Production intelligent management system for electric reactor

The intelligent production management system for reactors addresses the imbalance in raw material and product conversion by synchronously analyzing backlog risks and adjusting production line speed, enhancing inventory balance and reducing storage costs.

CN119090419AInactive Publication Date: 2024-12-06XUYI COUNTY ZHENGXIONG ELECTRONICS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411086276.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-12-06
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing reactor production management systems lack conversion correlation analysis of raw materials and products, leading to insufficient optimization between production line operation and inventory balance, which reduces their application effectiveness.

Method used

An intelligent production management system that synchronously analyzes the backlog risks of raw materials and products, generates early warning reminders, and automatically adjusts production line speed to balance inventory, reducing storage costs by optimizing the inventory balance ratio through cost and time-based calculations.

Benefits of technology

The system effectively maintains raw materials and products at a low-risk stage by balancing inventory, improving the response to market fluctuations and reducing storage costs while ensuring quality by avoiding long-term storage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119090419A_ABST
    Figure CN119090419A_ABST
Patent Text Reader

Abstract

The invention relates to the field of electric reactor production supervision, and in particular relates to an intelligent production management system for an electric reactor, which is used for solving the problem of insufficient optimization capability between production line operation and inventory balance caused by insufficient consideration proportion of a conversion balance relationship between raw materials and products during production supervision. According to the method, the product storage cost and the raw material storage cost are analyzed, function calculation is carried out according to the product storage cost and the raw material storage cost, the inventory balance proportion of products and raw materials is found, and the production line speed is adjusted according to the inventory balance proportion; the production speed of a production line can enable the proportion of raw materials and products to be close to the inventory balance proportion, the storage cost is reduced, the overstock risk of the raw materials and the overstock risk of the products are synchronously analyzed, the production line speed is automatically adjusted, and therefore the inventory overstock amount of the raw materials and the inventory overstock amount of the products are balanced; and the backlog coping capacity in production and the risk coping capacity for market fluctuation are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of reactor production supervision, and in particular to an intelligent production management system for reactors. Background Art

[0002] Reactors are widely used in circuits. Because of the electromagnetic induction effect, they have a certain inductance in the circuit, which can prevent current changes. Reactors are divided into hollow type, iron core type, dry type, oil-immersed type, etc. For example: dry hollow reactor, dry iron core reactor, oil-immersed iron core reactor, oil-immersed hollow reactor, clamped dry hollow reactor, wrapped dry hollow reactor, cement reactor, etc. In the production process of reactors, due to the large proportion of metal raw materials and oil raw materials, the storage and management are complicated, so it is necessary to use the production supervision system to manage the production of reactors intelligently;

[0003] At present, the reactor production management system in the prior art still has shortcomings. In the application, the existing reactor production management system generally supervises the production line by manual preset. The influencing factors referred to when managing the production line are generally a single inventory backlog or the adequacy of raw material reserves. In actual application, since raw materials and products have a conversion relationship, the existing production management system lacks conversion correlation analysis of raw materials and products, and thus cannot balance and adjust the proportion relationship between raw materials and products. The optimization ability between production line operation and inventory balance is insufficient, which reduces the application effect of the production management system.

[0004] In view of the above technical problems, this application proposes a solution. Summary of the invention

[0005] In the present invention, the backlog risk of raw materials and the backlog risk of products are analyzed synchronously, and corresponding early warning reminders are generated. At the same time, the production line speed can be automatically adjusted to balance the inventory backlog of raw materials and products, so that the inventory of raw materials and products are kept at a low-risk stage. When supervising the production line, the product storage cost and the raw material storage cost are analyzed, and function calculation is performed based on the product storage cost and the raw material storage cost to find the inventory balance ratio of products and raw materials. The production line speed is adjusted according to the inventory balance ratio, so that the production speed of the production line can make the ratio of raw materials and products close to the inventory balance ratio, reduce the storage cost, solve the problem of insufficient consideration of the conversion balance relationship between raw materials and products when supervising production, resulting in insufficient optimization ability between production line operation and inventory balance, and propose a production intelligent management system for reactors.

