Steel approach bridge capable of walking and walking method thereof

By integrating the hoisting mechanism and moving device on the steel guide bridge, the automatic lifting and walking functions are achieved, and the problems of structural damage and poor mobility caused by water level changes are solved, and emergency response capabilities and safety are improved.

CN119083285APending Publication Date: 2024-12-06THE SECOND ENG COMPANY OF CCCC FOURTH HARBOR ENG +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411243796.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-05
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The existing steel guide bridges need to be disassembled and assembled when the water level changes, which has poor mobility and affects emergency flood control response.

Method used

A walking steel guide bridge is designed, and a lifting mechanism and moving device is used to realize automatic lifting and overall walking of the bridge body, reducing dependence on lifting equipment, and improving emergency maneuverability.

Benefits of technology

Through the cooperation of the hoisting mechanism and the mobile device, the risk of bending of the guide bridge during floods is reduced, the safety of use and operation are improved, and labor costs and disaster relief time are reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119083285A_ABST
    Figure CN119083285A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of steel approach bridge shore connection, in particular to a steel approach bridge capable of walking and a walking method thereof.The steel approach bridge comprises a bridge body, a jacking mechanism is connected to one end of the bridge body, an auxiliary device is arranged at the other end of the bridge body, and a moving device is arranged at the bottom of the jacking mechanism; the jacking mechanism enables the end, away from the auxiliary device, of the bridge body to ascend and descend, the moving device is matched with the auxiliary device to achieve walking of the bridge body, and the risk that the approach bridge is bent in the flood period can be reduced through cooperation of the jacking mechanism, the moving device and the auxiliary device. The use safety and operation convenience of the approach bridge in a complex environment are improved, meanwhile, the approach bridge does not need to be disassembled and assembled through external machinery, and the maneuverability of the approach bridge is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of steel approach bridge landing, in particular to a walking steel approach bridge and a walking method thereof. Background Art

[0002] In coastal and inland cruise / yacht docks, floating docks are the main structural form. Usually, the floating dock is connected to the land through a movable approach bridge. One end of the approach bridge is hinged on the pier on land, and the other end is lapped to the floating dock. In order to ensure the strength and durability of the structure, the approach bridge is generally made of aluminum alloy or steel structure. When a flood comes, the rapid rise in water level will cause the floating dock to rise and move. Since one end of the floating dock is connected to the movable approach bridge, and the other end of the movable approach bridge is fixed on the land pier, this rapid change in water level will produce a large vertical lift and horizontal displacement. In this process, the relative displacement between the floating dock and the approach bridge will produce a large moment or stress, resulting in stress concentration on the structure. When the stress concentration exceeds the yield strength of the approach bridge, it will cause the approach bridge to bend and deform. However, due to the heavy weight of the steel structure approach bridge, when the water level rises significantly, the approach bridge needs to be dismantled in time; and when the water level drops, it needs to be reinstalled. It is usually impossible to move it by manpower, and often requires the use of lifting equipment for operation, which has poor mobility and is not conducive to flood control emergency response. Summary of the invention

[0003] The purpose of the present invention is to overcome the problems in the prior art that the bridge needs to be disassembled and assembled by equipment when the water level changes, has poor maneuverability and is not conducive to emergency flood prevention, and to provide a walking steel approach bridge and a walking method thereof.

[0004] In a first aspect, the present invention provides a walkable steel approach bridge, comprising a bridge body, one end of the bridge body is connected to a jacking mechanism, the other end is provided with an auxiliary device, and the bottom of the jacking mechanism is provided with a moving device;

[0005] The lifting mechanism enables the end of the bridge body away from the auxiliary device to perform lifting and lowering movement;

[0006] The moving device cooperates with the auxiliary device to realize the walking of the bridge body.

[0007] The present invention is a walkable steel approach bridge. By providing a jacking mechanism and a moving device, the automatic lifting and lowering of one end of the bridge body and the overall walking function are realized. The jacking mechanism enables the approach bridge to flexibly adjust its height when the water level changes, avoiding structural damage caused by rising or falling water levels. The moving device ensures that the approach bridge can move automatically when needed, reducing dependence on lifting equipment and improving emergency mobility. The coordination of the jacking mechanism, the moving device and the auxiliary device can reduce the risk of bending of the approach bridge during floods, improve the safety and ease of operation of the approach bridge in complex environments, and at the same time, there is no need to disassemble and assemble the approach bridge through external machinery, thereby improving the mobility of the approach bridge.

