Underwater hard rock directional treatment medium replacement and filling method and system and construction method
By determining the appropriate media characteristics and construction methods in hard rock geology, the problem of drainage riser in hard rock geology in underwater tunnels is solved, and the drainage pipe lifting construction on the bottom of underwater hard rock is realized to ensure construction safety Sex and reliability.
Patent Information
- Application Number
- CN202411211849.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-30
- Publication Date
- 2024-12-06
AI Technical Summary
In hard rock geology, it is difficult for the existing technology to achieve drainage riser of underwater tunnels through lifting construction, and there is a lack of effective medium replacement method to replace hard rock strata to meet the lifting construction requirements.
By determining the medium with suitable water permeability, plasticity and cohesion characteristics for medium replacement, it is ensured that the friction between the medium's cohesion and the lifting riser is less than the sum of the gravity of the medium itself and the surrounding rock friction force in the non-lifting area. , steel casing and rotary drilling equipment are used to clean hard rocks and layered backfilling and compact the medium.
The drainage pipe hoisting construction at the bottom of the underwater hard rock is realized, ensuring construction safety and reliability, expanding the applicability of vertical lifting construction, and solving the problem of drainage riser in hard rock geology.
Smart Images

Figure CN119084005A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of nuclear power drainage construction, and in particular to an underwater hard rock directional treatment medium replacement method, system and construction method. Background Art
[0002] At present, nuclear power drainage systems mostly adopt shield tunnels, and the drainage outlets are constructed by vertical jacking of prefabricated concrete pipes. The jacking construction of drainage risers in underwater tunnels is mainly suitable for soft formations. In hard rock geology, vertical jacking construction cannot be carried out due to insufficient jacking force and difficult radial verticality. The relevant technology proposes to solve the problem of the inability to jack up the drainage pipes in the hard rock geology of the seabed through the hard rock clearance construction process, but it does not disclose how to determine the medium used to replace the hard rock layer after the hard rock is cleared to meet the requirements of subsequent jacking construction. Summary of the invention
[0003] In order to solve the deficiencies of the prior art, the purpose of the present invention is to provide an underwater hard rock directional treatment medium replacement method, system and construction method to achieve drainage pipe jacking construction for underwater hard rock bottom.
[0004] To achieve the above objectives, according to some embodiments, a first aspect of the present invention provides an underwater hard rock directional treatment medium replacement method, comprising:
[0005] Clean the hard rock in the area to be replaced;
[0006] Determine the replacement medium, and use the replacement medium to backfill and compact the hard rock cleaned area in layers;
[0007] The process of determining the replacement medium includes:
[0008] Based on water permeability and plasticity, preliminarily determine the alternative replacement medium;
[0009] The cohesive force characteristics of the preliminarily determined alternative replacement medium are obtained to determine the replacement medium; the cohesive force characteristics of the replacement medium satisfy the following requirement: the sum of the cohesive force of the medium plus the friction between the replacement medium and the jacking riser is less than the sum of the self-gravity of the medium in the non-jacking area plus the friction between the medium in the non-jacking area and the surrounding rock (or steel casing).
[0010] A second aspect of the present invention provides an underwater hard rock directional treatment medium replacement system, comprising:
[0011] A hard rock cleaning module configured to clean hard rock in the area to be replaced;
[0012] The medium replacement module is configured to determine the replacement medium, and use the replacement medium to backfill and compact the area after hard rock cleaning in layers; wherein, the replacement medium determination process includes: preliminarily determining the alternative replacement medium based on permeability and plasticity; obtaining the cohesion characteristics of the preliminarily determined alternative replacement medium, and determining the replacement medium; the cohesion characteristics of the replacement medium satisfy the sum of the medium cohesion plus the friction between the replacement medium and the jacking riser, which is less than the sum of the self-gravity of the medium in the non-jacking area plus the friction between the medium in the non-jacking area and the surrounding surrounding rock (or steel casing).
[0013] A third aspect of the present invention provides an underwater hard rock directional processing construction method, comprising:
[0014] Determine the construction location and set up the water construction platform;
[0015] Sinking steel casing at the construction location;
[0016] Clean the hard rock inside the steel casing that has been sunk into place;
[0017] Determine the replacement medium, and use the replacement medium to backfill and compact the area after hard rock cleaning in layers; the replacement medium determination process includes: preliminarily determining the candidate replacement medium based on permeability and plasticity; obtaining the cohesive force characteristics of the preliminarily determined candidate replacement medium to determine the replacement medium; the sum of the cohesive force of the medium plus the friction between the replacement medium and the jacking riser is less than the sum of the self-gravity of the medium in the non-jacking area plus the friction between the medium in the non-jacking area and the surrounding rock (or steel casing);
[0018] Dismantle the steel casing and the water construction platform.
