Method for filling subgrade in soil and stone combined water

Through the combination of soil and stone, stone and clay are used to fill the water roadbed, forming a stable foot protection, filter layer and earthwork area, solving the roadbed stability problem in areas with shortage of stone, and achieving technical effects that take into account both stability and low cost. .

CN119083254APending Publication Date: 2024-12-06ROAD & BRIDGE INT CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411268131.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-11
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

In areas with shortage of stone, reducing the use of stone cannot ensure the stability of the roadbed in the water, resulting in the roadbed being susceptible to impact and erosion by water flow, affecting driving safety and traffic interruption.

Method used

The soil and stone combination method is used to fill the roadbed in the water, including two protective foot guards, two reverse filter layers and earthwork areas. The two protective foot guards are filled with stones, and the reverse filter layers and earthwork areas are filled with clay. The permeability of the first clay is less than that of The second clay forms a stable roadbed structure through cofferdam construction, drainage and dredging, stone replacement and slope masonry.

Benefits of technology

Reduce the use of stone in areas with shortage of stone, while ensuring the stability of the roadbed in water, reducing construction costs, avoiding roadbed deformation and slope collapse, and improving construction quality and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119083254A_ABST
    Figure CN119083254A_ABST
Patent Text Reader

Abstract

The invention discloses an earth-rock combined underwater roadbed filling method. The earth-rock combined underwater roadbed filling method comprises the following steps: S1, building a cofferdam; s2, draining and dredging; s3, the rockwork is replaced and filled; s4, the subgrade in water is constructed in a soil and stone combined mode; the subgrade in water comprises two protection feet, two inverted filter layers and an earthwork area, the two protection feet are located on the water facing sides of the two sides of the subgrade and formed by stone filling, the two inverted filter layers are located on the inner sides of the two protection feet respectively and formed by first clay filling, and the earthwork area is located between the two inverted filter layers and formed by second clay filling; the water permeability of the first clay is smaller than that of the second clay. The technical problem that the stability of the subgrade in water cannot be guaranteed due to the fact that the usage amount of stone is reduced in a stone shortage area is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of underwater roadbed construction, and in particular to a soil-rock combined underwater roadbed filling method. Background Art

[0002] Due to the needs of engineering construction, more and more highways are built along rivers and reservoirs. The stability of the roadbed of highways built along rivers and reservoirs will inevitably affect the quality of highway use, the difficulty of repair, and the later maintenance of highways. The flooded roadbed is easily damaged by water, hollowed out at the foot of the slope, and the fine-grained filler in the roadbed is lost, resulting in deformation and damage of the roadbed, slope collapse, affecting driving safety and even interrupting traffic, causing loss of life and property.

[0003] Most of the wading roadbeds are mainly constructed by riprap and stone filling. A large amount of stone is used in the underwater roadbed. Although it can ensure the stability of the underwater roadbed, the construction cost is extremely high in areas where stone is scarce. In order to reduce costs, stone is not used or the amount of stone used is reduced, but the stability of the underwater roadbed cannot be guaranteed. For example, the patent with application number CN202210156903.3 discloses a riprap and silt squeezing construction method and slope protection structure for wading roadbed. A mold bag is set on the slopes on both sides of the roadbed backfilled with blocks of stone, and the slope foot at the bottom of the slope is matched. After the mold bag is filled with concrete, a protective layer structure covering the side of the slope is formed, and the slope foot at the bottom of the slope supports and limits the protective layer structure to prevent the protective layer from falling off. Subsequently, after the concrete in the protective layer structure solidifies, grouting is injected into the gaps between the blocks through the grouting pipe, and the concrete mortar is filled between the gaps between the blocks to solidify the blocks into a whole. Based on this construction method and protective structure, the integrity of the roadbed is increased by grouting. In addition, a mold bag protective layer is set on the side of the roadbed. The mold bag protective layer is used to reduce the scouring of water flow and limit the shedding of roadbed materials, so that the roadbed is not easily emptied by water scouring and erosion, thereby ensuring the construction quality.