[0008] Preferably, the jacking mechanism is connected to both sides of the bridge body, and the jacking mechanism includes a hydraulic cylinder, which is fixedly connected to the bridge body, and a movable piston is provided in the hydraulic cylinder, one end of the movable piston is located inside the hydraulic cylinder, and the other end is connected to the movable device.

[0009] By configuring the lifting mechanism as a hydraulic cylinder and a movable piston, and fixing the hydraulic cylinder to the bridge body, the hydraulic cylinder can drive the movable piston to achieve lifting of the bridge body, and configuring two lifting mechanisms ensures that the bridge body is evenly stressed during the lifting process.

[0010] Preferably, the moving device comprises a support, one end of which is hinged to the moving piston and the other end of which is provided with a moving wheel.

[0011] The support is hinged with the moving piston to ensure that the bridge body can be smoothly lifted and lowered, and a moving wheel is arranged at one end of the support to ensure that the bridge body can move after lifting and lowering.

[0012] Preferably, an extension plate is provided on the support, a guide device is provided on the extension plate, and the guide device and the extension plate are arranged perpendicular to each other.

[0013] Through the predetermined direction provided by the guide rod, the jacking mechanism can maintain a stable motion trajectory during the lifting process, ensuring that the approach bridge always follows the designed path during lifting. This precise direction control effectively avoids deviation or tilt during the lifting process, and improves the safety and reliability of the approach bridge during operation.

[0014] Preferably, the bridge body is provided with a control unit, and the control unit realizes the movement of the moving wheel. The moving wheel is provided with a motor, and the motor is communicatively connected with the control unit.

[0015] The control unit can realize the movement and stopping of the moving wheels, thereby preventing the moving wheels from being out of control during jacking, causing the steel approach bridge to slide out of the floating dock.

[0016] Preferably, the guide device is arranged in parallel with the lifting mechanism, and the guide device comprises a guide rod, the guide rod is arranged perpendicularly to the extension plate, a sleeve is provided at one end of the guide rod away from the extension plate, and the sleeve is fixedly connected to the bridge body.

[0017] By fixedly connecting the sleeve to the bridge body, it is ensured that the guide rod sleeved with the sleeve can move in one direction, thereby limiting the moving path of the jacking mechanism.

[0018] Preferably, mounting grooves are provided on both sides of the bridge body, the lifting mechanism is located in the mounting grooves, baffles are provided on both sides of the bridge body, and the baffles and the mounting grooves form a accommodating cavity.

[0019] The installation of the jacking mechanism and the bridge body is ensured by the accommodating cavity formed by the installation groove and the baffle, ensuring that the jacking mechanism can smoothly control the bridge body.

[0020] Preferably, an oil cylinder bottom plate is provided at one end of the baffle away from the bridge body.

[0021] The cylinder base plate can effectively disperse the force generated during cylinder operation and extend the service life of the equipment.

[0022] Preferably, a backup energy device is provided at the bottom of the bridge body. Such a configuration enables the backup energy device to supply power when there is a power failure on the bridge body, thereby ensuring the movement of the bridge body.

[0023] In a second aspect, the present invention provides a method for walking a steel approach bridge, wherein the steel approach bridge in the method is located on a floating dock, and the steel approach bridge relies on the above-mentioned steel approach bridge that can walk, specifically:

[0024] When the water level rises and the height of the floating dock from the ground decreases, the walking method of the steel approach bridge is as follows:

[0025] S1. Release the connection between the steel approach bridge and the ground;

[0026] S2, starting the lifting mechanism to lift the bridge body;

[0027] S3, after the bridge body is lifted, the moving device is started, and the steel approach bridge is controlled to move by the moving device and the auxiliary device until the steel approach bridge is away from the ground;

[0028] S4, starting the jacking mechanism to lower the bridge body;

[0029] S4, complete walking;

[0030] and

[0031] When the water level drops and the height of the floating dock from the ground increases, the walking method of the steel approach bridge is as follows:

[0032] S1, starting the lifting mechanism to lift the bridge body;

[0033] S2, after the bridge body is lifted, the moving device is started, and the steel approach bridge is controlled to move by the moving device and the auxiliary device until one end of the steel approach bridge is above the ground;

[0034] S3, starting the jacking mechanism to lower the bridge body;

[0035] S4, at the position below the bridge body to the ground, the connection between the steel approach bridge and the ground is restored;

[0036] S5. Complete walking.

