Loess stratum shallow tunnel large pipe shed drilling boulder treatment device and method
By using real-time monitoring and ionization devices to crush lone stones in the loess strata, the problems of low drilling efficiency, equipment wear and inclination caused by loess strata are solved, and efficient loess strata treatment and uniform grouting are achieved, improving the improvement of loess strata The safety and efficiency of tunnel construction.
Patent Information
- Application Number
- CN202411005047.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-07-25
AI Technical Summary
The lone stones present in the loess strata lead to low drilling efficiency, serious equipment wear, inclination and offset problems, poor grouting effect, and difficult treatment of lone stones, affecting the safety and efficiency of tunnel construction.
A device including a power mechanism, a drill rod, a collection mechanism, a data processing control mechanism and a stone crushing mechanism are designed to monitor the drilling process in real time through sensors, detect the position and size of the stone using electromagnetic waves, and use hard wires and ionization. The electrode produces ionization and causes the broken stones to occur in a short period of time.
It improves drilling efficiency, reduces equipment wear, prevents tilt and offset during drilling, ensures uniformity of grouting effect, simplifies the treatment of lonely stones, and improves the continuity and safety of construction.
Smart Images

Figure CN119083888A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel engineering, and in particular to a device and method for processing boulders in large pipe sheds for drilling shallow tunnels in loess strata. Background Art
[0002] Loess stratum refers to a geological stratum containing a large amount of loess components in the soil. It is widely distributed in the northwest region of my country. Due to its unique origin and structure, the binding force between loess particles is weak, resulting in its low strength and easy compression deformation under the action of external force. The porosity of the loess stratum is high and has good water permeability, but this also makes its mechanical properties further reduced when eroded by water. Loess is easy to disintegrate when it meets water and forms a muddy state, which seriously affects its stability. Therefore, the loess stratum has low strength and high compressibility.
[0003] Therefore, the loess stratum is very prone to instability during the tunnel excavation process, causing safety hazards such as collapse and deformation. In order to ensure the safety of tunnel excavation and construction efficiency, it is usually necessary to adopt super-long pipe-roof support technology. The super-long pipe-roof can not only provide effective initial support, but also enhance the stability of the loess stratum through the combined pipe-roof grouting technology. However, in the actual construction process, there are often a certain number of boulders in the loess stratum. The existence of these boulders brings many challenges to the drilling of the pipe-roof.
[0004] In the prior art, due to the poor mechanical properties of the loess stratum, the drill bit is easily subject to resistance, especially when encountering boulders, the drilling efficiency is significantly reduced, and the existing drilling equipment and technology are difficult to quickly and effectively penetrate the boulders, resulting in slow overall construction progress; the boulders in the loess stratum not only affect the drilling efficiency, but also cause increased wear of the drill bit and related equipment. Frequent replacement of the drill bit and maintenance of equipment not only increase the construction cost, but also extend the construction period; during the drilling process, the drill bit is prone to offset when encountering boulders, causing the pipe shed to tilt or shift during the installation process, which will seriously affect the support effect of the pipe shed and increase the risk and difficulty of tunnel construction; the pipe shed combined grouting technology is to improve the stability of the loess stratum, but in the case of the pipe shed tilting or shifting, the grouting effect is difficult to ensure, and the slurry is difficult to distribute evenly, which may lead to unsatisfactory support effect and even cause secondary disasters; the prior art has limited means of dealing with boulders, mainly relying on manual crushing or external mechanical equipment. This treatment method is not only inefficient, but also has certain safety risks, especially in a narrow construction environment, where the operation is more difficult. Summary of the invention
[0005] The purpose of the present invention is to provide a device and method for handling boulders in large pipe-roof drilling of shallow buried tunnels in loess strata, so as to solve the problems of low drilling efficiency, severe equipment wear, tilt and offset problems, poor grouting effect and difficulty in handling boulders in the prior art.
