Intelligent operation management method and system based on double control centers
The dual control center architecture with intelligent sensors and advanced data fusion algorithms addresses data fusion and coordination issues, improving prediction accuracy and emergency response efficiency in smart operation management systems.
Patent Information
- Application Number
- CN202411075979.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-08-07
AI Technical Summary
Existing smart operation management systems face challenges in data fusion, untimely decision responses, and lack of effective coordination between control centers, leading to poor decision-making and slow emergency responses.
A dual control center architecture is implemented, with a main control center and sub-control centers, utilizing intelligent sensors for data collection and edge computing for preprocessing, advanced data fusion algorithms for integrating data sources, and dynamic decision-making based on real-time data analysis to generate and adjust decision instructions.
Enhances data quality and transmission efficiency, improves prediction accuracy, optimizes operational efficiency, and ensures rapid and effective emergency responses, thereby enhancing system adaptability and security.
Smart Images

Figure CN119091648A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of artificial intelligence technology, and in particular to an intelligent operation management method and system based on dual control centers. Background Art
[0002] With the rapid development of the Internet of Things (IoT), big data, and artificial intelligence (AI) technologies, smart operation and management has become an important means to improve urban governance and service quality. In recent years, the multi-control center architecture based on distributed architecture has gradually become a research hotspot. By building a model in which the main control center and multiple sub-control centers work together, more sophisticated data management and faster response capabilities are achieved. However, in actual application, how to effectively coordinate the relationship between the control centers is still a key issue that needs to be solved.
[0003] The data processing methods in traditional distributed architectures are often extensive and lack effective data fusion algorithms to achieve deep integration of data from different sources. The existing control center architecture has a slow response speed when dealing with emergencies. The generation of decision instructions is too static and cannot be dynamically adjusted according to changes in real-time data, resulting in poor decision-making results. Summary of the invention
[0004] In view of the above existing problems, the present invention is proposed.
[0005] Therefore, the present invention provides a smart operation management method and system based on dual control centers to solve the problems of insufficient data fusion, untimely decision response and lack of effective coordination mechanism in the existing smart operation management system.
[0006] In order to solve the above technical problems, the present invention provides the following technical solutions:
[0007] In a first aspect, an embodiment of the present invention provides a smart operation management method based on a dual control center, which includes constructing a dual control center architecture including a main control center and a sub-control center, and establishing a coordination mechanism between the main control center and the sub-control center;
[0008] The sub-control center continuously collects data through intelligent sensors, and performs pre-processing and preliminary analysis through edge computing devices, extracts key features and generates preliminary reports, which are then uploaded to the main control center;
[0009] The main control center uses advanced data fusion algorithms to integrate data from different sources and predict future passenger flow trends through big data analysis;
[0010] Generate decision instructions based on data analysis results;
[0011] According to the changes in real-time data, the main control center dynamically adjusts decision-making instructions and automatically initiates corresponding response measures when encountering emergencies.
[0012] As a preferred solution of the intelligent operation management method based on dual control centers described in the present invention, the data continuously collected through intelligent sensors includes environmental changes, crowd density and equipment working status.
[0013] As a preferred solution of the intelligent operation management method based on dual control centers described in the present invention, wherein: the preprocessing includes data cleaning, data conversion and data compression;
[0014] The preprocessing and preliminary analysis by edge computing equipment, extraction of key features and generation of preliminary reports, and uploading to the main control center include the following steps:
[0015] Extract key features from preprocessed statistical data and identify periodic patterns in temporal data;
[0016] Based on the Z-Score method, calculate the outlier value of each observation;
[0017] The extracted key features and outliers are recorded and a preliminary report is generated;
[0018] Use the TLS protocol to establish an encrypted connection and package the compressed data blocks into data packets in chronological order;
[0019] The data packet is encrypted using the AES-256 encryption algorithm and sent to the main control center through an encrypted channel.
