Optimization method and optimization device of power distribution network frame and storage medium
By analyzing weather and electricity use scenarios and optimizing the distribution network grid structure, the problem of inability to optimize based on weather and electricity use scenarios in the existing technology is solved, and the stability of power supply and resource allocation efficiency are improved.
Patent Information
- Application Number
- CN202411571695.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-06
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-11-06
AI Technical Summary
The existing distribution network grid planning cannot be optimized based on weather conditions and electricity usage scenarios, resulting in unstable power supply and inefficient resource allocation.
By obtaining historical weather data and future preset weather, analyzing electric usage scenarios, generating load curves, evaluating the reliability of transmission lines, and adjusting the connection line, supply path adjustment and substation interconnection based on the reliability value to optimize the distribution network network frame structure.
Real-time adjustment of distribution network grids has been achieved, the stability and reliability of power supply has been improved, resource allocation has been optimized, and resource utilization has been ensured during peak periods and trough periods.
Smart Images

Figure CN119093365A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power distribution networks, and in particular to a power distribution network framework optimization method, an optimization device and a storage medium. Background Art
[0002] The grid planning of the distribution network is to determine when, where and what type of lines and the number of loops to be built in order to achieve the required transmission capacity within the planning period and minimize the system cost while meeting various technical indicators. The content of the distribution network grid planning is to determine the transmission method in the city, select the grid voltage, determine the layout and scale of the substation, and determine the network structure.
[0003] However, the current distribution network planning has the problem of being unable to be optimized according to weather conditions and electricity usage scenarios. Summary of the invention
[0004] The problem solved by the present invention is that the existing power distribution network framework planning cannot be optimized according to weather conditions and power consumption scenarios.
[0005] In order to solve the above problems, the present invention provides a method for optimizing a power distribution network, the optimization method comprising: Obtaining historical weather data of the area to be planned and preset weather in a future preset time period, and obtaining the impact value of the preset weather on power demand based on the historical weather data; Obtaining a power usage scenario in a future preset time period, obtaining the number and duration of whole-block power usage and the number and duration of fragmented power usage according to the power usage scenario, and obtaining a load curve representing load characteristics in different time periods according to the number and duration of whole-block power usage and the number and duration of fragmented power usage; Acquire a current connection line of an electric load node in a transmission line, and determine the reliability of the current connection line according to the load curve and the impact value; If the reliability is less than a first preset value, adjusting the current connection line by adding a contact line according to the load curve and the impact value; If the reliability is less than the second preset value and greater than the first preset value, adjusting the power supply path of the current connection line according to the load curve and the impact value; If the reliability is greater than a second preset value, the current connection line is not adjusted.
[0006] Optionally, the adjusting the current connection line by adding a contact line according to the load curve and the impact value includes: Determine the length and number of overloaded lines where the current connection line is overloaded according to the load curve and the impact value; If the length of the overloaded line is greater than the preset length value, and the number of the overloaded lines is greater than the number threshold, a target substation is selected for interconnection according to the terrain, distance, and the number of inter-station interconnections of substations in the neighboring area of the area to be planned; If the length of the overloaded line is greater than a preset length value, and the number of the overloaded lines is less than a number threshold, interconnecting the substations in the area to be planned; If the length of the overloaded line is less than the preset length value, and the number of the overloaded lines is greater than the number threshold, then a double contact line is added within each length corresponding to the overloaded line; If the length of the overloaded line is less than a preset length value, and the number of the overloaded lines is less than a number threshold, adjacent lines in the overloaded line are connected to the overloaded line in accordance with the proximity principle.
[0007] Optionally, selecting a target substation for interconnection according to terrain, distance, and the number of inter-station interconnections of substations in an adjacent area of the area to be planned includes: Obtaining the first inter-station interconnection number and the first intra-station interconnection number of all first adjacent substations at a first distance from the area to be planned; Obtaining a first matching score for each first neighboring substation according to weights of terrain, the number of first inter-station interconnections, and the number of first intra-station interconnections; If at least one of the first matching scores is greater than a first preset score, confirming the first neighboring substation with the highest first matching score as the target substation; If all of the first matching scores are less than a first preset score, and at least two of the first matching scores are greater than a second preset score, confirming at least two target substations in the first neighboring substations corresponding to the at least two first matching scores, wherein the first preset score is greater than the second preset score; If all of the first matching scores are smaller than a second preset score, a target substation is reselected from other distances.