[0004] With regard to the problem in the related art that reducing the amount of stone used in areas with stone shortages cannot ensure the stability of the underwater roadbed, no effective solution has been proposed yet. Summary of the invention

[0005] The main purpose of the present application is to provide a soil-rock combined underwater roadbed filling method to solve the problem that reducing the amount of stone used in areas with stone shortage cannot ensure the stability of the underwater roadbed.

[0006] In order to achieve the above-mentioned purpose, according to one aspect of the present application, a soil-rock combined underwater roadbed filling method is provided.

[0007] The soil-rock combined underwater roadbed filling method according to the present application comprises the following steps: S1, cofferdam construction; S2, drainage and silt removal; S3, replacement of stone; S4, construction of underwater roadbed by soil-rock combination; the underwater roadbed comprises: two guardrails, two filter layers and earthwork area, wherein the two guardrails are located on the water side of both sides of the roadbed and are formed by stone filling, the two filter layers are respectively located on the inner sides of the two guardrails and are formed by first clay filling, the earthwork area is located between the two filter layers and is formed by second clay filling; the water permeability of the first clay is less than the water permeability of the second clay.

[0008] Furthermore, in step S1, the cofferdam construction includes: constructing two water-blocking cofferdams 1.5m outside the slope foot line of the main line embankment, the cofferdams can be used as access roads for roadbed construction, and the cofferdams are filled with clay to play a role in water isolation.

[0009] Furthermore, in step S2, the drainage and dredging includes: using a water pump to pump water within the red line range to the periphery of the cofferdam; before excavating the silt area, taking drainage measures in advance, and according to the on-site terrain and drainage direction, digging temporary drainage ditches at the foot of the slope on both sides of the cofferdam to divert water to the sump, and then continuously draining water through a water pump to avoid the formation of water pits due to rainfall; using two excavators to cooperate in excavation and transportation, the silt is excavated and loaded onto a dump truck and transported to the silt disposal site.

[0010] Furthermore, in step S3, the replacement of stone includes: when the silt layer is less than 3m, a base treatment method of dredging and replacing stone is adopted; stone replacement is carried out according to the dredging location and depth, the stone (granular material) is medium-hard and hard rock, the compressive strength is not less than 30MPa, the maximum particle is not more than 150mm, the stone content of stone with a particle size of more than 40mm is 30% to 70%, the mud content is not more than 10%, the stone crushing value is not more than 35% and it should be well graded, and stones (granular materials) of uniform particle size shall not be used, and the pores between stones (granular materials) shall be filled with slag, stone chips and other materials, and the specific materials shall be selected according to the actual situation on site; when the excavation and replacement are 1m away from the original pond bottom line, a crushed stone particle size transition zone is set, and the maximum particle size of the crushed stone is not more than 40mm when transitioning to the top surface, and the thickness is not less than 0.3m.

[0011] Furthermore, in step S4, the top width of the foot guard is less than 1.5m, the water side adopts a slope of 1:1.75, the back side adopts a slope of 1:0.75, and is filled with stones with small compression deformation and good water stability.

[0012] Further, in step S4, after the foot guard is formed by stone filling, the side slope is stacked along the backwater side foot guard. The side slope stacking should be started from the bottom to the top after the compacted filling height of the roadbed reaches 2m, and the distance between the stacking working surface and the roadbed rolling filling working surface is ≥10m; the stacking width is 1m, and the stone with a strength greater than 30MPa that is not easy to differentiate is used, the particle size is greater than 30cm and is as regular as possible, the stacked stones are as close and dense as possible, without obvious voids and looseness, the load-bearing contact surface between the blocks is slightly inclined inward, the stones should be staggered and overlapped, bite each other, and no through seams should be generated, and the blocks at the layered parts should be staggered and connected together; the large-diameter stones are not loose, the side slope is stacked tightly, densely and without looseness, the receiving surface between the blocks is inclined inward, and the slope surface is smooth; there should be no dangerous rocks on the upper slope.

[0013] Furthermore, in step S4, the filter layer is 0.5m thick and is made of bagged gravel. Each layer of bagged gravel is staggered and stacked layer by layer along the backwater side of the foot guard with a slope of 1:0.75. A layer of filter geotextile is laid on the foot guard side of the filter layer. The filter geotextile is folded up and down every 2m, with a fold width of 1m. The vertical spacing of the folds should be consistent with the longitudinal laying spacing of the high-strength reinforced geotextile.

