Safety monitoring and early warning method and system for overline overbridge construction

By dividing safety monitoring nodes, using distributed sensors, and constructing a risk assessment model, the method and system address low sensitivity and untimely warnings in overpass construction, ensuring timely and accurate safety monitoring and warnings.

CN119090255AInactive Publication Date: 2024-12-06ZHONGTIE ELECTRIZATION BUREAU GRP BEIJING CONSTR ENG

Patent Information

Application Number
CN202411012550.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-26
Publication Date
2024-12-06
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing overpass construction safety monitoring methods suffer from low monitoring sensitivity and untimely safety warnings, failing to meet the needs of modern engineering construction.

Method used

A method and system that divides safety monitoring nodes based on the construction organization process, uses distributed sensor equipment to collect and preprocess data, constructs a safety risk assessment model, and issues warnings when risk thresholds are exceeded.

Benefits of technology

Improves monitoring sensitivity and responsiveness by providing timely safety risk warnings, enhancing the efficiency and accuracy of safety monitoring in overpass construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119090255A_ABST
    Figure CN119090255A_ABST
Patent Text Reader

Abstract

The invention discloses a safety monitoring and early warning method and system for overline overbridge construction, and relates to the technical field of artificial intelligence, and the method comprises the steps: carrying out the division of safety monitoring nodes according to a construction organization process, and obtaining a safety monitoring process; on the basis of a safety monitoring process, field information acquisition is carried out through a sensing equipment assembly, and field monitoring data are obtained; preprocessing the field monitoring data to obtain real-time safety monitoring data; based on the safety monitoring process, safety monitoring indexes are extracted, and a safety risk assessment model is constructed; based on the security risk assessment model, obtaining a security risk assessment result; and judging whether the safety risk assessment result exceeds a safety risk threshold, and if yes, performing safety risk early warning. The problems that in the prior art, overline overbridge construction safety monitoring sensitivity is low, and safety early warning is not timely are solved, and the technical effect of improving safety monitoring sensitivity and early warning responsivity is achieved through multi-sensor monitoring and safety risk assessment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of artificial intelligence technology, and in particular to a method and system for monitoring and warning safety during construction of an overpass. Background Art

[0002] With the acceleration of urbanization and the continuous development of engineering technology, the safety of overpass construction has attracted more and more attention. In the construction process of overpasses, there are great safety hazards due to factors such as high-altitude operations and complex environments. Once an accident occurs, it will not only cause serious casualties and property losses, but also have a serious impact on traffic. However, traditional overpass construction safety monitoring methods often have problems such as inaccurate monitoring data and untimely warnings, which are difficult to meet the needs of modern engineering construction. Existing overpass construction safety monitoring methods have problems such as low monitoring sensitivity and untimely safety warnings. Summary of the invention

[0003] The present application provides a safety monitoring and early warning method and system for overpass construction, which is used to solve the technical problems of low monitoring sensitivity and untimely safety warning in the prior art.

[0004] In view of the above problems, the present application provides a method and system for safety monitoring and early warning of overpass construction.

[0005] In a first aspect of the present application, a method for monitoring and warning safety of overpass construction is provided, the method comprising:

[0006] According to the construction organization process of the target project, the safety monitoring nodes are divided to obtain multiple safety monitoring processes; based on the multiple safety monitoring processes, the construction site information is collected through distributed sensor equipment components to obtain field monitoring data, and the field monitoring data carries a process identification; the field monitoring data is preprocessed to obtain real-time safety monitoring data; based on the multiple safety monitoring processes, multiple groups of safety monitoring indicators are extracted to construct a safety risk assessment model; based on the safety risk assessment model, combined with the real-time safety monitoring data, a construction safety risk assessment is performed to obtain a safety risk assessment result; it is determined whether the safety risk assessment result exceeds the safety risk threshold, and if so, a safety risk warning is issued.