[0019] Compared with the prior art, the present invention has the following beneficial effects:
[0020] The present invention provides a method, system and construction method for replacing medium in underwater hard rock directional treatment, and adopts an objective and feasible scheme to determine the medium used for replacement in the jacking construction of drainage risers in underwater tunnels, thereby realizing the jacking construction of drainage pipes for underwater hard rock bottom layers. During construction, by directional treatment of hard rocks within the jacking range of the drainage risers in underwater tunnels, medium replacement is carried out simultaneously, which solves the problem that the jacking construction of drainage risers cannot be applied to hard rock geology, ensures the safety and reliability of tunnel construction and drainage riser construction, and at the same time expands the applicability of vertical jacking construction, which is no longer limited to the top layer of soft soil, and has a significant role in promoting the application of drainage riser jacking construction.
[0021] Advantages of additional aspects of the present invention will be given in part in the following description, and in part will become obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.
[0023] Figure 1 This is the overall schematic diagram of the construction layout;
[0024] Figure 2 This is a schematic diagram of the construction process of rotary drilling in steel casing;
[0025] Figure 3 This is a schematic diagram of the medium layering construction in the replacement area;
[0026] Figure 4 This is a schematic diagram of the overall construction process. DETAILED DESCRIPTION
[0027] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0028] Embodiment 1
[0029] Embodiment 1 of the present invention provides a method for replacing a medium for directional treatment of underwater hard rock, comprising:
[0030] Clean the hard rock in the area to be replaced;
[0031] Determine the replacement medium, and use the replacement medium to backfill and compact the hard rock cleaned area in layers;
[0032] The process of determining the replacement medium includes:
[0033] Based on water permeability and plasticity, preliminarily determine the alternative replacement medium;
[0034] The cohesive force characteristics of the preliminarily determined alternative replacement medium are obtained to determine the replacement medium; the cohesive force characteristics of the replacement medium satisfy the following requirement: the sum of the cohesive force of the medium plus the friction between the replacement medium and the jacking riser is less than the sum of the self-gravity of the medium in the non-jacking area plus the friction between the medium in the non-jacking area and the surrounding rock (or steel casing).
[0035] During the medium replacement process, the construction area, i.e. the area to be replaced, should be determined first, the center point of the area should be located, and then the steel casing should be installed in a directional manner so that the steel casing is embedded in the rock layer by 0.5m. Then the hard rock inside the steel casing is cleaned by using a rotary drill, and the cleaning depth is about 1m into the underwater tunnel structure (which can be adjusted according to the construction range of the jacking riser).
[0036] Specifically, the center of the steel casing is aligned with the center axis of the drainage outlet, and then the steel casing is sunk using a hydraulic vibration hammer, with the bottom of the steel casing entering the rock 0.5m. After the steel casing is sunk into place, a rotary drill is used to clean the hard rock inside the casing, and the bottom elevation of the excavation hole enters the underwater tunnel structure by about 1m.
[0037] After the hard rock is cleaned, the determined replacement medium is used to backfill and compact the area after the hard rock cleaning in layers. The replacement medium is replaced and compacted in layers from bottom to top. According to the technical specifications for building foundation treatment, the compaction coefficient λc should be no less than 0.94, and the replacement height is the thickness of the rock and soil covered by the underwater tunnel. The compaction of the replacement medium is constructed inside the steel casing. The operating space is small and there are no conditions for mechanical compaction and vibration compaction. Therefore, impact compaction is adopted, and the impact compaction equipment needs to be customized according to the situation. During the impact compaction construction process, it is difficult for the impact equipment to effectively compact the medium at the edge of the steel casing. Therefore, the impact equipment needs to select the appropriate size and curvature according to the size of the steel casing. According to the actual construction situation, the diameter of the circle where the arc length of the impact equipment is located is 15cm less than the diameter of the circle where the steel casing is located.
[0038] The selection of the replacement medium is the key point of this embodiment. In the related art, the replacement medium is usually selected only based on empirical factors, lacking an objective and reasonable selection method. This embodiment selects the replacement medium by considering permeability, plasticity and cohesion, thereby improving the feasibility and applicability of the overall construction plan.
