Deep foundation pit drainage equipment for super high-rise building construction and construction method

By using traction spiral plates and cleaning scrapers in deep foundation pit drainage equipment to clean the silt on the surface of the filter screen, the problems of low drainage system efficiency and pump damage caused by sediment deposition are solved, and construction efficiency and equipment reliability are improved.

CN119083469APending Publication Date: 2024-12-06THE FIRST COMPARY OF CHINA EIGHTH ENG BUREAU LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411354553.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-27
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

In the construction of super high-rise buildings, the water pump output is low due to sediment deposition in the deep foundation pit drainage system, and the filter net needs to be cleaned frequently, which increases the workload of operators and the risk of equipment damage.

Method used

A deep foundation pit drainage equipment is designed, including pipelines, placement grooves, positioning rings, filter mesh, traction spiral plates and cleaning scrapers. The silt on the surface of the filter mesh is cleaned by rotating the spiral plates to avoid silt blockage and sedimentation. .

Benefits of technology

It effectively avoids sediment deposits on the surface of the filter mesh, improves the working efficiency of the drainage system, reduces the demand for filter mesh cleaning, and extends the service life of the water pump.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119083469A_ABST
    Figure CN119083469A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of building construction drainage, in particular to deep foundation pit drainage equipment for super high-rise building construction and a construction method.The deep foundation pit drainage equipment is characterized in that a containing groove is formed in the end face of a pipeline, a filter screen is arranged in the containing groove, a storage groove is formed in the side face of a balance weight ring, a positioning rod is arranged in the storage groove, and a traction spiral plate is arranged on the surface of a supporting rod; traction plates are arranged on the side surfaces of the supporting rods; the device has the beneficial effects that firstly, the filter screen is matched with the fixing ring for positioning, the filter screen can be used for preventing silt from blocking a pipeline when sewage in a foundation pit is discharged, finally, the traction spiral plate is fixed right in front of the pipeline, and after the drainage pump is matched with the hose to be connected with the pipeline, water in the foundation pit can be pumped out through suction in the pipeline; a traction spiral plate can rotate through pumped-out water flow, so that a traction plate arranged on the side face of one end of a supporting rod can be matched with a sweeping scraper to clean the surface of the filter screen, and the situation that silt is easily deposited on the surface of the filter screen is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building construction drainage, and in particular to deep foundation pit drainage equipment and a construction method for super high-rise building construction. Background Art

[0002] At present, with the rapid development of modern construction industry, high-rise and super high-rise buildings are increasing day by day. Due to the large upper load, most high-rise and super high-rise buildings adopt compensatory foundations, and generally set up multi-story basements to facilitate the stability of the building. However, this leads to a large foundation burial depth and deep foundation pit excavation. Especially when excavating deep foundation pits in areas with high groundwater levels, the soil aquifer is cut off, and groundwater will continue to seep into the foundation pit, causing sand flow, slope instability or a decrease in the bearing capacity of the foundation.

[0003] In order to ensure the stability of deep foundation pits, drainage is required. The commonly used drainage method is open drainage of foundation pits, which is to use a drainage system composed of drainage ditches, water collection wells, and water pipes to discharge surface water and seepage water from the foundation pit. The water in the foundation pit is concentrated and directed into the water collection well through the drainage ditch for temporary storage. After it is full, the water is pumped out and discharged into the external water collection tank through water pumps and water pipes. Since the foundation pit will cause a large amount of sediment in the surface water during construction, the sediment is generally gathered into the water collection well through the drainage ditch, forming a sediment layer at the bottom of the water collection well. When the water in the water collection well is extracted by a water pump, the water pump is generally placed at the bottom of the water collection well to work. However, when the water pump is operating at the bottom of the water collection well, the water flow will disturb the deposited sediment, resulting in a large sediment content in the water, which is very easy to cause damage to the water pump.

[0004] At present, when pumping water from a water collection well, in order to prevent the water pump from being damaged by sediment, a filter is generally installed on the input port of the water pump for protection. However, when the water pump is installed with the filter to pump water, sediment is easily deposited on the surface of the filter, resulting in a low output of the water pump. The operator needs to clean the filter regularly to ensure the working efficiency of the drainage system, which greatly increases the workload of the operator.