[0008] Optionally, the reselecting a target substation from another distance includes: Obtain the second inter-station interconnection number and the second intra-station interconnection number of all second adjacent substations at a second distance from the area to be planned; Obtaining a second matching score for each second adjacent substation according to the terrain, the second inter-station interconnection number, and the weight of the second intra-station interconnection number; If at least one of the second matching scores is greater than a second preset score, confirming the second neighboring substation with the highest second matching score as the target substation; If all of the second matching scores are smaller than a second preset score, the first neighboring substation with the highest first matching score and the second neighboring substation with the highest second matching score are both confirmed as target substations.
[0009] Optionally, interconnecting the substations in the area to be planned includes: Get the voltage level of the power grid; If the voltage level is 500KV, the substations in the planned area are interconnected by a ring network structure and a chain structure; If the voltage level is 220KV, the substations in the planned area are interconnected using a ring network structure or a grid structure; If the voltage level is 110KV, the substations in the area to be planned are interconnected using a chain structure.
[0010] Optionally, the adjusting the power supply path of the current connection line according to the load curve and the impact value includes: The corresponding impact value and load curve are superimposed according to the time period to obtain the corresponding impact value and load characteristics in each time period; Mark the time period when the impact value is greater than the threshold and is in the whole power consumption as T1, and mark the time period when the impact value is greater than the threshold or is in the whole power consumption as T2; Merging the electric load nodes of the current connection line with the electric load nodes not involved in the merger in the area to be planned within a time period marked as T1; The electric load node of the currently connected line and the electric load node of the adjacent line are switched during a time period marked as T2.
[0011] Optionally, obtaining the impact value of the preset weather on the power demand according to the historical weather data includes: The impact value of the preset weather on the electricity demand is obtained according to the mapping relationship between the historical weather data and the impact value of the electricity demand.
[0012] Optionally, the load curves characterizing load characteristics in different time periods obtained according to the number and duration of the whole-block electricity consumption and the number and duration of the fragmented-block electricity consumption include: Dividing the future preset time period into a plurality of consecutive time intervals; According to the time interval, the number and duration of the entire power consumption are summarized to obtain a first power consumption in each time interval; According to the time interval, the number and duration of the electricity consumption of the fragments are summarized to obtain the second electricity consumption in each time interval; The load curve is formed according to a plurality of the time intervals, a plurality of the first power consumptions, and a plurality of the second power consumptions.
[0013] The present application also provides a distribution network optimization device for implementing any of the above optimization methods, wherein the optimization device comprises: A weather acquisition unit is used to acquire historical weather data of the area to be planned and preset weather in a preset time period in the future; A power usage scenario acquisition unit, used to acquire a power usage scenario in a future preset time period, and obtain the number and duration of whole power usage and the number and duration of fragmented power usage according to the power usage scenario; A connection circuit acquisition unit, used to acquire a current connection circuit of an electric load node in a transmission line; A processor, the processor is connected to the weather acquisition unit, the power usage scenario acquisition unit and the connection circuit acquisition unit, and is used to acquire the impact value of the preset weather on the power demand according to the historical weather data, and to obtain a load curve representing the load characteristics in different time periods according to the number and duration of the whole block power usage and the number and duration of the fragmented block power usage; and is also used to: determine the reliability of the current connection line according to the load curve and the impact value; If the reliability is less than a first preset value, adjusting the current connection line by adding a contact line according to the load curve and the impact value; If the reliability is less than the second preset value and greater than the first preset value, adjusting the power supply path of the current connection line according to the load curve and the impact value; If the reliability is greater than a second preset value, the current connection line is not adjusted.