[0039] The main function of the replacement medium is to replace the hard rock layer to ensure the safety and reliability of the drainage jacking pipe construction. It must have good water resistance, poor water permeability, plasticity, good cohesion and other properties. The main characteristics to be considered are as follows:
[0040] (1) During the construction of drainage riser jacking, the sum of the cohesive force of the medium plus the friction between the replacement medium and the jacking riser is less than the sum of the gravity of the medium in the non-jacking area plus the friction between the medium in the non-jacking area and the surrounding rock (or steel casing), ensuring that the medium will not be lifted up by the riser as a whole during the jacking process, resulting in a void. Since the steel casing in the rock cannot be removed and needs to be left in the rock formation, it is necessary to consider not only the friction between the medium and the jacking riser, but also the friction between the medium and the steel casing in the calculation.
[0041] (2) The medium has the characteristics of poor water permeability and good water resistance, which ensures the sealing during tunnel construction and jacking construction and avoids water seepage accidents.
[0042] (3) The plasticity of the medium is related to the difficulty of the drainage jacking construction. In principle, the greater the plasticity, the more conducive it is to the jacking construction.
[0043] (4) For multiple media that meet the parameter requirements, test and compare them to finally determine the most suitable medium as the replacement filler.
[0044] First, the first step is to select the medium based on its water permeability. The replacement medium must have the characteristics of poor water permeability and good water resistance. Rock and soil can be divided into three categories based on their water permeability:
[0045] (1) Permeable: gravel, pebbles, sand, etc.;
[0046] (2) Semi-permeable: loess, silt, silty clay, etc.;
[0047] (3) Impermeable: clay, mudstone, shale, etc.
[0048] Permeability coefficient is also called hydraulic conductivity coefficient. In isotropic media, it is defined as unit flow rate under unit hydraulic gradient. It indicates the difficulty of fluid passing through the pore structure. It is a quantitative indicator representing the permeability of soil. The permeability of soil can be reflected by permeability coefficient.
[0049] The permeability coefficients of various types of rock and soil can be selected by referring to Table 1.
[0050] Table 1 Permeability coefficients of various types of rock and soil
[0051] Soil Type Permeability coefficient k(m / s) Soil Type Permeability coefficient k(m / s) Soil Type Permeability coefficient k(m / s) clay <![CDATA[<5×10 -9 ]]> Pink sand <![CDATA[10 -6 ~10 -5 ]]> coarse sand <![CDATA[2×10 -4 ~5×10 -4 ]]> Silty clay <![CDATA[5×10 -9 ~10 -8 ]]> Fine sand <![CDATA[10 -5 ~5×10 -5 ]]> gravel <![CDATA[5×10 -4 ~10 -3 ]]> Silt <![CDATA[5×10 -8 ~10 -6 ]]> medium sand <![CDATA[5×10 -5 ~2×10 -4 ]]> pebble <![CDATA[10 -3 ~5×10 -3 ]]>
[0052] In order to meet the requirements of jacking construction, the replacement medium should have high water resistance and low permeability. Therefore, clay with a low permeability coefficient should be selected as the replacement medium.
[0053] The second step is to compare the plasticity of the medium. Plasticity is an important characteristic of the physical properties of fine-grained soil, which can be expressed by the plasticity index. The medium is determined to be clay through the first step, and then the clay is divided into three categories according to the plasticity index: clay, sub-clay and light sub-clay. The clay plasticity index I p Greater than 17, sub-clay plasticity index I p 10~17; light sub-clay plasticity index I p 3 to 10.
[0054] The plasticity index comprehensively reflects various important factors that affect the characteristics of clay soil to a certain extent. The larger the plasticity index, the finer the soil particles, the larger the specific surface area, the higher the clay particles or hydrophilic mineral content of the soil, the larger the range of water content in the plastic state of the soil, and the more conducive to the jacking construction of the jacking pipe. In this embodiment, clay with a plasticity index greater than 17 is selected.
