Water leakage treatment method for basement roof

Through the comprehensive inspection, closure and drainage pipe system in the basement roof leak area, the problem of short leakage protection maintenance time in the existing technology is solved, and the long-term leakage prevention effect is achieved, reducing the frequency of water leakage and saving Repair cost.

CN119083759APending Publication Date: 2024-12-06SICHUAN INSITITUTE OF BUILDING RES
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411091805.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-09
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The existing basement roof leak treatment method has a short leak-proof maintenance time, which is prone to leakage problems again.

Method used

A comprehensive inspection is carried out in the leaking area, remove the loose surface layer, seal the leaking parts on the hard base layer, and paste carbon fiber cloth on the base surface. At the same time, install a drainage pipe system to discharge the leakage, and use a double 'block + discharge' Insurance strategy.

Benefits of technology

It significantly improves the long-term water leakage prevention effect of the sealing structure, reduces the frequency of water leakage, maintains the stability of the roof structure, and saves maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119083759A_ABST
    Figure CN119083759A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of basement leakage treatment, discloses a water leakage treatment method for a basement roof, and aims to solve the problem that secondary leakage is easy to occur due to short leakage-proof maintenance time of an existing basement roof water leakage treatment mode. On the basis that only a blocking strategy is adopted in an existing basement top plate water leakage treatment method, a drainage pipeline system is additionally arranged in a water leakage area and used for timely draining accumulated leakage water at a leakage position of an overburden layer above a basement top plate; according to the method, a double-insurance water leakage treatment strategy of'blocking and draining 'is adopted, drainage is taken as a main part, blocking is taken as an auxiliary part, leakage water can be prevented from gathering at the position of the top plate with the leakage defect for a long time so as to prevent the leakage water from gradually eroding the blocking structure to cause leakage again, the long-acting water leakage prevention effect of the blocking structure can be remarkably improved, and the service life of the blocking structure is prolonged. The number of times of water leakage treatment is reduced, the stability of the top plate structure is kept, and the maintenance cost can be saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of basement leakage treatment, and more specifically, relates to a method for treating water leakage of a basement top plate. Background Art

[0002] With the acceleration of urbanization and the improvement of living standards, urban buildings are usually equipped with basements. As the space of the basement becomes larger and larger, the load on the basement roof also increases. This is the result of large-scale and high-rise urban buildings and full use of underground space. However, the basement is a hidden project. There is usually a soil layer above the basement. As the basement is used for a long time, leakage will occur frequently. According to the national building leakage survey report in recent years, the basement leakage rate is as high as 57.51%, of which more than 80% appear in the form of local leakage. Basement leakage is called the "cancer" of buildings.

[0003] Among them, the basement roof is a frequent leakage area. The most common cause of leakage is the loose bonding of the top plate post-casting concrete and the inadequate maintenance of the top plate concrete. This is especially true in some dilapidated and old communities. Secondly, some newly built basements will also have large-scale leakage problems due to construction technology and drawing design. The leakage problem of the basement roof will not only affect the normal use of the building, but also have a certain adverse impact on the safety and service life of the roof structure.

[0004] At present, the method for dealing with the existing water leakage phenomenon of the basement roof is generally to use plugging materials to plug the leaking gaps, that is, to use a plane filling repair structure. However, only solving the water leakage problem by plugging is only a temporary solution, not a fundamental solution, because there are already defects in the roof structure at the leakage point of the basement roof. Even if the leakage point has been completely blocked by the plugging material, the water in the overburden layer above the roof will still gather and act on the leakage point. As time goes by, the plugging material at the leakage point will also leak again under the long-term erosion of water, and even directly cause the repair structure to break and produce more serious water leakage cracks. Therefore, how to more effectively solve the water leakage phenomenon of the basement roof so that it is not easy to reappear or no longer leaks is a problem that needs to be solved at this stage. Summary of the invention

[0005] The purpose of the present invention is to provide a method for treating water leakage of a basement roof, aiming to solve the problem that the existing method for treating water leakage of a basement roof has a short anti-leakage maintenance time and is prone to leakage again.

[0006] To achieve the above object, the present invention provides the following technical solutions:

[0007] A method for treating water leakage in a basement top plate, characterized by comprising the following steps:

[0008] S1, conduct a comprehensive inspection of the roof area and identify the leaking areas one by one;

[0009] S2, removing the loose surface layer in the water leakage area until the hard base layer is completely exposed;

[0010] S3, sealing the leaking parts on the hard base;

[0011] S4, pasting carbon fiber cloth on the base surface of the leaking area after the leak is sealed;

[0012] S5, installing a drainage pipe system at the leaking area of ​​the top plate to drain the leaked water accumulated above the top plate.

