System for detecting influence of water quality on water electrolysis hydrogen production and use method

By designing a water quality detection system for electrolytic water hydrogen production, the problems of water quality change monitoring and regulation in electrolytic water hydrogen production system have been solved, the efficiency and quality of hydrogen have been improved, and the development of clean energy has been promoted.

CN119082801AActive Publication Date: 2024-12-06SHAANXI HYDROGEN ENERGY RES INST CO LTD
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202411578535.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-07
Publication Date
2024-12-06
Estimated Expiration
2044-11-07

AI Technical Summary

Technical Problem

The existing electrolytic hydrogen production system fails to effectively monitor and regulate water quality changes, resulting in fluctuations in hydrogen production efficiency and quality, limiting its application in the field of clean energy.

Method used

A system for the impact of water quality on electrolytic hydrogen production is designed, including a single electrolytic hydrogen production system, tank body, analytical detection system and an inert gas purge system. The water quality changes are monitored in real time through laboratory-level equipment and evaluated their electrolysis. The influence of hydrogen production in water.

Benefits of technology

It improves electrolytic efficiency, provides support for water quality regulation data, improves the efficiency and quality of hydrogen production, promotes the development of clean energy, and reduces the cost of hydrogen production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119082801A_ABST
    Figure CN119082801A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of water electrolysis hydrogen production detection equipment, and discloses a system for detecting the influence of water quality on water electrolysis hydrogen production and a use method. The single-electrolytic-tank electrolytic hydrogen production system is arranged at the hydrogen inlet end of the tank body; the analysis and detection system is arranged at the hydrogen discharge end of the tank body; the inert gas purging system comprises an inert gas bottle and an inert gas pressure control tank; when the system is used, the system can evaluate the influence of water quality on hydrogen production by electrolysis of water in a low-cost manner, and the immeasurable loss caused by damage of a hydrogen production industrial device due to direct evaluation on the industrial device is avoided; meanwhile, data obtained by using a small-area electrolytic tank can be used for guiding industrial production, and a basis is provided for expanding the electrolytic water source problem; the problems that an existing water quality detection system is single in monitoring parameter and difficult to meet the high requirement of water electrolysis hydrogen production for water quality are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of water electrolysis hydrogen production detection equipment, and specifically relates to a detection system for the influence of water quality on water electrolysis hydrogen production and a use method thereof. Background Art

[0002] In water electrolysis hydrogen production technology, water quality has a direct and critical impact on hydrogen production efficiency and hydrogen quality. At present, water electrolysis hydrogen production technology is widely used in the industrial and energy fields, but due to the differences in electrolysis characteristics under different water quality conditions, there are large fluctuations in the efficiency and purity of hydrogen production. Existing water electrolysis hydrogen production systems often ignore the impact of water quality on the hydrogen production process, which not only limits the improvement of electrolysis efficiency, but also affects the quality of hydrogen, thereby restricting its widespread application in the field of clean energy.

[0003] Impurities in water, such as minerals, microorganisms, and organic matter, will change the conductivity and pH value of the electrolyte, thereby affecting the electrolysis efficiency. For example, calcium and magnesium ions in high-hardness water will form precipitation, block the electrode surface, and reduce the electrolysis efficiency; and the presence of organic matter may produce by-products during the electrolysis process, affecting the purity of hydrogen. In addition, the heat generated during the electrolysis process will also affect the water quality. For example, an increase in temperature may cause the conductivity of water to change, further affecting the electrolysis efficiency. Existing water quality detection systems and methods are mainly concentrated in the fields of drinking water and wastewater treatment. The real-time monitoring and control technology for water quality characteristics during the electrolysis of water to produce hydrogen is still in its infancy. The lack of a system that can accurately detect water quality changes and evaluate its impact on the efficiency and quality of hydrogen produced by electrolysis of water in real time limits the application of water quality control technology in the process of hydrogen produced by electrolysis of water. Therefore, the development of a system that can monitor water quality changes in real time and accurately evaluate its impact on hydrogen produced by electrolysis of water is of great significance for improving the efficiency and quality of hydrogen produced by electrolysis of water and promoting its application in the field of clean energy.

[0004] Therefore, in order to solve the above problems, the present invention designs a detection system for the impact of water quality on hydrogen production by electrolysis of water and a method for using the same, so as to evaluate the impact of water quality on hydrogen production by electrolysis of water at a laboratory scale and at a low cost, provide direct data support for industrial hydrogen production by electrolysis of water, and provide a basis for expanding the source of water for electrolysis of water. Summary of the invention

[0005] In view of the deficiencies in the prior art, the present invention provides a system and a method for using the system for detecting the effect of water quality on hydrogen production by electrolysis of water, which can evaluate the effect of water quality on industrial-scale hydrogen production by electrolysis of water through laboratory-level equipment, and can provide a basis for expanding the source of water for electrolysis of water and further reduce the cost of hydrogen production. At the same time, the present invention also provides a method for using the system for detecting the effect of water quality on hydrogen production by electrolysis of water; and solves the problem of feasibility evaluation of the application of different water qualities in the process of hydrogen production by electrolysis of water in the prior art.

[0006] In order to achieve the purpose of studying the influence of different water quality conditions on the effect of hydrogen production by electrolysis of water, the present invention provides the following technical solutions: The present invention provides a first solution: a detection system for the effect of water quality on hydrogen production by electrolysis of water, comprising: Tank; A single electrolytic cell electrolysis hydrogen production system is arranged at the hydrogen inlet end of the tank body and is connected to the tank body; An analysis and detection system is arranged at the hydrogen discharge end of the tank body and is connected to the tank body; The waste gas venting pipeline is arranged at the waste gas discharge end of the tank body and is connected to the tank body; Inert gas purge system, including: The inert gas bottle is connected to the inert gas pressure control tank, the single electrolytic cell hydrogen production system and the collection system respectively through the inert gas supply pipeline 1; The inert gas pressure-control tank is connected to the tank body and the collection system respectively through an inert gas supply pipeline 2.