[0014] An embodiment of the present application also provides a readable storage medium, on which a program or instruction is stored. When the program or instruction is executed by a processor, the steps of any of the above-mentioned optimization methods are implemented.
[0015] The method for optimizing the distribution network framework provided in the embodiment of the present application obtains the impact value on the power demand through historical weather and preset weather, and obtains the load curve representing the load characteristics through future power consumption scenarios, determines the reliability of the current connection line according to the load curve and the impact value, and implements different adjustment schemes for the current connection line according to the reliability value, so that the current connection line can be adjusted in real time according to the power consumption scenario and weather conditions, thereby ensuring the stability and reliability of the distribution network framework. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 A schematic diagram of a flow chart of a method for optimizing a distribution network framework provided in an embodiment of the present application; Figure 2 for Figure 1 A schematic flow chart of obtaining a load curve representing load characteristics in different time periods according to the number and duration of whole-block electricity consumption and the number and duration of fragmented electricity consumption in the optimization method shown; Figure 3 for Figure 1 The optimization method shown is a flow chart of adjusting the current connection line by adding a connecting line according to the load curve and the impact value. DETAILED DESCRIPTION
[0017] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, specific embodiments of the present invention will be described in detail below.
[0018] See also Figure 1 , Figure 1 The present invention provides a method for optimizing a distribution network framework, and the optimization method includes the following steps: 110. Obtain historical weather data of the area to be planned and preset weather in a preset time period in the future, and obtain the impact value of the preset weather on electricity demand based on the historical weather data.
[0019] Among them, historical weather data includes factors such as temperature, humidity, wind speed, etc. that may affect electricity demand.
[0020] The preset weather corresponds to the historical weather data. Exemplarily, the preset weather includes factors such as temperature, humidity, wind speed, etc. that may affect electricity demand.
[0021] In some embodiments, obtaining the impact value of preset weather on electricity demand based on historical weather data includes: obtaining the impact value of preset weather on electricity demand based on a mapping relationship between historical weather data and the impact value of electricity demand. Obtaining the impact value of preset weather on electricity demand through historical weather data can improve the accuracy of power load forecasting, and can more effectively allocate power resources to ensure sufficient power supply during peak hours, and appropriately reduce power generation during off-peak hours to achieve optimal resource allocation.
[0022] In some other embodiments, obtaining the impact value of preset weather on electricity demand based on historical weather data includes: using statistical methods or machine learning models to calculate the impact value of different weather conditions on electricity demand based on historical weather data and corresponding electricity demand data, and then obtaining the impact value of preset weather on electricity demand. By obtaining historical weather data and combining it with historical records of electricity demand, a more accurate prediction model can be established. These models can take into account the changes in electricity demand under different weather conditions, thereby improving the accuracy of the impact value of predicting electricity demand.
[0023] 120. Obtain power usage scenarios within a preset time period in the future, obtain the number and duration of whole power usage and the number and duration of fragmented power usage according to the power usage scenarios, and obtain load curves representing load characteristics in different time periods according to the number and duration of whole power usage and the number and duration of fragmented power usage.
[0024] The whole block of electricity consumption can be industrial electricity consumption, commercial electricity consumption and other electricity consumption scenarios, while the fragmented electricity consumption can be residential electricity consumption and other electricity consumption scenarios.
[0025] The flow chart of the load curve representing the load characteristics in different time periods according to the number and duration of the whole block power consumption and the number and duration of the fragmented block power consumption can be found in Figure 2 , Figure 2 for Figure 1 The optimization method shown is a flow chart of obtaining a load curve representing load characteristics in different time periods according to the number and duration of whole-block electricity consumption and the number and duration of fragmented electricity consumption. The specific process is as follows: 121. Divide the future preset time period into a number of consecutive time intervals.
[0026] The preset time period can be divided into minutes, hours, days, months, etc. as needed to obtain multiple time intervals.
[0027] 122. Summarize the number and duration of the entire electricity consumption according to the time interval to obtain the first electricity consumption.
[0028] The number and duration of the recorded entire blocks of power consumption are classified and sorted according to time intervals, and all power consumption in each time interval is accumulated to obtain the first power consumption in each time interval.