[0013] As a further preferred embodiment of the present technical solution, step S3 includes:

[0014] S31, digging a groove, digging a "V"-shaped slope groove at the leaking part on the hard base;

[0015] S32, sealing the leaking part and setting a glue injection channel, filling the groove with an anchoring agent, and installing a hollow glue injection tube in the anchoring agent, wherein one end of the hollow glue injection tube extends to the leaking part at the bottom of the groove; before glue injection, the leaking water can flow out through the hollow glue injection tube, and during glue injection, the hollow glue injection tube serves as a glue injection channel;

[0016] S33, preparing the adhesive liquid, mixing the adhesive liquid product raw materials weighed according to the weight ratio to evenly prepare a finished adhesive, and storing the finished adhesive separately in a glue storage tank and tightening the tank mouth;

[0017] S34, glue injection, when the anchoring agent in the groove reaches the initial setting strength, glue injection can be carried out. Before glue injection, the glue injection nozzle is installed on the pre-buried hollow glue injection pipe, and the glue in the slurry storage tank is hydraulically pumped to the glue injection nozzle by the glue pressure pump and injected into the leaking part at the bottom of the groove;

[0018] S35, closing the glue injection channel, and after checking that there is no water leakage, using crack sealing glue to block and smooth the port of the glue injection channel.

[0019] As a further preference in the present technical solution, in the step S31, the arrangement of the grooves adopts different forms according to different situations of water leakage; when the water leakage occurs through a single crack, the grooves are arranged along the extension direction of the leakage crack; when the water leakage occurs in a sheet form, a plurality of the grooves are arranged every 0.8 to 1.0 meters in the sheet leakage area; when the water leakage occurs in a hole-like or point-like form, the grooves are uniformly arranged by connecting the points into lines.

[0020] As a further preference in the present technical solution, in the step S32, the offline plugging method is used for plugging. First, a pressure-resistant rubber tube is placed at the bottom of the groove. The diameter of the pressure-resistant rubber tube is determined according to the size of the leakage water flow. The larger the water flow, the larger the diameter of the pressure-resistant rubber tube. Subsequently, the anchoring agent prepared in advance is filled into the groove, and the pressure-resistant rubber tube is quickly pulled out while filling the anchoring agent until the pressure-resistant rubber tube is completely pulled out. At this time, a dark groove consistent with the diameter of the pressure-resistant rubber tube is formed at the bottom of the groove, and the hollow rubber injection tube is buried and extended to the dark groove.

[0021] As a further preferred embodiment of the present technical solution, in the step S33, the amount of the raw material of the glue product is appropriately adjusted according to the working requirements, and the variation range is 7% to 15%.

[0022] As a further preference in the present technical solution, in the step S34, the order of glue injection in the single groove is to start from the first hollow glue injection tube at one end of the groove and proceed one by one until the last hollow glue injection tube at the other end of the groove completes the glue injection; when the leaking part at the bottom of the groove no longer flows through the glue injection nozzle, the glue injection is stopped and the glue injection nozzle is closed; after the glue liquid solidifies for 10 to 24 hours, the glue injection nozzle is removed and the glue injection effect is checked.

[0023] As a further preference in the present technical solution, in the step S4, the base surface of the leaking area is repaired and leveled before the carbon fiber cloth is pasted to ensure that the thickness of the top plate in the leaking area is consistent with the thickness of the top plates in other positions. After the repairing and leveling work is completed, the base surface of the leaking area is cleaned and kept dry.

[0024] As a further preference in the present technical solution, in the step S4, the moisture content of the base surface layer to which the carbon fiber cloth is pasted is not more than 6%, and the base surface layer with a moisture content exceeding the limit is artificially dried or pasted with a structural adhesive specially used for high-humidity surfaces; the effective bonding area of ​​a single piece of the carbon fiber cloth on the base surface layer is not less than 95%; after the pasting construction of the carbon fiber cloth is completed, a waterproof coating is applied on its surface.

[0025] As a further preference in the present technical solution, in step S5, the drainage pipe system includes a vertical drainage pipe arranged at the water seepage position on the top plate and a horizontal drainage pipe connected to the vertical drainage pipe, and the horizontal drainage pipe extends to the basement water collection well.

