Engineering project management method, task editing method, device, equipment and system

By establishing the correspondence between the bid section and editors in the project and standard format management, the inefficiency of the combined draft and data merging errors caused by different editors are solved, and efficient and accurate combined drafts of the project are achieved.

CN119090449APending Publication Date: 2024-12-06GLODON CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411242025.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-05
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

In engineering project management, due to the inconsistent habits of different editors, the project manager needs to spend a lot of time unifying the project data, and the combined draft process is prone to errors and inconsistent versions, resulting in management chaos and data merging errors.

Method used

By establishing the correspondence between the subtasks of each section in the project and the corresponding editors, a task allocation list is generated, and ensuring that all subtask information is in a standard format, the data format submitted by the editor after the client is edited remains unchanged , realize one-click manuscript combination to avoid manuscript errors caused by inconsistent versions.

Benefits of technology

It improves the combined efficiency of project management, saves the combined time and cost of project management, and ensures the accuracy and consistency of the combined process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119090449A_ABST
    Figure CN119090449A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of computer assistance, in particular to an engineering project management method, a task editing method, a device, equipment and a system. The method comprises the following steps: when a task allocation instruction is received, establishing a corresponding relationship between subtasks of each section in an engineering project and corresponding editors, generating a task allocation list, and issuing the task allocation list to at least one client; and receiving editing data of at least one subtask submitted by at least one client, generating a manuscript combining instruction when the submitted editing data of the subtask meets a manuscript combining condition, carrying out manuscript combining processing on the editing data of the at least one subtask according to the manuscript combining instruction, and generating and submitting an engineering project manuscript combining file. According to the method, task distribution and one-bonding manuscript combining functions of engineering project management are realized, edited data do not need to be imported and exported in the manuscript combining process, the manuscript combining efficiency is improved, the manuscript combining time of project management is saved, and the cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of computer-aided technology, and in particular to an engineering project management method, a task editing method, a device, equipment and a system. Background Art

[0002] Due to the complex structure of construction projects, multiple people are often required to operate the engineering cost and budget compilation documents at the same time. They can obtain each other's operation data through the network and work together to complete the work of engineering cost document / budget compilation. Generally, after the project is created, the project manager assigns tasks to editors. After the editors receive the tasks and complete the engineering editing tasks on the client, they report them to the project manager, who then collates, checks, and submits them.

[0003] In the process of different editors performing engineering project subtasks, due to the inconsistency of editing habits among different editors, after receiving the edited data, the project manager needs to spend a lot of time to unify the list comprehensive unit price, material description and material price, and the work is repeated every time the manuscript is merged. In addition, if the edited data submitted by an editor does not meet the requirements or there is an error in the editing, it needs to be returned to the editor for modification. If multiple modifications occur, it will result in multiple process versions and chaotic management, which is easy to cause errors in data merging. Summary of the invention

[0004] In view of this, the present invention provides an engineering project management method, a task editing method, an apparatus, a device and a system to solve the problems of low manuscript compilation efficiency, inconsistent formats and easy errors in manuscript compilation during the collaborative compilation process of engineering project editors.

[0005] In a first aspect, the present invention provides a method for project management, which can be applied to a client or a server, and comprises:

[0006] When a task assignment instruction is received, a correspondence between the subtasks of each bid section in the project and the corresponding editors is established, and a task assignment list is generated, the task assignment list includes subtask information of at least one bid section and the correspondence, wherein each subtask information complies with a standard format and the content is editable;

[0007] Sending the subtask information of the at least one bid section to at least one client according to the corresponding relationship;

[0008] Receiving editing data of at least one subtask submitted by the at least one client, each of the editing data is generated by an editor on the client after editing according to the subtask information, and the standard format remains unchanged;

[0009] When the edited data of the submitted subtasks meets the merge condition, a merge instruction is generated, and the edited data of the at least one subtask is merged according to the merge instruction to generate and submit a merged file of the engineering project.

[0010] The method provided in this aspect provides a task allocation function for engineering project management, that is, the subtasks of each section are paired with editors, so that each subtask is assigned to different editors to perform the editing subtask, so that different editors can edit and view files at the same time, and collaborate to complete tasks at different locations and times.

[0011] In addition, it also includes an automatic manuscript consolidation function. Since the format of the editing data received for each subtask is in a standard format, and the standard format will not be changed during the editing operation performed by the editor, after the editing data is submitted, if the manuscript consolidation conditions are met, one-click consolidation can be achieved, avoiding errors in consolidation due to inconsistent versions, or problems such as inability to consolidation. This method does not require importing and exporting edited data during the consolidation process, thereby improving consolidation efficiency, saving project management consolidation time and reducing costs.

[0012] In combination with the first aspect, in a possible implementation, the receiving of the task assignment instruction includes: generating and receiving the task assignment instruction in response to a user's click operation on a task assignment control of an engineering compilation application. This implementation is based on engineering project management software, and when a click operation of a project manager is received on the software, a one-click automatic task assignment function is implemented.

[0013] In combination with the first aspect, in another possible implementation, the task allocation function is started to establish a corresponding relationship between the subtasks of each bid section in the engineering project and the corresponding editors, and a task allocation list is generated, including:

[0014] Reading the engineering project structure of the engineering compilation task, wherein the engineering project structure includes at least one bidding section, and each bidding section is associated with one or more subtasks;

[0015] Obtaining an editor list, wherein the editor list includes at least one editor ID capable of performing an editing operation;

[0016] According to the functions of each editor in the editor list, a corresponding relationship between the at least one editor ID and each subtask of the at least one bid section is established to generate the task allocation list.

[0017] In combination with the first aspect, in another possible implementation manner, before sending the subtask information of the at least one bid section to at least one client according to the corresponding relationship, the method further includes:

[0018] Setting the editing authority and identity authentication information of each editor in the editor list;

[0019] The sending the subtask information of the at least one bid section to at least one client according to the corresponding relationship includes:

[0020] Verifying the identity information of the editor of the client of at least one subtask information to be sent;

[0021] If the identity information verification is successful, the subtask information and the editing authority corresponding to the editor are packaged and sent to the corresponding client;

[0022] If the identity information verification fails, an indication of the verification failure is fed back to the client where the current editor is located.

[0023] In combination with the first aspect, in another possible implementation manner, after sending the subtask information of the at least one bid section to at least one client according to the corresponding relationship, the method further includes:

[0024] Establishing a project information table, wherein the editor ID, compilation status, data version number, and unit project identification information assigned to each node are recorded in the project information table, wherein each bidding section or a subtask under the bidding section is used as the node;

[0025] After receiving the editing data of at least one subtask submitted by at least one client, the method further includes:

[0026] Update one or more of the editor ID, compilation status, data version number, and identification information of the unit project of at least one node in the project information table.

[0027] In combination with the first aspect, in another possible implementation, the generating of a merge instruction when the editing data of the submitted subtask meets the merge condition includes: after issuing the subtask information of the at least one section, generating a merge instruction when the number of edited data of the submitted subtasks reaches a preset number within a preset time period, or generating the merge instruction when a user clicks on a merge control.

[0028] In combination with the first aspect, in another possible implementation, the combining the editing data of the at least one subtask according to the combining instruction to generate and submit a combined engineering project file includes:

[0029] Combining all the received editing data according to the combining instruction and generating a combined engineering project file;

[0030] The compilation status of at least one node in the engineering information table is updated to be completed, and the engineering project completed file and the updated engineering information table are uploaded to the cloud server.

[0031] In combination with the first aspect, in another possible implementation, before submitting the engineering project draft document, the method further includes: sending the engineering project draft document to a third-party organization for review, or automatically starting a document review process;

[0032] If the review is qualified, the joint draft document of the engineering project will be submitted;

[0033] If the review fails, the engineering project draft file will be converted into a preset format file, and the preset format file will be sent to the copy space of at least one editor, so that each editor can obtain the preset format file from the copy space and edit and modify the engineering project draft file.