[0020] As a preferred solution of the intelligent operation management method based on dual control centers described in the present invention, the main control center uses an advanced data fusion algorithm to integrate data from different sources, and predicts future passenger flow trends through big data analysis, including the following steps:
[0021] The main control center receives the data packet and decrypts it to verify the integrity of the data and the authenticity of the source;
[0022] Design a Bayesian network based on probability statistics to integrate multiple types of verified data;
[0023] Extract key features from the fused data, group the data using the K-means clustering algorithm, and discover patterns in the data;
[0024] Use the Apriori algorithm to find frequent item sets and association rules in the data, and set support and confidence thresholds to filter out meaningful association rules;
[0025] Construct a prediction model to predict future passenger flow trends. The expression is:
[0026]
[0027] Among them, f(t) represents the predicted passenger flow trend, i represents the index of the data, n represents the total number of data, and t i represents the time point corresponding to the i-th data, t represents the time variable, σ i represents the time standard deviation of the ith data point, b represents the bias term, λ represents the parameter that controls the steepness of the Sigmoid function, and c k represents the amplitude of the kth harmonic, ω k represents the angular frequency of the kth harmonic, φ k represents the phase of the kth harmonic, m represents the total number of harmonics, k represents the harmonic index, and θ represents the offset of the Sigmoid function.
[0028] As a preferred solution of the intelligent operation management method based on dual control centers described in the present invention, a decision instruction is generated based on the data analysis result, and the expression is:
[0029]
[0030] Among them, D r represents the rth decision instruction, D represents the set of all decision instructions, d represents the total number of service frequencies that need to be adjusted, j represents the service frequency index, and f j (t) represents the service frequency at time t, p represents the total number of route plans that need to be optimized, a represents the route plan index that needs to be optimized, and h a (t) represents the optimization effect of the ath route at time t, q represents the total number of facility maintenance plans that need to be adjusted, and gl(t) represents the maintenance status of the lth facility at time t.
[0031] As a preferred solution of the intelligent operation management method based on dual control centers described in the present invention, the main control center dynamically adjusts the decision instructions according to the changes in real-time data, and the expression is:
[0032]
[0033] Among them, D r ′ represents the rth decision instruction after adjustment, ΔD r represents the adjustment amount of the rth decision instruction, Δf j (t) represents the change in the jth service frequency adjustment strategy at time t, Δh a (t) represents the change in the ath route planning strategy at time t, Δg l(t) represents the change in the lth facility maintenance plan at time t, and sign(·) represents the sign function.
[0034] As a preferred solution of the intelligent operation management method based on dual control centers described in the present invention, when an emergency occurs, automatically starting corresponding response measures includes the following steps:
[0035] Utilize sensor networks to continuously collect data and analyze it to identify unusual patterns;
[0036] Set a safety threshold. When the detected data exceeds the safety threshold, it is considered an emergency.
[0037] Confirm the authenticity of the event through multi-source data fusion technology and automatically classify it according to its nature;
[0038] The system automatically sends an alarm signal to the main control center, retrieves the corresponding plan from the plan database according to the event type, and analyzes the instructions and steps in the plan;
[0039] According to the requirements of the plan, the emergency response measures will be notified to relevant agencies.
[0040] In a second aspect, the present invention provides a smart operation management system based on dual control centers, comprising:
[0041] Dual control center collaboration module: Build a dual control center architecture including a main control center and a sub-control center, and establish a collaboration mechanism between the main control center and the sub-control center;
[0042] Data collection and preprocessing module: The sub-control center continuously collects data through intelligent sensors, and performs preprocessing and preliminary analysis through edge computing devices, extracts key features and generates preliminary reports, which are then uploaded to the main control center;
[0043] Data fusion and analysis module: The main control center uses advanced data fusion algorithms to integrate data from different sources and predict future passenger flow trends through big data analysis;
[0044] Instruction generation module: generates decision instructions based on data analysis results;
[0045] Emergency response and coordination module: According to the changes in real-time data, the main control center dynamically adjusts decision-making instructions and automatically initiates corresponding response measures when encountering emergencies.
