (38), the external thread of the bidirectional screw rod (38) is connected to a moving block (39), and one end of the moving block (39) is fixedly connected to a fixing plate (301).

7. A tower crane safety monitoring device according to claim 5, Features: The motor (37) is fixedly connected to the outer surface of the mounting plate (31), and the bidirectional screw rod (38) is rotatably connected to one end of the mounting plate (31).

8. A tower crane safety monitoring device according to claim 5, Features: The mounting plate (31) is fixedly connected to the outside of the tower crane body (1), and a storage battery (310) is installed inside the mounting shell (33).

9. A tower crane safety monitoring device according to any one of claims 1 to 8, Features: Two protective plates (41) are provided, and the two protective plates (41) are respectively fixedly connected to the two sides of the parallel plate (25); two heat dissipation shells (44) are provided, and through holes are provided on the tops and bottoms of the two heat dissipation shells (44).

10. A working method of a tower crane safety monitoring device according to claim 9, It is characterized in that The following steps are involved: Step 1, the connecting shell (21) is fixedly connected to the outer wall of the tower crane body (1), and the length of the connecting shell (21) is consistent with the length of the tower crane body (1); Step 2, connecting the top of the parallel plate (25) through the rope of the electric hoist (202); The sliding seat (22) is slidably connected to the connecting shell (21), and the sliding seat (22) is limited by a limiting rod (201) to keep the sliding seat (22) stable; Step 3, the measuring seat (23) is perpendicular to the ground, and the vertical plate (24) is arranged to be parallel to the connecting shell (21), so that the vertical plate (24) is parallel to the tower body of the tower crane body (1); Step 4, the parallel plate (25) is parallel to the measuring seat (23), and infrared rays are irradiated by the infrared transmitter (26), and received by the infrared receiver on the top of the measuring seat (23), and then the parallel plate (25) is driven up by the electric hoist (202) by contracting the rope, thereby driving the measuring seat (23) to rise, and then starting to measure the verticality; When the infrared receiver does not receive the light reaching the infrared transmitter (26), it means that the tower crane body (1) is not in a vertical state, and then the alarm light (28) sounds, and the electric hoist (202) stops retracting, so that the staff can observe the position of the measuring seat (23) and know the non-vertical point, thereby completing the verticality monitoring operation; Step 5: The protective plate (41) is fixedly connected to the outside of the parallel plate (25), thereby shielding the light of the infrared emitter (26) to prevent the external sunlight from affecting the infrared irradiation; Step 6: The heat generated can be discharged into the bottom heat dissipation shell (44) through the heat dissipation holes (42) and the heat conductive sheet (43); Step 7: When the measuring seat (23) rises, the rising airflow from the outside enters the heat dissipation shell (44), thereby driving the heat dissipation fan (46) outside the rotating shaft (45) to rotate, thereby discharging the heat to the outside, completing the heat dissipation protection operation.