[0037] The present invention discloses a method for walking a steel approach bridge. When the water level rises, the staff removes the movable connection between the steel approach bridge and the ground to separate the steel approach bridge from the ground. Then, the steel approach bridge is moved on a floating dock by a jacking mechanism and a moving device in sequence to completely separate the steel approach bridge from the ground. This avoids the situation in which the approach bridge is damaged by force due to the floating dock floating up while the ground height remains unchanged when the water level rises. When the water level drops, one end of the approach bridge is moved to the ground by the jacking mechanism and the moving device. Then, the staff connects the approach bridge, thus realizing the rapid transfer of the approach bridge when encountering flood disasters, reducing labor costs and saving disaster relief time.

[0038] Preferably, when the water level rises, the walking of the steel approach bridge needs to be completed before the water level is flush with the ground.

[0039] Compared with the prior art, the present invention has the following beneficial effects:

[0040] 1. The present invention is a walking steel approach bridge, which realizes the automatic lifting and lowering of one end of the bridge body and the overall walking function by setting a jacking mechanism and a moving device. The jacking mechanism enables the approach bridge to flexibly adjust its height when the water level changes, avoiding structural damage caused by rising or falling water levels. The moving device ensures that the approach bridge can move automatically when needed, reducing dependence on lifting equipment and improving emergency mobility. The coordination of the jacking mechanism, the moving device and the auxiliary device can reduce the risk of bending of the approach bridge during floods, improve the safety and ease of operation of the approach bridge in complex environments, and at the same time, there is no need to disassemble and assemble the approach bridge through external machinery, thereby improving the mobility of the approach bridge.

[0041] 2. The present invention provides a method for moving a steel approach bridge. When the water level rises, the staff removes the movable connection between the steel approach bridge and the ground to separate the steel approach bridge from the ground. Then, the steel approach bridge is moved on the floating dock by a jacking mechanism and a moving device in sequence to completely separate the steel approach bridge from the ground. This avoids the situation in which the approach bridge is damaged by force due to the floating dock floating up while the ground height remains unchanged when the water level rises. When the water level drops, one end of the approach bridge is moved to the ground by a jacking mechanism and a moving device. Then, the staff connects the approach bridge, thereby realizing the rapid transfer of the approach bridge when encountering flood disasters, reducing labor costs, and saving disaster relief time. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] Figure 1 It is a schematic diagram of the connection between the steel approach bridge and the ground in the present invention;

[0043] Figure 2 It is a schematic diagram showing that the steel approach bridge in the present invention is not connected to the ground;

[0044] Figure 3 is a cross-sectional view of the steel approach bridge of the present invention;

[0045] Figure 4 It is a schematic diagram of the arrangement of the jacking mechanism and the guide device on the bridge body in the present invention;

[0046] Figure 5 It is a schematic diagram of the connection between the lifting mechanism and the guide device in the present invention;

[0047] Figure 6 For the present invention Figure 5 A in the enlarged view;

[0048] Figure 7 It is a schematic diagram of the connection between the hydraulic workstation and the bridge body of the present invention;

[0049] Figure 8 It is a schematic diagram of the connection between the steel approach bridge and the pier of the present invention.

[0050] Markings in the figure: 1-bridge body; 11-control unit; 111-hydraulic workstation; 12-installation slot; 13-baffle; 2-lifting mechanism; 21-hydraulic cylinder; 22-moving piston; 3-moving device; 31-support; 311-extension plate; 32-moving wheel; 321-motor; 4-auxiliary device; 5-guide device; 51-guide rod; 52-casing; 6-backup energy device; 7-pier; 8-reinforced wing plate. DETAILED DESCRIPTION

[0051] The present invention is further described in detail below in conjunction with specific embodiments. However, this should not be understood as the scope of the above subject matter of the present invention being limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.

[0052] Unless otherwise specified, in the description of the specific embodiments of the present invention, the terms indicating the orientation or position relationship such as "up", "down", "left", "right", "center", "inside", "outside", etc. are all based on the expression of the orientation or position relationship shown in the drawings, or are the orientation or position relationship when the invented product / equipment / device is usually used. These terms of orientation or position relationship are only for the convenience of describing the scheme of the present invention or simplifying the description in the specific embodiments, so as to facilitate the technicians to quickly understand the scheme, and do not indicate or imply that a specific device / component / element must have a specific orientation, or be constructed and operated in a specific position relationship, and therefore cannot be understood as a limitation on the present invention.