[0034] In combination with the first aspect, in another possible implementation, sending the subtask information of the at least one bid section to at least one client according to the corresponding relationship includes:

[0035] When the first subtask and the second subtask under the same bid section are executed in sequence, or when the first subtask and the second subtask under different bid sections are executed in sequence, the subtask information corresponding to the first subtask is sent to the first client; wherein the first subtask is executed before the second subtask;

[0036] When receiving the first edit data of the first subtask submitted by the first client, performing correctness verification and node matching processing on the first edit data, and after the verification passes, generating subtask information of the second subtask in combination with the first edit data of the first subtask;

[0037] The subtask information of the second subtask is sent to the second client, so that the second client generates second edited data after editing according to the subtask information of the second subtask.

[0038] In a second aspect, the present invention provides a method for editing tasks of an engineering project, which can be applied to a client, and the method includes:

[0039] Receiving subtask information under a bid section of an engineering project, wherein the subtask information is generated and sent by a sending end according to a task allocation instruction, conforms to a standard format and has editable content;

[0040] In response to the editor editing the subtask content according to the subtask information and the editing authority, generating corresponding subtask editing data, wherein the format of the editing data is the standard format;

[0041] The edited data of the subtask is sent to a sending end.

[0042] The task editing method provided in this aspect breaks down a complete project into subtask information consisting of multiple unit engineering files and sends them to different editors. After receiving them, each editor edits the task on the client, and the editing data generated after editing remains in the standard format, so that after submission, the manuscript can be combined with one click, improving the efficiency of combining manuscripts. In addition, the copy creation method is used to achieve data isolation when multiple people collaborate, so that different editors can work at the same time without conflicts.

[0043] In conjunction with the second aspect, in a possible implementation, sending the edited data of the subtask to the sending end includes: in response to the editor clicking a submit control on the engineering project management software, sending the edited data of the subtask to the sending end. This implementation implements the function of the editor submitting the edited data with one click on the client.

[0044] In combination with the second aspect, in another possible implementation, after sending the editing data of the subtask to the sending end, the method further includes:

[0045] When an update instruction is received, a project information table is obtained, in which the editor ID, compilation status, data version number, and identification information of the unit project assigned to each node are recorded;

[0046] Acquire the identification information of the unit project and the associated editor ID from the project information table, and pull the relevant data indicated by the identification information of the unit project from the copy space of the associated editor ID;

[0047] The related data is imported into the engineering data to be edited by the editor, and combined with the generated editing data of the subtask to generate new editing data; and the new editing data is sent to the sending end.

[0048] In combination with the second aspect, in yet another possible implementation, after sending the editing data of the subtask to the sending end, the method further includes:

[0049] If the edited data of the subtask is rejected after review, a preset format file is pulled from the copy space, the preset format file is generated by converting the edited data of the subtask, and is sent to the copy space;

[0050] Parsing the preset format file to obtain the editing data and the indication information of being rejected;

[0051] In response to the editor modifying the edit data according to the indication information, the modified edit data is generated and the modified edit data is sent to the sending end.

[0052] In combination with the second aspect, in yet another possible implementation, the method further includes:

[0053] Generate log information according to the editing data of the subtask, the log information includes: a submission information description and a history path, the submission information description is used for the editing data of the subtask, and the history path is used to trace the editing data of the subtask; upload the log information to the cloud server.

[0054] This implementation generates a corresponding log after each editing operation to facilitate subsequent version retrieval, so that file modifications can be documented and closed-loop management can be effectively achieved.

[0055] In a third aspect, the present invention provides a construction project management device, the device comprising:

[0056] The first generation module is used to establish a correspondence between the subtasks of each bid section in the engineering project and the corresponding editors when receiving a task assignment instruction, and generate a task assignment list, wherein the task assignment list includes subtask information of at least one bid section and the correspondence, wherein each subtask information complies with a standard format and the content is editable;

[0057] A first sending module, configured to send the subtask information of the at least one bid section to at least one client according to the corresponding relationship;

[0058] A first receiving module is used to receive editing data of at least one subtask submitted by at least one client, each of which is generated by an editor on the client after editing according to the subtask information, and the standard format remains unchanged;

[0059] The processing module is used to generate a manuscript combining instruction when the edited data of the submitted subtask meets the manuscript combining condition, perform manuscript combining processing on the edited data of the at least one subtask according to the manuscript combining instruction, and generate and submit a manuscript combining file of the engineering project.

[0060] In a fourth aspect, the present invention further provides a task editing device for an engineering project, the device comprising:

[0061] The second receiving module is used to receive subtask information under a bid section of the engineering project, wherein the subtask information is generated and sent by the sending end according to the task allocation instruction, conforms to the standard format and has editable content;

[0062] A second generating module is used to generate corresponding editing data of the subtask in response to the editing content of the subtask by the editor according to the subtask information and the editing authority, wherein the format of the editing data is the standard format;

[0063] The second sending module is used to send the editing data of the subtask to the sending end.

[0064] In a fifth aspect, the present invention provides an electronic device comprising: a memory and a processor, the memory and the processor being communicatively connected to each other, computer instructions being stored in the memory, and the processor executing the computer instructions to thereby execute a method for managing an engineering project according to the first aspect or any corresponding embodiment thereof, or also to execute the second aspect or a method for editing tasks for an engineering project according to any embodiment of the second aspect.

[0065] In a sixth aspect, the present invention further provides a construction project management system, the system comprising at least two terminal devices;

[0066] When one of the at least two end devices is used as a sending end, the engineering project management method of the first aspect or any corresponding implementation manner thereof is executed;

[0067] When one of the at least two terminal devices serves as a receiving end, the task editing method for the engineering project in the second aspect or any one of the implementations of the second aspect is executed.

[0068] In the seventh aspect, the present invention provides a computer-readable storage medium, on which computer instructions are stored, and the computer instructions are used to enable a computer to execute the engineering project management method of the above-mentioned first aspect or any corresponding embodiment thereof; or also execute the task editing method of the engineering project in the above-mentioned second aspect or any embodiment of the second aspect.

[0069] In addition, the present invention provides a computer program product, including computer instructions, which are used to enable a computer to execute the engineering project management method of the above-mentioned first aspect or any corresponding embodiment thereof; or also execute the task editing method of the engineering project in the above-mentioned second aspect or any embodiment of the second aspect.

[0070] The present invention provides an engineering project management method, task editing method, device, equipment and system, which provide a task allocation function for engineering project management, that is, pairing and associating the subtasks of each section with editors, thereby allocating each subtask to different editors to perform the editing subtask, so that different editors can edit and view files at the same time, and collaborate to complete tasks at different locations and times.

[0071] In addition, the present technical solution also provides one-click submission of editing data, one-click merging, and one-click rejection functions. Since the formats of the editing data received for each subtask are all in a standard format, and the standard format will not be changed during the editing operation performed by the editor, after the editing data is submitted, if the merging conditions are met, one-click merging can be achieved, avoiding errors in merging due to inconsistent versions, or problems such as being unable to merging. This method does not require importing and exporting edited data during the merging process, thereby improving merging efficiency, saving merging time for project management, and reducing costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0072] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0073] Figure 1 is an architecture diagram of a construction project management system according to an embodiment of the present invention;

[0074] Figure 2 is a schematic diagram of the internal structure of a construction project management system according to an embodiment of the present invention;

[0075] Figure 3 is a project compilation collaboration flow chart according to an embodiment of the present invention;

[0076] Figure 4 is a flowchart of a method for project management according to an embodiment of the present invention;

[0077] Figure 5 is a flowchart of engineering project task allocation according to an embodiment of the present invention;

[0078] Figure 6 is a flow chart of another engineering project management method according to an embodiment of the present invention;

[0079] Figure 7 is a schematic diagram of multiple people assisting in performing a task according to an embodiment of the present invention;

[0080] Figure 8 is a flow chart of a method for editing tasks of an engineering project according to an embodiment of the present invention;

[0081] Fig. 9 is a schematic diagram of a manuscript combining process according to an embodiment of the present invention;