[0006] The purpose of the present invention can be achieved through the following technical solutions:

[0007] A production intelligent management system for reactors, comprising an inventory management unit, wherein the inventory management unit is used to collect statistics on the inventory of reactors in a warehouse, obtain the total inventory of reactors and the storage time of each reactor in the warehouse;

[0008] A raw material control unit, which counts the stored production raw materials to obtain the total amount of production raw materials and the storage time of each batch of production raw materials in the warehouse;

[0009] A cost analysis unit, wherein the cost analysis unit obtains the total amount of inventory reactors and the total amount of production raw materials through the inventory management unit and the raw material control unit, and at the same time calculates the storage cost of the inventory reactors and the storage cost of the production raw materials, analyzes the storage cost and the total amount to obtain the optimal storage ratio range, and then analyzes the current storage ratio and the optimal storage ratio to generate a production speed increase signal or a production speed slowdown signal;

[0010] A time control unit, which is used to judge the storage time of the inventory reactors and production raw materials, and mark the backlog of reactors and backlog of raw materials according to the judgment result;

[0011] The time control unit collects statistics on the backlog risks of inventory reactors and production raw materials, generates corresponding backlog risk reminders, and adjusts the production line production speed according to the different backlog risks of reactors and raw materials to buffer the backlog risks;

[0012] A production line control unit, which is used to receive production line speed adjustment related signals and control the production line operation speed.

[0013] As a preferred embodiment of the present invention, the inventory management unit obtains the storage time of each inventory reactor, and calculates according to the storage time and current time of each reactor to obtain the storage time of each reactor in the warehouse;

[0014] The raw material control unit obtains the storage time of each group of production raw materials, and calculates according to the storage time of each group of production raw materials and the current time to obtain the storage time of each batch of production raw materials in the warehouse;

[0015] The inventory management unit sends the total amount of inventory reactors and the storage time of different reactors to the time control unit, and the raw material control unit sends the total amount of production raw materials and the storage time of each batch of production raw materials to the time control unit.

[0016] As a preferred embodiment of the present invention, after the cost analysis unit obtains the total amount of inventory reactors, it calculates the storage cost required for storing the inventory reactors in a 24-hour cycle, and divides the storage cost of the inventory reactors by the total amount of inventory reactors to obtain the storage cost of a single inventory reactor. After the cost analysis unit obtains the total amount of production raw materials, it calculates the total cost required for storing the production raw materials in a 24-hour cycle, and obtains the storage cost required for a unit of production raw materials by dividing the total cost required for storing the production raw materials by the total amount of production raw materials.

[0017] The cost analysis unit records the total amount of production raw materials under ideal conditions as X, the total amount of inventory reactors under ideal conditions as Y, the storage cost required for unit production raw materials as a, and the storage cost of a single inventory reactor as b, and generates a total storage cost function f(c), f(c)=θaX+βbY, wherein θ and β are weight coefficients, θ and X are in a fractional function relationship, β and Y are in a fractional function relationship, and there is a conversion relationship between X and Y with a conversion rate of q, the value of X+qY is a constant, and X and Y have minimum values ​​Xmin and Ymin that are not 0, respectively. The cost analysis unit finds the proportional relationship between X and Y when the total storage cost is the lowest through the image of the total storage cost function, records it as the optimal storage ratio Z, Z=X / Y, and expands both ends according to the optimal storage ratio Z to obtain the optimal storage ratio range Zmin~Zmax.

[0018] As a preferred embodiment of the present invention, the cost analysis unit calculates the ratio of the current total amount of production raw materials to the total amount of inventory reactors stored, and records it as the current storage ratio. The cost analysis unit compares the current storage ratio with the optimal storage ratio range. If the current storage ratio is less than the minimum value of the optimal storage ratio, a production speed slowdown signal is generated. If the current storage ratio is greater than the maximum value of the optimal storage ratio range, a production speed increase signal is generated.