[0006] To achieve the above object, the present invention provides the following technical solution: a device for processing isolated rocks when drilling a large pipe shed in a shallow tunnel in a loess layer, comprising:
[0007] Power mechanism;
[0008] A drill rod, which is arranged on a power mechanism, and a drill bit is arranged on the drill rod, and the power mechanism drives the drill rod and the drill bit to perform drilling operations;
[0009] A collection mechanism; the collection mechanism is arranged on the drill rod, and is used to collect data for monitoring the drilling process;
[0010] A data processing control mechanism, which is connected to the collection mechanism, and the collection mechanism transmits the monitored data to the data processing control mechanism, and the data processing control mechanism analyzes the drill pipe condition to determine whether there is a boulder in front of the drill pipe and the information of the boulder; and
[0011] A boulder crushing mechanism is connected to a drill pipe and is used to crush boulders in a short time during drilling.
[0012] Preferably, the power mechanism comprises a motor.
[0013] Preferably, the output end of the motor is fixedly connected to one end of the drill rod.
[0014] Preferably, the acquisition mechanism comprises a sensor device, and the sensor device is arranged on an end of the drill rod away from the motor.
[0015] Preferably, the boulder crushing mechanism includes a hard wire arranged on the drill rod, the hard wire is connected to an external power supply, the hard wire is arranged on the drill rod, one end of the hard wire away from the motor is connected to an ionization electrode, and the ionization electrode is arranged near the drill bit.
[0016] Preferably, the data processing control mechanism includes a data processing control device connected to the sensor device.
[0017] A method for processing boulders in a large pipe-roofed shallow tunnel in a loess stratum, using the device for processing boulders in a large pipe-roofed shallow tunnel in a loess stratum, the method comprising the following steps:
[0018] S1: insert the drill bit into the loess layer, drive the drill rod to rotate through the motor, and perform pipe rack drilling;
[0019] S2: Install sensor devices to monitor various data during the drilling process of the drill pipe in real time;
[0020] S3: The sensor device feeds back the monitored data to the data processing and control device to analyze the condition of the drill pipe. When the drill pipe parameters suddenly change, the sensor device emits electromagnetic waves to detect whether there is a boulder in front of the drill pipe and determine the specific information of the boulder.
[0021] S4: Place the drill bit against the boulder and slowly rotate it to drill a hole on the surface of the boulder. Then, fill the drill pipe with tap water, connect a hard wire, and repeatedly strike the ionizing electrode to impact and crush the boulder.
[0022] S5: After the hole is cleaned, slowly rotate the drill bit again, fill the drill pipe with tap water, and strike the ionization electrode until the boulder is completely broken. Use the sensor device to emit electromagnetic waves to detect whether the boulder in front of the drill pipe is completely removed.
[0023] It can be seen from the above technical solution that the present invention has the following beneficial effects:
[0024] The device and method for handling boulders in large pipe sheds for drilling shallow buried tunnels in loess strata, when a sudden change occurs in front of the drill rod, the sensor device releases electromagnetic waves to detect the volume and shape of the boulders, so that the position and size of the boulders can be accurately identified to ensure the pertinence and effectiveness of subsequent treatment. The sensor device can monitor various data in the drilling process of the drill rod in real time. This real-time monitoring can detect abnormal situations in time to prevent equipment damage or construction delays caused by boulders during the drilling process. Through the external power supply, hard wires and ionization electrodes, a strong ionization effect is generated to impact the boulders and generate a strong crushing force. This method can effectively crush the boulders in a short time, ensure the continuity and smooth progress of the drilling process, and solve the problems of low drilling efficiency, severe equipment wear, tilt and offset problems, poor grouting effect and difficulty in handling boulders in the prior art. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0026] Figure 2 for Figure 1 Enlarged view of point A in the middle;
[0027] Figure 3 The figure is a flow chart of the method of the present invention.