[0053] In addition, if the terms "horizontal", "vertical", "overhanging", "parallel" and the like appear, it does not mean that the corresponding devices / components / elements are required to be absolutely horizontal or vertical or overhanging or parallel, but may be slightly tilted or have deviations. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but may be slightly tilted. Alternatively, it can be simplified to mean that the corresponding devices / components / elements are set in directions such as "horizontal", "vertical", "overhanging", "parallel", etc., and can have an error / deviation of ±10% relative to the corresponding direction setting, more preferably an error / deviation within ±8%, more preferably an error / deviation within ±6%, more preferably an error / deviation within ±5%, and more preferably an error / deviation within ±4%. As long as the corresponding device / component / element is within the error / deviation range, it can still achieve its role in the scheme of the present invention.

[0054] In addition, the expressions “first”, “second”, “third”, etc., which appear in the terms, are merely used to distinguish the description of the same or similar components and should not be understood as emphasizing or implying the relative importance of specific components.

[0055] In addition, in the description of the embodiments of the present invention, "several", "plurality" and "a number" represent at least 2. It can be any number such as 2, 3, 4, 5, 6, 7, 8, 9, and even more than 9.

[0056] In addition, in the description of the technical solution of the present invention, unless otherwise clearly specified / defined / restricted, the terms "set", "install", "connect", "connected", "provided with", "laid", and "arranged" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection, and can be welding, riveting, bolting, threading, and other commonly used connection means in the field. This connection can be a mechanical connection, an electrical connection, or a communication connection; it can be a direct connection, or an indirect connection through an intermediate medium, and it can be the internal connection of two elements.

[0057] Example 1

[0058] like Figures 1 to 3 As shown, a walkable steel approach bridge is located on a floating dock, and the floating dock is located on the water surface and is set below the ground. The steel approach bridge is provided with a jacking mechanism 2 and one end thereof is provided with a hinged portion 24, and the steel approach bridge is movably connected to the ground through the hinged portion 24;

[0059] The steel approach bridge comprises a bridge body 1, and a jacking mechanism 2 is provided on both sides of the bridge body 1, and the jacking mechanism 2 is used to ensure that the steel approach bridge can be lifted and lowered, and ensure that after the connection between the steel approach bridge and the ground is released, the jacking mechanism 2 can be used to directly make a section of the steel approach bridge higher than the ground, so as to facilitate the subsequent movement of the steel approach bridge;

[0060] The jacking mechanism 2 includes a hydraulic cylinder 21 and a movable piston 22 moved by the hydraulic cylinder 21. The hydraulic cylinder 21 is connected to the side wall of the bridge body 1, so that the hydraulic cylinder 21 can be limited to ensure that the positions of the hydraulic cylinder 21 and the bridge body 1 remain unchanged. In this way, when the hydraulic cylinder 21 drives the movable piston 22 to rise and fall, it can simultaneously drive the bridge body 1 to rise and fall.

[0061] In one or more embodiments, a moving device 3 is provided at the lower end of the lifting mechanism 2, and the moving device 3 includes a support 31 hinged to the moving piston 22, and the other end of the support 31 is connected to a moving wheel 32 for walking;

[0062] The moving wheel 32 is provided with a motor 321, and the moving wheel 32 can be driven to move by the motor 321, and the moving wheel 32 can be driven to move without manual operation;

[0063] A control unit 11 is provided at the lower end of the bridge body 1, and the control unit 11 is in communication connection with the motor 321. The control unit 11 controls the opening and closing of the motor 321, thereby realizing the movement and position limiting of the moving wheel 32, so that the steel approach bridge will not move by itself after being disconnected from the ground;

[0064] Furthermore, a hydraulic workstation 111 is provided in the control unit 11, and the operator can control the lifting mechanism 2 through the hydraulic workstation 111 and the control unit 11, such as Figures 1 to 3 and Figure 7 shown.

[0065] In one or more embodiments, an extension plate 311 is transversely provided on the support 31, and the extension direction of the extension plate 311 is the moving direction of the steel approach bridge, and a guide device 5 is vertically provided on the extension plate 311, and the guide device 5 includes a guide rod 51, and a sleeve 52 is provided at one end of the guide rod 51 that is not connected to the extension plate 311, and the guide device 5 is always parallel to the jacking device;

[0066] By connecting the sleeve 52 to the bridge body 1, and the sleeve 52 is sleeved on the outside of the guide rod 51, when the jacking mechanism 2 is working, the moving piston 22 and the hydraulic cylinder 21 can move along the reciprocating route of the guide device 5, and because the guide device 5 is always parallel to the jacking device, the guide device 5 can limit the movement route of the jacking device when the jacking device moves;

[0067] Furthermore, the connection between the two ends of the jacking mechanism 2 and the bridge body 1 is generally provided with a reinforcement wing plate, and the connection between the jacking mechanism 2 and the bridge body 1 can be strengthened by the reinforcement wing plate to improve the connection stability, such as Figures 3 to 5 shown.