[0082] Fig.10aThis is a diagram of an operation interface for task allocation according to an embodiment of the present invention;

[0083] Fig.10b This is a diagram of an operation interface for submitting a task according to an embodiment of the present invention;

[0084] Fig.10c This is a diagram of an operation interface for combining manuscripts according to an embodiment of the present invention;

[0085] Fig.10d This is a window interface diagram displayed after manuscripts are combined according to an embodiment of the present invention;

[0086] Fig.10e This is a diagram of a rejection operation interface according to an embodiment of the present invention;

[0087] Fig.10f is an updated operation interface diagram according to an embodiment of the present invention;

[0088] Figure 10g This is a window interface diagram for viewing updated content after updating according to an embodiment of the present invention;

[0089] Fig.11 is a structural block diagram of a construction project management device according to an embodiment of the present invention;

[0090] Fig.12 is a structural block diagram of a task editing device according to an embodiment of the present invention;

[0091] Fig.13 It is a schematic diagram of the hardware structure of an electronic device according to an embodiment of the present invention. DETAILED DESCRIPTION

[0092] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0093] It should be understood that the terms used herein are only for the purpose of describing specific example embodiments and are not intended to be limiting. Unless the context clearly indicates otherwise, the singular forms "one", "an" and "said" as used herein may also be meant to include plural forms. The terms "include", "comprise" and "have" are inclusive and therefore specify the presence of stated features, elements and / or parts, but do not exclude the presence or addition of one or more other features, elements, parts, and / or combinations thereof. In addition, the terms "first" and "second" are used only for descriptive purposes and cannot be understood as indicating or suggesting relative importance.

[0094] See also Figure 1 , is an architecture diagram of an engineering project management system according to an embodiment of the present invention. The system includes a server and at least one client, and the server and each client may be connected by wire or wirelessly, and the wireless connection includes WLAN (Wireless Local Area Network), WiFi connection, etc.

[0095] The server may be a network device, such as a server or server cluster, data center, etc. The client may be a terminal device, including but not limited to a mobile terminal, such as a personal computer, a tablet computer, a smart phone, a wireless terminal device, a mobile terminal, a wearable device, etc. The client and the server are both provided with or installed with engineering project management software, and the engineering project management software functions may be implemented through software, hardware, or software and hardware, such as software APP.

[0096] Figure 1 In the embodiment, at least one client includes a client, PC1 and PC2. In addition, each client or server is controlled by a user (User). Specifically, the User includes a project manager, an editor, a co-author, a reviewer, etc. This embodiment does not impose any restrictions on this.

[0097] See also Figure 2 , is a schematic diagram of the internal structure of an engineering project management system according to an embodiment of the present invention. Figure 2 It includes the client and the server. The client has functional software including probability, budget, settlement, audit and other functions, and also includes infrastructure and collaboration components. The collaboration component is used to interact with the functional software, such as client permission control, status management, etc. The infrastructure module includes account management, encryption lock management and other functions.

[0098] On the service side, such as the server, it can include front-end UI design module, Nginx gateway, collaboration service module, storage service module, basic service module, data storage module, etc.

[0099] Among them, the front-end UI design module belongs to the application layer and can be implemented by installing the APP. After installing the APP, the functions of guiding the web page and the project file display interface can be realized, that is, the various nodes in the project and the online editing content can be displayed on the display interface. The Nginx gateway plays the role of transmitting information, transmitting the front-end UI data of the application layer to the collaboration service module, storage service module, etc. The collaboration service module includes at least one of the following functions: allocation information management, member management, status management, log management, etc. The storage service module includes functions such as file storage management and backup management.

[0100] In addition, in the client, the basic service module is used to detect the user login status and generate cloud documents. In the data storage module, it is used to store the relational database MySQL and the non-relational database Redis. Optional. The data storage module can be a cache.

[0101] The following is an introduction to the engineering compilation assistance process. Figure 3 As shown, generally, the basic process of engineering cost or budget preparation includes: the project manager creates a project through a server or client, assigns tasks according to the project structure, and then passes the assigned subtask files to different editors (also called editors). After receiving the subtask transfer files, the editors perform the preparation work, such as construction engineering cost, budget preparation, etc., generate the preparation project file, and submit the file to the project manager. After receiving the project file sent by at least one editor, the project manager performs operations such as combining the manuscripts, making unified adjustments, and submitting it to the reviewer for review.

[0102] After receiving the document, the reviewer will perform the review work on the client. If there are errors or problems during the review process, they will be fed back to the corresponding editor for modification. After the editor has modified it, it will be submitted to the project manager again. After the project manager has re-drafted and adjusted it, it will be submitted to the reviewer for review again. Finally, after the review is passed, the project cost / budget task is completed.

[0103] Among them, editors refer to personnel involved in the editing of engineering cost / budget. Reviewers refer to reviewers who review whether the engineering cost / budget compilation meets the requirements and whether there are any anomalies in the engineering data. The project manager is responsible for creating the project, task allocation, manuscript compilation, adjustment, and submission for review.

[0104] In the general project engineering operation preparation process, there are the following problems:

[0105] 1. During the cost / budget preparation process, there may be changes in drawings, changes in bid documents, internal audits, and other issues, which may lead to the need to modify the project data multiple times. After each modification, the project files need to be sent to the project manager for data merging, which is then checked. This process requires repeated merging multiple times.

[0106] 2. Different editors have different habits. After the project manager merges the data, he needs to spend a lot of time to unify the comprehensive unit price of the list, material description and material price. The work is repeated every time the manuscripts are merged.

[0107] 3. Multiple modifications result in multiple process versions and chaotic management, which can easily lead to data merging errors.

[0108] 4. When reviewers encounter problems during the review, they communicate based on communication tools and then record the problems in OA. The audit issues and process records cannot be effectively closed, and the review efficiency is low.

[0109] In order to solve the above problems, the embodiments of the present invention provide a project management method and a task editing method. Specifically, in the project management method, the project manager can adjust the project permissions of each editor at any time through the "task allocation" function, and can revoke permissions or reallocate them to other people.

[0110] During the editing process, the project manager can use the "Merge" function to force the merging of project files. For example, if an editor is unable to continue editing due to illness, the project manager can force the merge of the currently edited part and then reallocate it to someone else to continue editing.

[0111] When the user uses the client or server to perform functions such as "task assignment", "submission", "combination", and "rejection", a log will be generated for each operation performed. The log function can be used to view operation information and retrieve process data, which facilitates data backtracking and version management.

[0112] In addition, after each operation is executed, the data cloud storage module will be used to store the edited data, logs, etc. in the cloud document system of OSS (Object Storage Service), which supports enterprise-level isolation, project-level isolation, and file-level permission management. In this cloud document storage system, project-level isolation technology is used. After "task assignment", a Core space will be created to store the data structure of the project, realize the management of the project structure, and create project copies for participating members, so that each member can modify without interfering with each other and execute concurrently. After "submitting the combined manuscript", the final engineering data is generated and stored in the "results file", and the engineering information can be viewed in real time on the client and the cost cloud service end.

[0113] The engineering project management method provided in this embodiment is described in detail below.

[0114] An embodiment of the present invention provides an embodiment of an engineering project management method. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0115] Figure 4 is a flow chart of a method for project management according to an embodiment of the present invention, which can be executed by a server or a client. Figure 4 As shown, the process includes:

[0116] Step S101: When a task allocation instruction is received, a correspondence between the subtasks of each bid section in the engineering project and the corresponding editors is established, and a task allocation list is generated.

[0117] The task allocation list includes at least one section of subtask information and corresponding relationships, where each subtask information conforms to the standard format and the content is editable. A unit in the project pricing compilation project (also known as "unit project") is generally divided by building, which is represented as a node in the pricing software, and each node can correspond to a subtask.

[0118] One possible implementation is as follows Figure 5 As shown, when the engineering project management software is started on the client or server, the task assignment control of the engineering compilation task to be compiled is displayed on the interface; when the user clicks on the task assignment control, the task assignment instruction is generated and received in response to the user's click on the task assignment control of the engineering compilation application.