[0007] The second aspect of the present application provides a safety monitoring and early warning system for overpass construction, the system comprising:

[0008] The monitoring node division module divides the safety monitoring nodes according to the construction organization process of the target project to obtain multiple safety monitoring processes; the on-site information collection module collects construction site information based on the multiple safety monitoring processes through distributed sensing equipment components to obtain on-site monitoring data, and the on-site monitoring data carries a process identifier; the data preprocessing module preprocesses the on-site monitoring data to obtain real-time safety monitoring data; the safety risk assessment model construction module extracts multiple groups of safety monitoring indicators based on the multiple safety monitoring processes and constructs a safety risk assessment model; the safety risk assessment module conducts construction safety risk assessment based on the safety risk assessment model and in combination with the real-time safety monitoring data to obtain a safety risk assessment result; the safety risk warning module determines whether the safety risk assessment result exceeds the safety risk threshold, and if so, issues a safety risk warning.

[0009] One or more technical solutions provided in this application have at least the following technical effects or advantages:

[0010] This application divides the safety monitoring nodes according to the construction organization process of the target project to obtain the safety monitoring process; based on the safety monitoring process, the distributed sensor equipment components are used to collect construction site information and obtain on-site monitoring data; the on-site monitoring data is preprocessed to obtain real-time safety monitoring data; based on the safety monitoring process, the safety monitoring indicators are extracted and a safety risk assessment model is constructed; based on the safety risk assessment model, a construction safety risk assessment is performed to obtain a safety risk assessment result; it is determined whether the safety risk assessment result exceeds the safety risk threshold, and if so, a safety risk warning is issued. The present invention solves the problems of low sensitivity of safety monitoring and untimely safety warning in the construction of cross-line overpasses in the prior art, and achieves the technical effect of improving the sensitivity of safety monitoring and the responsiveness of warnings through multi-sensor monitoring and safety risk assessment. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0012] Figure 1 A schematic diagram of a process flow for a safety monitoring and early warning method for overpass construction provided in an embodiment of the present application;

[0013] Figure 2 A schematic diagram of a flow chart for dividing safety monitoring nodes in a safety monitoring and early warning method for overpass construction provided in an embodiment of the present application;

[0014] Figure 3 A schematic diagram of the structure of a safety monitoring and early warning system for overpass construction provided in an embodiment of the present application.

[0015] Explanation of the accompanying drawings: monitoring node division module 11, on-site information collection module 12, data preprocessing module 13, safety risk assessment model construction module 14, safety risk assessment module 15, safety risk early warning module 16. DETAILED DESCRIPTION

[0016] The present application provides a method for safety monitoring and early warning of cross-line overpass construction, which is used to solve the technical problem of low monitoring efficiency in the prior art. By using it for safety monitoring and early warning of cross-line overpass construction, the technical effect of improving monitoring efficiency and early warning accuracy is achieved.

[0017] The technical solutions in the embodiments of the present application will be described clearly and completely below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0018] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or server that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or modules that are not clearly listed or inherent to these processes, methods, products or devices.

[0019] Embodiment 1

[0020] like Figure 1 As shown, the present application provides a vehicle behavior analysis method based on Fourier transform, the method comprising:

[0021] Step S100: dividing the safety monitoring nodes according to the construction organization process of the target project to obtain multiple safety monitoring processes;

[0022] In the embodiment of the present application, the construction organization process of the target project is first analyzed to identify the possible safety risks and potential safety hazards, such as risks in high-altitude operations, cross operations, mechanical operations, etc. Based on the safety risks in the construction organization process obtained by analysis, the nodes that need to be monitored for safety are determined, that is, at which construction processes or key parts safety monitoring is required.

[0023] According to the determined safety monitoring nodes, the construction organization process of the target project is divided into multiple independent construction processes, each of which corresponds to a safety monitoring node. These processes should include the main construction process and related auxiliary processes, such as the construction of bridge foundations, the installation of steel structures, and aerial work.

[0024] Step S200: Based on the multiple safety monitoring processes, the distributed sensor equipment assembly is used to collect construction site information and obtain on-site monitoring data, wherein the on-site monitoring data carries a process identifier;

[0025] In the embodiment of the present application, appropriate distributed sensing equipment components, such as displacement sensors, tilt sensors, force sensors, etc., are selected according to the construction organization process and safety monitoring node division of the target project. These sensing devices should be able to adapt to the complex environment and harsh conditions of the construction site. Distributed sensing equipment components are installed at the corresponding positions of each safety monitoring process so that they can effectively monitor the safety status during the construction process. According to the characteristics and monitoring requirements of each sensing device, corresponding parameters are configured, such as monitoring frequency, data transmission method, monitoring range, etc.