[0005] To this end, the present invention proposes a deep foundation pit drainage device and a construction method for super high-rise building construction to solve the above problems. Summary of the invention

[0006] The object of the present invention is to provide a deep foundation pit drainage device and a construction method for super high-rise building construction to solve the problems raised in the above-mentioned background technology.

[0007] To achieve the above object, the present invention provides the following technical solution: a deep foundation pit drainage device for super high-rise building construction, the deep foundation pit drainage device for super high-rise building construction comprising: a pipe, a placement groove is opened on the end surface of the pipe, a positioning ring is arranged in the placement groove, a filter screen is arranged in the positioning ring, and a fixing ring is arranged in the placement groove;

[0008] A counterweight ring, a storage groove is provided on the side of the counterweight ring, and a positioning rod and a limit spring are arranged in the storage groove;

[0009] A support rod is provided with a traction spiral plate on the surface of the support rod, a traction plate is provided on the side of the support rod, and a cleaning scraper is provided at the bottom of the traction plate.

[0010] Preferably, the end face of the pipe is provided with a hose connector, which can be used to connect to the hose, and then the hose is connected to the drainage pump. A limit rod is provided on the surface of the placement groove, and there are multiple groups of limit rods. The multiple groups of limit rods are fixedly connected to the surface of the placement groove. The positioning ring can be sleeved on the limit rod, and the filter net is fixedly connected to the inner ring surface of the positioning ring.

[0011] Preferably, the counterweight ring can be screwed onto the surface of the pipe, and multiple groups of receiving grooves are provided. The multiple groups of receiving grooves are regularly arranged in a circle about the end face of the counterweight ring. A bottom plate is provided on the surface of the receiving groove, and a guide plate is provided on the side of the receiving groove. The guide plate is a square plate structure. Two groups of guide plates are provided, and the two groups of guide plates are symmetrically distributed about the receiving groove.

[0012] Preferably, a base is provided on the end face of the positioning rod, one end of the limit spring is fixedly connected to the surface of the bottom plate, the other end of the limit spring is fixedly connected to the surface of the base, a slide groove is provided on the side of the positioning rod, the guide plate is inserted into the slide groove, a positioning slot is provided on the side of the guide plate, and the base is fixedly connected to the end face of the positioning rod.

[0013] Preferably, a through hole is opened on the side of the base, a positioning card is arranged in the through hole, a metal spring is arranged on the end face of the positioning card, two groups of positioning card plates are arranged, the two groups of positioning card plates are symmetrically distributed about the metal spring, the positioning card plate has an "L"-shaped plate structure, one end of the positioning card plate can be inserted into the positioning card slot, and the positioning card plate can be received in the through hole.

[0014] Preferably, a positioning groove is provided on the side of the counterweight ring, a threaded hole is provided on the surface of the positioning groove, a traction belt is provided on the end face of the positioning groove, a fixed bottom plate is provided at one end of the traction belt, the traction belt can be folded and stored, and multiple groups of positioning grooves are provided, and the multiple groups of positioning grooves are all opened on the side of the counterweight ring.

[0015] Preferably, a hole is provided on the surface of the fixed base plate, a first bearing is arranged in the hole, a limiting bolt is provided on the inner ring surface of the first bearing, a fixing ring can be sleeved on the limiting rod, a fixing block is provided on the side of the fixing ring, a second threaded hole is provided on the side of the fixing block, the limiting bolt can be screwed into the second threaded hole, and the fixing block as a whole presents an "L"-shaped plate structure.

[0016] Preferably, an auxiliary bearing is sleeved on one end of the support rod, a support frame is arranged on the outer ring surface of the auxiliary bearing, multiple groups of support frames are provided, and the multiple groups of support frames are regularly arranged in a circle about the surface of the auxiliary bearing. A traction ring is provided at one end of the support frame, and a limited bearing is provided on the end surface of the other group of support frames. The traction ring can be sleeved on the positioning rod, and the traction ring can be displaced along the positioning rod.

[0017] Preferably, a movable nut is provided on the surface of the limit bearing, and the movable nut can be screwed on the positioning rod. The traction plate is fixed on the side of the support rod at a certain angle. The cleaning scraper contacts the surface of the filter screen. A water flow guide plate is provided on the surface of the traction spiral plate. There are multiple groups of water flow guide plates, and the multiple groups of water flow guide plates are fixedly connected to the surface of the traction spiral plate.

