Offshore wind turbine integral installation device based on buoyancy method construction and construction method
By designing an overall installation device for offshore fan based on floating support method and using slide rails and anchors to fix the tower, the problems of high installation cost, time-consuming and high safety risks of offshore wind turbines are solved, and stable and efficient wind turbine installation is achieved.
Patent Information
- Application Number
- CN202410965080.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-18
- Publication Date
- 2024-12-06
AI Technical Summary
The installation of offshore wind turbines requires assistance from large floating cranes, which leads to high cost, time-consuming and high safety risks. The high center of gravity of the wind turbine structure has stability problems, and the floating support method construction has failed to effectively promote.
Design an overall installation device for offshore fan based on the floating support method, including barge, fan foundation and fan fixing device, use slide rails and anchors to fix the tower, lower the overall center of gravity, and complete the installation of the wind turbine at offshore through the floating support method .
It realizes stability and safety during the transportation of wind turbines, reduces construction costs and time, avoids the use of large floating gondolas, and improves installation efficiency and safety.
Smart Images

Figure CN119084234A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to an overall installation device for an offshore wind turbine based on a floating construction method and a construction method, belonging to the technical field of offshore wind turbine installation. Background Art
[0002] The installation methods of single-pile offshore wind power are mainly divided into split hoisting method and integral hoisting method. The similarities between these two methods are that they both require piling on the seabed and installing a single pile foundation. The difference is that split hoisting requires the tower, blades and other components to be transported to the wind farm, and the components are assembled by hoisting, and then commissioned and tested; integral hoisting is to assemble the tower, nacelle, blades and other components at the dock, test and debug the wind turbine, and then transport the wind turbine as a whole to the wind farm and hoist it on the single pile foundation.
[0003] Since both the split hoisting method and the integral hoisting method require the assistance of a large floating crane, the installation of offshore wind turbines is costly, time-consuming, requires high operation, and prone to accidents. The blades are also easily damaged when the hoist is removed. A more feasible solution to the above-mentioned offshore wind turbine installation problems is to use the floating method instead of the traditional hoisting method.
[0004] At present, the floating method has been successfully applied to the installation of offshore oil and gas platforms. Its core technology is to use the power of tides and construction technologies such as ship load adjustment to achieve the positioning and overall installation of offshore structures, thereby avoiding the use of large floating cranes. In addition, this method also has significant advantages such as large installable weight, short construction period, and low technical risk.
[0005] However, due to the tall structure and high center of gravity of wind turbines, there may be stability problems during overall upright transportation and installation, so it has not yet been widely used.
[0006] Therefore, it is necessary to propose an integrated installation device for offshore wind turbines based on floating construction, so as to solve the problems mentioned in the above background. Summary of the invention
[0007] The purpose of the present invention is to provide an integrated installation device and construction method for an offshore wind turbine, so as to solve the problem in the above-mentioned background technology that the installation of offshore wind turbines requires the cooperation of floating cranes, resulting in slow installation progress, high installation costs and prone to safety accidents.
[0008] To achieve the above-mentioned objectives, the present invention provides the following technical solutions: an integrated installation device for offshore wind turbines based on floating construction, the installation device comprising a barge, a wind turbine foundation, and a wind turbine fixing device and a wind turbine set arranged on the barge; a rectangular opening is provided at one end of the barge, just for the wind turbine foundation fixed on the seabed to enter; a wind turbine base limiting hole is provided on the rectangular opening, for placing the wind turbine set; at least one slide rail is provided on each side of the wind turbine base limiting hole on the barge; the wind turbine fixing device comprises two wind turbine fixing modules and a plurality of anchor rods; the two wind turbine fixing modules are symmetrically arranged on both sides of the wind turbine base limiting hole, and move respectively through the corresponding slide rails on the same side; the wind turbine fixing module comprises a tower fixing frame; a plurality of mounting holes are penetrated on the tower fixing frame; the anchor rods pass through the mounting holes to fix the two tower fixing frames, so as to fix the wind turbine tower on the wind turbine set between the two tower fixing frames.
[0009] Furthermore, each of the wind turbine fixing modules also includes: a motor and a rail car; the rail car is arranged on the slide rail; the tower fixing frame is fixed on the rail car; the motor is used to drive the rail car to roll; an arc-shaped tower groove is opened on the side wall of the tower fixing frame, and the tower grooves of the two tower fixing frames together form a column gap for embedding the wind turbine tower to fix the wind turbine set.
[0010] Furthermore, the slide rail is an I-shaped slide rail.