[0026] During the construction process, the distributed sensing equipment components will automatically collect information on the construction site, such as structural displacement, tilt angle, stress and strain, etc. This information is stored in the form of data. While collecting on-site monitoring data, it is necessary to associate the data with the corresponding process and mark each data with a process label. This will facilitate subsequent data processing and analysis, as well as correspondence with safety monitoring processes.

[0027] Step S300: pre-processing the on-site monitoring data to obtain real-time safety monitoring data;

[0028] In an embodiment of the present application, the collected field monitoring data is cleaned to remove invalid, erroneous or abnormal data. For example, remove values ​​beyond the normal range, remove data that does not conform to the actual situation, etc. The collected data is normalized, and data of different dimensions and scales are standardized to make the data comparable. Common normalization methods include minimum-maximum normalization, standardization, etc. Due to interference at the construction site and errors in sensor equipment, the collected data may have noise and fluctuations. In order to reduce the impact of noise and fluctuations on the safety monitoring results, a filtering algorithm can be used to filter the data, such as moving average filtering, Kalman filtering, etc.

[0029] According to the identification of each process, the processed data is associated with the corresponding process, and each data is marked with the corresponding process identification. In this way, the data processing results can correspond to each safety monitoring process. The processed on-site monitoring data is output in real time, and the real-time safety monitoring data can be displayed in the form of tables, graphics, etc., for subsequent safety risk assessment and early warning management.

[0030] Step S400: extracting multiple groups of safety monitoring indicators based on the multiple safety monitoring processes and constructing a safety risk assessment model;

[0031] In an embodiment of the present application, for each safety monitoring process, the possible safety risks and influencing factors are analyzed, and the corresponding safety monitoring indicators are extracted. For example, for the safety monitoring of bridge construction, bridge deformation, supporting structure displacement, wind speed, temperature, etc. can be extracted as safety monitoring indicators. According to the extracted safety monitoring indicators, a corresponding safety risk assessment model is established, and a regression analysis model is used here to establish a safety risk assessment model. According to historical data or expert experience, the parameters of the safety risk assessment model, such as weights, thresholds, etc., are set. These parameters can be adjusted and optimized according to actual conditions. When training the model, the safety risk assessment model is trained and verified using historical data to ensure the accuracy and reliability of the model.

[0032] Step S500: Based on the safety risk assessment model and in combination with the real-time safety monitoring data, a construction safety risk assessment is performed to obtain a safety risk assessment result;

[0033] In the embodiment of the present application, the real-time collected construction site information, such as structural displacement, wind speed, temperature, etc., is input into the safety risk assessment model. The input real-time safety monitoring data is processed and analyzed using the trained safety risk assessment model. According to the model algorithm and the preset threshold, the safety risk assessment results of each process are calculated. This can include indicators such as risk level, risk probability, and potential loss.

[0034] The safety risk assessment results of multiple processes can be comprehensively analyzed to evaluate the safety status of the overall construction process. For example, the risks of each process can be weighted averaged or other comprehensive evaluation methods can be used to obtain the overall risk assessment results.

[0035] Step S600: Determine whether the security risk assessment result exceeds the security risk threshold, and if so, issue a security risk warning.

[0036] In an embodiment of the present application, the safety risk assessment results of each process, such as risk level, risk probability and other indicators, are extracted from the safety risk assessment model. The extracted safety risk assessment results are compared with the preset safety risk threshold. This can be done by a quantitative or qualitative comparison method, and the appropriate comparison method is selected according to the actual situation. Based on the comparison results, it is determined whether the safety risk assessment results exceed the threshold. If the threshold is exceeded, a safety risk warning is triggered; otherwise, real-time safety monitoring and assessment continues.

[0037] Once a safety risk warning is triggered, appropriate measures need to be taken, which may include notifying relevant personnel, taking emergency response measures, adjusting construction plans, etc.