[0007] In a preferred embodiment of the present invention, the single electrolytic cell electrolysis hydrogen production system comprises: A single electrolytic cell, and connected to the single electrolytic cell: The liquid inlet and liquid replenishment pipeline is arranged at the replenishment end of the single electrolytic cell, and includes a liquid replenishment water pipe and a liquid tank. The liquid replenishment water pipe is arranged between the single electrolytic cell and the liquid tank, and a first control valve and a liquid pump are arranged on the liquid replenishment water pipe. A hydrogen purification pipeline is arranged at the hydrogen discharge end of the single electrolytic cell, comprising a hydrogen discharge pipeline, the hydrogen discharge pipeline is arranged between the single electrolytic cell and the tank body, and a hydrogen purification separator and a third control valve are arranged on the hydrogen discharge pipeline; The single electrolytic cell hydrogen production system also includes: An oxygen exhaust pipeline connected to the single electrolytic cell is provided with a second control valve.

[0008] In a preferred embodiment of the present invention, the water quality detection system for the effect of water electrolysis on hydrogen production also includes a collection system, which is arranged on the hydrogen purification pipeline of the single electrolytic cell electrolysis hydrogen production system and is connected to the hydrogen exhaust pipeline of the hydrogen purification pipeline, including: A hydrogen collecting pipeline is arranged between the hydrogen exhaust pipeline and the hydrogen pressurizing cylinder, and the hydrogen input end of the hydrogen collecting pipeline is connected to the hydrogen exhaust pipeline between the hydrogen purification separator and the third control valve, and the exhaust end is connected to the hydrogen pressurizing cylinder, and a fourth control valve and a one-way valve are arranged on the hydrogen collecting pipeline; A hydrogen collecting tank is connected to the hydrogen pressurizing cylinder through a hydrogen pipeline, and a fifth control valve is provided on the hydrogen pipeline; A hydrogen exhaust pipeline is also provided on the hydrogen purification pipeline of the single electrolytic cell electrolytic hydrogen production system. The hydrogen input end of the hydrogen exhaust pipeline is connected to the hydrogen discharge pipeline between the hydrogen purification separator and the third control valve. The hydrogen exhaust pipeline is provided with a seventeenth control valve.

[0009] In a preferred embodiment of the present invention, the inert gas input end of the inert gas supply pipeline 1 is connected to the inert gas bottle, and the two branches of the inert gas output end are respectively connected to the single electrolytic cell and the inert gas pressure controlling tank; and a sixteenth control valve is provided on the branch connected to the single electrolytic cell; and a thirteenth control valve is provided on the branch connected to the inert gas pressure controlling tank.

[0010] In a preferred embodiment of the present invention, one end of the inert gas supply pipeline 2 is connected to the inert gas discharge end of the inert gas pressure control tank, and the other end is connected to the inert gas replenishing end of the tank body, and a ninth control valve, a first pressure gauge and an eleventh control valve are also arranged on the pipeline of the inert gas supply pipeline 2, and an inert gas pressure control pipeline and a pressurized gas supply pipeline are also arranged on the pipeline between the ninth control valve and the eleventh control valve; the other end of the inert gas pressure control pipeline is connected to the inert gas pressure control tank, the pressurized gas supply pipeline is arranged at the hydrogen output end of the inert gas pressure control pipeline, and is connected to the hydrogen pressurizing cylinder, the first pressure gauge is arranged on the pipeline between the ninth control valve and the inert gas pressure control pipeline; and a fourteenth control valve is also arranged on the pressurized gas supply pipeline, the pressurized gas supply pipeline is also connected to the inert gas output end branch of the inert gas bottle, and a fifteenth control valve is arranged on the inert gas output end branch.

[0011] In a preferred embodiment of the present invention, the inert gas pressure control pipeline includes a high-pressure unloading solenoid valve, and an eighth control valve and a tenth control valve arranged on the inert gas delivery and control pipeline; the high-pressure unloading solenoid valve is arranged on the pipeline of the second inert gas supply pipeline, and is connected to the inert gas input end of the inert gas delivery and control pipeline, and the output end of the inert gas delivery and control pipeline is connected to the inert gas pressure control tank.

[0012] In a preferred embodiment of the present invention, a pressurized bypass is further provided on the bypass of the inert gas delivery and control pipeline between the eighth control valve and the tenth control valve, and a motor, a twelfth control valve and an inert gas control tank are provided on the pressurized bypass, and the twelfth control valve is provided at the air inlet end of the inert gas control tank.

[0013] In a preferred embodiment of the present invention, the analysis and detection system comprises: The chromatograph is connected with the tank body through the hydrogen conduit at the detection end, and a sixth control valve is arranged on the hydrogen conduit at the detection end; the computer is electrically connected with the chromatograph; The exhaust gas venting pipeline is also provided with a seventh control valve and a second pressure gauge.

[0014] The present invention provides a second solution: a method for using a system for detecting the effect of water quality on hydrogen production by electrolysis of water, comprising the following steps: Step 1: Air tightness check Close all control valves in the system, and simultaneously open the sixteenth control valve and the third control valve until the pressure of the entire system reaches 0.12MPa. Hold the pressure for 30 minutes and observe the value change of the second pressure gauge; Step 2: Inert gas purging Close all control valves in the system, open the 16th control valve, the 3rd control valve, and the 7th control valve to purge the system for 5 minutes, then close the 7th control valve, the 16th control valve, and finally the 3rd control valve; Step 3: Hydrogen production by electrolysis Close all control valves of the system, open the second control valve and the seventeenth control valve at the same time, open the first control valve and the liquid pump, pass direct current and the liquid to be tested into the single electrolytic cell, obtain hydrogen and oxygen through chemical reaction, the oxygen is discharged through the oxygen exhaust pipeline, and the hydrogen is discharged through the seventeenth control valve pipeline; Step 4: Sampling test At the same time, close the fourth control valve, open the third control valve, maintain the time for 1 minute, close the third control valve, open the fourth control valve, and open the eleventh control valve and the sixth control valve at the same time to blow the hydrogen sample into the chromatograph.