[0011] Furthermore, the rail vehicle includes: wheels, braking devices and two connecting brackets; each of the connecting brackets is fixedly connected to the tower fixing frame and is symmetrically distributed on both sides of the slide rail web; the wheels are fixed on the connecting brackets and roll on the slide rails; the braking device is used to control the movement state of the wheels.
[0012] Furthermore, a buffer body is provided on the tower groove to buffer the strong impact between the wind turbine set and the tower fixing frame during transportation.
[0013] Furthermore, a tower expansion bottom is provided at the bottom of the wind turbine tower, and the tower expansion bottom is placed in the limiting hole of the wind turbine base.
[0014] Furthermore, the tower fixing frame is a structure that is thick in the middle and thin at both ends, and its own weight serves as a counterweight to lower the overall center of gravity of the wind turbine set and the wind turbine fixing device, thereby ensuring the stability of the wind turbine set during transportation.
[0015] Furthermore, the tower fixing frame is also provided with a ladder and an operating platform for use in fixing and installing the anchor rods;
[0016] The operating platform is provided with a ladder hole and a fence to facilitate personnel entry and exit and ensure safety.
[0017] A construction method of an offshore wind turbine overall installation device based on a floatation method is implemented using any of the offshore wind turbine installation devices described above, and the specific steps are as follows:
[0018] Step 1: hoisting and loading of wind turbines;
[0019] The wind turbine is assembled at the pre-installation site at the dock, and debugged and tested. Then the wind turbine is hoisted vertically as a whole to the limit hole of the wind turbine base of the barge, and the motor is used to drive the rail car so that the tower grooves on the two tower fixing frames wrap the wind turbine tower, and then the tower fixing frames are fixed with anchor rods. The hoist is dismantled to complete the loading.
[0020] Step 2: transport and position the wind turbines. The barge is moved by towing by a tugboat, and the barge arrives at the designated location of the wind farm, so that the wind turbine foundation is located below the wind turbine tower, and then the barge is anchored and fixed.
[0021] Step 3: Install the wind turbine. After the wind turbine is aligned with the wind turbine foundation, gradually increase the ballast water of the barge to lower the wind turbine and make contact with the flange of the wind turbine foundation. Fix the wind turbine to the wind turbine foundation with the bolts on the wind turbine foundation. Then remove the anchor rods on the wind turbine fixing device and open the tower fixing frame by driving the rail car with the motor.
[0022] Step 4: Evacuate the barge. After the wind turbine is installed, continue to add ballast water to the barge to make the bottom height of the tower expansion higher than the barge deck height. Then collect the anchor and evacuate the barge by tugboat, thus completing the installation of the wind turbine.
[0023] Compared with the prior art, the present invention has the following beneficial effects:
[0024] (1) Ensure the stability and safety of wind turbines during transportation. The barge is equipped with a wind turbine fixing device, which provides reliable horizontal and vertical support and reduces the overall center of gravity of the wind turbine and the fixing device, thereby effectively enhancing the stability of the wind turbine during transportation.
[0025] (2) Floating installation, without the assistance of large floating cranes, greatly reduces construction costs and time. The wind turbine is installed and adjusted on land, and loaded onto the ship by crane. After the barge is in place, the wind turbine is connected to the wind turbine foundation by floating. The installation process does not require the assistance of large floating cranes, which greatly improves installation efficiency and reduces the construction risk and cost of hoisting the wind turbine as a whole. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 This is a schematic diagram of an overall installation device for an offshore wind turbine according to an embodiment of the present invention;
[0027] Figure 2 This is a top view of an overall installation device for an offshore wind turbine according to an embodiment of the present invention;
[0028] Figure 3 This is a schematic diagram of a barge according to an embodiment of the present invention;
[0029] Figure 4 This is a top view of a barge according to an embodiment of the present invention;
[0030] Figure 5 This is a schematic diagram of a fan according to an embodiment of the present invention;
[0031] Figure 6 This is a front three-dimensional diagram of a fan fixing device according to an embodiment of the present invention;
[0032] Figure 7 A rear three-dimensional diagram of a fan fixing device according to an embodiment of the present invention;
[0033] Figure 8 Schematic diagram of a fan fixing device in an open state according to an embodiment of the present invention
[0034] Fig. 9 This is a schematic diagram of a rail vehicle and a slide rail according to an embodiment of the present invention;
[0035] Fig.10 This is a front view of a rail vehicle and a slide rail according to an embodiment of the present invention;
[0036] Fig.11 This is a schematic structural diagram of a rail vehicle according to an embodiment of the present invention;
[0037] Fig.12 This is a schematic diagram of the installation of a fan according to an embodiment of the present invention;
[0038] Fig.13 This is a front view of the fan installation according to an embodiment of the present invention;
[0039] Fig.14 This is a side view of the fan installation according to an embodiment of the present invention;
[0040] In the figure: 1. barge; 101. hull; 102. slide rail; 103. rectangular opening; 104. limit hole of wind turbine base; 2. wind turbine fixing device; 201. tower fixing frame; 202. mounting hole; 203. operating platform; 2031. ladder hole; 204. ladder; 205. guardrail; 206. anchor rod; 207. motor; 208. rail car; 2081. wheel; 2082. brake device; 2083. wheel bracket; 209. tower slot; 210. buffer body; 3. wind turbine set; 301. tower; 302. tower bottom expansion; 4. wind turbine foundation; 401. steel pipe pile; 402. flange; 403. bolt. DETAILED DESCRIPTION
[0041] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention. An overall installation device and construction method for an offshore wind turbine based on a floating construction method can achieve stable and efficient installation of an offshore wind turbine.