[0119] For example, the task data of the engineering project is uploaded according to the user's click operation on the server or client. The data includes engineering files, which can be allocated according to the bidding section. The bidding section engineering tasks of units 1 to 4 are allocated to user User1, and the bidding section engineering tasks of units 3 and 4 are allocated to user User2, and a project information table is created.

[0120] When a user clicks on the task assignment function on the server or client application APP, a task assignment instruction is generated and a corresponding editor is set for each unit project node. At this time, the server or PC will create a virtual table of project information, such as Figure 5 As shown in the table, the project information table records the editor to which each node belongs, the compilation status, the data version number and other information, and is used to store the allocation information of each node.

[0121] Optionally, a copy of the project data is generated for each editor on the server or PC, and each copy is stored in the personal space of the client or terminal device where each editor is located. Normal data modifications are based on the copy data.

[0122] Step S102: Sending subtask information of the at least one bid section to at least one client according to the corresponding relationship.

[0123] The at least one client refers to a client corresponding to at least one editor, and the purpose is that the editor of each client completes the editing operation on the subtask information.

[0124] Optionally, before sending the subtask information to the client, the above method further includes: verifying the identity of each editor. Specifically, an identity authentication method includes: first setting the editing authority and identity authentication information of each editor in the editor list; then verifying the identity information of the editor to which the client of at least one subtask information to be sent belongs; if the identity information verification is successful, the corresponding subtask information and the editing authority corresponding to the editor are packaged and sent to the client corresponding to the editor; if the identity information verification is unsuccessful, feedback of the verification failure indication information is sent to the client to which the current editor belongs.

[0125] Furthermore, the verification method may be an encryption key method or a token password method, etc. This embodiment does not limit the encryption method.

[0126] Step S103: receiving editing data of at least one subtask submitted by the at least one client.

[0127] Each edit data is generated by the editor on the client according to the subtask information and his / her own editing authority, and the standard format remains unchanged. When the editor performs collaborative work according to the subtask information sent by the server or client, the edit data of the subtask is generated. Collaborative work means that multiple people operate the same engineering cost / budget compilation file at the same time, and they can obtain each other's operation data through the network and work together to complete the engineering cost file / budget compilation and other tasks.

[0128] See also Figure 7 As shown, user 1 (user1) and user 2 (user2) execute the engineering cost task on their respective clients, complete the corresponding subtasks in the collaborative space, generate their respective edited data, and back up the edited data to the copy space.

[0129] Step S104: when the edited data of the submitted subtasks meet the merge condition, a merge instruction is generated, and the edited data of at least one subtask is merged according to the merge instruction to generate and submit a merged file of the engineering project.

[0130] The editing data of the submitted subtasks meets the manuscript combining conditions and generates manuscript combining instructions, which specifically include:

[0131] After the subtask information of at least one bid section is issued, when the number of edited data of the submitted subtasks reaches the preset number within the preset time period, a merge instruction is generated. For example, if 10 subtask information is issued to 10 clients, and 10 edited data reported by the 10 clients are received within the preset time period, the merge condition is met and a merge instruction is generated. In this embodiment, the terminal device automatically generates a merge instruction.

[0132] Alternatively, another implementation method is that the terminal device passively generates a merge instruction, specifically, generates a merge instruction when receiving a user click operation on the merge control. For example, when the edit data of the submitted subtask reaches a preset number, the merge control is lit and displayed, and the editing authority open to all editors is revoked; when receiving a user click operation on the merge control, a merge instruction is generated, the merge process is started, all the received edit data are merged, and a merge file for the project is generated.

[0133] For example Fig. 9 As shown, when receiving the editing data reported by user 1 (user1) and user 2 (user2) after performing the editing operation, the two editing data are combined according to the combination instruction, and the combination process is executed to generate a combined file of the engineering project containing the sections of unit 1 to unit 4.

[0134] In addition, the compilation status of at least one node in the engineering information table is updated to "compiled", and the engineering project manuscript file and the updated engineering information table are uploaded to the cloud server. The engineering project manuscript file is backed up as a historical version file.

[0135] The engineering project management method provided in this embodiment provides a task allocation function for engineering project management. When a task allocation instruction is received, the subtasks of each section are paired and associated with the editors, and each subtask information is allocated to different clients so that the editors of each client can perform the editing subtasks, so that different editors can edit and view files at the same time, and collaborate to complete tasks at different locations and times.

[0136] In addition, this method also provides an automatic merging function. Since the formats of the editing data of each subtask received are all in a standard format, and the standard format will not be changed during the editing operation performed by the editor, after the editing data is submitted, a one-click merging operation can be achieved according to the merging instruction, avoiding merging errors or failures due to inconsistent versions. This method does not need to import or export edited data during the merging process, thereby improving merging efficiency, saving merging time for project management, and reducing costs.

[0137] In addition, the method provided in this embodiment, in step S104: before submitting the combined engineering project document, further includes: sending the combined engineering project document to a third-party organization for review, or automatically starting a document review process.

[0138] The third-party organization may be a project management review organization, which is used to check or review the project manuscript. Specifically, the third-party organization may realize automatic review by a machine or a preset program code, or manual review, such as review by a reviewer. In addition, the function of the third-party organization may be integrated into the client or server, so that the current client or server has the manuscript review function.

[0139] If the review is qualified, the engineering project draft file is submitted. If the review is unqualified, the engineering project draft file is converted into a preset format file, and the preset format file is sent to the copy space of at least one editor, so that each editor obtains the preset format file from the copy space and edits and modifies the engineering project draft file.

[0140] Specifically, if the review result determines that the edited data 1 is erroneous or needs to be modified, the edited data 1 will be rejected to the editor 1 at the client 1, so that the editor 1 can re-edit and estimate the edited data 1, and submit the re-edited data to the third-party review agency or the current client / server again.

[0141] If the review is qualified, the server or client submits the project draft file to complete the project preparation task.

[0142] Optionally, the above-mentioned implementation method of rejecting the edited data to the client specifically includes: converting the edited data into a preset format file, and sending the preset format file to the copy space of the corresponding editor, so that the editor can obtain the preset format file from the copy space and edit and modify the engineering project draft file.

[0143] The preset format file can be a merge file, that is, the latest unit project data is converted into a merge file, and then sent to the copy space of editor 1. At the same time, the compilation status of the unit project node corresponding to the project information table is returned to "under compilation". After the editor (user1) pulls the merge file in the copy space, the relevant merge file data will be merged into his own project, and the compilation can continue after the merging is completed.

[0144] It should be noted that before using the technical solutions disclosed in the embodiments of the present disclosure, the user information involved in the present disclosure, such as user identity information, user operation information, etc., shall be authorized in an appropriate manner in accordance with relevant laws and regulations. For example, before performing operations such as task assignment, manuscript compilation, submission, and rejection, the system will send a prompt message to the user to clearly prompt the user that the operation requested to be performed will require the acquisition and use of the user's personal information. Thereby, the user can independently choose whether to provide personal information to software or hardware such as electronic devices, applications, servers, or storage media that perform the operations of the technical solutions of the present disclosure based on the prompt information. In addition, during the user personal information authorization process, a prompt message can be sent to the user, for example, in the form of a pop-up window, and the prompt information can be presented in the form of text in the pop-up window.

[0145] It should be understood that the above notification and authorization process for obtaining user personal information are only illustrative and do not constitute a limitation on the implementation method of the present disclosure. Other methods that meet relevant laws and regulations may also be applied to the implementation method of the present disclosure.

[0146] In a possible implementation, Figure 6 As shown, the above step S101: establishing a correspondence between the subtasks of each bid section of the engineering project and the corresponding editors, and generating the task allocation list, specifically includes:

[0147] Step S101-1: Read the engineering project structure of the engineering compilation task, wherein the engineering project structure includes at least one bidding section, and each bidding section is associated with one or more subtasks.

[0148] Optionally, the engineering project structure of the engineering compilation task may be pre-stored in a memory of the client or server and read from the memory.