[0029] 123. The number and duration of electricity consumption of the fragments are summarized according to the time interval to obtain the second electricity consumption.
[0030] The number and duration of the recorded whole-block power consumption are classified and sorted according to time intervals, and all power consumption in each time interval is accumulated to obtain the second power consumption in each time interval.
[0031] 124. Form a load curve according to multiple time intervals, multiple first power consumptions, and multiple second power consumptions.
[0032] Exemplarily, the first power consumption and the second power consumption in each time interval are accumulated to obtain the power consumption, multiple time intervals are used as horizontal axes, and multiple power consumptions are used as vertical axes. The multiple power consumptions are marked in the corresponding time intervals in turn, and then these marked points are connected with a smooth curve to form a load curve.
[0033] By forming a load curve, we can get the changes of various types of power loads over time, which is an important basis for dispatching power systems and planning power systems. By analyzing the load curve, we can understand the change pattern of loads, peak loads, valley loads, and load fluctuations.
[0034] 130. Obtain the current connection line of the electric load node in the transmission line, and determine the reliability of the current connection line according to the load curve and the impact value.
[0035] The load rate can be obtained from the load curve. When the load rate is low, it means that the power supply capacity of the line may be insufficient at peak load; when the load rate is high, there may be a risk of overload. The load rate refers to the percentage of the average load to the maximum load in a certain statistical period.
[0036] By combining the load factor and impact value for evaluation, the reliability of the line can be evaluated more comprehensively. For example, if the load factor is low and the impact value is large, it means that the line may face greater power supply pressure during peak load and have lower reliability; while if the load factor is high but the impact value is small, it means that although the line faces the risk of overload, the overall reliability may still be high.
[0037] 140. If the reliability is less than the first preset value, the current connection line is adjusted by adding a connecting line according to the load curve and the impact value.
[0038] The first preset value can be set according to actual conditions and is not specifically limited here.
[0039] Please continue reading Figure 3 , Figure 3 for Figure 1 The schematic diagram of the process of adding a contact line to adjust the current connection line according to the load curve and the impact value in the optimization method shown. The specific process is as follows: 141. Determine the length and number of overloaded lines of the current connected line according to the load curve and the impact value.
[0040] The overload situation can be set according to the actual situation. For example, if the load rate is greater than the first threshold and the impact value is greater than the second threshold, it is determined that the current connection line in the current area is overloaded, and this section is recorded as an overloaded line.
[0041] 142. If the length of the overloaded line is greater than the preset length value, and the number of overloaded lines is greater than the number threshold, the target substation is selected for interconnection based on the terrain, distance, and the number of inter-station interconnections of substations in the neighboring areas of the planned area.
[0042] Among them, selecting the target substation for interconnection according to the terrain, distance, and the number of inter-station interconnections of substations in the neighboring areas of the planned area includes: 1421. Obtain the first inter-station interconnection number and the first intra-station interconnection number of all first adjacent substations at a first distance from the area to be planned.
[0043] The step of obtaining all first neighboring substations includes: using a geographic information system (GIS) or related computing tools to calculate the distance between the area to be planned and each substation, and screening out all first neighboring substations closest to the area to be planned.
[0044] Obtaining the first inter-station interconnection number includes: counting and calculating the first inter-station interconnection number according to the interconnection situation between the first adjacent substations, wherein the interconnection situation includes the number, capacity and connection mode of the interconnection lines.
[0045] Obtaining the first intra-station interconnection number includes: counting and calculating the first intra-station interconnection number according to the internal structure of the first adjacent substation, wherein the internal structure includes the arrangement and connection method of equipment such as transformers, switchgear, and busbars.
[0046] 1422. Obtain a first matching score for each first adjacent substation according to the weights of the terrain, the first number of inter-station interconnections, and the first number of intra-station interconnections.
[0047] The weights of the terrain, the number of interconnections between the first stations, and the number of interconnections within the first station can be obtained by correction and adjustment based on historical data, experimental data, and simulation data. No specific limitation is made here.