[0028] In the figure: 1. power mechanism; 11. motor; 2. drill rod; 3. drill bit; 4. acquisition mechanism; 41. sensor device; 5. data processing and control mechanism; 51. data processing and control device; 6. boulder crushing mechanism; 61. hard wire; 62. ionization electrode; 7. loess layer; 8. boulder. DETAILED DESCRIPTION
[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0030] like Figure 1 and Figure 2 As shown, a boulder processing device for large pipe-roof drilling in shallow buried tunnels in loess strata comprises a power mechanism 1, a drill rod 2, a drill bit 3, a collection mechanism 4, a data processing control mechanism 5 and a boulder crushing mechanism 6. The drill rod 2 is arranged on the power mechanism 1, the drill bit 3 is arranged on the drill rod 2, the collection mechanism 4 is arranged on the drill rod 2, the data processing control mechanism 5 is connected with the collection mechanism 4, the boulder crushing mechanism 6 is connected with the drill rod 2, the power mechanism 1 drives the drill rod 2 and the drill bit 3 to perform drilling operations, the collection mechanism 4 functions to collect and monitor data during the drilling process, the collection mechanism 4 transmits the monitored data to the data processing control mechanism 5, the data processing control mechanism 5 analyzes the status of the drill rod 2, determines whether there is a boulder 8 in front of the drill rod 2 and the information of the boulder, the boulder crushing mechanism 6 functions to crush the boulder 8 in a short time during the drilling process, improves the construction efficiency, reduces the wear on the equipment, solves the problems of tilt and offset during the drilling process, has a good grouting effect, and effectively handles the problem of the boulder.
[0031] like Figure 1 and Figure 2As shown, the power mechanism 1 includes a motor 11, the output end of the motor 11 is fixedly connected to one end of the drill rod 2, the collection mechanism 4 includes a sensor device 41, and the sensor device 41 is arranged on the end of the drill rod 2 away from the motor 11. The boulder crushing mechanism 6 includes a hard wire 61 and an ionization electrode 62. The hard wire 61 is arranged on the drill rod 2, and the hard wire 61 is connected to an external high-voltage power supply. The hard wire 61 is arranged on the drill rod 2, and the end of the hard wire 61 away from the motor 11 is connected to the ionization electrode 62. The ionization electrode 62 is arranged near the drill bit 3, and when the drill bit 3 hits the boulder 8, the ionization electrode 62 is convenient for crushing the boulder. The boulder crushing mechanism 6 generates a strong ionization effect through the high-voltage power supply, the hard wire 61 and the ionization electrode 62. The boulder 8 is impacted and a strong crushing force is generated. This method can effectively crush the boulder 8 in a short time, ensuring the continuity and smooth progress of the drilling process. The data processing control mechanism 5 includes a data processing control device 51, and the data processing control device 51 is connected to the sensor device 41. The sensor device 41 collects various data during the drilling process, such as drilling speed, torque, pressure, vibration, etc., and transmits the drilling data collected at the end of the pipe rack to the computer in real time. The data receiving and analysis software on the computer side stores, analyzes and displays the received data, helping construction personnel to understand the drilling situation in real time and make timely adjustments. Real-time monitoring can detect abnormal situations in time to prevent equipment damage or construction delays caused by boulders 8 during the drilling process.
[0032] like Figure 3 As shown, a method for processing boulders in a shallow tunnel in a loess layer with a large pipe shed is also provided. The method adopts the device for processing boulders in a shallow tunnel in a loess layer with a large pipe shed. The method comprises the following steps:
[0033] S1: insert the drill bit into the loess layer, drive the drill rod to rotate through the motor, and perform pipe rack drilling;
[0034] S2: Install sensor devices to monitor various data during the drilling process of the drill pipe in real time;
[0035] S3: The sensor device feeds back the monitored data to the data processing and control device to analyze the condition of the drill pipe. When the drill pipe parameters suddenly change, the sensor device emits electromagnetic waves to detect whether there is a boulder in front of the drill pipe and determine the specific information of the boulder.
[0036] S4: Place the drill bit against the boulder and slowly rotate it to drill a hole on the surface of the boulder. Then, fill the drill pipe with tap water, connect a hard wire, and repeatedly strike the ionizing electrode to impact and crush the boulder.
[0037] S5: After the hole is cleaned, slowly rotate the drill bit again, fill the drill pipe with tap water, and strike the ionization electrode until the boulder is completely broken. Use the sensor device to emit electromagnetic waves to detect whether the boulder in front of the drill pipe is completely removed.