[0149] Step S101-2: Obtain an editor list, which includes at least one editor ID capable of performing editing operations, including but not limited to the editor's name, ID number, ID mark, ID card number, etc.

[0150] Step S101 - 3 : According to the functions of each editor in the editor list, a corresponding relationship between at least one editor ID and each subtask of the at least one bid section is established to generate a task allocation list.

[0151] The functions of each editor can include the editor's professional level, qualifications, and company, etc. These functions can be obtained and stored through the editor's registration information. Each corresponding relationship includes the corresponding relationship between an editor and a subtask, such as the relationship between company 1-user1, company 3-user2, etc. Figure 5 In the example shown, the task assignment list can be presented using a project information table.

[0152] In addition, in the above step S102, after the subtask information of at least one section is sent to at least one client according to the corresponding relationship, it also includes: establishing a project information table, in which the editor ID, compilation status, data version number, and unit project identification information assigned to each node are recorded, wherein each section or a subtask under the section serves as the node.

[0153] The above step S103: after receiving the editing data of at least one subtask submitted by at least one client, it also includes: updating one or more of the editor ID, compilation status, data version number, and identification information of the unit project of at least one node in the project information table.

[0154] For example, before editing, the compilation status of units 1 to 4 is set to "unedited". After the subtask information is sent to each user, each user performs the editing operation. Before reporting the editing data, the compilation status is updated to "under compilation"; after receiving the editing data reported by each user, the status is updated to "submitted". Correspondingly, the editor ID, data version number, unit project and other information can also be updated at any time, so that the contents in the project information table reflect the latest progress of the current project task.

[0155] In another possible implementation of this embodiment, the above step S102, sending the subtask information of at least one bid section to at least one client according to the corresponding relationship, specifically includes:

[0156] When the first subtask and the second subtask under the same bidding section are executed in sequence, or when the first subtask and the second subtask under different bidding sections are executed in sequence, the subtask information corresponding to the first subtask is sent to the first client; wherein the first subtask is executed before the second subtask.

[0157] When receiving the first editing data of the first subtask submitted by the first client, the first editing data is checked for correctness and node matching is processed. After the verification is passed, subtask information of the second subtask is generated in combination with the first editing data of the first subtask; the subtask information of the second subtask is sent to the second client, so that the second client generates the second editing data after editing according to the subtask information of the second subtask.

[0158] For example, if subtask 1 and subtask 2 are two related subtasks that are executed successively, and the execution of subtask 2 requires the editing data of subtask 1, that is, subtask 1 is executed before subtask 2, therefore, during the execution process, the task information corresponding to subtask 1 is first sent to the first client, so that user1 of the first client executes subtask 1. After user1 executes subtask 1 to generate first editing data and uploads it to the client or server, the client or server generates task information of subtask 2 based on the first editing data, and sends it to the second client, so that user2 of the second client executes subtask 2. After user2 executes the editing task of subtask 2, second editing data is generated, and the second editing data is submitted to the client or server through the second client, thereby completing the editing operation of subtask 1 and subtask 2.

[0159] Optionally, subtask 1 and subtask 2 under the same section may be two subtasks executed in parallel, and the client or server will send task information of the two subtasks to the first client and the second client respectively, so that user1 and user2 of the two clients can start the editing operation at the same time.

[0160] In addition, the method provided in this embodiment further includes: generating log information according to the editing data of the subtask, and uploading the log information to the cloud server. The log information includes: submission information description and historical path, the submission information description is used for the editing data of the subtask, and the historical path is used to trace the editing data of the subtask.

[0161] If the server or client receives N edit data, N log information is generated, where N ≥ 1 and is a positive integer.

[0162] In another embodiment, the present invention further provides a method for editing a task of an engineering project, which can be applied to a client, specifically, to a client for performing editing operations, on which an engineering project management software APP is pre-installed, such as Figure 8 As shown, the method includes:

[0163] Step S201: receiving subtask information under a bid section of a project.

[0164] The subtask information is generated and sent by the sending end according to the task allocation instruction, conforms to the standard format and is editable. Specifically, the generation and sending process of the subtask information refers to steps S101 to S104 of the above embodiment, which will not be repeated in this embodiment.

[0165] After starting the engineering project management software APP, the local client receives at least one subtask information from the sending end. The sending end refers to the server or client where the project manager is located.

[0166] The standard format is a format customized by the engineering project management software, such as the merge format. This format supports document editing, engineering data addition and modification, and other operations. The specific form of the standard format in this embodiment is not limited.

[0167] Step S202: in response to the editor editing the subtask content according to the subtask information and the editing authority, generating the corresponding subtask editing data, wherein the format of the editing data is the standard format.

[0168] After the client receives the subtask information, the editor edits the engineering cost of the current task according to his or her editing authority. The client adds the edited data, content and other information to the framework of the standard format to generate the edited data.

[0169] Step S203: Send the edited data of the subtask to the sending end.

[0170] The sending end is the above-mentioned server or the client where the project manager is located.

[0171] Specifically, sending the edited data of the subtask to the sending end includes: in response to the editor clicking the submit control on the engineering project management software, sending the edited data of the subtask to the sending end. This embodiment realizes the function of the editor submitting the edited data with one click on the client.

[0172] The task editing method provided in this aspect breaks down a complete project into sub-task information consisting of multiple unit engineering files, and sends them to different editors. The client generates editing data based on the editing content of the editors, and the editing data still maintains the standard format unchanged. Therefore, after the editing data is submitted, the receiving end can merge the manuscripts with one click, thereby improving the efficiency of merging manuscripts. In addition, the copy creation method is used to achieve data isolation during multi-person collaboration, so that different editors can work at the same time without conflicts.

[0173] In another possible implementation, the method further includes: receiving a click operation of the editor on the update control; in response to the click operation, obtaining a project information table, in which the editor ID, compilation status, data version number, and identification information of the unit project assigned to each node are recorded; obtaining the identification information of the unit project and the associated editor ID from the project information table, and pulling the relevant data indicated by the identification information of the unit project from the copy space of the associated editor ID. The relevant data is imported into the project data to be edited by the editor, combined with the generated editing data of the subtask, to generate new editing data; and the new editing data is sent to the sending end.

[0174] In addition, after sending the editing data of the subtask to the sending end, the above step S203 also includes: if the editing data of the subtask is rejected after review, pulling a preset format file from the copy space, the preset format file is generated by converting the editing data of the subtask and sent to the copy space.

[0175] The preset format file is parsed to obtain the edit data and the indication information of being rejected; in response to the editor modifying the edit data according to the indication information, modified edit data is generated, the modified edit data maintains the standard format unchanged, and the modified edit data is sent to the sending end again. In this embodiment, when the edit data is rejected by the client, the rejection modification function is realized.

[0176] In another possible implementation, the method further includes: generating log information based on the edited data of the subtask, the log information including: submission information description and historical path, the submission information description is used for the edited data of the subtask, and the historical path is used to trace the edited data of the subtask; uploading the log information to the cloud server. In this implementation, after each edit operation, a corresponding log trace is generated to facilitate subsequent version retrieval, file modifications are well documented, and closed-loop management is effectively achieved.

[0177] The following is an example of the above-mentioned project management method and task editing method in combination with the operation interface display of the client or server.

[0178] See also Figure 10a to Figure 10g FIG. 1 is a schematic diagram of an operation interface of an engineering project management method and a task editing method provided by an embodiment of the present invention. The operation process can be executed in a client or a server.

[0179] 1. Task Allocation

[0180] like Fig.10aThe figure shows an operation interface diagram of task allocation. The project manager starts the engineering project management software on the server or client. For example, after opening the pricing project, he clicks the "task allocation" function control. At this time, the project structure of the project will be read, and the employee list of the current enterprise will be obtained from the user center service. Then, the allocation interface will be constructed. The user can select the corresponding employee to allocate editing permissions for each unit project node. Fig.10a As shown by the arrow, the icons in preparation, such as the "Construction Project" icon, can be used to check the preparation status of each person at any time.