[0048] 1423. If at least one first matching score is greater than a first preset score, the first neighboring substation with the highest first matching score is confirmed as the target substation.
[0049] The highest matching number can be understood as the most suitable substation obtained by comprehensive consideration of the terrain and substation conditions.
[0050] 1424. If all first matching scores are less than the first preset score, and at least two first matching scores are greater than the second preset score, then at least two target substations are confirmed in the first neighboring substations corresponding to the at least two first matching scores, and the first preset score is greater than the second preset score.
[0051] By identifying at least two target substations, the stability and reliability of the entire transmission line can be improved.
[0052] 1425. If all first matching scores are smaller than the second preset score, reselect the target substation from other distances.
[0053] In some embodiments, reselecting a target substation from other distances includes: obtaining the second inter-station interconnection number and the second intra-station interconnection number of all second neighboring substations at a second distance from the area to be planned; obtaining a second matching score for each second neighboring substation according to the weights of the terrain, the second inter-station interconnection number and the second intra-station interconnection number; if at least one second matching score is greater than the second preset score, the second neighboring substation with the highest second matching score is confirmed as the target substation; if all second matching scores are less than the second preset score, the first neighboring substation with the highest first matching score and the second neighboring substation with the highest second matching score are both confirmed as target substations.
[0054] 143. If the length of the overloaded line is greater than the preset length value, and the number of overloaded lines is less than the number threshold, the substations in the planned area are interconnected.
[0055] In some embodiments, interconnecting substations in the planned area includes: 1431. Obtain the voltage level of the power grid.
[0056] 1432. If the voltage level is 500KV, the substations in the planned area shall be interconnected by using a ring network structure and a chain structure.
[0057] 1433. If the voltage level is 220KV, the substations in the planned area shall be interconnected using a ring network structure or a grid structure.
[0058] 1434. If the voltage level is 110KV, the substations in the planned area shall be interconnected using a chain structure.
[0059] By interconnecting the substations in the planned area in different ways through different voltage levels, the reliability, economy and flexibility of the power system can be significantly improved, and it can adapt to different load demands and optimize the degree of energy utilization.
[0060] 144. If the length of the overloaded line is less than the preset length value, and the number of overloaded lines is greater than the number threshold, a double contact line is added within each length corresponding to the overloaded line.
[0061] This application adds dual interconnection lines within the length corresponding to the overloaded line. Since each line has spare capacity, it can share the load of the overloaded line to a certain extent. When a line is overloaded, part of the load can be transferred to other lines by adjusting the switch state of the interconnection line, thereby alleviating the overload phenomenon, protecting the line and equipment from damage, and improving power supply reliability, enhancing line load capacity, optimizing line layout and resource allocation, and improving the safety and stability of the power grid.
[0062] 145. If the length of the overloaded line is less than the preset length value, and the number of overloaded lines is less than the number threshold, the adjacent lines in the overloaded line are connected to the overloaded line according to the proximity principle.
[0063] This application can quickly allocate the power resources of the adjacent lines to the overloaded lines through the nearby grid connection, thereby effectively alleviating the current pressure of the overloaded lines and preventing equipment damage or power outages caused by long-term overload. In addition, through grid connection, the adjacent lines can be interconnected with the overloaded lines to form a more stable power grid system.
[0064] 150. If the reliability is less than the second preset value and greater than the first preset value, the power supply path of the current connection line is adjusted according to the load curve and the impact value.
[0065] In some embodiments, adjusting the power supply path of the current connection line according to the load curve and the impact value includes: 151. The corresponding impact value and load curve are superimposed according to the time period to obtain the corresponding impact value and load characteristics in each time period.
[0066] 152. Mark the time period when the impact value is greater than the threshold and is in the whole power consumption as T1, and mark the time period when the impact value is greater than the threshold or is in the whole power consumption as T2.
[0067] 153. In the time period marked as T1, the electric load nodes of the current connection line are merged with the electric load nodes that are not involved in the merger in the area to be planned.
[0068] 154. Transfer the electric load node of the current connected line and the electric load node of the adjacent line within the time period marked as T2.