[0068] In one or more embodiments, mounting grooves 12 are provided on both sides of the bridge body 1, baffles 13 are provided outside the mounting grooves 12, and the baffles 13 are connected to the bridge body 1, and a mounting cavity is formed by the baffles 13 and the mounting grooves 12, and the bridge body 1 and the hydraulic cylinder 21 can be connected through the mounting cavity. When the hydraulic cylinder 21 is installed in the hydraulic cavity, the hydraulic cylinder 21 and the baffles 13 are welded to ensure a stable connection between the hydraulic cylinder 21 and the bridge body 1, such as Figure 4 and Figure 6 shown.

[0069] In one or more embodiments, a backup energy device 6 is provided under the bridge body 1, and the backup energy device 6 can ensure that even in an emergency, such as a power failure or a natural disaster causing an external power outage, the backup energy device 6 can immediately switch and provide power support for the jacking mechanism 2 and the moving device 3, ensuring that the lifting and walking functions of the approach bridge are not affected, and ensuring the continuity of operation. Figure 1 to Figure 2 shown.

[0070] Example 2

[0071] This embodiment 2 is a walking method of the walkable steel approach bridge in embodiment 1 during high tide and low tide:

[0072] When the water level rises due to heavy rain, tides, etc., the floating dock will rise with the water level, resulting in a decrease in the height difference between the floating dock and the ground. In this case, the floating dock may no longer maintain an appropriate height match with the approach bridge, causing the approach bridge to tilt or unevenly stressed, which in turn affects the connection stability between the floating dock and the ground. At this time, the movement of the steel approach bridge is as follows:

[0073] The first step is to release the fixed connection between the steel approach bridge and the ground when the water level rises, so that the approach bridge is out of contact with the ground.

[0074] This operation ensures that during the subsequent lifting and walking process, the approach bridge will not be restricted or cause unnecessary stress due to connection with the ground;

[0075] Step 2: After the bridge is separated from the ground, the lifting mechanism 2 is started to lift the bridge body 1. The lifting mechanism 2 will gradually lift the end of the approach bridge that is movably connected to the ground until the bridge body 1 is completely separated from the ground.

[0076] Ensure that the approach bridge is not affected by ground obstacles after being raised to facilitate subsequent movement;

[0077] Step 3: After the bridge body 1 is lifted to a sufficient height, the moving device 3 is started, and the moving device 3 and the auxiliary device 4 work together to facilitate the steel approach bridge to move on the floating dock;

[0078] Ensure the approach bridge is clear of the ground and moved to a new location or completely off the ground area, ensuring there is no interference between the pontoon and the approach bridge;

[0079] Step 4: After the approach bridge is moved to the designated position, the lifting mechanism 2 is started to lower the bridge body 1 gradually until the approach bridge contacts the ground again;

[0080] This step enables the approach bridge to be firmly positioned in its new position after the walking operation is completed.

[0081] Step 5: After the bridge body 1 is lowered to the designated position, the walking operation is completed.

[0082] At low tide, the steel approach bridge needs to be installed back in place. At this time, the walking method of the steel approach bridge is as follows:

[0083] The first step is to start the lifting mechanism 2 to lift the bridge body 1;

[0084] Step 2: After the approach bridge is lifted to a suitable height, the moving device 3 is started, and the moving device 3 works in coordination with the auxiliary device 4 to control the approach bridge to move along a predetermined path;

[0085] Move one end of the approach bridge toward the ground and adjust its position until the approach bridge and the ground are aligned;

[0086] Step 3: After the approach bridge moves to the predetermined position, the lifting mechanism 2 is restarted to slowly lower the bridge body 1 to a height close to the ground;

[0087] Ensure that the approach bridge is in stable contact with the ground to avoid impact force or structural damage caused by rapid lowering;

[0088] Step 4: After the bridge body 1 of the approach bridge is firmly in contact with the ground, the fixed connection between the approach bridge and the ground is restored;

[0089] Make sure the approach bridge is firmly connected to the ground. This operation enables the approach bridge to work stably at the new height and adapt to the changes of the floating dock;

[0090] Step 5: After the connection between the approach bridge and the ground is restored, the entire walking operation is completed.