[0026] As a further preference in the present technical solution, a through hole is drilled at the water seepage position on the top plate, the vertical drain pipe is inserted in the through hole, the top of the vertical drain pipe is wrapped with a layer of anti-filtration non-woven fabric, and a water filter layer is arranged between the top and the soil above the top plate, and the root of the vertical drain pipe is tightly sealed with a plugging agent; the lower end of the vertical drain pipe is connected to the horizontal drain pipe, and the horizontal drain pipe is provided with lifting clips at intervals, and the upper ends of the lifting clips are fixed to the top plate; the slope of the horizontal drain pipe is not less than 0.5% during installation.

[0027] Compared with the prior art, the present invention has the following beneficial effects:

[0028] 1. In addition to the blocking strategy adopted in the existing basement roof leakage treatment method, the present invention also adds a drainage pipe system at the leakage area, which is used to drain the accumulated leakage water at the leakage site in the covering layer above the basement roof in time. The present invention adopts a "blocking + drainage" double insurance leakage treatment strategy, in which drainage is mainly used and blocking is supplemented, which can avoid the leakage water from accumulating for a long time at the top plate position where leakage defects already exist, so as to prevent it from gradually eroding the blocking structure and leaking again, which can significantly improve the long-term anti-leakage effect of the blocking structure, reduce the number of times of handling leakage phenomena, maintain the stability of the top plate structure, and save maintenance costs.

[0029] 2. Under the premise of adding a drainage pipe system, the basement roof leakage treatment method of the present invention can reduce the performance of the sealing materials and the sealing requirements used for filling and plugging accordingly, and can reasonably control the maintenance cost. Although the maintenance cost required for a single leakage treatment by the leakage treatment method of the present invention is still higher than the maintenance cost required for filling and plugging only, the long-term anti-leakage effect brought by the present invention can save the maintenance cost of multiple repairs in the future, which is more cost-effective and more practical. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0031] Figure 1 It is the overall process flow chart of the present invention;

[0032] Figure 2is a specific process flow chart of step S3 in the present invention;

[0033] Figure 3 It is a schematic diagram of the construction structure of step S3 and step S4 in the present invention;

[0034] Figure 4 It is a schematic diagram of the construction effect of step S3 and step S4 in the present invention;

[0035] Figure 5 It is a schematic diagram of the construction structure of step S5 in the present invention. DETAILED DESCRIPTION

[0036] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0037] like Figures 1 to 5 As shown, a water leakage treatment method for a basement top plate in an exemplary embodiment of the present invention comprises the following steps:

[0038] S1, conduct a comprehensive inspection of the roof area and mark the leaking areas one by one. In this step, firstly, the entire basement roof area is roughly inspected manually, and the more obvious leaking areas on the roof (i.e., the locations with obvious dripping or wetness) are marked, and then the other areas are carefully scanned using a leak detector to determine the leaking areas with less obvious water seepage and mark them;

[0039] S2, remove the surface loose layer in the water leakage area until the hard base is completely exposed. In this step, the surface loose layer includes the whitewash, paint, dust and scum, oil stains on the surface of the top plate and the weathered and corroded parts of the concrete layer. The whitewash, paint, dust and scum on the surface of the top plate can be removed by a high-pressure water gun or a wire brush, and the oil stains can be wiped off by an organic solvent. The organic solvent can be acetone, ethanol or ethyl acetate. The weathered and corroded parts in the concrete can be chiseled out by an electric hammer or an electric drill. It should be noted that the load-bearing steel structure inside the top plate structure should not be damaged during this step.

[0040] S3, sealing the leaking parts on the hard base, this step specifically includes:

[0041] S31, digging a groove, digging a "V"-shaped slope groove at the leaking part on the hard base, and after digging, blowing out the dust in the groove with oil-free compressed air or flushing with clean water; the arrangement of the groove adopts different forms according to different situations of water leakage. When the water leakage occurs in the form of a single crack, the groove is arranged along the extension direction of the leaking crack; when the water leakage occurs in the form of a sheet, a plurality of grooves are arranged every 0.8 to 1.0 meters in the sheet leakage area; when the water leakage occurs in the form of a hole or a point, the grooves are uniformly arranged by connecting the points into lines; it should be noted that for the parts that have been filled with glue injection and still have leakage, the original glue injection nozzle needs to be removed when digging the "V"-shaped groove;