[0042] Based on the above requirements, an offshore wind turbine integrated installation device based on floating construction method includes a barge 1, a wind turbine foundation 4, and a wind turbine fixing device 2 and a wind turbine set 3 arranged on the barge 1; a rectangular opening 103 is provided at one end of the barge 1, which is just for the wind turbine foundation 4 fixed on the seabed to enter; a wind turbine base limiting hole 104 is provided on the rectangular opening 103, for placing the wind turbine set 3; at least one slide rail 102 is provided on each side of the wind turbine base limiting hole 104 on the barge 1; the wind turbine The fixing device 2 includes two wind turbine fixing modules and a plurality of anchor rods 206; the two wind turbine fixing modules are symmetrically arranged on both sides of the wind turbine base limiting hole 104, and move respectively through the corresponding slide rails 102 on the same side; the wind turbine fixing module includes a tower fixing frame 201; a plurality of mounting holes 202 are penetrated on the tower fixing frame 201; the anchor rods 206 pass through the mounting holes 202 to fix the two tower fixing frames 201, so as to fix the wind turbine tower 301 on the wind turbine set 3 between the two tower fixing frames 201.
[0043] Embodiment 1:
[0044] See also Figure 1-14 ,: A specific offshore wind turbine overall installation device based on floating construction includes a barge 1, a wind turbine fixing device 2, a wind turbine unit 3, and a wind turbine foundation 4. The stern of the barge 1 is provided with a rectangular opening 103, and the rectangular opening 103 is provided with a wind turbine base limiting hole 104, which is preferably arranged near the middle of the barge 1, that is, the end of the rectangular opening 103, for placing the wind turbine unit 3. A total of four slide rails 102 are arranged on both sides of the wind turbine base limiting hole 104 on the hull 101 of the barge 1. The wind turbine fixing device 2 is arranged above the slide rail 102 of the barge 1, and is a fixing device for the wind turbine tower 301 on the wind turbine unit 3, and mainly includes a tower fixing frame 201, a plurality of anchor rods 206, a motor 207, a rail car 208, and a buffer body 210. The wind turbine fixing device 2 is provided with two left and right tower fixing frames 201. Four rail cars 208 are provided under each tower fixing frame 201, and the rail cars 208 can be driven by motors 207 to move on the slide rails 102. A plurality of mounting holes 202 are provided on both sides of the tower fixing frame 201, and the anchor rods 206 pass through the corresponding mounting holes 202 and are fixed by nuts to lock the two tower fixing frames 201 after closing. A tower expansion bottom 302 is provided at the bottom of the wind turbine tower 301, and the tower expansion bottom 302 is placed in the wind turbine base limiting hole 104 of the barge 1 during transportation.
[0045] like Figure 1 ,8 and 14, the width of the rectangular opening 103 is larger than the outer diameter of the wind turbine tower 301 and smaller than the diameter of the expanded bottom 302 of the wind turbine tower, and the rectangular opening 103 divides the stern of the barge 1 into two left and right cabins.
[0046] The diameter and height of the wind turbine base limiting hole 104 are consistent with the size of the tower bottom expansion 302, and are used to place the wind turbine set 3 during transportation.