[0069] By superimposing the corresponding impact value and load curve according to the time period, we can clearly see the load characteristics and demand changes of the power system in each period, and more accurately understand the power demand in different time periods. We can mark different time periods according to different power demands, and then make different route adjustments according to the marked time periods, so as to meet higher load demands, reasonably allocate power resources, and improve the utilization efficiency of power resources.
[0070] In some embodiments, the output of power generation equipment may be reduced or equipment maintenance may be performed during off-peak hours.
[0071] 160. If the reliability is greater than the second preset value, the current connection line is not adjusted.
[0072] If the reliability is greater than the second preset value, it means that the stability and reliability of the current connection line can meet the requirements, so no adjustment is required.
[0073] The embodiment of the present application also provides an optimization device for a distribution network grid, which is used to implement any of the optimization methods described above. The optimization device includes a weather acquisition unit, a power usage scenario acquisition unit, a connection circuit acquisition unit and a processor. The weather acquisition unit is used to acquire historical weather data of the area to be planned and preset weather in a preset time period in the future; the power usage scenario acquisition unit is used to acquire power usage scenarios in a preset time period in the future, and obtain the number and duration of whole-block power usage and the number and duration of fragmented power usage according to the power usage scenarios; the connection circuit acquisition unit is used to acquire the current connection line of the power load node in the transmission line; the processor and the weather acquisition unit, the power usage scenario acquisition unit It is connected to the connection circuit acquisition unit and is used to obtain the impact value of preset weather on power demand according to historical weather data, and obtain a load curve representing the load characteristics in different time periods according to the number and duration of whole-block power consumption and the number and duration of fragmented power consumption; it is also used to: determine the reliability of the current connection line according to the load curve and the impact value; if the reliability is less than a first preset value, adjust the current connection line by adding a connecting line according to the load curve and the impact value; if the reliability is less than a second preset value and greater than the first preset value, adjust the power supply path of the current connection line according to the load curve and the impact value; if the reliability is greater than the second preset value, do not adjust the current connection line.
[0074] An embodiment of the present application also provides a readable storage medium, which stores computer-executable instructions. When the computer-executable instructions are read and executed by a processor, the surgical robot where the readable storage medium is located is controlled to implement the distribution network framework optimization method as in the above-mentioned embodiment.
[0075] In the several embodiments provided in this application, it should be understood that the disclosed method for optimizing the power distribution network can also be implemented in other ways. The embodiments described above are merely illustrative.
[0076] If the function is implemented in the form of a software function module and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art, or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, server, or network device, etc.) to perform all or part of the steps of the methods of each embodiment of the present invention. The aforementioned readable storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, and other media that can store program codes.
[0077] Although the present invention is disclosed as above, the present invention is not limited thereto. Any person skilled in the art can make various changes and modifications without departing from the spirit and scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the scope defined by the claims.
Claims
1. A method for optimizing a distribution network framework, characterized in that: The optimization method comprises: Obtaining historical weather data of the area to be planned and preset weather in a future preset time period, and obtaining the impact value of the preset weather on power demand based on the historical weather data; Obtaining a power usage scenario in a future preset time period, obtaining the number and duration of whole-block power usage and the number and duration of fragmented power usage according to the power usage scenario, and obtaining a load curve representing load characteristics in different time periods according to the number and duration of whole-block power usage and the number and duration of fragmented power usage; Acquire a current connection line of an electric load node in a transmission line, and determine the reliability of the current connection line according to the load curve and the impact value; If the reliability is less than a first preset value, adjusting the current connection line by adding a contact line according to the load curve and the impact value; If the reliability is less than the second preset value and greater than the first preset value, adjusting the power supply path of the current connection line according to the load curve and the impact value; If the reliability is greater than a second preset value, the current connection line is not adjusted.