[0046] In a third aspect, an embodiment of the present invention provides a computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: when the computer program is executed by the processor, any step of the intelligent operation and management method based on dual control centers as described in the first aspect of the present invention is implemented.
[0047] In a fourth aspect, an embodiment of the present invention provides a computer-readable storage medium having a computer program stored thereon, wherein: when the computer program is executed by a processor, it implements any step of the intelligent operation and management method based on dual control centers as described in the first aspect of the present invention.
[0048] The beneficial effects of the present invention are as follows: a dual control center architecture is constructed, hierarchical management is achieved through the coordination mechanism between the main and sub-control centers, and the flexibility and reliability of the system are improved. The sub-control center uses intelligent sensors to collect data such as environmental changes and crowd density, and performs pre-processing and preliminary analysis through edge computing, thereby improving data quality and transmission efficiency. The main control center uses advanced data fusion algorithms to integrate data from different sources, predicts passenger flow trends through big data analysis, and guides decision-making. Decision instructions are generated based on data analysis results, and are dynamically adjusted according to real-time data changes, thereby enhancing the adaptability and efficiency of the system. When encountering emergencies, the system can automatically initiate response measures to ensure the stability and security of the system. This series of steps significantly improves operational efficiency, user experience, and security levels. BRIEF DESCRIPTION OF THE DRAWINGS
[0049] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0050] Figure 1 This is a flow chart of the intelligent operation management method based on dual control centers in Example 1.
[0051] Figure 2 A flow chart is generated for the decision instructions in Example 1. DETAILED DESCRIPTION
[0052] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.
[0053] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0054] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.
[0055] Example 1, reference Figure 1 and Figure 2 , which is the first embodiment of the present invention, and provides a smart operation management method based on dual control centers, comprising the following steps:
[0056] S1. Build a dual control center architecture consisting of a main control center and a sub-control center, and establish a coordination mechanism between the main control center and the sub-control center.
[0057] S2. Continuously collect data including environmental changes, crowd density and equipment working status through smart sensors; perform preprocessing and preliminary analysis through edge computing devices, extract key features and generate preliminary reports, and upload them to the main control center, including the following steps: extract key features from preprocessed statistical data, and identify periodic patterns for time data; calculate the outliers of each observation value based on the Z-Score method; record the extracted key features (maximum value, minimum value, mean value, etc.) and outliers and generate preliminary reports; use the TLS protocol to establish an encrypted connection, and package the compressed data blocks into data packets in chronological order; use the AES-256 encryption algorithm to encrypt the data packets, and send the encrypted data packets to the main control center through an encrypted channel.
[0058] Furthermore, data cleaning includes invalid data filtering and erroneous data correction;
[0059] Invalid data filtering refers to detecting and removing null or missing values. For numerical data, outliers that are beyond a reasonable range are removed, such as temperature data that exceeds the range of human survival. Error data correction refers to filling missing values with simple time series methods (such as moving averages) and applying outlier detection algorithms to remove abnormal data points. Data conversion refers to converting data into a unified format, such as unifying temperature units into degrees Celsius and converting unstructured data (such as text notes) into structured data (such as labels or classifications). Data compression refers to using the LZ4 compression algorithm to compress preprocessed data to reduce the bandwidth required for data transmission.