[0047] like Fig. 9 , 10 and 11, the slide rail 102 is "I-shaped". The rail car 208 comprises four symmetrically arranged wheels 2081, a brake device 2082 and two connecting brackets 2083, the movement of which is controlled by the motor 207, and the braking is realized by the brake device 2082, the brake device 2082 is realized by the existing brake device, the connecting bracket 2083 is fixed to the bottom of the tower fixed frame 201, and is located on both sides of the web of the slide rail 102; the wheels 2081 are arranged on the side walls of the connecting bracket 2083 in pairs, and their vertical displacement is limited by the upper and lower wing plates of the "I-shaped" slide rail 102.
[0048] like Figure 6 The wind turbine fixing device 2 comprises two identical and symmetrically arranged tower fixing frames 201. The tower fixing frames 201 are thick in the middle and thin at both ends. They are heavy in weight and serve as counterweights to lower the overall center of gravity of the wind turbine set 3 and the wind turbine fixing device 2, thereby ensuring the stability of the wind turbine set 3 during transportation.
[0049] like Figure 7 and 8 The middle part of the inner side of the tower fixing frame 2 is provided with a semicircular tower groove 209 matching the size of the tower 301. After the two tower fixing frames 201 are closed by their respective rail vehicles 208, the columnar space formed by the two tower grooves 209 matches the size of the tower 301, so that the wind turbine tower 301 can be fixed. The groove wall of the tower groove 209 is provided with a buffer body 210 to alleviate the strong impact between the wind turbine tower 301 and the wind turbine fixing device 201 during transportation.
[0050] like Figure 8 The mounting holes 202 are provided through the upper, middle and lower thinner parts of both ends of the tower fixing frame 201 .
[0051] like Figure 7 To facilitate the installation of the anchor rod 206, the tower fixing frame 201 is provided with a ladder 204, and two operating platforms 203 are provided in the middle and upper part. The operating platform 203 is provided with a ladder hole 2031 to facilitate the entry and exit of personnel, and a fence 205 is provided on the outside.
[0052] Embodiment 2:
[0053] The construction method for overall installation of an offshore wind turbine based on the floating construction method is implemented based on the device of Example 1 of the present invention, and the specific steps are as follows:
[0054] Step 1: Wind turbine 3 hoisting and loading
[0055] Assemble the wind turbine 3 at the pre-installation site at the dock, and perform debugging and testing; vertically hoist the wind turbine 3 as a whole to the wind turbine base limit hole 104 of the barge 1, and use the motor 207 to drive the rail car 208 to make the tower grooves 209 of the two tower fixing frames 201 wrap the wind turbine tower 301, and then use the anchor rod 206 to fix the tower fixing frame 201; remove the hoisting device to complete the loading
[0056] Step 2: Transport and place wind turbine 3
[0057] The barge 1 is moved by towing by a tugboat, and arrives at a designated point of the wind farm, so that the wind turbine foundation 4 is located below the wind turbine tower 301 , and then the barge 1 is anchored and fixed.
[0058] Step 3: Wind turbine 3 installation
[0059] After the wind turbine set 3 is aligned with the wind turbine foundation 4, the ballast water of the barge 1 is gradually increased to make the wind turbine set 3 descend and contact the flange 402 of the wind turbine foundation 4; the wind turbine set 3 is fixed to the wind turbine foundation 4 by the bolts 403 on the wind turbine foundation 4; the anchor rod 206 on the wind turbine fixing device 2 is removed, and the rail car 208 is driven by the motor 207 to open the tower fixing frame 201.
[0060] Step 4: Barge Evacuation
[0061] After the wind turbine 3 is installed, the barge ballast water is further increased to make the bottom height of the tower expansion bottom 302 higher than the deck height of the barge 1; then the anchor is collected and the barge 1 is evacuated by a tugboat, thereby completing the installation of the wind turbine 3.
[0062] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the ideas and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. An integrated installation device for offshore wind turbines based on floating construction, characterized in that: The installation device comprises a barge (1), a wind turbine foundation (4), and a wind turbine fixing device (2) and a wind turbine generator set (3) arranged on the barge (1); a rectangular opening (103) is provided at one end of the barge (1) for the wind turbine foundation (4) fixed on the seabed to enter; a wind turbine base limiting hole (104) is provided on the rectangular opening (103) for placing the wind turbine generator set (3); at least one slide rail (102) is provided on each side of the wind turbine base limiting hole (104) on the barge (1); The fan fixing device (2) comprises two fan fixing modules and a plurality of anchor rods (206); The two fan fixing modules are symmetrically arranged on both sides of the fan base limiting hole (104), and move respectively through the corresponding slide rails (102) on the same side; The wind turbine fixing module comprises a tower fixing frame (201); A plurality of mounting holes (202) are formed through the tower fixing frame (201); The anchor rod (206) passes through the mounting hole (202) to fix the two tower fixing frames (201), so as to fix the wind turbine tower (301) on the wind turbine set (3) between the two tower fixing frames (201).