[0019] As a preferred embodiment of the present invention, the time control unit records the product storage time of each inventory reactor as ti, where i=1, 2, 3..., n. The time control unit compares the product storage time ti of each inventory reactor with a preset time threshold. If the product storage time ti is greater than the preset storage time threshold, it is recorded as a backlog reactor. If the product storage time ti is not greater than the preset storage time threshold, it is recorded as a normal reactor.

[0020] The time control unit records the raw material storage time of each batch of production raw materials as Tu, u=1, 2, 3…, n. The time control unit compares the raw material storage time Tu of each batch of production raw materials with the preset storage threshold. If the raw material storage time Tu is greater than the preset storage threshold, the corresponding batch of production raw materials is recorded as backlog raw materials. If the raw material storage time Tu is not greater than the preset storage threshold, the corresponding batch of production raw materials is recorded as normal raw materials.

[0021] As a preferred implementation mode of the present invention, the time control unit obtains the total amount of inventory reactors and the product storage time ti of the inventory reactors through the inventory management unit, and records the total amount of inventory reactors as DL. The time control unit obtains the total amount of production raw materials and the raw material storage time Tu through the raw material control unit, and records the total amount of production raw materials as YL. The time control unit generates the reactor inventory risk value DF through formula analysis. The time control unit compares the reactor inventory risk value DF with the preset product risk threshold. If the reactor inventory risk value DF is greater than the preset product risk threshold, a high-risk product signal is generated; if the reactor inventory risk value DF is not greater than the preset product risk threshold, a low-risk product signal is generated.

[0022] The time control unit generates the raw material risk value YF through formula analysis. The time control unit compares the raw material risk value YF with the preset raw material risk threshold. If the raw material risk value YF is greater than the preset raw material risk threshold, a raw material high-risk signal is generated; if the raw material risk value YF is not greater than the preset raw material risk threshold, a raw material low-risk signal is generated.

[0023] As a preferred embodiment of the present invention, the time control unit generates a production line deceleration signal after simultaneously generating a product high-risk signal and a raw material low-risk signal, and the time control unit generates a production line acceleration signal after simultaneously generating a product low-risk signal and a raw material high-risk signal.

[0024] Compared with the prior art, the present invention has the following beneficial effects:

[0025] 1. In the present invention, when supervising the production of reactors, the backlog risks of raw materials and products are analyzed simultaneously, and corresponding early warning reminders are generated according to the analysis results. At the same time, when high-risk warnings do not appear for raw materials and products at the same time, the production line speed can be automatically adjusted to balance the inventory backlog of raw materials and products, so that the inventory of raw materials and products are kept at a low-risk stage, thereby improving the ability to cope with backlogs in production and the risk response ability in the face of market fluctuations.

[0026] 2. In the present invention, when supervising the production line, the product storage cost and the raw material storage cost are analyzed, and function calculation is performed based on the product storage cost and the raw material storage cost to find the inventory balance ratio of products and raw materials, and the production line speed is adjusted according to the inventory balance ratio, so that the production speed of the production line can make the ratio of raw materials and products close to the inventory balance ratio, thereby reducing the storage cost.

[0027] 3. In the present invention, the storage time of products and raw materials is supervised, and judgment is made based on the storage time of products and raw materials, so as to generate early warning reminders to avoid long-term storage of products or raw materials affecting the quality of use. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.

[0029] Figure 1 is a system block diagram of the present invention;

[0030] Figure 2 It is a system flow chart of the present invention. DETAILED DESCRIPTION

[0031] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0032] Embodiment 1:

[0033] See also Figure 1 - Figure 2 As shown, a production intelligent management system for reactors includes a cost analysis unit, an inventory management unit, a raw material control unit, a time control unit and a production line control unit. The inventory management unit is used to count the reactors produced to obtain the total amount of inventory reactors and obtain the storage time of each inventory reactor. According to the storage time and current time of each reactor, calculation is performed to obtain the storage time of each reactor in the warehouse.