[0181] At this time, the server or client backend will do the following: split the entire project into data packages consisting of a bid section and multiple units, each of which contains the relevant data of the unit's project. And upload the data package to the server storage and set it as the Core directory.

[0182] In addition, the server or client generates a copy of the project data for each editor and sends it to each client. Normal data modifications are based on the copy data, and the project data will not be affected or conflicted.

[0183] After the task is assigned, the software will adjust the editable scope according to the task assignment and clarify the responsibilities of each editor. And verify the identity of the editor. For example, one implementation method for verifying the identity of the editor is: identity authentication based on the currently logged in account name; if the server determines that user A passes the authentication, it will issue the editing permission to the client (user A). The server-side storage searches in the user account list to see if there is an ID that is the same as the ID of editor A; if they are the same, it is determined that the authentication is passed. In addition, the virtual table obtained from the server is matched. It can be determined which unit engineering node permissions the user has.

[0184] 2. Task Submission

[0185] After the task is assigned, all users participating in the collaboration can see the collaborative project in the pricing workbench. After opening it, they can edit the unit engineering data for which they have the authority. For example, editor user A can only adjust the unit engineering data for which he has the authority. After the editing is completed, the edited engineering data is submitted, which means the data is edited.

[0186] Specifically, userA first obtains the project information table from the cloud server; then, when compiling the project on the client, such as the PC, the server's project information table is obtained; based on the editor and the node compilation status, it is determined whether the current editor can modify the project data of the corresponding node. If editing is allowed, the editing is done, the editing data is generated, and then submitted to the server.

[0187] like Fig.10bAs shown in the figure, after user A submits the work, the editing of the current unit project of the user has been completed, and the project status will become "√". After submission, the project manager can also understand the compilation progress in real time based on the project status.

[0188] In the process of multi-person collaborative creation, for example, after editor A (user A) submits data, if editor B (user B) wants to obtain user A's data for reference, the update function can be used to update the relevant data. The following operations will be performed during the update:

[0189] ① The second client obtains the project information table and obtains the corresponding copy space ID according to the information of editor A (user A) in the table.

[0190] ② Obtain the ID information of the unit project from the project information, and pull the relevant data of this unit project from the copy space of editor A (user A).

[0191] ③ Import the pulled data into the engineering data of the current editor (such as user B), including data correctness verification, node matching, data merging, data recalculation, project data summary and other operations. After the data is merged, the unit engineering data is consistent with the data of editor A, and the cost is statistically summarized according to the new data.

[0192] 3. Co-production

[0193] After all editors have completed and submitted their data, the project manager can click the "Combine" control on the display interface to perform a one-click combine operation, which generates a combine file for the project. The combine process involves three operations:

[0194] ①Update the latest data of all editors.

[0195] ② The editing authority of all compilations will be revoked. At this time, the project information table will be modified, and the editing status of all compilations will be changed to "Compiled", and only the project manager who compiled the manuscript will have editing authority.

[0196] ③Upload the merged complete project to the server to prevent data loss.

[0197] See also Fig.10d , which is the display interface after the manuscripts are combined. After the manuscripts are combined, the display interface shows that the creation status is "combined status". At this time, the project manager revokes the editing authority of all editors on the client or server side, and then uniformly adjusts and reviews all editing authorities for the project.

[0198] IV. Rejection

[0199] After the project manager executes the one-click merge on the client or server side, if the reviewer finds problems that need to be modified during the review process, such as Fig.10e As shown, if a certain data in the decoration project is wrong and needs to be modified, the reviewer or project manager can click the "Reject" control with one click to reject the edited data to the editor's client, so that the corresponding unit project is rejected to the editor to continue to compile and generate new edited data.

[0200] In addition to opening the project on the client to view the rejection results, you can also view relevant data on the web page through the cost cloud management platform. The rejection process is as follows:

[0201] ① After rejection, the project manager’s latest unit engineering data will be converted into a merge file and sent to the editor’s copy space.

[0202] ② Return the compilation status of the corresponding unit project node in the project information table to "under compilation". Decentralize authority.

[0203] ③After receiving the merge file, the editor will merge the relevant merge file data into his own project.

[0204] After the merge is complete, you can continue compiling.

[0205] 5. Update and post-update viewing functions

[0206] The method provided in this embodiment also supports real-time viewing and updating operations on the client. Specifically, during the compilation process, editor user A can save the project data in real time, and the modified data will be saved in the data copies of each editor.

[0207] Specifically, in Fig.10f On the display interface shown, click the "Update" control. Based on this click operation, the client will automatically update the currently edited data, so that user A will modify the copy data each time he opens and operates, and will not affect other people's data. In addition, a patch history version file will be generated each time the data is saved.

[0208] It should be understood that the file storage method of the historical version file can be completed based on other incremental methods such as svn, in addition to direct file storage and git-based patch, and this embodiment does not limit this.

[0209] After user A completes the compilation, he can use the submit function to change the unit project compilation status from "under compilation" to "submitted". Other editors can then update the edited data and submit the updated edited data to the server.

[0210] like Figure 10g As shown, after editing and submitting the "update", other editor user B can update user A's edited data in his own client, and review and refer to provide basis and assistance for user B to edit engineering data.

[0211] In addition, the method provided in this embodiment also provides a "log" function. The user's operation will generate a log, which is convenient for the user to trace and retrieve data. The log contains two parts:

[0212] ① Submit information description. ② Retrieve historical data. Retrieve historical data will be done in combination with the "historical version" mechanism of cloud storage.

[0213] The method provided in this embodiment has the following beneficial effects:

[0214] 1. Real-time data sharing. Edit list members can edit and view files at the same time, and collaborate to complete tasks at different locations and times.

[0215] 2. Tasks can be distributed online, task progress can be tracked, and responsibilities can be clearly divided.

[0216] 3. Since the subtask information is edited and issued in a standard format, the group price modification is completed, and one-click submission reduces file transfer. There is no need to import or export during the collaboration process, the version is unified and error-free, and the efficiency is high.

[0217] 4. One-click combination and one-click rejection can reduce unnecessary repeated business adjustments and review adjustments.

[0218] 5. Added a new log function to realize version retrieval, making file modifications traceable, thereby effectively realizing closed-loop management of engineering projects.

[0219] In the present embodiment, a project management device is also provided, which is used to implement the above-mentioned embodiments and preferred implementation modes, and the descriptions that have been made will not be repeated. As used below, the term "module" can implement a combination of software and / or hardware of a predetermined function. Although the device described in the following embodiments is preferably implemented in software, the implementation of hardware, or a combination of software and hardware is also possible and conceived.

[0220] This embodiment provides a project management device for implementing all or part of the functions of the client or server. Fig.11 As shown, the device includes: a first generating module 1101, a first sending module 1102, a first receiving module 1103, and a processing module 1104. In addition, the device may also include other more or fewer modules, such as a storage module, a review module, a rejection module, a submission module, etc., which are not limited in this embodiment.

[0221] The first generation module 1101 is used to establish a correspondence between the subtasks of each section in the engineering project and the corresponding editors when receiving a task assignment instruction, and generate a task assignment list, which includes subtask information of at least one section and the correspondence, wherein each subtask information conforms to a standard format and the content is editable.

[0222] The first sending module 1102 is used to send the subtask information of the at least one bid section to at least one client according to the corresponding relationship.

[0223] The first receiving module 1103 is used to receive the editing data of at least one subtask submitted by the at least one client, each of the editing data is generated by an editor on the client after editing according to the subtask information, and the standard format remains unchanged;

[0224] The processing module 1104 is used to generate a merge instruction when the edited data of the submitted subtask meets the merge condition, merge the edited data of the at least one subtask according to the merge instruction, and generate and submit a merged file of the engineering project.

[0225] In addition, the device also includes: a review module, which is used to send the engineering project draft file to a third-party organization for review, or to self-start a file review process. If the review is qualified, the engineering project draft file is submitted; if the review is unqualified, the engineering project draft file is converted into a preset format file, and the preset format file is sent to the copy space of at least one editor, so that each editor obtains the preset format file from the copy space and edits and modifies the engineering project draft file.