[0042] S32, seal the leaking part and set up a glue injection channel, fill the groove with anchoring agent, and install a hollow glue injection tube in the anchoring agent, one end of the hollow glue injection tube extends to the leaking part at the bottom of the groove; before glue injection, the leaking water can flow out through the hollow glue injection tube, and when glue injection is performed, the hollow glue injection tube serves as the glue injection channel; in this embodiment, the offline plugging method is used for plugging. First, a pressure-resistant rubber tube is placed at the bottom of the groove. The diameter of the pressure-resistant rubber tube is determined according to the size of the leaking water flow. To determine, the greater the water flow, the larger the diameter of the pressure-resistant rubber tube; then fill the groove with the prepared anchoring agent, and quickly pull out the pressure-resistant rubber tube while filling the anchoring agent until the pressure-resistant rubber tube is completely pulled out, at this time, a dark groove consistent with the diameter of the pressure-resistant rubber tube is formed at the bottom of the groove, and the end of the hollow rubber injection tube is buried and extends to the dark groove; the spacing of the hollow rubber injection tube on the anchoring agent is 0.8 to 1.5 meters; in this embodiment, the anchoring agent uses a roll-type anchoring agent.

[0043] S33, glue liquid preparation, the glue liquid product raw materials weighed by weight ratio are stirred evenly to form a finished adhesive. In this embodiment, the finished adhesive includes two parts of modified epoxy resin adhesives of grades A and B. The amount of the glue liquid product raw materials used for the two parts of modified epoxy resin adhesives of grades A and B is appropriately adjusted according to the work requirements, and the variation range is 7% to 15%; specifically, the two parts of modified epoxy resin adhesives of grades A and B are stored separately in two glue storage tanks and the tank mouths are tightened to prevent the two from accidentally contacting and reacting to cause a decrease in adhesive performance; it should be noted that if the construction is carried out in winter, the water used for mixing the glue liquid product raw materials needs to be heated to 20°C to accelerate the dissolution of the raw materials;

[0044] S34, glue injection, when the anchoring agent in the groove reaches the initial setting strength, glue injection can be carried out. Before glue injection, the glue injection nozzle is installed on the pre-buried hollow glue injection tube, and the glue injection nozzle is connected to the outlet of the glue pump through the glue injection tube, and the inlet of the glue pump is connected to the two slurry storage tanks through two infusion tubes respectively; when performing glue injection, the glue injection pressure is set to 0.2-0.3MPa, and the glue pump is started. Under the pressure of the glue pump, the adhesive in the two slurry storage tanks is simultaneously and equally pressed to the glue injection nozzle and injected into the leaking part at the bottom of the groove; wherein, the glue injection order in a single groove is from one end of the groove to the other end of the groove. The first hollow glue injection tube starts to be injected one by one until the last hollow glue injection tube at the other end of the groove is injected; when the leaking part at the bottom of the groove no longer flows through the glue injection nozzle, the glue injection is stopped and the glue injection nozzle is closed to prevent the glue from flowing back, and then the glue injection tube is connected to the adjacent glue injection nozzle to continue the glue injection until all the glue injection nozzles are fully injected; after the glue solidifies for 10 to 24 hours, the glue injection nozzle is removed and the glue injection effect is checked; it should be noted that after the glue injection of a single groove is completed, the residual glue in the glue pump and the glue injection tube should be blown clean immediately with compressed air to prevent the glue from condensing in the tube;

[0045] S35, closing the glue injection channel, after checking that there is no water leakage, using crack sealing glue to block and smooth the port of the glue injection channel. In this embodiment, the crack sealing glue is Class B glue, and its safety performance index must comply with relevant technical specifications;