[0060] It should be noted that smart sensors can monitor environmental changes (such as temperature and humidity), crowd density, and the working status of equipment (such as operating efficiency and fault warning) in real time, ensuring a comprehensive understanding of the status of the monitored area and timely discovering potential problems such as overheating, crowds, or equipment failures, thereby preventing safety accidents. Edge computing devices can process data nearby to reduce the pressure on the main control center and quickly generate key features and preliminary reports to facilitate quick decision-making, reduce data transmission and latency, and improve the response speed and overall efficiency of the system. By extracting key features (such as maximum, minimum, and mean values) and identifying periodic patterns in time data, it can help understand the trends and laws of the data, and more accurately predict future environmental changes, fluctuations in crowds, and equipment status, and prepare for response in advance. By extracting key features (such as maximum, minimum, and mean values) and identifying periodic patterns in time data, it can help understand the trends and laws of the data. Using statistical methods (Z-Score) to identify outliers helps distinguish between normal and abnormal data, improving the accuracy and reliability of data analysis.
[0061] S3. The main control center uses advanced data fusion algorithms to integrate data from different sources and predict future passenger flow trends through big data analysis, including the following steps:
[0062] The main control center receives the data packet and decrypts it to verify the integrity of the data and the authenticity of the source;
[0063] Design a Bayesian network based on probability statistics to integrate multiple types of verified data;
[0064] Extract key features from the fused data, group the data using the K-means clustering algorithm, and discover patterns in the data;
[0065] Use the Apriori algorithm to find frequent item sets and association rules in the data, and set support and confidence thresholds to filter out meaningful association rules;
[0066] Construct a prediction model to predict future passenger flow trends. The expression is:
[0067]
[0068] Among them, f(t) represents the predicted passenger flow trend, i represents the index of the data, n represents the total number of data, and t i represents the time point corresponding to the i-th data, t represents the time variable, σ i represents the time standard deviation of the ith data point, b represents the bias term, λ represents the parameter that controls the steepness of the Sigmoid function, and c k represents the amplitude of the kth harmonic, ω krepresents the angular frequency of the kth harmonic, φ k represents the phase of the kth harmonic, m represents the total number of harmonics, k represents the harmonic index, and θ represents the offset of the Sigmoid function.
[0069] Furthermore, the expression of Bayesian network fusion data is:
[0070]
[0071] Among them, A represents the probability of traffic congestion in a specific area within a specific time period, B represents the traffic flow data from the sub-control center, C represents the weather data from another sub-control center, D represents the passenger flow data from the third sub-control center, and E represents the special event data from the fourth sub-control center. p(a) represents the prior probability of event A, P(B|A) represents the probability of observing data B when event A occurs, P(C|A) represents the probability of observing data C when event A occurs, P(D|A) represents the probability of observing data D when event A occurs, and P(E|A) represents the probability of observing data E when event A occurs. P(B), P(C), P(D) and P(E) represent the marginal probabilities of data B, C, D and E respectively, and P(A|B, C, D, E) represent the posterior probability of event A given data B, C, D and E respectively.
[0072] It should be noted that the data packets are received and decrypted by the main control center to verify the integrity of the data and the authenticity of the source, which improves the credibility of the data and ensures the accuracy of subsequent data analysis and prediction; a Bayesian network based on probability statistics is designed to fuse multiple types of verified data, which improves the accuracy of the prediction model and can more accurately predict future passenger flow trends; key features are extracted from the fused data, and the K-means clustering algorithm is used to group the data and discover patterns in the data, which helps to more deeply understand the characteristics of passenger flow distribution and provide support for optimizing operational strategies; the Apriori algorithm is used to find frequent item sets and association rules in the data, and support and confidence thresholds are set to screen out meaningful association rules, which helps to identify which factors have a significant impact on passenger flow changes and provide a basis for decision-making; based on historical data and analysis results, future passenger flow trends are predicted, which improves operational efficiency and reduces losses caused by improper resource allocation.
[0073] S4. Generate decision instructions based on data analysis results. The expression is:
[0074]
[0075] Among them, D rrepresents the rth decision instruction, D represents the set of all decision instructions, d represents the total number of service frequencies that need to be adjusted, j represents the service frequency index, and f j (t) represents the service frequency at time t, p represents the total number of route plans that need to be optimized, a represents the route plan index that needs to be optimized, and h a (t) represents the optimization effect of the ath route at time t, q represents the total number of facility maintenance plans that need to be adjusted, and gl(t) represents the maintenance status of the lth facility at time t.