[0015] The present invention provides a third solution: a method for using a system for detecting the effect of water quality on hydrogen production by electrolysis of water, comprising the following steps: Step 1: Air tightness check Close all control valves in the system, and simultaneously open the sixteenth control valve and the third control valve until the pressure of the entire system reaches 0.12MPa. Hold the pressure for 30 minutes and observe the value change of the second pressure gauge; Step 2: Inert gas purging Close all control valves in the system, open the 16th control valve, the 3rd control valve, and the 7th control valve to purge the system for 5 minutes, then close the 7th control valve, the 16th control valve, and finally the 3rd control valve; Step 3: Hydrogen production by electrolysis Close all control valves of the system, open the second control valve and the seventeenth control valve at the same time, open the first control valve and the liquid pump, pass direct current and the liquid to be tested into the single electrolytic cell, obtain hydrogen and oxygen through chemical reaction, the oxygen is discharged through the oxygen exhaust pipeline, and the hydrogen is discharged through the seventeenth control valve pipeline; Step 4: Hydrogen Collection Open the fourth control valve and the one-way valve to allow hydrogen to enter the hydrogen pressurizing cylinder. Open the fifth control valve and the fifteenth control valve. The high-pressure inert gas pushes the piston to press the hydrogen into the hydrogen collecting tank. The piston is reset by the spring. Step 5: Sampling test At the same time, close the fourth control valve, open the third control valve, maintain the time for 1 minute, close the third control valve, open the fourth control valve, and open the eleventh control valve and the sixth control valve at the same time to blow the hydrogen sample into the chromatograph.

[0016] Compared with the prior art, the present invention provides a detection system and a method for detecting the effect of water quality on hydrogen production by electrolysis of water, which has the following beneficial effects: The present invention designs a laboratory-level water quality detection system for the effect of water electrolysis on hydrogen production, including a single electrolytic cell hydrogen production system, a tank, an analysis and detection system, an inert gas purge system and a collection system. When used, it can: (1) Improve electrolysis efficiency: Precisely control and monitor water quality to avoid the impact of impurities on electrolysis efficiency and improve hydrogen production efficiency; (2) Promote water quality control: Provide data support for the application of water quality control technology in the process of hydrogen production by water electrolysis, and optimize water quality control strategies through real-time data feedback; (3) Promote the development of clean energy: By improving the efficiency and quality of hydrogen produced by water electrolysis, promote the widespread application of hydrogen as a clean energy and contribute to the development of sustainable energy; At the same time, this system can evaluate the impact of water quality on hydrogen production by electrolysis of water in a low-cost manner, avoiding direct evaluation on industrial equipment, which would cause immeasurable losses if hydrogen production equipment is destroyed. The data obtained by the small-area electrolytic cell used in this system can be fully used to guide industrial production and provide a basis for expanding the source of water for electrolysis. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 This is a system structure diagram of the detection system for the effect of water quality on hydrogen production by electrolysis of water according to the present invention.

[0018] In the figure: 1, tank body; 2, liquid tank; 3, first control valve; 4, liquid pump; 5, single electrolytic cell; 6, second control valve; 7, purification separator; 8, third control valve; 9, fourth control valve; 10, one-way valve; 11, hydrogen pressurizing cylinder; 12, fifth control valve; 13, hydrogen collecting tank; 14, sixth control valve; 15, chromatograph; 16, computer; 17, seventh control valve; 18, inert gas pressure control tank; 19, eighth control valve; 20, ninth control valve; 21, tenth control valve; 22, first pressure gauge; 23. Eleventh control valve; 24. Motor; 25. Twelfth control valve; 26. Thirteenth control valve; 27. Fourteenth control valve; 28. Fifteenth control valve; 29. ​​Sixteenth control valve; 30. Piston; 31. Spring; 32. Inert gas bottle; 33. Second pressure gauge; 34. High-pressure unloading solenoid valve; 35. Inert gas regulating tank; 36. Seventeenth control valve. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0020] See also Figure 1 , the present invention provides a technical solution: A detection system for the effect of water quality on electrolytic hydrogen production is used for conducting an evaluation experiment on the effect of water quality on electrolytic hydrogen production in a laboratory, comprising a single electrolytic cell electrolytic hydrogen production system, a tank body 1 and an analysis and detection system. The single electrolytic cell electrolytic hydrogen production system is used to replace water of different water quality for electrolytic hydrogen production when in use, comprising a single electrolytic cell 5, and a liquid inlet and refilling pipeline, an oxygen exhaust pipeline and a hydrogen purification pipeline connected to the single electrolytic cell 5. The hydrogen inlet end of the tank body 1 is connected to the hydrogen purification pipeline to introduce the purified hydrogen into the tank body 1. The analysis and detection system is arranged at the hydrogen discharge end of the tank body 1, and includes a chromatograph 15 and a computer 16. The chromatograph 15 is connected to the hydrogen discharge end of the tank body 1 through a hydrogen conduit at the detection end, and is used to detect the quality of hydrogen. A sixth control valve 14 is arranged on the hydrogen conduit at the detection end to control the hydrogen conduit. The computer 16 is connected to the chromatograph 15 through a wire, and is used to record and display the detection results of the chromatograph 15, so as to complete the evaluation process of the quality of the generated hydrogen under different water qualities.

[0021] The liquid inlet and replenishment pipeline is arranged at the replenishment end of the single electrolytic cell 5, including a replenishment water pipe and a liquid tank 2. One end of the replenishment water pipe is connected to the single electrolytic cell 5, and the other end is deep in the liquid tank 2, which is used to replenish the water in the liquid tank 2 into the single electrolytic cell 5 to ensure the process of electrolytic hydrogen production; and in order to control the opening and closing of the replenishment water pipe when in use, a first control valve 3 and a liquid pump 4 are also arranged on the pipeline of the replenishment water pipe. The liquid pump 4 is used to ensure the flow rate in the replenishment water pipe when in use, and the opening and closing of the replenishment water pipe is controlled by the first control valve 3. When in use, the first control valve 3 is used to control the replenishment process of the single electrolytic cell 5.