[0038] Further, such as Figure 2 As shown, step S100 in the method provided in the embodiment of the present application further includes:

[0039] Obtain the construction organization process information of the target project;

[0040] Based on the construction organization process information, multiple sub-projects are obtained;

[0041] For the multiple sub-projects, retrieve historical safety accidents, and configure the safety monitoring levels of the multiple sub-projects according to the historical safety accident frequencies;

[0042] According to the multiple sub-projects, the safety monitoring nodes are divided to obtain multiple safety monitoring processes, and corresponding safety monitoring levels are configured.

[0043] In the embodiment of the present application, engineering data are collected, and relevant data such as construction drawings, construction plans, construction contracts, etc. of the target project are obtained to understand the overall situation of the project and the construction organization process. Conduct field research on the target project, observe the layout and construction progress of the construction site, communicate with on-site construction personnel and management personnel, and understand the organizational process and key links in the actual construction process. According to the collected engineering data and field research results, the construction process of the target project is divided into different stages, and each stage corresponds to a different construction organization process. According to the divided construction stages, the construction content, construction sequence, construction methods and other information of each stage are described in detail to obtain a complete construction organization flowchart or text data.

[0044] After that, understand the specific construction content and requirements of each stage, and divide the target project into multiple sub-projects according to the construction organization process and actual construction conditions. Each sub-project corresponds to a specific construction stage or a specific construction task.

[0045] Consult the safety management information of related projects or communicate with safety management personnel to collect historical safety accident data of the target project or similar projects, including information such as accident type, time, location, and cause. Perform statistical analysis on the collected historical safety accident data and calculate the safety accident frequency of each sub-project, that is, the number of accidents per unit time. According to the safety accident frequency of each sub-project and other relevant factors, such as importance and construction difficulty, configure the corresponding safety monitoring level for each sub-project. For example, configure the sub-project with a higher frequency of safety accidents as a high-level monitoring object to strengthen safety management and monitoring measures.

[0046] When dividing the safety monitoring nodes, you first need to carefully study the construction organization process information and the detailed requirements of each sub-project, and understand the construction sequence and key links of each sub-project. According to the construction characteristics and safety monitoring level requirements of each sub-project, it is divided into multiple safety monitoring nodes. Each node corresponds to a specific construction link or a key process. Analyze and study each safety monitoring node to determine the corresponding safety monitoring process. These processes can be key processes, high-risk processes, or processes prone to safety problems. According to the characteristics and risk level of each safety monitoring process, configure the corresponding safety monitoring level for each process. For example, high-risk or key processes are configured as high-level monitoring objects, increase the monitoring frequency, and strengthen safety management measures.

[0047] Furthermore, step S200 in the method provided in the embodiment of the present application further includes:

[0048] The on-site monitoring data includes the first process safety monitoring data, the second process safety monitoring data, and the Nth process safety monitoring data;

[0049] Based on the first safety monitoring process, obtaining first process safety monitoring data through the first sensor device assembly;

[0050] The first process safety monitoring data includes first subject monitoring data, first construction equipment monitoring data and first environment monitoring data.

[0051] In the embodiment of the present application, the on-site monitoring data includes the first process safety monitoring data, the second process safety monitoring data, and the Nth process safety monitoring data. These data cover different stages of the entire construction process, and each stage has its own specific safety monitoring data.

[0052] Based on the first safety monitoring process, the first process safety monitoring data is obtained through the first sensor device assembly. This process can be understood as using the first sensor device assembly to collect safety monitoring data in the first construction process.

[0053] The first process safety monitoring data includes the first main body monitoring data, the first construction equipment monitoring data and the first environment monitoring data. This means that in the safety monitoring of the first process, attention is paid not only to the conditions of the construction main body, such as structural deformation, support displacement, etc., but also to the conditions of the construction equipment, such as equipment operating status, load, etc., and also to the environmental factors of the construction site, such as wind speed, temperature, etc. The acquisition and analysis of these data will help to have a more comprehensive understanding of the safety status of the construction process.

[0054] For the first subject monitoring data, it may include the displacement, settlement, vibration and other data of the construction subject; for the first construction equipment monitoring data, it may include the operating status, load, energy consumption and other data of the equipment; for the first environment monitoring data, it may include wind speed, temperature, humidity, noise and other data. These data can be collected through corresponding sensors and then further analyzed and processed. Such data division helps to understand the construction situation of each process in more detail, as well as the possible safety risks. At the same time, through the analysis and processing of these data, the safety risk assessment and early warning of the construction process can be realized, so as to better ensure the safety of the construction process.