[0055] The third step is to obtain the cohesion characteristics between the media. According to the first and second steps, it is preliminarily determined that the alternative replacement medium is clay with a large plasticity index. In the third step, in order to facilitate construction, the distribution of clay near the project is first determined, and clay that meets the plasticity index is selected. In a certain construction project, the local clay soils that meet the requirements include calcareous clay and red clay, that is, the alternative replacement media are calcareous clay and red clay. Subsequently, rock and soil sampling was carried out on calcareous clay and red clay respectively, and the cohesion and internal friction angle of the two clays were obtained through rock and soil triaxial tests. The cohesion of calcareous clay obtained by the test is C = 23.5kPa, and the internal friction angle ψ = 15.3°; the cohesion of red clay is C = 23.8kPa, and the internal friction angle ψ = 15.1°. By establishing a model to simulate the entire jacking construction process, the parameters such as medium cohesion, friction coefficient between medium and jacking pipe, friction coefficient between medium and surrounding rock layer (or steel casing) and specific gravity are input to determine whether the sum of medium cohesion plus friction between replacement medium and jacking riser is less than the sum of self-gravity of medium in non-jacking area plus friction between medium in non-jacking area and surrounding surrounding rock (or steel casing). If yes, the medium is usable, otherwise, the medium is unusable. After numerical simulation analysis, calcareous clay and red clay can meet the requirements of replacement medium.
[0056] When two or more media meet the requirements for replacement media, further selection can be made based on factors such as the difficulty of obtaining the corresponding media locally and the price of the media.
[0057] Embodiment 2
[0058] This embodiment provides an underwater hard rock directional processing medium replacement system, including:
[0059] A hard rock cleaning module configured to clean hard rock in the area to be replaced;
[0060] The medium replacement module is configured to determine the replacement medium, and use the replacement medium to backfill and compact the area after hard rock cleaning in layers; wherein, the process of determining the replacement medium includes: preliminarily determining the alternative replacement medium based on permeability and plasticity; obtaining the cohesion characteristics of the preliminarily determined alternative replacement medium, and determining the replacement medium; the cohesion characteristics of the replacement medium satisfy: the sum of the medium cohesion plus the friction between the replacement medium and the jacking riser is less than the sum of the self-gravity of the medium in the non-jacking area plus the friction between the medium in the non-jacking area and the surrounding surrounding rock (or steel casing).
[0061] It should be noted here that the various modules in this embodiment correspond one-to-one to the steps of the method in Example 1, and the specific implementation process is the same, which will not be repeated here.
[0062] Embodiment 3
[0063] This embodiment provides an underwater hard rock directional processing construction method, such as Figure 1-Figure 4As shown, including:
[0064] S1. Determine the construction location and set up the water operation platform;
[0065] S2. Sink the steel casing at the construction location;
[0066] S3. Clean the hard rock inside the steel casing sunk into place;
[0067] S4. Determine the replacement medium, and use the replacement medium to backfill and compact the area after hard rock cleaning in layers; wherein the replacement medium determination process includes: preliminarily determining the candidate replacement medium according to the permeability and plasticity; obtaining the cohesion characteristics of the preliminarily determined candidate replacement medium, and determining the replacement medium; the cohesion characteristics of the replacement medium satisfy: the sum of the cohesion of the medium plus the friction between the replacement medium and the jacking riser is less than the sum of the self-weight of the medium in the non-jacking area plus the friction between the medium in the non-jacking area and the surrounding rock (or steel casing);
[0068] S5. Remove the steel casing and the water working platform.
[0069] In step S1, the foundation of the water operation platform is first positioned to determine the platform erection position. After the platform erection position is determined, the water operation platform is erected.
[0070] In step S2, the center point of the hard rock treatment position is located, and then the steel casing is sunk. The center of the steel casing is located to coincide with the center axis of the drainage outlet, and the steel casing is sunk using a hydraulic vibration hammer, with the bottom of the steel casing entering the rock by 0.5m.
[0071] In step S3, the hard rock inside the steel casing is cleaned by using a rotary drill. The cleaning depth is about 1m into the underwater tunnel structure (which can be adjusted according to the construction range of the jacking riser). After the steel casing is sunk into place, a rotary drill is used to clean the hard rock inside the casing. The rotary drill uses skip hole construction. When excavating, the 1st sequence hole is constructed first, the 2nd sequence hole is constructed in a clockwise direction, and the 3rd sequence hole is constructed last. Figure 2 As shown in the figure, the bottom elevation of the excavation hole is about 1m into the underwater tunnel structure. Skip hole construction can reduce the mutual influence of the space.
[0072] In step S4, the medium is replaced and compacted layer by layer from bottom to top, and the thickness of each layer does not exceed 0.4m. Figure 3 As shown, the replacement height is the thickness of rock and soil covered by the underwater tunnel.