[0076] Furthermore, the process of generating decision instructions includes collecting real-time frequency data of all services (such as train schedules, bus routes, etc.), real-time data of all route planning, including congestion, traffic flow, etc., and status data of all facility maintenance, including equipment failure rate, maintenance records, etc.; calculating the weighted sum of all service frequencies at time t, calculating the sum of the optimization effects of all routes at time t, and calculating the sum of the square root values of all facility maintenance status at time t, generating all possible decision instructions, selecting the largest instruction as the best decision, maximizing service frequency and service quality while minimizing the negative impact of facility maintenance problems.
[0077] Furthermore, with regard to the adjustment of service frequency, the frequency of other unaffected lines will be increased to relieve the pressure on the affected lines, the service frequency during non-peak hours will be reduced, and resources will be concentrated on peak hours and key routes; for route planning optimization, train routes will be replanned to avoid affected areas, and temporary bus routes will be added as alternative means of transportation; for facility maintenance, maintenance inspections of facilities around affected areas will be strengthened, and maintenance and repair work of key equipment will be prioritized.
[0078] It should be noted that by collecting real-time frequency data of all services (such as train schedules, bus routes, etc.), dynamic monitoring of service frequency is achieved, and then the service frequency is adjusted according to the monitoring data. Finally, the service frequency is increased during peak hours to meet passenger demand, and the service frequency is reduced during non-peak hours to save resources.
[0079] S5. According to the changes in real-time data, the main control center dynamically adjusts the decision instructions, and the expression is:
[0080]
[0081] Among them, D r ′ represents the rth decision instruction after adjustment, ΔD r represents the adjustment amount of the rth decision instruction, Δf j (t) represents the change in the jth service frequency adjustment strategy at time t, Δh a(t) represents the change in the ath route planning strategy at time t, Δg l (t) represents the change in the lth facility maintenance plan at time t, and sign(·) represents the sign function.
[0082] It should be noted that the main control center dynamically adjusts decision instructions based on changes in real-time data, which enables the system to make the most appropriate decisions based on the current situation, ensuring that the decision instructions are always optimal, and can better adapt to the ever-changing operating environment, thereby improving the flexibility and adaptability of the system and ensuring the quality and efficiency of operational services.
[0083] S6. When encountering an emergency, automatically starting the corresponding response measures includes the following steps:
[0084] Utilize sensor networks to continuously collect data and analyze it to identify unusual patterns;
[0085] Set a safety threshold. When the detected data exceeds the safety threshold, it is considered an emergency.
[0086] Confirm the authenticity of the event through multi-source data fusion technology and automatically classify it according to its nature;
[0087] The system automatically sends an alarm signal to the main control center, retrieves the corresponding plan from the plan database according to the event type, and analyzes the instructions and steps in the plan;
[0088] According to the requirements of the plan, the emergency response measures will be notified to relevant agencies.
[0089] It should be noted that the use of sensor networks to continuously collect data, analyze the data, identify abnormal patterns, and improve the response speed and accuracy of emergencies; by setting safety thresholds, the system can more accurately identify emergencies, reduce false alarms, and improve the reliability and efficiency of the system; by automatically sending alarm signals and retrieving plans, the automation and rapid start of emergency response are achieved; by notifying relevant agencies of emergency response measures, cross-departmental collaboration is achieved, the speed and efficiency of the overall response are improved, and the impact of emergencies is reduced.