[0055] Furthermore, step S300 in the method provided in the embodiment of the present application further includes:

[0056] Cleaning and clustering the field monitoring data to obtain multiple standard data sets;

[0057] Serializing the multiple standard data sets to obtain multiple real-time sensor data sequences;

[0058] The real-time safety monitoring data is obtained by performing concentrated value calculation based on multiple real-time sensor data sequences.

[0059] In the embodiments of the present application, the purpose of data cleaning is to remove invalid, erroneous or incomplete data to ensure the accuracy and reliability of the data. Clustering is to divide the data set into multiple subsets, each of which represents a specific data category or pattern. Through data cleaning and clustering, the original field monitoring data can be processed to obtain multiple standard data sets, which are more standardized and easy to analyze and process.

[0060] Serialization refers to converting a data set into a linear data stream for easy storage and transmission. Through serialization, standard data sets can be converted into real-time sensor data sequences, which can be used for real-time monitoring and early warning.

[0061] Centralized value calculation refers to statistical analysis and calculation of multiple real-time sensor data sequences to obtain one or more centralized values, which can reflect the safety status of the entire construction process. For example, by calculating the average, maximum, minimum and other indicators of multiple real-time sensor data sequences, key safety monitoring data in the construction process can be obtained.

[0062] Through the above steps, the original on-site monitoring data can be processed and analyzed to obtain multiple standard data sets and real-time sensor data sequences, and the centralized value calculation can be performed based on these sequences to obtain real-time safety monitoring data. These data can provide decision makers with timely and accurate safety risk information, which helps to ensure the safety and reliability of the construction process. At the same time, through the analysis and mining of historical data, it can also provide reference and guidance for future construction and improve construction efficiency and quality.

[0063] Furthermore, step S400 in the method provided in the embodiment of the present application further includes:

[0064] The safety monitoring indicators include structural safety indicators, equipment safety indicators, and environmental safety indicators;

[0065] Based on the multiple safety monitoring processes and according to historical construction accident data, safety monitoring feature extraction is performed respectively to obtain multiple groups of safety monitoring features;

[0066] Performing feature frequency statistics for the multiple groups of security monitoring features, and configuring a safety impact coefficient according to the feature frequency statistical results;

[0067] By combining the safety impact coefficient with the multiple groups of safety monitoring characteristics, multiple groups of safety monitoring indicators are obtained.

[0068] In the embodiment of the present application, the structural safety index mainly focuses on the stability, strength, durability, etc. of the construction subject, the equipment safety index focuses on the operating status, load, energy consumption, etc. of the equipment, and the environmental safety index focuses on the wind speed, temperature, humidity, noise, etc. of the construction site. The selection and determination of these indicators are helpful to comprehensively evaluate the safety status of the construction process.

[0069] By analyzing and mining historical construction accident data, multiple safety-related features are extracted from multiple safety monitoring processes. These features may include the deformation of the construction entity, the operating efficiency of the equipment, the environmental wind speed, etc.

[0070] Feature frequency statistics refer to the statistics of the frequency of occurrence of each safety monitoring feature in historical construction accidents. The safety impact coefficient is configured according to the frequency statistics of each feature, which reflects the degree of influence of each feature on the safety of the construction process.

[0071] Through the safety impact coefficient, multiple groups of safety monitoring features are combined to obtain multiple groups of safety monitoring indicators. This step combines multiple groups of safety monitoring features into multiple groups of safety monitoring indicators according to the safety impact coefficient of each feature. These indicators can reflect the safety status of the construction process in different aspects and provide comprehensive safety risk information for decision makers.

[0072] In summary, by analyzing and mining historical construction accident data, safety-related features are extracted from multiple safety monitoring processes, and safety impact coefficients are configured based on the statistical results of feature frequency. Then, combining these features and coefficients, multiple sets of safety monitoring indicators reflecting different aspects are obtained. These indicators can provide decision makers with timely and accurate safety risk information, which helps to ensure the safety and reliability of the construction process.