[0073] The main function of the replacement medium is to replace the hard rock layer to ensure the safety and reliability of the drainage jacking pipe construction. It must have good water resistance, poor water permeability, plasticity, good cohesion and other properties. The main characteristics to be considered are as follows:
[0074] (1) During the construction of drainage riser jacking, the sum of the cohesive force of the medium plus the friction between the replacement medium and the jacking riser is less than the sum of the gravity of the medium in the non-jacking area plus the friction between the medium in the non-jacking area and the surrounding rock (or steel casing), ensuring that the medium will not be lifted up by the riser as a whole during the jacking process, resulting in air loss.
[0075] (2) The medium has the characteristics of poor water permeability and good water resistance, which ensures the sealing during tunnel construction and jacking construction and avoids water seepage accidents.
[0076] (3) The plasticity of the medium is related to the difficulty of the drainage jacking construction. In principle, the greater the plasticity, the more conducive it is to the jacking construction.
[0077] (4) For multiple media that meet the parameter requirements, test and compare them to finally determine the most suitable medium as the replacement filler.
[0078] First, the first step is to select the medium based on its water permeability. The replacement medium must have the characteristics of poor water permeability and good water resistance. Rock and soil can be divided into three categories based on their water permeability:
[0079] (1) Permeable: gravel, pebbles, sand, etc.;
[0080] (2) Semi-permeable: loess, silt, silty clay, etc.;
[0081] (3) Impermeable: clay, mudstone, shale, etc.
[0082] Permeability coefficient is also called hydraulic conductivity coefficient. In isotropic media, it is defined as unit flow rate under unit hydraulic gradient. It indicates the difficulty of fluid passing through the pore structure. It is a quantitative indicator representing the permeability of soil. The permeability of soil can be reflected by permeability coefficient.
[0083] In order to meet the requirements of jacking construction, the replacement medium should have high water resistance and low permeability. Therefore, clay with a low permeability coefficient should be selected as the replacement medium.
[0084] The second step is to compare the plasticity of the medium. Plasticity is an important characteristic of the physical properties of fine-grained soil, which can be expressed by the plasticity index. The medium is determined to be clay through the first step, and then the clay is divided into three categories according to the plasticity index: clay, sub-clay and light sub-clay. The clay plasticity index I p Greater than 17, sub-clay plasticity index I p 10~17; light sub-clay plasticity index I p 3 to 10.
[0085] The plasticity index comprehensively reflects various important factors that affect the characteristics of clay soil to a certain extent. The larger the plasticity index, the finer the soil particles, the larger the specific surface area, the higher the clay particles or hydrophilic mineral content of the soil, the larger the range of water content in the plastic state of the soil, and the more conducive to the jacking construction of the jacking pipe. In this embodiment, clay with a plasticity index greater than 17 is selected.
[0086] The third step is to obtain the cohesion characteristics between the media. According to the first and second steps, it is preliminarily determined that the alternative replacement medium is clay with a large plasticity index. In the third step, in order to facilitate construction, the distribution of clay near the project is first determined, and clay that meets the plasticity index is selected. In a certain construction project, the local clay soils that meet the requirements include calcareous clay and red clay, that is, the alternative replacement media are calcareous clay and red clay. Subsequently, geotechnical sampling was carried out on calcareous clay and red clay respectively, and the cohesion and internal friction angle of the two clays were obtained through geotechnical triaxial tests. The cohesion of calcareous clay obtained by the test is C = 23.5kPa, and the internal friction angle ψ = 15.3°; the cohesion of red clay is C = 23.8kPa, and the internal friction angle ψ = 15.1°. Through numerical simulation analysis, both calcareous clay and red clay can meet the requirements of replacement media.
[0087] In step S5, after the medium replacement is completed, the steel casing is removed, and then the water operation platform is removed, and the construction is completed.
[0088] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A method for replacing underwater hard rock directional treatment medium. It is characterized in that include: Clean the hard rock in the area to be replaced; Determine the replacement medium, and use the replacement medium to backfill and compact the hard rock cleaned area in layers; The process of determining the replacement medium includes: Based on water permeability and plasticity, preliminarily determine the alternative replacement medium; The cohesive force characteristics of the preliminarily determined alternative replacement medium are obtained to determine the replacement medium; the cohesive force characteristics of the replacement medium satisfy the following requirement: the sum of the cohesive force of the replacement medium plus the friction between the replacement medium and the jacking riser is less than the sum of the self-gravity of the replacement medium in the non-jacking area plus the friction between the replacement medium in the non-jacking area and the surrounding surrounding rock or steel casing.