[0018] A construction method for deep foundation pit drainage equipment for super high-rise building construction specifically comprises the following steps:

[0019] S1: First, fix the weight ring on the surface of the pipe, then pull the positioning rod out of the storage slot and use the positioning card plate to insert it into the positioning card slot for fixing;

[0020] S2: Then the filter screen is positioned together with the fixing ring. The filter screen can be used to prevent the silt from clogging the pipe when the sewage in the foundation pit is discharged;

[0021] S3: Finally, fix the traction spiral plate in front of the pipeline. After connecting the pipeline with the drainage pump in conjunction with the hose, the water in the foundation pit can be pumped out through the suction force in the pipeline. The pumped water flow can make the traction spiral plate rotate, so that the traction plate set on the side of one end of the support rod can cooperate with the cleaning scraper to clean the surface of the filter screen.

[0022] Compared with the prior art, the present invention has the following beneficial effects:

[0023] The present invention proposes a deep foundation pit drainage equipment and construction method for super high-rise building construction. When in use, the counterweight ring is first fixed to the surface of the pipe, and then the positioning rod is pulled out of the receiving groove and fixed by inserting the positioning card plate into the positioning card groove. Then the filter screen is positioned together with the fixing ring. The filter screen can be used to avoid mud and sand clogging the pipe when the sewage in the foundation pit is discharged. Finally, the traction spiral plate is fixed in front of the pipe. After the drainage pump is connected to the pipe in cooperation with the hose, the water in the foundation pit can be pumped out by the suction in the pipe. The traction spiral plate can be rotated by the pumped water flow, so that the traction plate set on the side of one end of the support rod can cooperate with the cleaning scraper to clean the surface of the filter screen, thereby avoiding the problem that mud and sand are easily deposited on the surface of the filter screen, resulting in a low output of the drainage pump and requiring the operator to clean the filter screen regularly. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic diagram of the structure of the present invention;

[0025] Figure 2 This is a schematic diagram of the structure of the present invention when the structure is tilted;

[0026] Figure 3 This is a schematic diagram of the structure of the counterweight ring of the present invention;

[0027] Figure 4 for Figure 3 The enlarged structural diagram at A in the middle;

[0028] Figure 5 This is a schematic diagram of the structure of the fixing ring of the present invention;

[0029] Figure 6 It is a side view of the counterweight ring of the structure of the present invention;

[0030] Figure 7 for Figure 6 The enlarged structural diagram at B in the middle;

[0031] Figure 8 This is a schematic diagram of the structure of the traction spiral plate of the present invention;

[0032] Fig. 9 for Figure 8 The enlarged structural diagram at C in the middle;

[0033] Fig.10 It is a schematic diagram of the end surface structure of the structure of the present invention;

[0034] Fig.11 for Fig.10 The enlarged structural diagram at D in the middle;

[0035] Fig.12 It is a partial cross-sectional view of the structure of the present invention;

[0036] Fig.13 for Fig.12 Enlarged structural diagram at E in the middle.

[0037] In the figure: 1. pipeline; 2. placement groove; 3. positioning ring; 4. filter screen; 5. fixing ring; 6. counterweight ring; 7. storage groove; 8. positioning rod; 9. limit spring; 10. support rod; 11. traction spiral plate; 12. traction plate; 13. cleaning scraper; 14. hose connector; 15. limit rod; 16. bottom plate; 17. guide plate; 18. base; 19. slide groove; 20. positioning card groove; 21. through hole; 22. positioning card plate; 23. metal spring; 24. positioning groove; 25. threaded hole; 26. traction belt; 27. fixed bottom plate; 28. first bearing; 29. ​​limit bolt; 30. fixing block; 31. second threaded hole; 32. auxiliary bearing; 33. support frame; 34. traction ring; 35. limit bearing; 36. movable nut; 37. water flow guide plate. DETAILED DESCRIPTION

[0038] In order to make the purpose and technical solution of the present invention clearly and completely described, and the advantages more clearly understood, the embodiments of the present invention are further described in detail with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are part of the embodiments of the present invention, rather than all of the embodiments, and are only used to explain the embodiments of the present invention, and are not used to limit the embodiments of the present invention. All other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0039] In the description of the present invention, it should be noted that the terms "center", "middle", "upper", "lower", "left", "right", "inner", "outer", "top", "bottom", "side", "vertical", "horizontal" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "one", "first", "second", "third", "fourth", "fifth", "sixth" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0040] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0041] For the purpose of simplicity and illustration, the principles of the embodiments are mainly described by reference to examples. In the following description, many specific details are proposed to provide a thorough understanding of the embodiments. However, it is obvious that for those of ordinary skill in the art, these embodiments may not be limited to these specific details in practice. In some instances, known methods and structures are not described in detail to avoid making these embodiments unnecessarily difficult to understand. In addition, all embodiments can be used in combination with each other.