[0073] Furthermore, the method also includes:

[0074] Based on the big data, for the multiple safety monitoring processes, multiple sample structural safety indicators, multiple sample equipment safety indicators, multiple sample environmental safety indicators and multiple sample accident results are collected;

[0075] Perform construction safety risk assessment based on the multiple sample structural safety indicators, multiple sample equipment safety indicators, multiple sample environmental safety indicators, and multiple sample accident results to obtain multiple sample risk levels;

[0076] Assign safety impact weights to the structural safety index, equipment safety index, and environmental safety index respectively to obtain corresponding risk impact factors;

[0077] Based on the multiple sample structure safety indicators, multiple sample equipment safety indicators, multiple sample environment safety indicators, multiple sample risk levels and the risk influencing factors, supervised training is performed in combination with machine learning to obtain the safety risk assessment model.

[0078] In the embodiment of the present application, the sample data is obtained by screening, processing and analyzing a large amount of data of the historical construction process, which can reflect the safety status and accident risks of different construction stages. Then, the construction safety risk of each safety monitoring process is evaluated based on the collected sample data, and the corresponding risk level is obtained. These risk levels can reflect the safety status and accident risks of each process in different aspects.

[0079] Then, according to the role and impact of each indicator in historical construction accidents, a corresponding weight is assigned to it, thereby obtaining the corresponding risk impact factor. These factors can reflect the contribution of each indicator to the safety of the construction process.

[0080] Finally, the collected sample data and the corresponding risk level are used as input, combined with the machine learning algorithm for model training, to obtain a safety risk assessment model. This model can be used to conduct safety risk assessment and early warning for future construction processes, providing decision makers with timely and accurate safety risk information.

[0081] By collecting a large amount of historical construction data, construction safety risk assessment is performed for multiple safety monitoring processes, and weights are assigned to structural safety indicators, equipment safety indicators, and environmental safety indicators. Then, the sample data is trained using a machine learning algorithm to obtain the safety risk assessment model. This model can be used to conduct safety risk assessment and early warning for future construction processes, providing decision makers with timely and accurate safety risk information.

[0082] In summary, the embodiments of the present application have at least the following technical effects:

[0083] This application divides the safety monitoring nodes according to the construction organization process of the target project to obtain the safety monitoring process; based on the safety monitoring process, the distributed sensing equipment components are used to collect construction site information and obtain on-site monitoring data; the on-site monitoring data is preprocessed to obtain real-time safety monitoring data; based on the safety monitoring process, the safety monitoring indicators are extracted to build a safety risk assessment model; based on the safety risk assessment model, the construction safety risk assessment is performed to obtain the safety risk assessment results; it is determined whether the safety risk assessment results exceed the safety risk threshold, and if so, a safety risk warning is issued. The present invention solves the technical problem of low monitoring efficiency in the prior art, and achieves the technical effect of improving monitoring efficiency and warning accuracy by being used for safety monitoring and early warning of cross-line overpass construction.

[0084] Embodiment 2

[0085] Based on the same inventive concept as the above-mentioned method for monitoring and warning the safety of overpass construction, Figure 3 As shown, the present application provides a safety monitoring and early warning system for overpass construction, and the system and method embodiments in the present application are based on the same inventive concept. The system includes:

[0086] A monitoring node division module 11, wherein the monitoring node division module 11 divides the safety monitoring nodes according to the construction organization process of the target project to obtain a plurality of safety monitoring processes;

[0087] A site information collection module 12, wherein the site information collection module 12 collects construction site information based on the multiple safety monitoring processes through distributed sensor equipment components to obtain site monitoring data, wherein the site monitoring data carries a process identifier;

[0088] A data preprocessing module 13, wherein the data preprocessing module 13 preprocesses the on-site monitoring data to obtain real-time safety monitoring data;

[0089] A safety risk assessment model building module 14, wherein the safety risk assessment model building module 14 extracts multiple groups of safety monitoring indicators based on the multiple safety monitoring processes and builds a safety risk assessment model;

[0090] A safety risk assessment module 15, wherein the safety risk assessment module 15 performs construction safety risk assessment based on the safety risk assessment model and in combination with the real-time safety monitoring data to obtain a safety risk assessment result;

[0091] The security risk warning module 16 determines whether the security risk assessment result exceeds the security risk threshold, and if so, issues a security risk warning.