2. A method for replacing underwater hard rock directional treatment medium according to claim 1, It is characterized in that The alternative replacement medium is initially determined based on water permeability and plasticity, including: Obtaining the permeability coefficient of rock and soil, and selecting rock and soil with a permeability coefficient lower than a first set threshold as a first candidate replacement medium; The plasticity index of the first candidate replacement medium is obtained, and the rock and soil having a plasticity index higher than a second set threshold is selected as the candidate replacement medium.
3. The underwater hard rock directional treatment medium replacement method according to claim 1, It is characterized in that Conduct geotechnical triaxial tests on the preliminarily determined candidate replacement medium to obtain the cohesion and internal friction angle of the medium; According to the obtained cohesion and internal friction angle, the medium is numerically simulated and analyzed to determine whether the cohesion characteristics of the medium meet the requirements and determine the replacement medium.
4. The underwater hard rock directional treatment medium replacement method according to claim 1, It is characterized in that The step of backfilling and compacting the hard rock cleaned area in layers with a replacement medium includes backfilling the hard rock cleaned area in layers with a set height of replacement medium and performing impact compaction.
5. An underwater hard rock directional treatment medium replacement system, It is characterized in that include: A hard rock cleaning module configured to clean hard rock in the area to be replaced; The medium replacement module is configured to determine the replacement medium, and use the replacement medium to backfill and compact the area after hard rock cleaning in layers; wherein, the replacement medium determination process includes: preliminarily determining the alternative replacement medium based on permeability and plasticity; obtaining the cohesion characteristics of the preliminarily determined alternative replacement medium, and determining the replacement medium; the cohesion characteristics of the replacement medium satisfy: the sum of the cohesion of the replacement medium plus the friction between the replacement medium and the jacking riser is less than the sum of the self-weight of the replacement medium in the non-jacking area plus the friction between the replacement medium in the non-jacking area and the surrounding surrounding rock or steel casing.
6. A method for underwater hard rock directional treatment construction, It is characterized in that include: Determine the construction location and set up the water operation platform; Sinking steel casing at the construction location; Clean the hard rock inside the steel casing that has been sunk into place; Determine the replacement medium, and use the replacement medium to backfill and compact the area after hard rock cleaning in layers; the replacement medium determination process includes: preliminarily determining the candidate replacement medium based on permeability and plasticity; obtaining the cohesion characteristics of the preliminarily determined candidate replacement medium to determine the replacement medium; the cohesion characteristics of the replacement medium satisfy: the sum of the cohesion of the replacement medium plus the friction between the replacement medium and the jacking riser is less than the sum of the self-weight of the replacement medium in the non-jacking area plus the friction between the replacement medium in the non-jacking area and the surrounding surrounding rock or steel casing; Dismantle the steel casing and the water working platform.
7. An underwater hard rock directional treatment construction method as claimed in claim 6, It is characterized in that The alternative replacement medium is initially determined based on water permeability and plasticity, including: Obtaining the permeability coefficient of rock and soil, and selecting rock and soil with a permeability coefficient lower than a first set threshold as a first candidate replacement medium; The plasticity index of the first candidate replacement medium is obtained, and the rock and soil having a plasticity index higher than a second set threshold is selected as the candidate replacement medium.
8. An underwater hard rock directional treatment construction method as claimed in claim 6, It is characterized in that Conduct geotechnical triaxial tests on the preliminarily determined candidate replacement medium to obtain the cohesion and internal friction angle of the medium; According to the obtained cohesion and internal friction angle, the medium is numerically simulated and analyzed to determine whether the cohesion characteristics of the medium meet the requirements and determine the replacement medium.
9. An underwater hard rock directional treatment construction method as claimed in claim 6, It is characterized in that The step of backfilling and compacting the hard rock cleaned area in layers with a replacement medium includes backfilling the hard rock cleaned area in layers with a set height of replacement medium and performing impact compaction.
10. An underwater hard rock directional treatment construction method as claimed in claim 6, It is characterized in that The hard rock in the steel casing sunk into place is cleaned. It includes using a rotary drill to clean the hard rock inside the casing, using a skip-hole construction method to sequentially excavate the No. 1 hole and the No. 2 hole inside the steel casing, and finally excavating the No. 3 hole located in the middle of the No. 1 hole and the No. 2 hole.
Citation Information
Cited By
Construction method for multi-layer three-dimensional tracking full replacement treatment of soft foundation
CN120061314A
A construction method for treating soft foundation by multi-layer three-dimensional tracking full replacement
CN120061314B