[0042] Embodiment 1

[0043] See also Figures 1 to 13 The present invention provides a technical solution: a deep foundation pit drainage device for super high-rise building construction, the deep foundation pit drainage device for super high-rise building construction comprising: a pipe 1, a placement groove 2 is opened on the end surface of the pipe 1, a positioning ring 3 is arranged in the placement groove 2, a filter screen 4 is arranged in the positioning ring 3, and a fixing ring 5 is arranged in the placement groove 2;

[0044] A counterweight ring 6, a receiving groove 7 is provided on the side of the counterweight ring 6, and a positioning rod 8 and a limit spring 9 are arranged in the receiving groove 7;

[0045] A support rod 10, a traction spiral plate 11 is arranged on the surface of the support rod 10, a traction plate 12 is arranged on the side of the support rod 10, and a cleaning scraper 13 is arranged at the bottom of the traction plate 12;

[0046] First, fix the counterweight ring 6 on the surface of the pipe 1, then pull the positioning rod 8 out of the receiving groove 7 and use the positioning card plate 22 to clamp it into the positioning card groove 20 for fixing, then position the filter screen 4 together with the fixing ring 5. The filter screen 4 can be used to prevent the silt from clogging the pipe 1 when the sewage in the foundation pit is discharged. Finally, fix the traction spiral plate 11 in front of the pipe 1. After the drainage pump is connected to the pipe 1 in cooperation with the hose, the water in the foundation pit can be pumped out by the suction force in the pipe 1. The traction spiral plate 11 can be rotated by the pumped water flow, so that the traction plate 12 set on the side of one end of the support rod 10 can cooperate with the cleaning scraper 13 to clean the surface of the filter screen 4, thereby preventing the silt from easily depositing on the surface of the filter screen 4, resulting in a low output of the drainage pump, and the operator needs to clean the filter screen 4 regularly.

[0047] Embodiment 2

[0048] On the basis of the first embodiment, in order to facilitate the positioning of the pipeline 1, a positioning rod 8 is provided, a hose connector 14 is provided on the end face of the pipeline 1, and the hose connector 14 can be used to connect with the hose, and then the hose is connected to the drainage pump. A limit rod 15 is provided on the surface of the placement groove 2, and the limit rod 15 is provided with multiple groups, and the multiple groups of limit rods 15 are fixedly connected to the surface of the placement groove 2. The positioning ring 3 can be sleeved on the limit rod 15, the filter screen 4 is fixedly connected to the inner ring surface of the positioning ring 3, the counterweight ring 6 can be screwed on the surface of the pipeline 1, and the receiving groove 7 is provided with multiple groups. The multiple groups of receiving grooves 7 are regularly arranged in a circle with respect to the end face of the counterweight ring 6. The surface of the receiving groove 7 is provided with a bottom plate 16, and the side of the receiving groove 7 is provided with a guide plate 17. The guide plate 17 is a square plate structure, and two groups of guide plates 17 are provided. The two groups of guide plates 17 are symmetrically distributed about the receiving groove 7;

[0049] During use, when it is necessary to discharge the sewage in the foundation pit, first connect the pipe 1 to the hose using the hose connector 14, and then screw the counterweight ring 6 on the surface of the pipe 1, so that the positioning rod 8 can be pushed out of the storage groove 7. When in use, one end of the positioning rod 8 can be inserted into the foundation pit and the counterweight ring 6 can be used to fix one end of the pipe 1 to avoid the problem of pipe 1 floating in the sewage. Then the hose can be connected to the drainage pump and the drainage pump can be used in conjunction with the pipe 1 to discharge the sewage in the foundation pit. The setting of the filter net 4 can prevent large mud and sand from being sucked into the pipe 1 due to the suction of the pipe, thereby clogging the pipe 1 and affecting its use.