[0092] Furthermore, the system also includes:

[0093] Obtain the construction organization process information of the target project;

[0094] Based on the construction organization process information, multiple sub-projects are obtained;

[0095] For the multiple sub-projects, retrieve historical safety accidents, and configure the safety monitoring levels of the multiple sub-projects according to the historical safety accident frequencies;

[0096] According to the multiple sub-projects, the safety monitoring nodes are divided to obtain multiple safety monitoring processes, and corresponding safety monitoring levels are configured.

[0097] Furthermore, the system also includes:

[0098] The on-site monitoring data includes the first process safety monitoring data, the second process safety monitoring data, and the Nth process safety monitoring data;

[0099] Based on the first safety monitoring process, obtaining first process safety monitoring data through the first sensor device assembly;

[0100] The first process safety monitoring data includes first subject monitoring data, first construction equipment monitoring data and first environment monitoring data.

[0101] Furthermore, the system also includes:

[0102] Cleaning and clustering the field monitoring data to obtain multiple standard data sets;

[0103] Serializing the multiple standard data sets to obtain multiple real-time sensor data sequences;

[0104] The real-time safety monitoring data is obtained by performing concentrated value calculation based on multiple real-time sensor data sequences.

[0105] Furthermore, the system also includes:

[0106] The safety monitoring indicators include structural safety indicators, equipment safety indicators, and environmental safety indicators;

[0107] Based on the multiple safety monitoring processes and according to historical construction accident data, safety monitoring feature extraction is performed respectively to obtain multiple groups of safety monitoring features;

[0108] Performing feature frequency statistics for the multiple groups of security monitoring features, and configuring a safety impact coefficient according to the feature frequency statistical results;

[0109] By combining the safety impact coefficient with the multiple groups of safety monitoring characteristics, multiple groups of safety monitoring indicators are obtained.

[0110] Furthermore, the system also includes:

[0111] Based on the big data, for the multiple safety monitoring processes, multiple sample structural safety indicators, multiple sample equipment safety indicators, multiple sample environmental safety indicators and multiple sample accident results are collected;

[0112] Perform construction safety risk assessment based on the multiple sample structural safety indicators, multiple sample equipment safety indicators, multiple sample environmental safety indicators, and multiple sample accident results to obtain multiple sample risk levels;

[0113] Assign safety impact weights to the structural safety index, equipment safety index, and environmental safety index respectively to obtain corresponding risk impact factors;

[0114] Based on the multiple sample structure safety indicators, multiple sample equipment safety indicators, multiple sample environment safety indicators, multiple sample risk levels and the risk influencing factors, supervised training is performed in combination with machine learning to obtain the safety risk assessment model.

[0115] It should be noted that the above-mentioned sequence of the embodiments of the present application is only for description and does not represent the advantages and disadvantages of the embodiments. And the above-mentioned specific embodiments of this specification are described. Other embodiments are within the scope of the attached claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the embodiments and still achieve the desired results. In addition, the processes depicted in the drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0116] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the protection scope of the present application.

[0117] This specification and drawings are merely exemplary illustrations of the present application and are deemed to cover any and all modifications, variations, combinations or equivalents within the scope of the present application. Obviously, a person skilled in the art may make various modifications and variations to the present application without departing from the scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the present application and its equivalents, the present application intends to include these modifications and variations.

Claims

1. Safety monitoring and early warning method for overpass construction. It is characterized in that The method comprises: According to the construction organization process of the target project, the safety monitoring nodes are divided to obtain multiple safety monitoring processes; Based on the multiple safety monitoring processes, construction site information is collected through distributed sensor equipment components to obtain on-site monitoring data, where the on-site monitoring data carries a process identifier; Preprocessing the on-site monitoring data to obtain real-time safety monitoring data; Based on the multiple safety monitoring processes, extract multiple groups of safety monitoring indicators and build a safety risk assessment model; Based on the safety risk assessment model and in combination with the real-time safety monitoring data, a construction safety risk assessment is performed to obtain a safety risk assessment result; Determine whether the security risk assessment result exceeds the security risk threshold, and if so, issue a security risk warning.