[0038] Among them, the sensor device 41 in step S2 is installed at the end of the drill rod 2. The sensor device 41 monitors the data of the drill rod 2 in real time during the drilling process, including drilling speed, torque, pressure, and vibration. The specific information of the boulder 8 is determined in step S3, including the volume, shape and other parameters of the boulder. The ionization electrode is struck in step S5 until the boulder 8 is completely broken and the boulder parameters return to normal.
[0039] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A device for handling isolated rocks when drilling a large pipe shed in a shallow tunnel in a loess stratum, characterized in that: include: Power mechanism (1); A drill rod (2), the drill rod (2) being arranged on a power mechanism (1), a drill bit (3) being arranged on the drill rod (2), and the power mechanism (1) driving the drill rod (2) and the drill bit (3) to perform drilling operations; A collection mechanism (4); the collection mechanism (4) is arranged on the drill rod (2), and the collection mechanism (4) is used to collect data for monitoring the drilling process; a data processing control mechanism (5), the data processing control mechanism (5) being connected to the collection mechanism (4), the collection mechanism (4) transmitting the monitored data to the data processing control mechanism (5), the data processing control mechanism (5) analyzing the condition of the drill rod (2), determining whether there is a boulder in front of the drill rod (2) and the information of the boulder; and A boulder crushing mechanism (6) is connected to a drill pipe (2) and is used to crush boulders in a short time during drilling.
2. The device for handling boulders during large pipe-roof drilling in shallow tunnels in loess strata according to claim 1 is characterized by: The power mechanism (1) comprises a motor (11).
3. The device for handling boulders during large pipe-roof drilling in shallow tunnels in loess strata according to claim 2 is characterized by: The output end of the motor (11) is fixedly connected to one end of the drill rod (2).
4. The device for handling boulders during large pipe-roof drilling in shallow loess tunnels according to claim 2 is characterized by: The acquisition mechanism (4) comprises a sensor device (41), and the sensor device (41) is arranged on an end of the drill rod (2) away from the motor (11).
5. The device for handling boulders during large pipe-roof drilling in shallow loess tunnels according to claim 1, characterized in that: The boulder crushing mechanism (6) comprises a hard wire (61) arranged on a drill rod (2), the hard wire (61) being connected to an external power source, the hard wire (61) being arranged on the drill rod (2), an end of the hard wire (61) away from the motor (11) being connected to an ionization electrode (62), and the ionization electrode (62) being arranged near a drill bit (3).
6. The device for handling boulders during large pipe-roof drilling in shallow loess tunnels according to claim 4, characterized in that: The data processing control mechanism (5) comprises a data processing control device (51) connected to the sensor device (41).
7. A method for treating isolated rocks when drilling a large pipe shed in a shallow tunnel in a loess stratum, characterized in that: The device for processing boulders in large pipe-roof drilling in shallow buried tunnels in loess strata according to any one of claims 1 to 6 is used, and the method comprises the following steps: S1: insert the drill bit into the loess layer, drive the drill rod to rotate through the motor, and perform pipe rack drilling; S2: Install sensor devices to monitor various data during the drilling process of the drill pipe in real time; S3: The sensor device feeds back the monitored data to the data processing and control device to analyze the condition of the drill pipe. When the drill pipe parameters suddenly change, the sensor device emits electromagnetic waves to detect whether there is a boulder in front of the drill pipe and determine the specific information of the boulder. S4: Place the drill bit against the boulder and slowly rotate it to drill a hole on the surface of the boulder. Then, fill the drill pipe with tap water, connect a hard wire, and repeatedly strike the ionizing electrode to impact and crush the boulder. S5: After the hole is cleaned, slowly rotate the drill bit again, fill the drill pipe with tap water, and strike the ionization electrode until the boulder is completely broken. Use the sensor device to emit electromagnetic waves to detect whether the boulder in front of the drill pipe is completely removed.
Citation Information
Patent Citations
Construction method for shield tunnel boulder exploration and blasting treatment
CN106524844A
Pipe shed construction method for subway on sand layer section with enriched underwater
CN107339108A
Drilling system for deep soft soil foundation mingled with rock
CN109989708A
Construction method for shield crossing of densely-punched holes in lonestone and boulder stratums
CN111577300A
Combined type multi-electrode high-voltage pulse discharge hard rock breaking device and breaking method
CN112044569A