[0034] The raw material control unit counts the stored production raw materials to obtain the total amount of production raw materials, and obtains the storage time of each group of production raw materials. It calculates based on the storage time of each group of production raw materials and the current time to obtain the storage time of each batch of production raw materials in the warehouse;

[0035] The inventory management unit sends the total amount of inventory reactors and the storage time of different reactors to the time control unit, and the raw material control unit sends the total amount of production raw materials and the storage time of each batch of production raw materials to the time control unit;

[0036] The time control unit records the storage time of each inventory reactor as ti, where i=1, 2, 3…, n. The time control unit compares the storage time ti of each inventory reactor with the preset time threshold. If the storage time ti of the product is greater than the preset storage time threshold, it is recorded as a backlog reactor. If the storage time ti of the product is not greater than the preset storage time threshold, it is recorded as a normal reactor.

[0037] The time control unit records the raw material storage time of each batch of production raw materials as Tu, u=1, 2, 3…, n. The time control unit compares the raw material storage time Tu of each batch of production raw materials with the preset storage threshold. If the raw material storage time Tu is greater than the preset storage threshold, the corresponding batch of production raw materials is recorded as backlog raw materials. If the raw material storage time Tu is not greater than the preset storage threshold, the corresponding batch of production raw materials is recorded as normal raw materials.

[0038] The time control unit sends the backlog of reactors and raw materials to the management equipment through the network, and displays the batches and quantities of the backlog of reactors and raw materials on the screen to remind the management personnel.

[0039] Embodiment 2:

[0040] See also Figure 1 - Figure 2 As shown, the time control unit obtains the total amount of inventory reactors and the product storage time ti of the inventory reactors through the inventory management unit, and records the total amount of inventory reactors as DL. The time control unit obtains the total amount of production raw materials and the raw material storage time Tu through the raw material control unit, and records the total amount of production raw materials as YL. The time control unit generates the reactor inventory risk value DF through formula analysis. The time control unit compares the reactor inventory risk value DF with the preset product risk threshold. If the reactor inventory risk value DF is greater than the preset product risk threshold, a product high-risk signal is generated. If the reactor inventory risk value DF is not greater than the preset product risk threshold, a product low-risk signal is generated. After the product high-risk signal is generated, the time control unit sends the product low-risk signal to the management device through the network, and displays the corresponding text reminder on the display screen to play the role of alarm reminder;

[0041] The time control unit generates the raw material risk value YF through formula analysis. The time control unit compares the raw material risk value YF with the preset raw material risk threshold. If the raw material risk value YF is greater than the preset raw material risk threshold, a raw material high-risk signal is generated. If the raw material risk value YF is not greater than the preset raw material risk threshold, a raw material low-risk signal is generated. The time control unit sends the raw material high-risk signal to the management device through the network, and displays the corresponding text on the display screen to serve as an early warning reminder for the management personnel;

[0042] After the time control unit generates a product high-risk signal and a raw material low-risk signal at the same time, it generates a production line deceleration signal to reduce the production speed of the production line, reduce the accumulation speed of reactor products, and reduce the amount of inventory reactors. After the time control unit generates a product low-risk signal and a raw material high-risk signal at the same time, it generates a production line acceleration signal to increase the production speed of the production line, speed up the consumption of production raw materials, and reduce the inventory of production raw materials.

[0043] Embodiment three:

[0044] See also Figure 1 - Figure 2 As shown, the cost analysis unit obtains the total amount of inventory reactors through the inventory management unit, and obtains the total amount of production raw materials through the raw material management unit;

[0045] After the cost analysis unit obtains the total amount of inventory reactors, it calculates the storage cost required for storing the inventory reactors in a 24-hour cycle, and divides the storage cost of the inventory reactors by the total amount of inventory reactors to obtain the storage cost of a single inventory reactor. After the cost analysis unit obtains the total amount of production raw materials, it calculates the total cost required for storing the production raw materials in a 24-hour cycle, and divides the total cost required for storing the production raw materials by the total amount of production raw materials to obtain the storage cost required for unit production raw materials.