[0050] In order to facilitate the storage and fixation of the positioning rod 8, a limit spring 9 and a positioning card plate 22 are set, a base 18 is set on the end face of the positioning rod 8, one end of the limit spring 9 is fixedly connected to the surface of the bottom plate 16, and the other end of the limit spring 9 is fixedly connected to the surface of the base 18. A slide groove 19 is opened on the side of the positioning rod 8, and the guide plate 17 is inserted into the slide groove 19. A positioning card groove 20 is opened on the side of the guide plate 17. The base 18 is fixedly connected to the end face of the positioning rod 8, and a through hole 21 is opened on the side of the base 18. A positioning card plate 22 is set in the through hole 21, and a metal spring piece 23 is set on the end face of the positioning card plate 22. Two groups of positioning card plates 22 are provided, and the two groups of positioning card plates 22 are symmetrically distributed about the metal spring piece 23. The positioning card plate 22 has an "L"-shaped plate structure. One end of the positioning card plate 22 can be inserted into the positioning card groove 20, and the positioning card plate 22 can be stored in the through hole 21;

[0051] When it is necessary to pull the positioning rod 8 out of the storage slot 7 during use, the positioning rod 8 can be directly pushed first, and then the positioning rod 8 can be moved down by using the slide slot 19 in cooperation with the guide plate 17. The setting of the guide plate 17 prevents the positioning rod 8 from being separated from the storage slot 7. Then, when the positioning rod 8 is moved to a suitable position, the elastic force of the metal spring sheet 23 can be used to displace the positioning card plate 22 and insert it into the positioning card slot 20, thereby fixing the positioning rod 8 to avoid the problem of the positioning rod 8 continuing to move in the storage slot 7. The setting of the through hole 21 can limit the displacement of the positioning card plate 22, so that the positioning card plate 22 can only be displaced along the setting of the through hole 21. When it is necessary to store the positioning rod 8, the positioning card plate 22 can be taken out of the positioning card slot 20, and the elastic force of the limit spring 9 can be used to reset the positioning rod 8 and store it in the storage slot 7, which is more convenient.

[0052] Embodiment 3

[0053] On the basis of the second embodiment, in order to facilitate the cleaning of the surface of the filter screen 4, a traction spiral plate 11 is provided, a movable nut 36 is provided on the surface of the limit bearing 35, and the movable nut 36 can be screwed on the positioning rod 8, the traction plate 12 is fixed to the side of the support rod 10 at a certain angle, the cleaning scraper 13 is in contact with the surface of the filter screen 4, and a water flow guide plate 37 is provided on the surface of the traction spiral plate 11. The water flow guide plates 37 are provided in multiple groups, and the multiple groups of water flow guide plates 37 are fixedly connected to the surface of the traction spiral plate 11;

[0054] When the sewage in the foundation pit is discharged during use, the drainage pump can be started to generate suction inside the pipe 1, so that the sewage in the foundation pit can be sucked into the pipe 1, so that the flow of water can be used in conjunction with the water flow guide plate 37 to exert a thrust on the traction spiral plate 11, so that the traction spiral plate 11 can rotate in conjunction with the auxiliary bearing 32, thereby driving the traction plate 12 and the cleaning scraper 13 to rotate, and the cleaning scraper 13 can be used to hang up the mud and sand attached to the surface of the filter screen 4, and then the inclined guiding property of the traction plate 12 can be used to float the mud and sand to the surroundings to prevent the mud and sand from clogging the surface of the filter screen 4.

[0055] In order to facilitate the installation of the traction spiral plate 11, a support frame 33 is provided, a hole is opened on the surface of the fixed bottom plate 27, a first bearing 28 is arranged in the hole, a limiting bolt 29 is arranged on the inner ring surface of the first bearing 28, the fixing ring 5 can be sleeved on the limiting rod 15, a fixing block 30 is arranged on the side of the fixing ring 5, a second threaded hole 31 is opened on the side of the fixing block 30, the limiting bolt 29 can be screwed into the second threaded hole 31, the fixing block 30 is an "L"-shaped plate structure as a whole, an auxiliary bearing 32 is sleeved on one end of the support rod 10, a support frame 33 is arranged on the outer ring surface of the auxiliary bearing 32, the support frame 33 is provided with multiple groups, and the multiple groups of support frames 33 are regularly arranged in a circle with respect to the surface of the auxiliary bearing 32, a traction ring 34 is provided at one end of the support frame 33, and a limiting bearing 35 is arranged on the end surface of another group of support frames 33, the traction ring 34 can be sleeved on the positioning rod 8, and the traction ring 34 can be displaced along the positioning rod 8;