[0090] This embodiment also provides a smart operation management system based on dual control centers, including: a dual control center collaboration module: constructing a dual control center architecture including a main control center and a sub-control center, and establishing a collaboration mechanism between the main control center and the sub-control center;
[0091] Data collection and preprocessing module: The sub-control center continuously collects data through intelligent sensors, and performs preprocessing and preliminary analysis through edge computing devices, extracts key features and generates preliminary reports, which are then uploaded to the main control center;
[0092] Data fusion and analysis module: The main control center uses advanced data fusion algorithms to integrate data from different sources and predict future passenger flow trends through big data analysis;
[0093] Instruction generation module: generates decision instructions based on data analysis results;
[0094] Emergency response and coordination module: According to the changes in real-time data, the main control center dynamically adjusts decision-making instructions and automatically initiates corresponding response measures when encountering emergencies.
[0095] This embodiment also provides a computer device, which is suitable for the case of an intelligent operation and management method based on dual control centers, including: a memory and a processor; the memory is used to store computer executable instructions, and the processor is used to execute computer executable instructions to implement the intelligent operation and management method based on dual control centers as proposed in the above embodiment.
[0096] The computer device may be a terminal, and the computer device includes a processor, a memory, a communication interface, a display screen and an input device connected via a system bus. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The communication interface of the computer device is used to communicate with an external terminal in a wired or wireless manner, and the wireless manner can be achieved through WIFI, an operator network, NFC (near field communication) or other technologies. The display screen of the computer device may be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device may be a touch layer covering the display screen, or a key, trackball or touchpad provided on the housing of the computer device, or an external keyboard, touchpad or mouse, etc.
[0097] The present embodiment also provides a storage medium on which a computer program is stored. When the program is executed by a processor, the intelligent operation and management method based on a dual control center as proposed in the above embodiment is implemented; the storage medium can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (Static Random Access Memory, referred to as SRAM), electrically erasable programmable read-only memory (Electrically Erasable Programmable Read-Only Memory, referred to as EEPROM), erasable programmable read-only memory (Erasable Programmable Read Only Memory, referred to as EPROM), programmable read-only memory (Programmable Red-Only Memory, referred to as PROM), read-only memory (Read-Only Memory, referred to as ROM), magnetic storage, flash memory, disk or optical disk.
[0098] In summary, the present invention constructs a dual control center architecture, realizes hierarchical management through the collaborative mechanism between the main and sub-control centers, and improves the flexibility and reliability of the system. The sub-control center uses intelligent sensors to collect data such as environmental changes and crowd density, and performs pre-processing and preliminary analysis through edge computing, thereby improving data quality and transmission efficiency. The main control center uses advanced data fusion algorithms to integrate data from different sources, predicts passenger flow trends through big data analysis, and guides decision-making. Decision instructions are generated based on data analysis results, and dynamically adjusted according to real-time data changes, which enhances the adaptability and efficiency of the system. When encountering emergencies, the system can automatically initiate response measures to ensure the stability and security of the system. This series of steps significantly improves operational efficiency, user experience, and security levels.
[0099] Example 2
[0100] Referring to Table 1, which is the second embodiment of the present invention, in order to further verify the advancement of the present invention, experimental simulation data of the intelligent operation management method based on dual control centers are provided.
[0101] A dual control center architecture consisting of a main control center and four sub-control centers was deployed at a large transportation hub. Each sub-control center is responsible for monitoring environmental changes, crowd density, and equipment working status in a specific area.