[0046] The cost analysis unit records the total amount of production raw materials under ideal conditions as X, the total amount of inventory reactors under ideal conditions as Y, the storage cost required for unit production raw materials as a, and the storage cost of a single inventory reactor as b, and generates a total storage cost function f(c), f(c) = θaX + βbY, wherein θ and β are weight coefficients, θ and X are in a fractional function relationship, β and Y are in a fractional function relationship, and there is a conversion relationship between X and Y with a conversion rate of q, the value of X+qY is a constant, and X and Y have minimum values ​​Xmin and Ymin that are not 0, respectively. The cost analysis unit finds the proportional relationship between X and Y when the total storage cost is the lowest through the image of the total storage cost function, and records it as the optimal storage ratio Z, Z = X / Y, and expands both ends according to the optimal storage ratio Z to obtain the optimal storage ratio range Zmin~Zmax;

[0047] The cost analysis unit calculates the ratio of the current total amount of production raw materials to the total amount of storage of reactors in stock, and records it as the current storage ratio. The cost analysis unit compares the current storage ratio with the optimal storage ratio range. If the current storage ratio is less than the minimum value of the optimal storage ratio, a production speed reduction signal is generated, and the production speed reduction signal is sent to the production line control unit, thereby reducing the production speed, increasing the storage amount of production raw materials, reducing the storage amount of reactor products, and adjusting the storage cost. If the current storage ratio is greater than the maximum value of the optimal storage ratio range, a production speed increase signal is generated, and the production speed reduction signal is sent to the production line control unit, thereby increasing the production speed, reducing the storage amount of production raw materials, and increasing the storage amount of reactor products, thereby adjusting the storage cost.

[0048] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.

Claims

1. A production intelligent management system for reactors, characterized in that: It includes an inventory management unit, which is used to collect statistics on the inventory of reactors in the warehouse to obtain the total inventory of reactors and the storage time of each reactor in the warehouse; A raw material control unit, which counts the stored production raw materials to obtain the total amount of production raw materials and the storage time of each batch of production raw materials in the warehouse; A cost analysis unit, wherein the cost analysis unit obtains the total amount of inventory reactors and the total amount of production raw materials through the inventory management unit and the raw material control unit, and at the same time calculates the storage cost of the inventory reactors and the storage cost of the production raw materials, analyzes the storage cost and the total amount to obtain the optimal storage ratio range, and then analyzes the current storage ratio and the optimal storage ratio to generate a production speed increase signal or a production speed slowdown signal; A time control unit, which is used to judge the storage time of the inventory reactors and production raw materials, and mark the backlog of reactors and backlog of raw materials according to the judgment result; The time control unit collects statistics on the backlog risks of inventory reactors and production raw materials, generates corresponding backlog risk reminders, and adjusts the production line production speed according to the different backlog risks of reactors and raw materials to buffer the backlog risks; A production line control unit, which is used to receive production line speed adjustment related signals and control the production line operation speed.

2. The production intelligent management system for reactors according to claim 1, characterized in that: The inventory management unit obtains the storage time of each inventory reactor, and calculates according to the storage time and current time of each reactor to obtain the storage time of each reactor in the warehouse; The raw material control unit obtains the storage time of each group of production raw materials, and calculates according to the storage time of each group of production raw materials and the current time to obtain the storage time of each batch of production raw materials in the warehouse; The inventory management unit sends the total amount of inventory reactors and the storage time of different reactors to the time control unit, and the raw material control unit sends the total amount of production raw materials and the storage time of each batch of production raw materials to the time control unit.