[0226] In another embodiment, the present invention further provides a task editing device for an engineering project, which is used to implement all or part of the functions of the above-mentioned task editing method. Fig.12 As shown, the device includes: a second receiving module 1201, a second generating module 1202 and a second sending module 1203. In addition, the device may also include other more or fewer modules, which is not limited in this embodiment.

[0227] The second receiving module 1201 is used to receive subtask information under a bid section of the engineering project. The subtask information is generated and sent by the sending end according to the task allocation instruction, conforms to the standard format and has editable content.

[0228] The second generating module 1202 is used to generate corresponding subtask editing data in response to the editor's editing of the subtask content according to the subtask information and editing authority, and the format of the editing data is the standard format.

[0229] The second sending module 1203 is used to send the editing data of the subtask to the sending end.

[0230] The further functional description of each of the above modules and units is the same as that of the above corresponding embodiments and will not be repeated here.

[0231] The engineering project management device and task editing device in this embodiment are presented in the form of functional units, where the units refer to ASIC (Application Specific Integrated Circuit) circuits, processors and memories that execute one or more software or fixed programs, and / or other devices that can provide the above functions.

[0232] The embodiment of the present invention also provides an electronic device having the above Fig.11 The project management device shown, or having Fig.12 The task editing device shown.

[0233] See also Fig.13 , is a schematic diagram of the structure of an electronic device provided by an optional embodiment of the present invention, the electronic device includes: one or more processors 10, a memory 20, and interfaces for connecting various components, including high-speed interfaces and low-speed interfaces. The various components are connected to each other using different buses for communication, and can be installed on a common mainboard or in other ways as needed. The processor can process instructions executed in the electronic device, including instructions stored in or on the memory to display graphical information of a GUI on an external input / output device (such as a display device coupled to the interface).

[0234] In some optional embodiments, multiple processors and / or multiple buses can be used together with multiple memories and multiple storages if desired. Similarly, multiple electronic devices, such as other servers or clients, can be connected, with each device providing part of the necessary operations (e.g., as a server array, a group of blade servers, or a multi-processor system). Fig.13 A processor 10 is taken as an example.

[0235] The processor 10 may be a central processing unit, a network processor or a combination thereof. The processor 10 may further include a hardware chip. The hardware chip may be a dedicated integrated circuit, a programmable logic device or a combination thereof. The programmable logic device may be a complex programmable logic device, a field programmable gate array, a general purpose array logic or any combination thereof.

[0236] The memory 20 stores instructions executable by at least one processor 10, so that the at least one processor 10 executes the engineering project management method or task editing method shown in the above embodiment.

[0237] The memory 20 may include a program storage area and a data storage area, wherein the program storage area may store an operating system and application programs required for at least one function; the data storage area may store data created according to the use of the electronic device, and the like.

[0238] In addition, the memory 20 may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage devices. In some optional embodiments, the memory 20 may include a memory remotely arranged relative to the processor 10, and these remote memories may be connected to the electronic device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0239] The memory 20 may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a flash memory, a hard disk or a solid state drive; the memory 20 may also include a combination of the above types of memory.

[0240] like Fig.13 As shown, the electronic device further includes an input device 30 and an output device 40. The processor 10, the memory 20, the input device 30 and the output device 40 may be connected via a bus or other means. Fig.13 The example of connecting through bus is taken in the following.

[0241] The input device 30 can receive input digital or character information, and generate key signal input related to the user settings and function control of the electronic device, such as a touch screen, a keypad, a mouse, a track pad, a touch pad, an indicator rod, one or more mouse buttons, a trackball, a joystick, etc. The output device 40 may include a display device, an auxiliary lighting device (e.g., an LED) and a tactile feedback device (e.g., a vibration motor), etc. The above-mentioned display device includes but is not limited to a liquid crystal display, a light emitting diode, a display and a plasma display. In some optional embodiments, the display device can be a touch screen.

[0242] In addition, the electronic device also includes at least one communication interface for the electronic device to communicate with other clients or server networks.

[0243] It should be noted that the electronic device may be a server or other network device, or a client, such as a terminal device, a PC, etc., for implementing the above Figure 4 and Figure 6A method for project management, or Figure 8 The task editing method of the engineering project.

[0244] An embodiment of the present invention also provides a computer-readable storage medium, and the above-mentioned method according to the embodiment of the present invention can be implemented in hardware, firmware, or can be implemented as a computer code that can be recorded in a storage medium, or can be implemented by downloading through a network and originally stored in a remote storage medium or a non-temporary machine-readable storage medium and will be stored in a local storage medium, so that the method described herein can be stored in such software processing on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware.

[0245] The storage medium may be a disk, an optical disk, a read-only storage memory, a random access memory, a flash memory, a hard disk or a solid state drive, etc.; further, the storage medium may also include a combination of the above-mentioned types of memory. It is understood that a computer, a processor, a microprocessor controller or programmable hardware includes a storage component that can store or receive software or computer code. When the software or computer code is accessed and executed by the computer, processor or hardware, the engineering project management method and Figure 8 The task editing method of the engineering project.

[0246] Embodiments of the present application may also provide a computer program product, including computer program instructions, which, when executed by a processor, cause the processor to perform the steps in the above method. Wherein, the computer program product may be written in any combination of one or more programming languages ​​to perform program codes for performing the operations of the disclosed embodiments, wherein the programming languages ​​include object-oriented programming languages, such as Java, C++, etc., and also include conventional procedural programming languages, such as "C" language or similar programming languages. The program code may be executed entirely on a user computing device, partially on a user device, as an independent software package, partially on a user computing device, partially on a remote computing device, or entirely on a remote computing device or server.

[0247] In addition, the present invention also provides a project management system, the structure of which can be seen in Figure 1 As shown, the system includes at least two end devices; the end device can be a client or a service end, such as a server.

[0248] Specifically, when one of the at least two end devices is used as a sending end, such as a server as a sending end, the sending end may execute the above Figure 4 and or Figure 6 A method for engineering project management.

[0249] When one of the at least two end devices is used as a receiving end, for example, when a client is used as a receiving end, the receiving end may execute the above Figure 8 The task editing method of the engineering project.

[0250] The present embodiment provides a project management system that provides a task allocation function for project management. When a task allocation instruction is received, the subtasks of each section are paired and associated with the editors, and each subtask information is allocated to different clients so that the editors of each client can perform the editing subtasks, thereby allowing different editors to edit and view files at the same time, and collaborate to complete tasks at different locations and times.

[0251] In addition, the method also provides one-click submission of editing data, one-click merging, and one-click rejection functions. Since the formats of the editing data received for each subtask are all in a standard format, and the standard format will not be changed during the editing operation performed by the editor, after the editing data is submitted, the one-click merging function can be implemented according to the merging instruction, avoiding errors in merging due to inconsistent versions, or problems such as being unable to merging. The method does not need to import or export edited data during the merging process, thereby improving merging efficiency, saving merging time for project management, and reducing costs.

[0252] The above embodiments are only used to illustrate the technical solutions of the embodiments of the present invention, rather than to limit them. Although the embodiments of the present invention are described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some of the technical features therein by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for project management, characterized in that: The method comprises: When a task assignment instruction is received, a correspondence between the subtasks of each bid section in the engineering project and the corresponding editors is established, and a task assignment list is generated, wherein the task assignment list includes subtask information of at least one bid section and the correspondence, wherein each subtask information complies with a standard format and the content is editable; Sending the subtask information of the at least one bid section to at least one client according to the corresponding relationship; Receiving editing data of at least one subtask submitted by at least one client, each of the editing data is generated by an editor on the client after editing according to the subtask information, and the standard format remains unchanged; When the edited data of the submitted subtasks meets the merge condition, a merge instruction is generated, and the edited data of the at least one subtask is merged according to the merge instruction to generate and submit a merged file of the engineering project.