2. The overall installation device for offshore wind turbines based on floating construction according to claim 1 is characterized in that: Each of the fan fixing modules further comprises: a motor (207) and a rail vehicle (208); The rail vehicle (208) is arranged on the slide rail (102); The tower fixing frame (201) is fixed on a rail vehicle (208); The motor (207) is used to drive the rail vehicle (208) to roll; An arc-shaped tower groove (209) is formed on the side wall of the tower fixing frame (201), and the tower grooves (209) of the two tower fixing frames (201) together form a column gap for embedding the wind turbine tower (301) to fix the wind turbine set (3).
3. The overall installation device for offshore wind turbines based on floating construction according to claim 2 is characterized in that: The slide rail (102) is an I-shaped slide rail.
4. The overall installation device for offshore wind turbines based on floating construction according to claim 3 is characterized in that: The rail vehicle (208) comprises: wheels (2081), a braking device (2082) and two connecting brackets (2083); Each of the connecting brackets (2083) is fixedly connected to the tower fixing frame (201), and is symmetrically distributed on both sides of the web of the slide rail (102); The wheel (2081) is fixed on the connecting bracket (2083), and the wheel (2081) rolls on the slide rail (102); The braking device (2082) is used to control the motion state of the wheel (2081).
5. The overall installation device for offshore wind turbines based on floating construction according to claim 2 is characterized in that: A buffer body (210) is provided on the tower groove (209) for buffering strong impacts between the wind turbine set (3) and the tower fixing frame (201) during transportation.
6. The overall installation device for offshore wind turbines based on floating construction according to claim 1 is characterized in that: The bottom of the wind turbine tower (301) is provided with a tower expansion bottom (302), and the tower expansion bottom (302) is placed in the limiting hole (104) of the wind turbine base.
7. The overall installation device for offshore wind turbines based on floating construction according to claim 1 is characterized in that: The tower fixing frame (201) is a structure that is thick in the middle and thin at both ends, and its own weight serves as a counterweight to lower the overall center of gravity of the wind turbine set (3) and the wind turbine fixing device (2).
8. The overall installation device for offshore wind turbines based on floating construction according to claim 1 is characterized in that: The tower fixing frame (201) is also provided with a ladder (204) and an operating platform (203) for use in fixing and installing the anchor rod (206); the operating platform (203) is provided with a ladder hole (2031) and a fence (205) to facilitate personnel entry and exit and ensure safety.
9. A construction method for an offshore wind turbine integral installation device based on a floating construction method is characterized in that: The method is implemented by using the offshore wind turbine installation device according to any one of claims 1 to 8, and the specific steps are as follows: Step 1: hoisting and loading the wind turbine generator set (3); The wind turbine set (3) is assembled at the pre-installation site at the dock, and is debugged and tested; the wind turbine set (3) is then hoisted vertically as a whole onto the wind turbine base limiting hole (104) of the barge (1), and a motor (207) is used to drive a rail vehicle (208) so that the tower grooves (209) on the two tower fixing frames (201) wrap around the wind turbine tower (301), and then the tower fixing frames (201) are fixed using anchor rods (206); the hoisting device is disassembled, and the loading is completed; Step 2: transporting and positioning the wind turbine (3); moving the barge (1) by towing with a tugboat, and the barge (1) arrives at a designated location of the wind farm, so that the wind turbine foundation (4) is located below the wind turbine tower (301), and then anchoring and fixing the barge (1); Step three, installing the wind turbine generator set (3); after the wind turbine generator set (3) is aligned with the wind turbine foundation (4), gradually increasing the ballast water of the barge (1) to lower the wind turbine generator set (3) and make it contact with the flange (402) of the wind turbine foundation (4); fixing the wind turbine generator set (3) to the wind turbine foundation (4) by bolts (403) on the wind turbine foundation (4); then removing the anchor rod (206) on the wind turbine fixing device (2), and driving the rail car (208) by the motor (207) to open the tower fixing frame (201); Step 4: evacuate the barge; after the wind turbine set (3) is installed, continue to increase the ballast water of the barge (1) so that the bottom height of the tower expansion bottom (302) is higher than the deck height of the barge (1); then, collect the anchor and evacuate the barge (1) by tugboat, thereby completing the installation of the wind turbine set (3).