[0014] Furthermore, in step S4, a 32t high-performance vibratory roller is used to perform full-section compaction and reinforcement rolling every time 2m of water roadbed is laid.

[0015] Furthermore, in step S4, a high-strength reinforced geotextile is added every 2m in the earthwork area, and the paving range extends to 2m inside the stone fill body. The spacing of the high-strength reinforced geotextiles and the spacing of the reinforcement rolling are staggered, and the staggered spacing is 1m.

[0016] Furthermore, the high-strength reinforced geotextile is anchored to the foundation surface with U-shaped steel nails, and two longitudinally adjacent high-strength woven geotextiles are sewn in a J-shaped manner with high-tenacity polyester yarns, and the overlapped sewing part is at least 80 mm.

[0017] In an embodiment of the present application, a combination of soil and stone is used to fill the underwater roadbed, and the underwater roadbed includes: two foot guards, two filter layers and an earthwork area, wherein the two foot guards are located on the water side of both sides of the roadbed and are formed by stone filling, the two filter layers are respectively located on the inner sides of the two foot guards and are formed by first clay filling, and the earthwork area is located between the two filter layers and is formed by second clay filling; the water permeability of the first clay is less than the water permeability of the second clay; the purpose of reducing the amount of stone used in areas with stone shortages and ensuring the stability of the underwater roadbed is achieved, thereby achieving a technical effect of taking into account both stability and low cost, and further solving the technical problem that reducing the amount of stone used in areas with stone shortages cannot ensure the stability of the underwater roadbed. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The drawings constituting a part of this application are used to provide a further understanding of this application, so that other features, purposes and advantages of this application become more obvious. The schematic embodiment drawings and their descriptions of this application are used to explain this application and do not constitute an improper limitation on this application. In the drawings:

[0019] Figure 1 It is a schematic diagram of the process of the soil-rock combined underwater roadbed filling method according to an embodiment of the present application;

[0020] Figure 2 is a schematic diagram of the structure of an underwater roadbed according to an embodiment of the present application;

[0021] Figure 3 According to the embodiment of the present application Figure 2 A partial schematic diagram of part A.

[0022] Reference numerals

[0023] 1. Foot guard; 2. Filter layer; 3. Earthwork area; 4. High-strength reinforced geotextile; 5. Filter geotextile. DETAILED DESCRIPTION

[0024] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.

[0025] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0026] In the present application, the terms "upper", "lower", "left", "right", "front", "back", "top", "bottom", "inner", "outer", "middle", "vertical", "horizontal", "lateral", "longitudinal" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings. These terms are mainly used to better describe the present invention and its embodiments, and are not used to limit the indicated devices, elements or components to have a specific orientation, or to be constructed and operated in a specific orientation.

[0027] In addition, some of the above terms may be used to express other meanings in addition to indicating orientation or positional relationship. For example, the term "on" may also be used to express a certain dependency or connection relationship in some cases. For those skilled in the art, the specific meanings of these terms in the present invention can be understood according to specific circumstances.

[0028] In addition, the terms "installed", "set", "provided with", "connected", "connected", and "socketed" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral structure; it can be a mechanical connection or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be an internal connection between two devices, elements, or components. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0029] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0030] like Figure 1-3 As shown, the present application relates to a soil-rock combined with water roadbed filling method, and the soil-rock combined with water roadbed filling method comprises:

[0031] S1. Construction of cofferdam;

[0032] Specifically, in step S1, the cofferdam construction includes: constructing two water-blocking cofferdams 1.5m outside the slope foot line of the main line embankment. The cofferdams can be used as access roads for roadbed construction. The cofferdams are filled with clay to play a role in water isolation.

[0033] S2, drainage and desilting;

[0034] Specifically, in step S2, drainage and dredging includes:

[0035] Use water pumps to pump water within the red line to the periphery of the cofferdam; before excavating the silt area, take drainage measures in advance. According to the on-site terrain and drainage direction, dig temporary drainage ditches at the foot of the slope on both sides of the cofferdam to divert water to the collection pit, and then use water pumps to continuously drain water to avoid the formation of water pits due to rainfall; use two excavators to cooperate in excavation and transportation, load the silt onto dump trucks, and transport it to the silt disposal site.