[0022] The oxygen exhaust pipeline is arranged at the oxygen exhaust end of the single electrolytic cell 5, and is used to discharge and collect the generated oxygen. It includes an oxygen exhaust pipe, one end of which is connected to the single electrolytic cell 5, and the other end is connected to the exhaust end or the oxygen collection end. A second control valve 6 is also arranged on the pipeline of the oxygen exhaust pipe. The opening and closing of the oxygen exhaust pipe is controlled by the second control valve 6. When in use, the oxygen exhaust process is controlled by the second control valve 6.

[0023] The hydrogen purification pipeline is arranged at the hydrogen discharge end of the single electrolytic cell 5, including a hydrogen discharge pipeline, one end of which is connected to the single electrolytic cell 5, and the other end is connected to the hydrogen inlet end of the tank body 1, and a hydrogen purification separator 7 and a third control valve 8 are arranged on the hydrogen discharge pipeline. When in use, the hydrogen generated by electrolysis of water is purified by the hydrogen purification separator 7, and the opening and closing of the hydrogen discharge pipeline is controlled by the third control valve 8, and then the hydrogen replenishment process in the tank body 1 is controlled by the third control valve 8 when in use.

[0024] The end of the tank body 1 away from the hydrogen inlet end is also provided with a tank body emptying pipeline, and the tank body emptying pipeline includes a tank body emptying pipe, and a seventh control valve 17 and a second pressure gauge 33 arranged on the tank body emptying pipe. When in use, the opening and closing of the tank body emptying pipe is controlled by the seventh control valve 17, and then the discharge process of the residual gas in the tank body 1 is controlled, and the pressure and flow of the tank body emptying pipe are observed by the second pressure gauge 33 of the tank body emptying pipe.

[0025] As a preferred embodiment, see Figure 1The water quality effect detection system on hydrogen production by electrolysis of water also includes a collection system for collecting and sampling hydrogen. The collection system is connected to the hydrogen discharge pipeline of the hydrogen purification pipeline, including a hydrogen collection pipeline, a hydrogen pressurizing cylinder 11 and a hydrogen collection tank 13. One end of the hydrogen collection pipeline is connected to the hydrogen discharge pipeline between the hydrogen purification separator 7 and the third control valve 8, and the other end is connected to the hydrogen pressurizing cylinder 11. A fourth control valve 9 and a one-way valve 10 are also provided on the hydrogen collection pipeline. The one-way valve 10 is provided on the hydrogen collection pipeline close to the pressurizing cylinder 11. The hydrogen collection tank 13 is connected to the hydrogen pressurizing cylinder 11 through a hydrogen pipeline, and a fifth control valve 12 is provided on the hydrogen pipeline. The hydrogen collection process of the hydrogen collection tank 13 is controlled by the fifth control valve 12. When using the collection system to collect hydrogen, the third control valve 8 is closed and the fourth control valve 9 is opened, so that the hydrogen purified by the hydrogen purification separator 7 can enter the hydrogen pressurizing cylinder 11 through the one-way valve 10 and be gathered in the hydrogen pressurizing cylinder 11. When the hydrogen pressure reaches a certain value, the fifth control valve 12 is opened to allow the hydrogen to enter the hydrogen collection tank 13 for collection.

[0026] A piston plate 30 and a spring 31 are also provided in the hydrogen pressurizing cylinder 11. The piston plate 30 is movably installed in the hydrogen pressurizing cylinder 11 and is connected to one end of the spring 31. The other end of the spring 31 is connected to the end side wall of the hydrogen pressurizing cylinder 11. When in use, the hydrogen in the hydrogen pressurizing cylinder 11 is pushed out by controlling the extension of the spring 31, so that the hydrogen enters the hydrogen collecting tank 13 for collection.

[0027] The hydrogen exhaust pipeline is not purged and impure hydrogen in the hydrogen exhaust pipeline is not discharged during the hydrogen collection process. An exhaust branch is also provided on the hydrogen exhaust pipeline between the hydrogen purification separator 7 and the third control valve 8. The exhaust branch is also provided with a seventeenth control valve 36, and the opening and closing of the exhaust branch is controlled by the seventeenth control valve 36.

[0028] As a preferred embodiment, see Figure 1The water quality effect detection system for hydrogen production by electrolysis of water also includes an inert gas purging system for cleaning the entire system, and the inert gas purging system includes an inert gas bottle 32 and an inert gas pressure control tank 18; the inert gas bottle 32 is used to provide inert gas to the entire system, purge the system pipeline, and ensure the quality of the experiment. The inert gas bottle 32 is connected to the inert gas replenishing end of the inert gas pressure control tank 18 through the inert gas supply pipeline 1, and inert gas is provided to the inert gas pressure control tank 18 through the inert gas supply pipeline 1; the inert gas discharge end of the inert gas pressure control tank 18 is connected to the inert gas replenishing end of the tank body 1 through the inert gas supply pipeline 2, and inert gas is provided to the tank body 1 to achieve the purpose of pressurizing the hydrogen in the tank body 1. At the same time, when in use, the inert gas is passed into the tank body 1 to clean the inside of the tank body 1 to ensure the quality of the experiment.

[0029] The inert gas input end of the inert gas supply pipeline 1 is connected to the inert gas bottle 32, and the two branches of the inert gas output end are respectively connected to the single electrolytic cell 5 and the inert gas pressure control tank 18; and a sixteenth control valve 29 is arranged on the branch connected to the single electrolytic cell 5, and the opening and closing of the corresponding branch is controlled by the sixteenth control valve 29, so that the inert gas can enter the single electrolytic cell 5 to purge the entire single electrolytic cell electrolysis hydrogen production system; a thirteenth control valve 26 is arranged on the branch connected to the inert gas pressure control tank 18, and the thirteenth control valve 26 controls the opening and closing of the corresponding branch to replenish the inert gas pressure control tank 18.