[0056] When in use, the movable nut 36 can be rotated in accordance with the setting of the limit bearing 35, and then the traction ring 34 can be sleeved on the positioning rod 8, and the installation and fixation of the traction spiral plate 11 and the position of the traction spiral plate 11 can be adjusted by moving the movable nut 36. When it is necessary to position and install the filter screen 4, the filter screen 4 is first sleeved on the limit rod 15, and then the fixing ring 5 is also sleeved on the limit rod 15 to press the positioning ring 3, and then the limiting bolt 29 can be screwed out of the threaded hole 25, and then the limiting bolt 29 can be screwed into the second threaded hole 31 in accordance with the traction belt 26 to position the fixing ring 5, thereby realizing the installation and fixation of the filter screen 4. When not in use, the limiting bolt 29 can be screwed into the threaded hole 25 and the traction belt 26 can be stored in the positioning groove 24 for convenience.

[0057] A method for installing and disassembling deep foundation pit drainage equipment for super high-rise building construction, specifically comprising the following steps:

[0058] S1: First, fix the weight ring 6 on the surface of the pipe 1, then pull the positioning rod 8 out of the receiving groove 7 and use the positioning clamping plate 22 to clamp it into the positioning clamping groove 20 for fixing;

[0059] S2: Then the filter screen 4 is positioned together with the fixing ring 5. The filter screen 4 can be used to prevent the pipe 1 from being blocked by mud and sand when the sewage in the foundation pit is discharged;

[0060] S3: Finally, fix the traction spiral plate 11 in front of the pipeline 1. After connecting it to the pipeline 1 through a drainage pump in conjunction with a hose, the water in the foundation pit can be pumped out through the suction force in the pipeline 1. The pumped water flow can make the traction spiral plate 11 rotate, so that the traction plate 12 set on the side of one end of the support rod 10 can cooperate with the cleaning scraper 13 to clean the surface of the filter screen 4.

[0061] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A deep foundation pit drainage device for super high-rise building construction, characterized by: The deep foundation pit drainage equipment for super high-rise building construction comprises: a pipe (1), a placement groove (2) is provided on the end surface of the pipe (1), a positioning ring (3) is provided in the placement groove (2), a filter screen (4) is provided in the positioning ring (3), and a fixing ring (5) is provided in the placement groove (2); A counterweight ring (6), a side surface of the counterweight ring (6) is provided with a receiving groove (7), and a positioning rod (8) and a limit spring (9) are arranged in the receiving groove (7); A support rod (10) is provided with a traction spiral plate (11) on the surface of the support rod (10), a traction plate (12) is provided on the side of the support rod (10), and a cleaning scraper (13) is provided at the bottom of the traction plate (12).

2. The deep foundation pit drainage equipment for super high-rise building construction according to claim 1 is characterized by: The end surface of the pipeline (1) is provided with a hose connector (14), which can be used to connect with a hose, and then the hose is connected with a drainage pump. A limit rod (15) is provided on the surface of the placement groove (2). The limit rod (15) is provided in multiple groups, and the multiple groups of limit rods (15) are fixedly connected to the surface of the placement groove (2). The positioning ring (3) can be sleeved on the limit rod (15), and the filter screen (4) is fixedly connected to the inner ring surface of the positioning ring (3).

3. The deep foundation pit drainage equipment for super high-rise building construction according to claim 1 is characterized by: The counterweight ring (6) can be screwed onto the surface of the pipe (1); a plurality of receiving grooves (7) are provided; the plurality of receiving grooves (7) are regularly arranged in a circular shape with respect to the end surface of the counterweight ring (6); a bottom plate (16) is provided on the surface of the receiving groove (7); a guide plate (17) is provided on the side of the receiving groove (7); the guide plate (17) is in a square plate-shaped structure; two groups of guide plates (17) are provided; and the two groups of guide plates (17) are symmetrically distributed with respect to the receiving groove (7).