[0036] S3, Replace the stone filling;

[0037] In step S3, replacing the stone includes:

[0038] When the silt layer is less than 3m, the base treatment method of dredging and replacing with stone is adopted; stone replacement is carried out according to the dredging location and depth. The stone (granular material) is medium-hard and hard rock with a compressive strength of not less than 30MPa, the largest particle is not more than 150mm, the stone content of stone with a particle size of more than 40mm is 30% to 70%, the mud content is not more than 10%, the stone crushing value is not more than 35% and it should be well graded. Stone (granular material) of uniform particle size shall not be used, and the pores between stones (granular materials) shall be filled with slag, stone chips and other materials. The specific materials shall be selected according to the actual situation on site; when the excavation and replacement are 1m away from the original pond bottom line, a crushed stone particle size transition zone is set. When transitioning to the top surface, the maximum particle size of the crushed stone is not more than 40mm, and the thickness is not less than 0.3m.

[0039] S4. The underwater roadbed is constructed by combining soil and stone; the underwater roadbed comprises: two foot guards, two filter layers and an earthwork area, wherein the two foot guards are located on the water side of both sides of the roadbed and are formed by filling with stones, the two filter layers are located on the inner sides of the two foot guards and are formed by filling with a first clay, and the earthwork area is located between the two filter layers and is formed by filling with a second clay; the water permeability of the first clay is less than the water permeability of the second clay.

[0040] The water-facing sides of the two foot guards are in direct contact with water, while the earthwork area is between the two foot guards and will not be in contact with water, effectively preventing water from impacting and eroding the earthwork area and other negative effects. In addition, a low-permeability filter layer is arranged between the two foot guards and the earthwork area, which can effectively prevent water from penetrating through the stone in the foot guards and causing negative impacts on the earthwork area. In this way, only two foot guards are made of stone, and the rest of the positions are made of earthwork, which greatly reduces the amount of stone materials, and the stone foot guards are set on the outside of the earthwork area to block water impact and erosion of the earthwork area, which can ensure the stability of the roadbed in the water; in addition, the filter layer can further prevent water impact and erosion of the earthwork area, further ensuring the stability of the roadbed in the water. It should be understood that the second clay can be selected from common clay.

[0041] Preferably, in step S4, the top width of the foot guard is less than 1.5m, the water side adopts a slope of 1:1.75, the back side adopts a slope of 1:0.75, and the stone with small compression deformation and good water stability is used for filling. Further, the raw material requirements are: the submerged part of the roadbed is filled with stone with good stability and not easy to expand and disintegrate; the particle size of the embankment filler is not more than 500mm and does not exceed 2 / 3 of the layer thickness.

[0042] Preferably, in step S4, after the foot guard is formed by stone filling, the side slope is stacked along the backwater side foot guard. The side slope stacking should be started from the bottom to the top after the compacted filling height of the roadbed reaches 2m, and the distance between the stacking working surface and the roadbed rolling filling working surface is ≥10m; the stacking width is 1m, and the stone with a strength greater than 30MPa that is not easy to differentiate is used, the particle size is greater than 30cm and is as regular as possible, the stacked stones are as close and dense as possible, without obvious voids and looseness, the load-bearing contact surface between the blocks is slightly inclined inward, the stones should be staggered and overlapped, bite each other, and no through seams should be generated, and the blocks at the layered parts should be staggered and connected as a whole; the large-diameter stones are not loose, the slope stacking is close, dense and not loose, the receiving surface between the blocks is inclined inward, and the slope surface is smooth; there should be no dangerous rocks on the upper slope.

[0043] Preferably, in step S4, the filter layer is 0.5m thick and is made of bagged gravel. Each layer of bagged gravel is staggered and stacked layer by layer along the backwater side of the foot guard with a slope of 1:0.75. A layer of filter geotextile is laid on the foot guard side of the filter layer. The filter geotextile is folded up and down every 2m, with a fold width of 1m. The vertical spacing of the folds should be consistent with the longitudinal laying spacing of the high-strength reinforced geotextile.