[0030] One end of the inert gas supply pipeline 2 is connected to the inert gas discharge end of the inert gas pressure control tank 18, and the other end is connected to the inert gas replenishing end of the tank body 1, and a ninth control valve 20, a first pressure gauge 22 and an eleventh control valve 23 are also arranged on the pipeline of the inert gas supply pipeline 2, the ninth control valve 2 is arranged at the inert gas input end of the inert gas supply pipeline 2, the eleventh control valve 23 is arranged at the inert gas output end of the inert gas supply pipeline 2, and an inert gas pressure control pipeline and a pressurized gas supply pipeline are also arranged on the pipeline between the ninth control valve 20 and the eleventh control valve 23, the other end of the inert gas pressure control pipeline is connected to the inert gas pressure control tank 18, the pressurized gas supply pipeline is arranged at the hydrogen output end of the inert gas pressure control pipeline, and is communicated with the hydrogen pressurizing cylinder 11, and the first pressure gauge 22 is arranged on the pipeline between the ninth control valve 20 and the inert gas pressure control pipeline. When in use, by opening the ninth control valve 20 and the eleventh control valve 23, the inert gas in the inert gas pressure control tank 18 is passed into the tank body 1, the hydrogen in the tank body 1 is pressurized, and at the same time, by passing the inert gas into the tank body 1, the inside of the tank body 1 is cleaned. By setting the inert gas pressure control pipeline, the stability and pressure of the inert gas injected into the tank body 1 can be guaranteed, and the gas in the tank body 1 can be pressurized. The inert gas that has been stabilized by pressurization is passed into the rear end of the hydrogen pressurizing cylinder 11 through the pressurized gas supply pipeline, and the control spring 31 is extended to push the hydrogen in the hydrogen pressurizing cylinder 11 out, so that the hydrogen enters the hydrogen collection tank 13 for collection, and the fourteenth control valve 27 is also provided on the pressurized gas supply pipeline, and the opening and closing of the pressurized gas supply pipeline is controlled by the fourteenth control valve 27. The first pressure gauge 22 is used to monitor the inert gas flow in the second inert gas supply pipeline.

[0031] The pressurized gas delivery pipeline is also connected to the inert gas output end branch of the inert gas bottle 32 to provide inert gas to the hydrogen pressurizing cylinder 11, and a fifteenth control valve 28 is also arranged on the branch.

[0032] The inert gas pressure control pipeline includes a high-pressure unloading solenoid valve 34, and an eighth control valve 19 and a tenth control valve 21 arranged on the inert gas delivery and control pipeline; the high-pressure unloading solenoid valve 34 is arranged on the pipeline of the second inert gas supply pipeline and is connected to the inert gas input end of the inert gas delivery and control pipeline. When the inert gas is supplied at normal pressure, the eighth control valve 19 and the tenth control valve 21 are closed. When the inert gas is supplied at a constant pressure, when the gas pressure in the second inert gas supply pipeline is less than the set threshold value of the high-pressure unloading solenoid valve 34, the high-pressure unloading solenoid valve 34 is closed, the eighth control valve 19 and the tenth control valve 21 are opened, and the inert gas in the second inert gas supply pipeline returns to the inert gas pressure control tank 18 via the inert gas delivery and control pipeline. At the same time, a pressurized bypass is also provided on the bypass of the inert gas delivery and control pipeline. The pressurized bypass is provided with a motor 24, a twelfth control valve 25 and an inert gas control tank 35. The twelfth control valve 25 is provided at the air inlet end of the inert gas control tank 35. During the inert gas circulation process, the twelfth control valve 25 is opened (the eighth control valve 19 can also be closed at this time. In this process, the main function of the eighth control valve 19 is to protect the pressurized bypass pipeline. Closing the eighth control valve 19 can realize the inert gas control. In order to quickly collect the inert gas in the tank 35), the inert gas enters the inert gas regulating tank 35 through the pressurized bypass for collection. When the amount of inert gas collected in the inert gas regulating tank 35 reaches the required amount, the eighth control valve 19 and the ninth control valve 20 are closed, and the tenth control valve 21, the eleventh control valve 23, the twelfth control valve 25 and the motor 24 are opened at the same time. Under the action of the motor 24, the inert gas entering the high-pressure unloading solenoid valve 34 can be greater than the set threshold value of the high-pressure unloading solenoid valve 34, thereby realizing stable pressurization of the tank body 1.

[0033] In order to evaluate the oxygen content in hydrogen, this embodiment aims to verify the reliability of the equipment and measure the oxygen content of ultrapure water hydrogen in a small-area single-cell electrolysis to evaluate safety, and also serves as a blank comparison with other embodiments.

[0034] The liquid to be electrolyzed in the experiment is ultrapure water.

[0035] Step 1: Air tightness check Close all control valves in the system, and simultaneously open the sixteenth control valve 29 and the third control valve 8 until the pressure of the entire system reaches 0.12 MPa. Hold the pressure for 30 minutes and observe the value change of the second pressure gauge 33; Step 2: Inert gas purging Close all control valves in the system, open the sixteenth control valve 29, the third control valve 8, and the seventh control valve 17 to purge the system for 5 minutes, then first close the seventh control valve 17, the sixteenth control valve 29, and finally close the third control valve 8; Step 3: Hydrogen production by electrolysis Close all control valves of the system, open the second control valve 6 and the seventeenth control valve 36 at the same time, open the first control valve 3 and the liquid pump 4, pass direct current and the liquid to be tested into the single electrolytic cell 5, obtain hydrogen and oxygen through chemical reaction, the oxygen is discharged through the oxygen exhaust pipeline, and the hydrogen is discharged through the pipeline of the seventeenth control valve 36; Step 4: Sampling test At the same time, the fourth control valve 9 is closed, the third control valve 8 is opened, the time is maintained for 1 minute, the third control valve 8 is closed, the fourth control valve 9 is opened, and the eleventh control valve 23 and the control valve 14 are opened at the same time, and the hydrogen sample is blown into the chromatograph 15; the detector is a TCD detector; the chromatographic detection results: the oxygen content in hydrogen is shown in Table 1; Table 1: Oxygen content in hydrogen Table 1 date time Oxygen in Hydrogen (molar fraction) 20231114 9:30 0.00021 20231114 10:00 0.00022 20231114 10:30 0.00021 20231114 11:00 0.00022