[0091] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

[0092] Example 3

[0093] like Figure 8 As shown, in the present application, the connection between the bridge body and the ground can also be achieved by setting a pier 7 on the ground to achieve the connection between the steel approach bridge and the ground, and the pier 7 is hinged to one end of the steel approach bridge.

[0094] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A walkable steel approach bridge, characterized in that: It comprises a bridge body (1), one end of the bridge body (1) is connected to a jacking mechanism (2), the other end is provided with an auxiliary device (4), and the bottom of the jacking mechanism (2) is provided with a moving device (3); The lifting mechanism (2) enables the end of the bridge body (1) away from the auxiliary device (4) to perform lifting and lowering movement; The moving device (3) cooperates with the auxiliary device (4) to enable the bridge body (1) to move.

2. The walkable steel approach bridge according to claim 1, characterized in that: The jacking mechanism (2) is connected to both sides of the bridge body (1), and the jacking mechanism (2) comprises a hydraulic cylinder (21), the hydraulic cylinder (21) is fixedly connected to the bridge body (1), a movable piston (22) is arranged in the hydraulic cylinder (21), one end of the movable piston (22) is located inside the hydraulic cylinder (21), and the other end is connected to the movable device (3).

3. The walkable steel approach bridge according to claim 2, characterized in that: The moving device (3) comprises a support (31), one end of the support (31) is hinged to the moving piston (22), and the other end is provided with a moving wheel (32).

4. The walkable steel approach bridge according to claim 3, characterized in that: An extension plate (311) is provided on the support (31), a guide device (5) is provided on the extension plate (311), and the guide device (5) and the extension plate (311) are arranged perpendicular to each other.

5. A method according to claim 3, characterized in that: The bridge body (1) is provided with a control unit (11), and the control unit (11) realizes the movement of the moving wheel (32). The moving wheel (32) is provided with a motor (321), and the motor (321) is communicatively connected with the control unit (11).

6. The walkable steel approach bridge according to claim 4, characterized in that: The guide device (5) is arranged in parallel with the lifting mechanism (2), and the guide device (5) comprises a guide rod (51), the guide rod (51) is arranged perpendicularly to the extension plate (311), and a sleeve (52) is provided at one end of the guide rod (51) away from the extension plate (311), and the sleeve (52) is fixedly connected to the bridge body (1).

7. A walkable steel approach bridge according to any one of claims 1 to 6, characterized in that: The bridge body (1) is provided with mounting grooves (12) on both sides, the lifting mechanism (2) is located in the mounting grooves (12), baffles (13) are provided on both sides of the bridge body (1), and the baffles (13) and the mounting grooves (12) form a receiving cavity.

8. The walkable steel approach bridge according to claim 7, characterized in that: A backup energy device (6) is provided at the bottom of the bridge body (1).

9. A method for walking a steel approach bridge, wherein the steel approach bridge is located on a floating dock, one end of the steel approach bridge close to the jacking mechanism (2) is movably connected to the ground, and the floating dock is located on the water surface, and the floating dock rises and falls synchronously with the rise and fall of the water surface, characterized in that: A walkable steel approach bridge comprising any one of claims 1 to 8, specifically: When the water level rises and the height of the floating dock from the ground decreases, the walking method of the steel approach bridge is as follows: S1. Release the connection between the steel approach bridge and the ground; S2, starting the lifting mechanism (2) to lift the bridge body (1); S3, after the bridge body (1) is lifted, the moving device (3) is started, and the steel approach bridge is controlled to move by the moving device (3) and the auxiliary device (4) until the steel approach bridge is away from the ground; S4, starting the lifting mechanism (2) to lower the bridge body (1); S4, complete walking; and When the water level drops and the height of the floating dock from the ground increases, the walking method of the steel approach bridge is as follows: S1, starting the lifting mechanism (2) to lift the bridge body (1); S2, after the bridge body (1) is lifted, the moving device (3) is started, and the steel approach bridge is controlled to move by the moving device (3) and the auxiliary device (4) until one end of the steel approach bridge is located above the ground; S3, starting the lifting mechanism (2) to lower the bridge body (1); S4, restoring the connection between the steel approach bridge and the ground from the bottom of the bridge body (1) to the ground; S5. Complete walking.

10. A steel approach bridge walking method according to claim 9, characterized in that: When the water level rises, the walking of the steel approach bridge needs to be completed before the water level is flush with the ground.