[0044] Preferably, in step S4, a 32t high-performance vibratory roller is used for full-section compaction and reinforcement rolling for each 2m of water roadbed. Use a large bulldozer to flatten according to the loose paving thickness, and manually level individual uneven places. During the renovation process, stones with excessive particle size should be removed to ensure uniform distribution of coarse particles and avoid the concentration of coarse aggregates. When the stone gradation is poor, the particle size is large, the filling layer is thick, and the gaps between stones are large, stone chips, slag, and medium-coarse sand are swept into the gaps on the surface of each layer, and then the sand is flushed into the lower part with pressure, repeatedly several times, so that the gaps are filled. When paving stones manually, first lay large stones, with the large surface facing down and the small surface facing up, and place them stably, then use small stones to level, fill the gaps with stone chips, and finally compact. The stone-filled roadbed compaction machine uses a 25t vibratory roller to change the loose contact state between the particles into a tight bite state. During compaction, small stones or stone chips are used to level and fill the gaps at any time. Large pieces of hard materials that cannot be crushed by compaction equipment are removed or crushed manually. The maximum size of the crushed hard materials does not exceed 2 / 3 of the thickness of the compacted layer and is evenly distributed. The roadbed is inspected until the top surface of the compacted layer of the roadbed is stable, there are no wheel marks, the stones are tight, and the surface is flat. A 32t high-performance vibratory roller is used every 2m of the roadbed to compact and reinforce the entire section (including the foot guard and the inner fill part). Reinforcement rolling is required on the base and between the base and the bottom of the lower roadbed.

[0045] Preferably, in step S4, a high-strength reinforced geotextile is added every 2m in the earthwork area, and the laying range extends to 2m inside the stone fill body. The spacing of the high-strength reinforced geotextile is staggered with the spacing of the reinforcement rolling, and the staggered spacing is 1m. Normal clay is used to fill the middle of the stone large foot guard, and the filling process is controlled according to the normal roadbed filling. The difference is that a high-strength reinforced geotextile is added every 2m with the filling height, which can further improve the stability of the clay area.

[0046] Preferably, the high-strength reinforced geotextile is anchored to the foundation surface with U-shaped steel nails, and two longitudinally adjacent high-strength woven geotextiles are sewn in a J-shaped manner with high-tenacity polyester yarns, and the overlapped sewing part is at least 80 mm.

[0047] From the above description, it can be seen that the present application achieves the following technical effects:

[0048] In an embodiment of the present application, a combination of soil and stone is used to fill the underwater roadbed, and the underwater roadbed includes: two foot guards, two filter layers and an earthwork area, wherein the two foot guards are located on the water side of both sides of the roadbed and are formed by stone filling, the two filter layers are respectively located on the inner sides of the two foot guards and are formed by first clay filling, and the earthwork area is located between the two filter layers and is formed by second clay filling; the water permeability of the first clay is less than the water permeability of the second clay; the purpose of reducing the amount of stone used in areas with stone shortages and ensuring the stability of the underwater roadbed is achieved, thereby achieving a technical effect of taking into account both stability and low cost, and further solving the technical problem that reducing the amount of stone used in areas with stone shortages cannot ensure the stability of the underwater roadbed.

[0049] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A soil-rock combined submerged roadbed filling method, characterized in that: The following steps are involved: S1. Construction of cofferdam; S2, drainage and desilting; S3, Replace the stone filling; S4. The underwater roadbed is constructed by combining soil and stone; the underwater roadbed comprises: two foot guards, two filter layers and an earthwork area, wherein the two foot guards are located on the water side of both sides of the roadbed and are formed by filling with stones, the two filter layers are located on the inner sides of the two foot guards and are formed by filling with a first clay, and the earthwork area is located between the two filter layers and is formed by filling with a second clay; the water permeability of the first clay is less than the water permeability of the second clay.

2. The method for constructing roadbed in soil-rock combined water according to claim 1, characterized in that: In step S1, the cofferdam construction includes: Two water-blocking cofferdams are built 1.5m outside the slope foot line of the main line. The cofferdams can be used as access roads for roadbed construction. The cofferdams are filled with clay to play a water-blocking role.