[0036] To evaluate the effect of electrolytic organic wastewater on hydrogen quality, ethanol, acetic acid, and ethyl acetate were used to prepare the solution. The ultrapure water in Example 1 was used as the solution water. The COD value was tested using a COD reagent (German Lovibond ET99974) and a visible light spectrophotometer (Lovibond SpectroDirect). The COD of the prepared solution was measured to be 2760 mg / L.

[0037] Step 1: Air tightness check Close all control valves in the system, and simultaneously open the sixteenth control valve 29 and the third control valve 8 until the pressure of the entire system reaches 0.12 MPa. Hold the pressure for 30 minutes and observe the value change of the second pressure gauge 33; Step 2: Inert gas purging Close all control valves in the system, open the sixteenth control valve 29, the third control valve 8, and the seventh control valve 17 to purge the system for 5 minutes, then close the seventh control valve 17, then the sixteenth control valve 29, and finally the third control valve 8; Step 3: Hydrogen production by electrolysis Close all control valves of the system, open the second control valve 6 and the fourth control valve 9 at the same time, open the first control valve 3 and the liquid pump 4, pass the direct current and the liquid to be tested into the single electrolytic cell 5, obtain hydrogen and oxygen through chemical reaction, the oxygen is emptied through the oxygen exhaust pipeline, and the hydrogen is collected through the pipeline of the fourth control valve 9; Step 4: Hydrogen Collection Open the fourth control valve and the one-way valve 10 to allow hydrogen to enter the hydrogen pressurizing cylinder 11, open the fifth control valve 12 and the fifteenth control valve 28, and the high-pressure inert gas pushes the piston 30 to press the hydrogen into the hydrogen collecting tank 13, and the piston 30 is reset by the spring 31; Step 5: Sampling test At the same time, close the fourth control valve 9, open the third control valve 8, maintain the time for 1 minute, close the third control valve 8, open the fourth control valve 9, open the eleventh control valve 23 and the sixth control valve 14 at the same time, and blow the hydrogen sample into the chromatograph 15; the detector in the chromatograph uses a TCD detector, and the standard GB / T 8984-2008 is implemented; the chromatographic detection results: the oxygen content in hydrogen is shown in Table 2: Table 2: Oxygen content in hydrogen Table 2 date time Carbon monoxide carbon dioxide 20231115 9:30 0.0008 0.0032 20231115 10:00 0.0008 0.0034 20231115 10:30 0.0007 0.0032 20231115 11:00 0.0008 0.0033

[0038] Evaluation of the effect of electrolysis of potassium chloride inorganic salt aqueous solution on hydrogen quality. The potassium chloride solution was prepared on an analytical balance with a solution concentration of 2.3547 g / L.

[0039] Step 1: Air tightness check Close all control valves in the system, and simultaneously open the sixteenth control valve 29 and the third control valve 8 until the pressure of the entire system reaches 0.12 MPa. Hold the pressure for 30 minutes and observe the value change of the second pressure gauge 33; Step 2: Inert gas purging Close all control valves of the system, open the sixteenth control valve 29, the third control valve 8, and the seventh control valve 17 of inert gas to purge the system for 5 minutes, then close the seventh control valve 17, then the sixteenth control valve 29, and finally the third control valve 8; Step 3: Hydrogen production by electrolysis Close all control valves of the system, open the second control valve 6 and the fourth control valve 9 at the same time, open the first control valve 3 and the liquid pump 4, pass the direct current and the liquid to be tested into the single electrolytic cell 5, obtain hydrogen and oxygen through chemical reaction, the oxygen is emptied through the oxygen exhaust pipeline, and the hydrogen is collected through the pipeline of the fourth control valve 9; Step 4: Hydrogen Collection Open the fourth control valve 9 and the one-way valve 10 to allow hydrogen to enter the hydrogen pressurizing cylinder 11, open the fifth control valve 12 and the fifteenth control valve 28, and the high-pressure inert gas pushes the piston 30 to press the hydrogen into the hydrogen collecting tank 13, and the piston 30 is reset by the spring 31; Step 5: Sampling test At the same time, close the fourth control valve 9, open the third control valve 8, maintain the time for 1 minute, close the third control valve 8, open the fourth control valve 9, and open the eleventh control valve 23 and the sixth control valve 14 at the same time to blow the hydrogen sample into the chromatograph 15; The detector used in the chromatograph is TCD detector Chromatographic test results: The oxygen content in hydrogen is shown in Table 3; Table 3: Oxygen content in hydrogen Table 3 date time Chlorine 20231116 9:30 0.00011 20231116 10:00 0.00012 20231116 10:30 0.00011 20231116 11:00 0.00011

[0040] Evaluation of the effect of electrolytic potassium sulfate inorganic salt aqueous solution on hydrogen quality. Potassium sulfate solution was prepared on an analytical balance with a solution concentration of 3.2467 g / L.