2. The method according to claim 1, characterized in that: The receiving of the task assignment instruction comprises: In response to a user clicking operation on a task assignment control of an engineering compilation application, the task assignment instruction is generated and received.

3. The method according to claim 2, characterized in that The corresponding relationship between the subtasks of each bid section in the engineering project and the corresponding editors is established, and a task allocation list is generated, including: Reading the engineering project structure of the engineering compilation task, wherein the engineering project structure includes at least one bidding section, and each bidding section is associated with one or more subtasks; Obtaining an editor list, wherein the editor list includes at least one editor ID capable of performing an editing operation; According to the functions of each editor in the editor list, a corresponding relationship between the at least one editor ID and each subtask of the at least one bid section is established to generate the task allocation list.

4. The method according to claim 3, characterized in that Before sending the subtask information of the at least one bid section to at least one client according to the corresponding relationship, the method further includes: Setting the editing authority and identity authentication information of each editor in the editor list; The sending the subtask information of the at least one bid section to at least one client according to the corresponding relationship includes: Verifying the identity information of the editor of the client of at least one subtask information to be sent; If the identity information verification is successful, the subtask information and the editing authority corresponding to the editor are packaged and sent to the corresponding client; If the identity information verification fails, an indication of the verification failure is fed back to the client where the current editor is located.

5. The method according to any one of claims 1 to 4, characterized in that: After sending the subtask information of the at least one bid section to at least one client according to the corresponding relationship, the method further includes: Establishing a project information table, wherein the editor ID, compilation status, data version number, and unit project identification information assigned to each node are recorded in the project information table, wherein each bidding section or a subtask under the bidding section is used as the node; After receiving the editing data of at least one subtask submitted by at least one client, the method further includes: Update one or more of the editor ID, compilation status, data version number, and identification information of the unit project of at least one node in the project information table.

6. The method according to claim 5, characterized in that The step of generating a manuscript combining instruction when the editing data of the submitted subtask meets the manuscript combining condition includes: After the subtask information of the at least one bid section is issued, a manuscript combining instruction is generated when the number of edited data of the submitted subtasks reaches a preset number within a preset time period, or, The manuscript combining instruction is generated when a click operation on the manuscript combining control is received from the user.

7. The method according to claim 6, characterized in that The step of combining the editing data of the at least one subtask according to the combining instruction to generate and submit a combined engineering project file includes: Combining all the received editing data according to the combining instruction and generating the engineering project combining file; The compilation status of at least one node in the engineering information table is updated to be completed, and the engineering project completed file and the updated engineering information table are uploaded to the cloud server.

8. The method according to claim 1, characterized in that Before submitting the joint draft documents of the engineering project, it also includes: Send the draft project documents to a third-party organization for review, or initiate the document review process; If the review is qualified, the joint draft document of the engineering project will be submitted; If the review fails, the engineering project draft file will be converted into a preset format file, and the preset format file will be sent to the copy space of at least one editor, so that each editor can obtain the preset format file from the copy space and edit and modify the engineering project draft file.

9. The method according to any one of claims 1 to 4, characterized in that: The sending the subtask information of the at least one bid section to at least one client according to the corresponding relationship includes: When the first subtask and the second subtask under the same bidding section are executed in sequence, or when the first subtask and the second subtask under different bidding sections are executed in sequence, the subtask information corresponding to the first subtask is sent to the first client; wherein the first subtask is executed before the second subtask; When receiving the first edit data of the first subtask submitted by the first client, performing correctness verification and node matching processing on the first edit data, and after the verification passes, generating subtask information of the second subtask in combination with the first edit data of the first subtask; The subtask information of the second subtask is sent to the second client, so that the second client generates second edited data after editing according to the subtask information of the second subtask.

10. A task editing method for an engineering project, characterized in that: The method comprises: Receiving subtask information under a bid section of an engineering project, wherein the subtask information is generated and sent by a sending end according to a task allocation instruction, conforms to a standard format and has editable content; In response to the editor editing the subtask content according to the subtask information and the editing authority, generating corresponding editing data of the subtask, wherein the format of the editing data is the standard format; The edited data of the subtask is sent to the sending end.

11. The method according to claim 10, characterized in that The sending the editing data of the subtask to the sending end includes: In response to the editor clicking a submit control on the engineering project management software, the edited data of the subtask is sent to the sending end.

12. The method according to claim 10, characterized in that After sending the editing data of the subtask to the sending end, the method further includes: When an update instruction is received, a project information table is obtained, in which the editor ID, compilation status, data version number, and identification information of the unit project assigned to each node are recorded; Acquire the identification information of the unit project and the associated editor ID from the project information table, and pull the relevant data indicated by the identification information of the unit project from the copy space of the associated editor ID; Importing the relevant data into the engineering data to be edited by the editor, and combining it with the generated editing data of the subtask to generate new editing data; The new edited data is sent to the sending end.

13. The method according to any one of claims 10 to 12, characterized in that: After sending the editing data of the subtask to the sending end, the method further includes: If the edited data of the subtask is rejected after review, a preset format file is pulled from the copy space, the preset format file is generated by converting the edited data of the subtask, and is sent to the copy space; Parsing the preset format file to obtain the editing data and the rejected indication information; In response to the editor modifying the edit data according to the indication information, modified edit data is generated, and the modified edit data is sent to the sending end.

14. The method according to any one of claims 10 to 12, characterized in that: The method further comprises: Generate log information according to the edited data of the subtask, the log information including: a submission information description and a history path, the submission information description is used for the edited data of the subtask, and the history path is used to trace the edited data of the subtask; The log information is uploaded to the cloud server.

15. A construction project management device, characterized in that: The device comprises: The first generation module is used to establish a correspondence between the subtasks of each bid section in the engineering project and the corresponding editors when receiving a task assignment instruction, and generate a task assignment list, wherein the task assignment list includes subtask information of at least one bid section and the correspondence, wherein each subtask information complies with a standard format and the content is editable; A first sending module, configured to send the subtask information of the at least one bid section to at least one client according to the corresponding relationship; A first receiving module is used to receive editing data of at least one subtask submitted by at least one client, each of which is generated by an editor on the client after editing according to the subtask information, and the standard format remains unchanged; The processing module is used to generate a manuscript combining instruction when the edited data of the submitted subtask meets the manuscript combining condition, perform manuscript combining processing on the edited data of the at least one subtask according to the manuscript combining instruction, and generate and submit a manuscript combining file of the engineering project.

16. A task editing device for an engineering project, characterized in that: The device comprises: The second receiving module is used to receive subtask information under a bid section of the engineering project, wherein the subtask information is generated and sent by the sending end according to the task allocation instruction, conforms to the standard format and has editable content; A second generating module is used to generate corresponding editing data of the subtask in response to the editing content of the subtask by the editor according to the subtask information and the editing authority, wherein the format of the editing data is the standard format; The second sending module is used to send the editing data of the subtask to the sending end.

17. An electronic device, characterized in that: comprising a memory and a processor, wherein the memory and the processor are connected; The memory stores computer instructions, and the processor executes the engineering project management method as described in any one of claims 1 to 9, or executes the engineering project task editing method as described in any one of claims 10 to 14 by executing the computer instructions.

18. An engineering project management system, characterized in that: The system includes at least two end devices; When one of the at least two end devices is used as a sending end, the engineering project management method according to any one of claims 1 to 9 is executed; When one of the at least two terminal devices serves as a receiving end, the task editing method for the engineering project as claimed in any one of claims 10 to 14 is executed.

19. A computer-readable storage medium, characterized in that: The computer readable storage medium has computer instructions stored thereon; The computer instructions are used to enable a computer to execute the engineering project management method according to any one of claims 1 to 9, or to execute the engineering project task editing method according to any one of claims 10 to 14.

20. A computer program product, characterized in that It comprises computer instructions, wherein the computer instructions are used to enable a computer to execute the engineering project management method according to any one of claims 1 to 9, or to execute the engineering project task editing method according to any one of claims 10 to 14.