4. The deep foundation pit drainage equipment for super high-rise building construction according to claim 1 is characterized by: The end surface of the positioning rod (8) is provided with a base (18), one end of the limit spring (9) is fixedly connected to the surface of the bottom plate (16), and the other end of the limit spring (9) is fixedly connected to the surface of the base (18). A sliding groove (19) is provided on the side of the positioning rod (8), and the guide plate (17) is inserted into the sliding groove (19). A positioning groove (20) is provided on the side of the guide plate (17), and the base (18) is fixedly connected to the end surface of the positioning rod (8).

5. The deep foundation pit drainage equipment for super high-rise building construction according to claim 4 is characterized by: A through hole (21) is provided on the side of the base (18), a positioning card plate (22) is arranged in the through hole (21), a metal spring sheet (23) is arranged on the end surface of the positioning card plate (22), two groups of positioning card plates (22) are provided, the two groups of positioning card plates (22) are symmetrically distributed about the metal spring sheet (23), the positioning card plate (22) is in an "L"-shaped plate structure, one end of the positioning card plate (22) can be inserted into the positioning card slot (20), and the positioning card plate (22) can be received in the through hole (21).

6. The deep foundation pit drainage equipment for super high-rise building construction according to claim 1 is characterized by: The side of the counterweight ring (6) is provided with a positioning groove (24), the surface of the positioning groove (24) is provided with a threaded hole (25), the end surface of the positioning groove (24) is provided with a traction belt (26), one end of the traction belt (26) is provided with a fixed bottom plate (27), the traction belt (26) can be folded and stored, and a plurality of groups of positioning grooves (24) are provided, and the plurality of groups of positioning grooves (24) are all provided on the side of the counterweight ring (6).

7. The deep foundation pit drainage equipment for super high-rise building construction according to claim 6 is characterized by: A hole is provided on the surface of the fixed base plate (27), a first bearing (28) is provided in the hole, a limiting bolt (29) is provided on the inner ring surface of the first bearing (28), the fixed ring (5) can be sleeved on the limiting rod (15), a fixed block (30) is provided on the side of the fixed ring (5), a second threaded hole (31) is provided on the side of the fixed block (30), the limiting bolt (29) can be screwed into the second threaded hole (31), and the fixed block (30) is an "L"-shaped plate structure as a whole.

8. The deep foundation pit drainage equipment for super high-rise building construction according to claim 1 is characterized by: An auxiliary bearing (32) is sleeved on one end of the support rod (10), a support frame (33) is arranged on the outer ring surface of the auxiliary bearing (32), multiple groups of support frames (33) are arranged in a circular pattern with respect to the surface of the auxiliary bearing (32), a traction ring (34) is arranged on one end of the support frame (33), and a limit bearing (35) is arranged on the end surface of another group of support frames (33), the traction ring (34) can be sleeved on the positioning rod (8), and the traction ring (34) can be displaced along the positioning rod (8).

9. The deep foundation pit drainage equipment for super high-rise building construction according to claim 8, characterized in that: The surface of the limit bearing (35) is provided with a movable nut (36), which can be screwed onto the positioning rod (8). The traction plate (12) is fixed on the side of the support rod (10) at a certain angle. The cleaning scraper (13) contacts the surface of the filter screen (4). The surface of the traction spiral plate (11) is provided with a water flow guide plate (37). The water flow guide plates (37) are provided in multiple groups, and the multiple groups of water flow guide plates (37) are fixedly connected to the surface of the traction spiral plate (11).

10. A construction method for deep foundation pit drainage equipment used in super high-rise building construction according to any one of claims 1 to 9, characterized in that: The following steps are involved: S1: First, fix the counterweight ring (6) on the surface of the pipe (1), then pull the positioning rod (8) out of the receiving groove (7) and use the positioning clamping plate (22) to clamp it into the positioning clamping groove (20) for fixing; S2: Then the filter screen (4) is positioned together with the fixing ring (5). The filter screen (4) can be used to prevent the pipe (1) from being blocked by sediment when the sewage in the foundation pit is discharged; S3: Finally, the traction spiral plate (11) is fixed in front of the pipeline (1). After the drainage pump is connected to the pipeline (1) in cooperation with the hose, the water in the foundation pit can be pumped out by the suction force in the pipeline (1). The pumped water flow can cause the traction spiral plate (11) to rotate, so that the traction plate (12) provided on the side of one end of the support rod (10) can cooperate with the cleaning scraper (13) to clean the surface of the filter screen (4).