[0041] Step 1: Air tightness check Close all control valves in the system, and simultaneously open the sixteenth control valve 29 and the third control valve 8 until the pressure of the entire system reaches 0.12 MPa. Hold the pressure for 30 minutes and observe the value change of the second pressure gauge 33; Step 2: Inert gas purging Close all control valves in the system, open the sixteenth control valve 29, the third control valve 8, and the seventh control valve 17 to purge the system for 5 minutes, then close the seventh control valve 17, then the sixteenth control valve 29, and finally the third control valve 8; Step 3: Hydrogen production by electrolysis Close all control valves of the system, open the second control valve 6 and the fourth control valve 9 at the same time, open the first control valve 3 and the liquid pump 4, pass the direct current and the liquid to be tested into the single electrolytic cell 5, obtain hydrogen and oxygen through chemical reaction, the oxygen is emptied through the oxygen exhaust pipeline, and the hydrogen is collected through the pipeline of the fourth control valve 9; Step 4: Hydrogen Collection Open the fourth control valve 9 and the one-way valve 10 to allow hydrogen to enter the hydrogen pressurizing cylinder 11, open the fifth control valve 12 and the fifteenth control valve 28, and the high-pressure inert gas pushes the piston 30 to press the hydrogen into the hydrogen collecting tank 13, and the piston 30 is reset by the spring 31; Step 5: Sampling test At the same time, the fourth control valve 9 is closed, the third control valve 8 is opened, the time is maintained for 1 minute, the third control valve 8 is closed, the fourth control valve 9 is opened, and the eleventh control valve 23 and the sixth control valve 14 are opened at the same time to blow the hydrogen sample into the chromatograph 15; in the chromatograph, the detector is selected as the SCD detector; Chromatographic test results: The oxygen content in hydrogen is shown in Table 4: Table 4: Oxygen content in hydrogen Table 4 date time Sulfur dioxide 20231117 9:30 Not detected 20231117 10:00 Not detected 20231117 10:30 Not detected 20231117 11:00 Not detected It can be seen from the above-mentioned Examples 2 to 5 that the water quality impact detection system on water electrolysis hydrogen production designed in Example 1 of the present invention can effectively complete the experiment on the impact of water quality on the effect of water electrolysis hydrogen production in the laboratory.

[0042] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0043] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A system for detecting the effect of water quality on hydrogen production by electrolysis of water, characterized in that: include: Tank (1); A single electrolytic cell electrolytic hydrogen production system is arranged at the hydrogen inlet end of the tank body (1) and is in communication with the tank body (1); An analysis and detection system is arranged at the hydrogen discharge end of the tank body (1) and is in communication with the tank body (1); An exhaust gas discharge pipeline is arranged at the exhaust gas discharge end of the tank body (1) and is in communication with the tank body (1); Inert gas purge system, including: The inert gas bottle (32) is connected to the inert gas pressure control tank (18), the single electrolytic cell electrolysis hydrogen production system and the collection system respectively through an inert gas supply pipeline 1; The inert gas pressure-controlled tank (18) is connected to the tank body (1) and the collection system respectively through an inert gas supply pipeline 2.

2. A water quality detection system for the effect of water electrolysis on hydrogen production as claimed in claim 1, characterized in that: The single electrolytic cell hydrogen production system includes: A single electrolytic cell (5), and connected to the single electrolytic cell (5): A liquid inlet and liquid replenishment pipeline is arranged at the liquid replenishment end of the single electrolytic cell (5), comprising a liquid replenishment water pipe and a liquid tank (2); the liquid replenishment water pipe is arranged between the single electrolytic cell (5) and the liquid tank (2), and a first control valve (3) and a liquid pump (4) are arranged on the liquid replenishment water pipe; A hydrogen purification pipeline is arranged at the hydrogen discharge end of the single electrolytic cell (5), comprising a hydrogen discharge pipeline, the hydrogen discharge pipeline is arranged between the single electrolytic cell (5) and the tank body (1), and a hydrogen purification separator (7) and a third control valve (8) are arranged on the hydrogen discharge pipeline; The single electrolytic cell hydrogen production system also includes: An oxygen exhaust pipeline connected to the single electrolytic cell (5) is provided with a second control valve (6).

3. A water quality detection system for the effect of water electrolysis on hydrogen production as claimed in claim 2, characterized in that: The collection system is arranged on the hydrogen purification pipeline of the single electrolytic cell electrolysis hydrogen production system and is connected to the hydrogen exhaust pipeline of the hydrogen purification pipeline, and includes: A hydrogen collection pipeline is arranged between the hydrogen discharge pipeline and the hydrogen pressurizing cylinder (11), and the hydrogen input end of the hydrogen collection pipeline is connected to the hydrogen discharge pipeline between the hydrogen purification separator (7) and the third control valve (8), and the discharge end is connected to the hydrogen pressurizing cylinder (11), and a fourth control valve (9) and a one-way valve (10) are arranged on the hydrogen collection pipeline; A hydrogen collecting tank (13) is connected to the hydrogen pressurizing cylinder (11) via a hydrogen pipeline, and a fifth control valve (12) is provided on the hydrogen pipeline; A hydrogen exhaust pipeline is also provided on the hydrogen purification pipeline of the single electrolytic cell electrolytic hydrogen production system. The hydrogen input end of the hydrogen exhaust pipeline is connected to the hydrogen discharge pipeline between the hydrogen purification separator (7) and the third control valve (8). The hydrogen exhaust pipeline is provided with a seventeenth control valve (36).

4. A water quality detection system for the effect of water electrolysis on hydrogen production as claimed in claim 2, characterized in that: The input end of the inert gas supply pipeline 1 is connected to the inert gas bottle (32), and the two branches of the output end are respectively connected to the single electrolytic cell (5) and the inert gas pressure control tank (18); a sixteenth control valve (29) is provided on the branch connected to the single electrolytic cell (5); and a thirteenth control valve (26) is provided on the branch connected to the inert gas pressure control tank (18).