3. The production intelligent management system for reactors according to claim 1, characterized in that: After the cost analysis unit obtains the total amount of inventory reactors, it calculates the storage cost required for storing the inventory reactors in a 24-hour cycle, and divides the storage cost of the inventory reactors by the total amount of inventory reactors to obtain the storage cost of a single inventory reactor. After the cost analysis unit obtains the total amount of production raw materials, it calculates the total cost required for storing the production raw materials in a 24-hour cycle, and obtains the storage cost required for a unit of production raw materials by dividing the total cost required for storing the production raw materials by the total amount of production raw materials. The cost analysis unit records the total amount of production raw materials under ideal conditions as X, the total amount of inventory reactors under ideal conditions as Y, the storage cost required for unit production raw materials as a, and the storage cost of a single inventory reactor as b, and generates a total storage cost function f(c), f(c)=θaX+βbY, wherein θ and β are weight coefficients, θ and X are in a fractional function relationship, β and Y are in a fractional function relationship, and there is a conversion relationship between X and Y with a conversion rate of q, the value of X+qY is a constant, and X and Y have minimum values ​​Xmin and Ymin that are not 0, respectively. The cost analysis unit finds the proportional relationship between X and Y when the total storage cost is the lowest through the image of the total storage cost function, records it as the optimal storage ratio Z, Z=X / Y, and expands both ends according to the optimal storage ratio Z to obtain the optimal storage ratio range Zmin~Zmax.

4. The production intelligent management system for reactors according to claim 3 is characterized in that: The cost analysis unit calculates the ratio of the current total amount of production raw materials to the total amount of inventory reactors stored, and records it as the current storage ratio. The cost analysis unit compares the current storage ratio with the optimal storage ratio range. If the current storage ratio is less than the minimum value of the optimal storage ratio, a production speed slowdown signal is generated. If the current storage ratio is greater than the maximum value of the optimal storage ratio range, a production speed increase signal is generated.

5. The production intelligent management system for reactors according to claim 1, characterized in that: The time control unit records the product storage time of each inventory reactor as ti, where i=1, 2, 3..., n. The time control unit compares the product storage time ti of each inventory reactor with a preset time threshold. If the product storage time ti is greater than the preset storage time threshold, it is recorded as a backlog reactor. If the product storage time ti is not greater than the preset storage time threshold, it is recorded as a normal reactor. The time control unit records the raw material storage time of each batch of production raw materials as Tu, u=1, 2, 3…, n. The time control unit compares the raw material storage time Tu of each batch of production raw materials with the preset storage threshold. If the raw material storage time Tu is greater than the preset storage threshold, the corresponding batch of production raw materials is recorded as backlog raw materials. If the raw material storage time Tu is not greater than the preset storage threshold, the corresponding batch of production raw materials is recorded as normal raw materials.

6. The production intelligent management system for reactors according to claim 1, characterized in that: The time control unit obtains the total amount of inventory reactors and the product storage time ti of the inventory reactors through the inventory management unit, and records the total amount of inventory reactors as DL. The time control unit obtains the total amount of production raw materials and the raw material storage time Tu through the raw material control unit, and records the total amount of production raw materials as YL. The time control unit generates the reactor inventory risk value DF through formula analysis. The time control unit compares the reactor inventory risk value DF with the preset product risk threshold. If the reactor inventory risk value DF is greater than the preset product risk threshold, a high-risk product signal is generated; if the reactor inventory risk value DF is not greater than the preset product risk threshold, a low-risk product signal is generated. The time control unit generates the raw material risk value YF through formula analysis. The time control unit compares the raw material risk value YF with the preset raw material risk threshold. If the raw material risk value YF is greater than the preset raw material risk threshold, a raw material high-risk signal is generated; if the raw material risk value YF is not greater than the preset raw material risk threshold, a raw material low-risk signal is generated.

7. The production intelligent management system for reactors according to claim 1, characterized in that: The time control unit generates a production line deceleration signal after simultaneously generating a product high-risk signal and a raw material low-risk signal. The time control unit generates a production line acceleration signal after simultaneously generating a product low-risk signal and a raw material high-risk signal.