[0102] Smart sensors are installed in various areas, which can monitor the ambient temperature, humidity, human flow, equipment operation status, etc. in real time. At the same time, edge computing devices are configured to perform data preprocessing, outlier detection, and package the data and send it to the main control center. The edge computing device uses the Z-Score method to identify outliers and fills missing values through the moving average method. The data is converted into a unified format and compressed by the LZ4 compression algorithm, and then encrypted using the AES-256 encryption algorithm and sent to the main control center. After receiving the data, the main control center uses the Bayesian network to fuse the data from different sub-control centers. The K-means clustering algorithm and Apriori algorithm are used to discover data patterns and association rules, and a prediction model is built to predict the passenger flow trend in the next week. Based on the results of the prediction model, the main control center generates a series of decision instructions, including adjusting service frequency, optimizing route planning, and facility maintenance plans. For example, when the peak period is predicted to be approaching, the subway frequency is increased, and additional bus routes are planned to cope with high passenger flow. The system dynamically adjusts decision instructions according to changes in real-time data and initiates emergency response measures when emergencies are detected. For example, when a fire breaks out in a certain area, the system immediately takes measures to evacuate people and adjusts route planning to avoid the affected area. The details are shown in Table 1:
[0103] Table 1 Experimental record table
[0104]
[0105] By analyzing the tabular data and the historical data, the accuracy of the prediction model reached between 93% and 97%, which shows that the model has a high prediction accuracy and can accurately predict the trend of passenger flow changes in the next week. When high passenger flow is predicted, the system responds by increasing the frequency of services (such as subway trains), with adjustments ranging from +5% to +15%. This effectively alleviates congestion during peak hours and improves the travel experience of passengers. By optimizing the routes, the system is able to guide passengers to less congested paths, with optimization effects ranging from +3% to +7%, thereby reducing passengers' waiting time and travel time. The maintenance status of facilities has been improved by pre-maintenance and timely repair of equipment, with the maintenance status of facilities improving from -2% to -4%, reducing the equipment failure rate and improving the stability of the overall system.
[0106] In summary, the technical solution proposed in this invention has achieved remarkable results in practical applications, not only improving the accuracy of predictions, but also optimizing service quality through intelligent decision-making, reducing facility maintenance costs, and improving the overall experience of passengers. Compared with traditional manual management methods, the present invention can respond to changes faster and make decisions more accurately, reflecting its innovation and practicality.
[0107] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.
Claims
1. A smart operation management method based on dual control centers, Features: include, Build a dual control center architecture including a main control center and a sub-control center, and establish a coordination mechanism between the main control center and the sub-control center; The sub-control center continuously collects data through intelligent sensors, and performs pre-processing and preliminary analysis through edge computing devices, extracts key features and generates preliminary reports, which are then uploaded to the main control center; The main control center uses advanced data fusion algorithms to integrate data from different sources and predict future passenger flow trends through big data analysis; Generate decision instructions based on data analysis results; According to the changes in real-time data, the main control center dynamically adjusts decision-making instructions and automatically initiates corresponding response measures when encountering emergencies.
2. The intelligent operation management method based on dual control centers as claimed in claim 1, Features: The data continuously collected through the intelligent sensors include environmental changes, crowd density and equipment working status.
3. The intelligent operation management method based on dual control centers as claimed in claim 1, Features: The preprocessing includes data cleaning, data conversion and data compression; The preprocessing and preliminary analysis by edge computing equipment, extraction of key features and generation of preliminary reports, and uploading to the main control center include the following steps: Extract key features from preprocessed statistical data and identify periodic patterns in temporal data; Based on the Z-Score method, calculate the outlier value of each observation; The extracted key features and outliers are recorded and a preliminary report is generated; Use the TLS protocol to establish an encrypted connection and package the compressed data blocks into data packets in chronological order; The data packet is encrypted using the AES-256 encryption algorithm and sent to the main control center through an encrypted channel.
4. The intelligent operation management method based on dual control centers as claimed in claim 3, Features: The main control center uses advanced data fusion algorithms to integrate data from different sources and analyze big data to predict future passenger flow trends, including the following steps: The main control center receives the data packet and decrypts it to verify the integrity of the data and the authenticity of the source; Design a Bayesian network based on probability statistics to integrate multiple types of verified data; Extract key features from the fused data, group the data using the K-means clustering algorithm, and discover patterns in the data; Use the Apriori algorithm to find frequent item sets and association rules in the data, and set support and confidence thresholds to filter out meaningful association rules; Construct a prediction model to predict future passenger flow trends. The expression is: Among them, f(t) represents the predicted passenger flow trend, i represents the index of the data, n represents the total number of data, and t i represents the time point corresponding to the i-th data, t represents the time variable, σ i represents the time standard deviation of the ith data point, b represents the bias term, λ represents the parameter that controls the steepness of the Sigmoid function, and c k represents the amplitude of the kth harmonic, ω k represents the angular frequency of the kth harmonic, φ k represents the phase of the kth harmonic, m represents the total number of harmonics, k represents the harmonic index, and θ represents the offset of the Sigmoid function.