5. A water quality detection system for the effect of water electrolysis on hydrogen production as claimed in claim 3, characterized in that: One end of the inert gas supply pipeline 2 is connected to the gas discharge end of the inert gas pressure control tank (18), and the other end is connected to the inert gas supply end of the tank body (1). A ninth control valve (20), a first pressure gauge (22) and an eleventh control valve (23) are also provided on the pipeline of the inert gas supply pipeline 2. An inert gas pressure control pipeline and a pressurized gas supply pipeline are also provided on the pipeline between the ninth control valve (20) and the eleventh control valve (23). The other end of the inert gas pressure control pipeline is connected to the inert gas The pressure control tank (18) is connected, the pressurized gas supply pipeline is arranged at the inert gas output end of the inert gas pressure control pipeline and is connected to the hydrogen pressurizing cylinder (11), the first pressure gauge (22) is arranged on the pipeline between the ninth control valve (20) and the inert gas pressure control pipeline; a fourteenth control valve (27) is also arranged on the pressurized gas supply pipeline, the pressurized gas supply pipeline is also connected to the inert gas output end branch of the inert gas bottle (32), and a fifteenth control valve (28) is arranged on the inert gas output end branch.

6. A detection system for the effect of water quality on hydrogen production by electrolysis of water as claimed in claim 5, characterized in that: The inert gas pressure control pipeline comprises a high-pressure unloading solenoid valve (34), and an eighth control valve (19) and a tenth control valve (21) arranged on the inert gas delivery and control pipeline; the high-pressure unloading solenoid valve (34) is arranged on the pipeline of the second inert gas supply pipeline and is connected to the inert gas input end of the inert gas delivery and control pipeline, and the output end of the inert gas delivery and control pipeline is connected to the inert gas pressure control tank (18).

7. A water quality effect detection system for hydrogen production by electrolysis of water as claimed in claim 6, characterized in that: A pressurizing bypass is also provided on the bypass of the inert gas delivery control pipeline between the eighth control valve (19) and the tenth control valve (21), and a motor (24), a twelfth control valve (25) and an inert gas control tank (35) are provided on the pressurizing bypass. The twelfth control valve (25) is provided at the gas inlet end of the inert gas control tank (35).

8. A water quality effect detection system for hydrogen production by electrolysis of water as claimed in claim 3, characterized in that: The analytical detection system includes: A chromatograph (15) is connected to the tank (1) via a detection end hydrogen conduit, and a sixth control valve (14) is provided on the detection end hydrogen conduit; a computer (16) is electrically connected to the chromatograph (15); The exhaust gas venting pipeline is also provided with a seventh control valve (17) and a second pressure gauge (33).

9. A method for using the water quality effect detection system for hydrogen production by electrolysis of water as claimed in claim 8, characterized in that: The following steps are involved: Step 1: Air tightness check Close all control valves in the system, and simultaneously open the sixteenth control valve (29) and the third control valve (8) until the pressure of the entire system reaches 0.12 MPa, hold the pressure for 30 minutes, and observe the value change of the second pressure gauge (33); Step 2: Inert gas purging Close all control valves in the system, open the sixteenth control valve (29), the third control valve (8), and the seventh control valve (17) to purge the system for 5 minutes, then first close the seventh control valve (17), the sixteenth control valve (29), and finally close the third control valve (8); Step 3: Hydrogen production by electrolysis All control valves of the system are closed, and the second control valve (6) and the seventeenth control valve (36) are opened at the same time. The first control valve (3) and the liquid pump (4) are opened, and direct current and the liquid to be tested are passed into the single electrolytic cell (5). Hydrogen and oxygen are obtained through chemical reactions, and the oxygen is discharged through the oxygen exhaust pipeline, and the hydrogen is discharged through the pipeline of the seventeenth control valve (36); Step 4: Sampling test At the same time, the fourth control valve (9) is closed, the third control valve (8) is opened, the operation is maintained for 1 minute, the third control valve (8) is closed, the fourth control valve (9) is opened, and the eleventh control valve (23) and the sixth control valve (14) are opened simultaneously to blow the hydrogen sample into the chromatograph (15).

10. A method for using the water quality effect detection system for hydrogen production by electrolysis of water as claimed in claim 8, characterized in that: The following steps are involved: Step 1: Air tightness check Close all control valves in the system, and simultaneously open the sixteenth control valve (29) and the third control valve (8) until the pressure of the entire system reaches 0.12 MPa. Hold the pressure for 30 minutes and observe the value change of the second pressure gauge (33); Step 2: Inert gas purging Close all control valves in the system, open the sixteenth control valve (29), the third control valve (8), and the seventh control valve (17) to purge the system for 5 minutes, then first close the seventh control valve (17), the sixteenth control valve (29), and finally close the third control valve (8); Step 3: Hydrogen production by electrolysis All control valves of the system are closed, and the second control valve (6) and the seventeenth control valve (36) are opened at the same time. The first control valve (3) and the liquid pump (4) are opened, and direct current and the liquid to be tested are passed into the single electrolytic cell (5). Hydrogen and oxygen are obtained through chemical reactions, and the oxygen is discharged through the oxygen exhaust pipeline, and the hydrogen is discharged through the pipeline of the seventeenth control valve (36); Step 4: Hydrogen Collection The fourth control valve (9) and the one-way valve (10) are opened to allow hydrogen to enter the hydrogen pressurizing cylinder (11); the fifth control valve (12) and the fifteenth control valve (28) are opened, and the high-pressure inert gas pushes the piston (30) to press the hydrogen into the hydrogen collecting tank (13); the piston (30) is reset by the spring (31); Step 5: Sampling test At the same time, the fourth control valve (9) is closed, the third control valve (8) is opened, the operation is maintained for 1 minute, the third control valve (8) is closed, the fourth control valve (9) is opened, and the eleventh control valve (23) and the sixth control valve (14) are opened simultaneously to blow the hydrogen sample into the chromatograph (15).

Citation Information

Patent Citations

  • Water electrolysis hydrogen production method

    CN102586797A

  • Electrolytic bath system and pure water treatment system and metal recovery method thereof

    CN112941551A

  • Water electrolysis hydrogen production system

    CN113430536A

  • Automatic nitrogen replacement device and method for water electrolysis hydrogen production system

    CN114182295A

  • Proton exchange membrane pure water electrolysis hydrogen production system

    CN115572994A