3. The method for constructing roadbed in soil-rock combined water according to claim 1, characterized in that: In step S2, the drainage and dredging includes: Use water pumps to pump water within the red line to the periphery of the cofferdam; before excavating the silt area, take drainage measures in advance. According to the on-site terrain and drainage direction, dig temporary drainage ditches at the foot of the slope on both sides of the cofferdam to divert water to the collection pit, and then use water pumps to continuously drain water to avoid the formation of water pits due to rainfall; use two excavators to cooperate in excavation and transportation, load the silt onto dump trucks, and transport it to the silt disposal site.

4. The method for constructing roadbed in soil-rock combined water according to claim 1, characterized in that: In step S3, the stone replacement includes: When the silt layer is less than 3m, the base treatment method of dredging and replacing with stone is adopted; stone replacement is carried out according to the dredging location and depth. The stone (granular material) is medium-hard and hard rock with a compressive strength of not less than 30MPa, the largest particle is not more than 150mm, the stone content of stone with a particle size of more than 40mm is 30% to 70%, the mud content is not more than 10%, the stone crushing value is not more than 35% and it should be well graded. Stone (granular material) of uniform particle size shall not be used, and the pores between stones (granular materials) shall be filled with slag, stone chips and other materials. The specific materials shall be selected according to the actual situation on site; when the excavation and replacement are 1m away from the original pond bottom line, a crushed stone particle size transition zone is set. When transitioning to the top surface, the maximum particle size of the crushed stone is not more than 40mm, and the thickness is not less than 0.3m.

5. The method for constructing roadbed in soil-rock combined water according to claim 1, characterized in that: In step S4, the top width of the foot guard is less than 1.5m, the water side adopts a slope of 1:1.75, the back side adopts a slope of 1:0.75, and the stone with small compression deformation and good water stability is used for filling.

6. The method for constructing roadbed in soil-rock combined water according to claim 1, characterized in that: In step S4, after the foot guard is formed by stone filling, the side slope is stacked along the backwater side foot guard. The side slope stacking should be started from the bottom to the top after the compacted filling height of the roadbed reaches 2m. The distance between the stacking working surface and the roadbed rolling filling working surface is ≥10m; the stacking width is 1m, and the stone with a strength greater than 30MPa that is not easy to differentiate is used. The particle size is greater than 30cm and is as regular as possible. The stacked stones are as close and dense as possible, without obvious voids and looseness. The load-bearing contact surface between the blocks is slightly inclined inward. The stones should be staggered and overlapped, bite each other, and no through seams should be generated. The blocks at the layered parts should be staggered and connected together; the large-diameter stones are not loose, the slope stacking is close, dense and not loose, the receiving surface between the blocks is inclined inward, and the slope surface is smooth; there should be no dangerous rocks on the upper slope.

7. The method for constructing roadbed in soil-rock combined water according to claim 1, characterized in that: In step S4, the anti-filtration layer is 0.5m thick and is made of bagged gravel. Each layer of bagged gravel is staggered and stacked layer by layer along the backwater side of the foot guard with a slope of 1:0.

75. A layer of anti-filtration geotextile is laid on the foot guard side of the anti-filtration layer. The anti-filtration geotextile is folded up and down every 2m, with a fold width of 1m. The vertical spacing of the folds should be consistent with the longitudinal laying spacing of the high-strength reinforced geotextile.

8. The method for constructing roadbed in soil-rock combined water according to claim 1, characterized in that: In step S4, a 32t high-performance vibratory roller is used to perform full-section compaction and reinforcement rolling every time 2m of water roadbed is laid.

9. The method for constructing roadbed in soil-rock combined water according to claim 8, characterized in that: In step S4, a high-strength reinforced geotextile is added every 2m in the earthwork area, and the paving range extends to 2m inside the stone fill body. The spacing of the high-strength reinforced geotextiles and the spacing of the reinforcement rolling are staggered, and the staggered spacing is 1m.

10. The method for constructing roadbed in soil-rock combined water according to claim 9, characterized in that: The high-strength reinforced geotextile is anchored to the foundation surface with U-shaped steel nails. The two adjacent high-strength woven geotextiles are sewn in a J-shaped manner with high-tenacity polyester yarns, and the overlap and sewing part is at least 80mm.