[0046] S4, pasting carbon fiber cloth on the base surface of the leaking area after the leak is sealed. In this step, before pasting the carbon fiber cloth, the base surface of the leaking area is repaired and leveled to ensure that the thickness of the top plate of the leaking area is consistent with the thickness of the top plate of other positions; wherein, for the positions with obvious defects on the base surface of the leaking area, structural repair glue is used to repair and restore them, and for the positions with step differences and inner corners on the base surface of the leaking area, they are smoothed into a smooth curved surface; after completing the repair and leveling work, the base surface of the leaking area is cleaned and kept dry; it should be noted in this step that pasting the carbon fiber cloth The moisture content of the surface layer of the base surface on which the carbon fiber cloth is pasted is not more than 6%. For the base surface with excessive moisture content, artificial drying treatment shall be carried out or structural adhesive specially used for high-humidity surfaces shall be used for pasting. After the pasting of the carbon fiber cloth is completed, the carbon fiber cloth reinforcement construction shall be subjected to corresponding random inspection to ensure that the effective bonding area of ​​a single piece of the carbon fiber cloth on the base surface is not less than 95%, and the positive tensile bonding strength between the carbon fiber cloth and the base surface shall meet the specifications. If it fails to meet the standards, it shall be peeled off and pasted again, and re-inspected and accepted. After passing the inspection, a waterproof coating shall be applied on the surface of the carbon fiber cloth, and the amount of the waterproof coating shall be greater than 1.5kg / m 2, and the thickness is greater than 1mm; in this step, the role of the carbon fiber cloth is to reinforce the basement roof structure to overcome the structural stability problems caused by the leakage defects of the roof structure. The fibers used in the carbon fiber cloth are continuous fibers, and the fiber bundle direction is perpendicular to the leaking cracks; in this embodiment, the carbon fiber cloth is selected from high-strength grade I carbon fiber cloth, the tensile strength standard value is ≥3400MPa, the tensile elastic modulus is ≥2.4×105MPa, the thickness is 0.167mm, and the unit area mass is ≤300g / m 2 ; The adhesive used to stick the carbon fiber cloth is a Class A modified epoxy resin adhesive, and the standard value of its bonding shear strength should meet the relevant regulations;

[0047] S5. A drainage pipe system is installed at the leakage area of ​​the top plate to drain the leakage water gathered above the top plate. In this step, the drainage pipe system includes a vertical drainage pipe arranged at the seepage position on the top plate and a horizontal drainage pipe connected to the vertical drainage pipe, and the horizontal drainage pipe extends to the water collection well in the basement. The specific construction process of the drainage pipe system is as follows: a through hole is drilled at the seepage position on the top plate, and the vertical drainage pipe is inserted into the through hole. The top of the vertical drainage pipe is wrapped with a layer of anti-filtration non-woven fabric, and a water filter layer wrapped with galvanized steel wire mesh is arranged between the top of the vertical drainage pipe and the covering soil above the top plate. The height of the water filter layer should be not less than 50 mm. In this embodiment, the water filter layer uses well-graded small pebble particles; the root of the vertical drainage pipe is sealed with a plugging agent. Sealing plug; the lower end of the vertical drain pipe is connected to the horizontal drain pipe, and the horizontal drain pipe is provided with lifting clips at intervals of 700mm, and the upper ends of the lifting clips are fixed on the top plate; the slope of the horizontal drain pipe is not less than 0.5% during installation; it should be noted that the direction of the horizontal drain pipe is arranged according to the positions of all leakage areas on the top plate to ensure that the shortest pipe length is used to connect the vertical drain pipes in all leakage areas in series; in this embodiment, the vertical drain pipe adopts DN50mmPVC pipe, the horizontal drain pipe adopts DN75mmPVC pipe, and the lifting clip adopts PVC pipe lifting clip. It should be noted that when drilling the installation hole of the lifting clip on the basement top plate, be careful not to penetrate the top plate to avoid damaging the waterproof layer in the basement top plate.

[0048] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A method for treating water leakage in a basement roof. It is characterized in that The following steps are involved: S1, conduct a comprehensive inspection of the roof area and identify the leaking areas one by one; S2, removing the loose surface layer in the water leakage area until the hard base layer is completely exposed; S3, sealing the leaking parts on the hard base; S4, pasting carbon fiber cloth on the base surface of the leaking area after the leak is sealed; S5, installing a drainage pipe system at the leaking area of ​​the top plate to drain the leaked water accumulated above the top plate.

2. The method for treating water leakage in a basement roof according to claim 1, It is characterized in that The step S3 comprises: S31, digging a groove, digging a "V"-shaped slope groove at the leaking part on the hard base; S32, sealing the leaking part and setting a glue injection channel, filling the groove with an anchoring agent, and installing a hollow glue injection tube in the anchoring agent, wherein one end of the hollow glue injection tube extends to the leaking part at the bottom of the groove; before glue injection, the leaking water can flow out through the hollow glue injection tube, and during glue injection, the hollow glue injection tube serves as a glue injection channel; S33, preparing the adhesive liquid, mixing the adhesive liquid product raw materials weighed according to the weight ratio to evenly prepare a finished adhesive, and storing the finished adhesive separately in a glue storage tank and tightening the tank mouth; S34, glue injection, when the anchoring agent in the groove reaches the initial setting strength, glue injection can be carried out. Before glue injection, the glue injection nozzle is installed on the pre-buried hollow glue injection pipe, and the glue in the glue storage tank is hydraulically pumped to the glue injection nozzle by the glue pressure pump and injected into the leaking part at the bottom of the groove; S35, closing the glue injection channel, and after checking that there is no water leakage, using crack sealing glue to block and smooth the port of the glue injection channel.