5. The intelligent operation management method based on dual control centers as claimed in claim 4, Features: Based on the data analysis results, a decision instruction is generated, and the expression is: Among them, D r represents the rth decision instruction, D represents the set of all decision instructions, d represents the total number of service frequencies that need to be adjusted, j represents the service frequency index, and f j (t) represents the service frequency at time t, p represents the total number of route plans that need to be optimized, a represents the route plan index that needs to be optimized, and h a (t) represents the optimization effect of the ath route at time t, q represents the total number of facility maintenance plans that need to be adjusted, and gl(t) represents the maintenance status of the lth facility at time t.
6. The intelligent operation management method based on dual control centers as claimed in claim 5, Features: According to the changes in real-time data, the main control center dynamically adjusts the decision instructions, and the expression is: Among them, D r ′ represents the rth decision instruction after adjustment, ΔD r represents the adjustment amount of the rth decision instruction, Δf j (t) represents the change in the jth service frequency adjustment strategy at time t, Δh a (t) represents the change in the ath route planning strategy at time t, Δg l (t) represents the change in the lth facility maintenance plan at time t, and sign(·) represents the sign function.
7. The intelligent operation management method based on dual control centers as claimed in claim 6, Features: When an emergency occurs, automatically initiating the corresponding response measures includes the following steps: Utilize sensor networks to continuously collect data and analyze it to identify unusual patterns; Set a safety threshold. When the detected data exceeds the safety threshold, it is considered an emergency. Confirm the authenticity of the event through multi-source data fusion technology and automatically classify it according to its nature; The system automatically sends an alarm signal to the main control center, retrieves the corresponding plan from the plan database according to the event type, and analyzes the instructions and steps in the plan; According to the requirements of the plan, the emergency response measures will be notified to relevant agencies.
8. A smart operation management system based on dual control centers, based on the smart operation management method based on dual control centers according to any one of claims 1 to 7, Features: include, Dual control center collaboration module: Build a dual control center architecture including a main control center and a sub-control center, and establish a collaboration mechanism between the main control center and the sub-control center; Data collection and preprocessing module: The sub-control center continuously collects data through intelligent sensors, and performs preprocessing and preliminary analysis through edge computing devices, extracts key features and generates preliminary reports, which are then uploaded to the main control center; Data fusion and analysis module: The main control center uses advanced data fusion algorithms to integrate data from different sources and predict future passenger flow trends through big data analysis; Instruction generation module: generates decision instructions based on data analysis results; Emergency response and coordination module: According to the changes in real-time data, the main control center dynamically adjusts decision-making instructions and automatically initiates corresponding response measures when encountering emergencies.
9. A computer device comprising a memory and a processor, wherein the memory stores a computer program. Features: When the processor executes the computer program, the steps of the intelligent operation management method based on dual control centers described in any one of claims 1 to 7 are implemented.
10. A computer-readable storage medium having a computer program stored thereon, Features: When the computer program is executed by a processor, the steps of the intelligent operation management method based on dual control centers described in any one of claims 1 to 7 are implemented.
Citation Information
Patent Citations
Station passenger flow monitoring system, station passenger flow monitoring method, station passenger flow control system and station passenger flow control method
CN105404850A
Intelligent bus hierarchical decision-making system based on multi-system cooperation
CN112309122A
Passenger flow monitoring system and method
CN113473592A
Intelligent station system based on cloud side end and interaction method, equipment and medium thereof
CN117768500A