2. The method according to claim 1, It is characterized in that According to the construction organization process of the target project, the safety monitoring nodes are divided to obtain multiple safety monitoring processes, including: Obtain the construction organization process information of the target project; Based on the construction organization process information, multiple sub-projects are obtained; For the multiple sub-projects, retrieve historical safety accidents, and configure the safety monitoring levels of the multiple sub-projects according to the historical safety accident frequencies; According to the multiple sub-projects, the safety monitoring nodes are divided to obtain multiple safety monitoring processes, and corresponding safety monitoring levels are configured.

3. The method according to claim 1, It is characterized in that Based on the multiple safety monitoring processes, the distributed sensor equipment components are used to collect construction site information and obtain on-site monitoring data, and further include: The on-site monitoring data includes the first process safety monitoring data, the second process safety monitoring data, and the Nth process safety monitoring data; Based on the first safety monitoring process, obtaining first process safety monitoring data through the first sensor device assembly; The first process safety monitoring data includes first subject monitoring data, first construction equipment monitoring data and first environment monitoring data.

4. The method according to claim 1, It is characterized in that The preprocessing of the on-site monitoring data to obtain real-time safety monitoring data also includes: Cleaning and clustering the field monitoring data to obtain multiple standard data sets; Serializing the multiple standard data sets to obtain multiple real-time sensor data sequences; The real-time safety monitoring data is obtained by performing concentrated value calculation based on multiple real-time sensor data sequences.

5. The method according to claim 1, It is characterized in that The extracting of multiple groups of safety monitoring indicators based on the multiple safety monitoring processes includes: The safety monitoring indicators include structural safety indicators, equipment safety indicators, and environmental safety indicators; Based on the multiple safety monitoring processes and according to historical construction accident data, safety monitoring feature extraction is performed respectively to obtain multiple groups of safety monitoring features; Performing feature frequency statistics for the multiple groups of security monitoring features, and configuring a safety impact coefficient according to the feature frequency statistical results; By combining the safety impact coefficient with the multiple groups of safety monitoring characteristics, multiple groups of safety monitoring indicators are obtained.

6. The method according to claim 1, It is characterized in that The construction of the security risk assessment model includes: Based on the big data, for the multiple safety monitoring processes, multiple sample structural safety indicators, multiple sample equipment safety indicators, multiple sample environmental safety indicators and multiple sample accident results are collected; Perform construction safety risk assessment based on the multiple sample structural safety indicators, multiple sample equipment safety indicators, multiple sample environmental safety indicators, and multiple sample accident results to obtain multiple sample risk levels; Assign safety impact weights to the structural safety index, equipment safety index, and environmental safety index respectively to obtain corresponding risk impact factors; Based on the multiple sample structure safety indicators, multiple sample equipment safety indicators, multiple sample environment safety indicators, multiple sample risk levels and the risk influencing factors, supervised training is performed in combination with machine learning to obtain the safety risk assessment model.

7. Used in the safety monitoring and early warning system for overpass construction. It is characterized in that The system comprises: A monitoring node division module, wherein the monitoring node division module divides the safety monitoring nodes according to the construction organization process of the target project to obtain multiple safety monitoring processes; A site information collection module, wherein the site information collection module collects construction site information based on the multiple safety monitoring processes through distributed sensor equipment components to obtain site monitoring data, wherein the site monitoring data carries a process identifier; A data preprocessing module, wherein the data preprocessing module preprocesses the on-site monitoring data to obtain real-time safety monitoring data; A safety risk assessment model construction module, wherein the safety risk assessment model construction module extracts multiple groups of safety monitoring indicators based on the multiple safety monitoring processes and constructs a safety risk assessment model; A safety risk assessment module, wherein the safety risk assessment module performs construction safety risk assessment based on the safety risk assessment model and in combination with the real-time safety monitoring data to obtain a safety risk assessment result; The security risk warning module determines whether the security risk assessment result exceeds the security risk threshold, and if so, issues a security risk warning.

Citation Information

Patent Citations

  • Railway construction monitoring information platform based on digital native

    CN118134119A

Cited By

  • Cost control method and device of project cost, equipment, storage medium and product

    CN119761715A

  • Electronic warranty full-process management and control method and system

    CN120746489A

  • Trestle stress monitoring method and system based on mechanical sensor

    CN120907711A