3. The method for treating water leakage in a basement roof according to claim 2, It is characterized in that In step S31, the arrangement of the grooves adopts different forms according to different situations of water leakage; when water leakage occurs through a single crack, the grooves are arranged along the extension direction of the leakage crack; when water leakage occurs in a sheet form, multiple grooves are arranged every 0.8 to 1.0 meters in the sheet leakage area; when water leakage occurs in a hole-like or point-like form, the grooves are arranged uniformly by connecting the points into lines.

4. The method for treating water leakage in a basement roof according to claim 2, It is characterized in that In step S32, the offline plugging method is used for sealing. First, a pressure-resistant rubber tube is placed at the bottom of the groove. The diameter of the pressure-resistant rubber tube is determined according to the size of the leakage water flow. The larger the water flow, the larger the diameter of the pressure-resistant rubber tube. Then, the anchoring agent prepared in advance is filled into the groove, and the pressure-resistant rubber tube is quickly pulled out while filling the anchoring agent until the pressure-resistant rubber tube is completely pulled out. At this time, a dark groove consistent with the diameter of the pressure-resistant rubber tube is formed at the bottom of the groove, and the hollow rubber injection tube is buried and extended to the dark groove.

5. The method for treating water leakage in a basement roof according to claim 2, It is characterized in that In step S33, the amount of the raw material of the glue product is appropriately adjusted according to the work requirements, and the variation range is 7% to 15%.

6. The method for treating water leakage in a basement roof according to claim 2, It is characterized in that In step S34, the glue injection sequence in the single groove is to start from the first hollow glue injection tube at one end of the groove and proceed one by one until the last hollow glue injection tube at the other end of the groove completes the glue injection; when the leaking part at the bottom of the groove no longer flows through the glue injection nozzle, the glue injection is stopped and the glue injection nozzle is closed; after the glue liquid solidifies for 10 to 24 hours, the glue injection nozzle is removed and the glue injection effect is checked.

7. The method for treating water leakage in a basement roof according to claim 1, It is characterized in that In step S4, before pasting the carbon fiber cloth, the base surface of the leaking area is repaired and leveled to ensure that the thickness of the top plate in the leaking area is consistent with the thickness of the top plates in other positions. After completing the repairing and leveling work, the base surface of the leaking area is cleaned and kept dry.

8. The method for treating water leakage of a basement top plate according to claim 7, It is characterized in that In the step S4, the moisture content of the base surface layer to which the carbon fiber cloth is pasted is not more than 6%. The base surface layer with a moisture content exceeding the limit is artificially dried or pasted with a structural adhesive specially used for high-humidity surfaces; the effective bonding area of ​​a single piece of the carbon fiber cloth on the base surface layer is not less than 95%; after the pasting construction of the carbon fiber cloth is completed, a waterproof coating is applied on its surface.

9. The method for treating water leakage in a basement ceiling according to claim 1, It is characterized in that In step S5, the drainage pipe system includes a vertical drainage pipe arranged at the water seepage position on the top plate and a horizontal drainage pipe connected to the vertical drainage pipe, and the horizontal drainage pipe extends to the basement water collection well.

10. The method for treating water leakage of a basement top plate according to claim 9, It is characterized in that A through hole is drilled at the water seepage position on the top plate, and the vertical drain pipe is inserted in the through hole. The top of the vertical drain pipe is wrapped with a layer of anti-filtration non-woven fabric, and a water filter layer is arranged between the top and the soil above the top plate. The root of the vertical drain pipe is tightly sealed with a plugging agent; the lower end of the vertical drain pipe is connected to the horizontal drain pipe, and the horizontal drain pipe is provided with lifting clips at intervals, and the upper ends of the lifting clips are fixed to the top plate; the slope of the horizontal drain pipe is not less than 0.5% during installation.