2. The optimization method according to claim 1, characterized in that: The adjusting the current connection line by adding a contact line according to the load curve and the impact value comprises: Determine the length and number of overloaded lines where the current connection line is overloaded according to the load curve and the impact value; If the length of the overloaded line is greater than the preset length value, and the number of the overloaded lines is greater than the number threshold, a target substation is selected for interconnection according to the terrain, distance, and the number of inter-station interconnections of substations in the neighboring area of the area to be planned; If the length of the overloaded line is greater than a preset length value, and the number of the overloaded lines is less than a number threshold, interconnecting the substations in the area to be planned; If the length of the overloaded line is less than the preset length value, and the number of the overloaded lines is greater than the number threshold, then a double contact line is added within each length corresponding to the overloaded line; If the length of the overloaded line is less than a preset length value, and the number of the overloaded lines is less than a number threshold, adjacent lines in the overloaded line are connected to the overloaded line in accordance with the proximity principle.
3. The optimization method according to claim 2, characterized in that: The selecting of the target substation for interconnection according to the terrain, distance, and the number of interconnections between substations in the neighboring area of the planned area comprises: Obtaining the first inter-station interconnection number and the first intra-station interconnection number of all first adjacent substations at a first distance from the area to be planned; Obtaining a first matching score for each first neighboring substation according to weights of terrain, the number of first inter-station interconnections, and the number of first intra-station interconnections; If at least one of the first matching scores is greater than a first preset score, confirming the first neighboring substation with the highest first matching score as the target substation; If all of the first matching scores are less than a first preset score, and at least two of the first matching scores are greater than a second preset score, confirming at least two target substations in the first neighboring substations corresponding to the at least two first matching scores, wherein the first preset score is greater than the second preset score; If all of the first matching scores are smaller than a second preset score, a target substation is reselected from other distances.
4. The optimization method according to claim 3, characterized in that: The reselection of the target substation from other distances includes: Obtain the second inter-station interconnection number and the second intra-station interconnection number of all second adjacent substations at a second distance from the area to be planned; Obtaining a second matching score for each second adjacent substation according to the terrain, the second inter-station interconnection number, and the weight of the second intra-station interconnection number; If at least one of the second matching scores is greater than a second preset score, confirming the second neighboring substation with the highest second matching score as the target substation; If all of the second matching scores are smaller than a second preset score, the first neighboring substation with the highest first matching score and the second neighboring substation with the highest second matching score are both confirmed as target substations.
5. The optimization method according to claim 2, characterized in that: The interconnecting of the substations in the area to be planned includes: Get the voltage level of the power grid; If the voltage level is 500KV, the substations in the planned area are interconnected by a ring network structure and a chain structure; If the voltage level is 220KV, the substations in the planned area are interconnected using a ring network structure or a grid structure; If the voltage level is 110KV, the substations in the area to be planned are interconnected using a chain structure.
6. The optimization method according to any one of claims 1 to 5, characterized in that: The adjusting the power supply path of the current connection line according to the load curve and the impact value comprises: The corresponding impact value and load curve are superimposed according to the time period to obtain the corresponding impact value and load characteristics in each time period; Mark the time period when the impact value is greater than the threshold and is in the whole power consumption as T1, and mark the time period when the impact value is greater than the threshold or is in the whole power consumption as T2; Merging the electric load nodes of the current connection line with the electric load nodes not involved in the merger in the area to be planned within a time period marked as T1; The electric load node of the currently connected line and the electric load node of the adjacent line are switched during a time period marked as T2.
7. The optimization method according to any one of claims 1 to 5, characterized in that: The obtaining the impact value of the preset weather on the power demand according to the historical weather data comprises: The impact value of the preset weather on the electricity demand is obtained according to the mapping relationship between the historical weather data and the impact value of the electricity demand.
8. The optimization method according to any one of claims 1 to 5, characterized in that: The load curves representing the load characteristics in different time periods obtained according to the number and duration of the whole block power consumption and the number and duration of the fragmented block power consumption include: Dividing the future preset time period into a plurality of consecutive time intervals; According to the time interval, the number and duration of the entire power consumption are summarized to obtain a first power consumption in each time interval; According to the time interval, the number and duration of the electricity consumption of the fragments are summarized to obtain the second electricity consumption in each time interval; The load curve is formed according to a plurality of the time intervals, a plurality of the first power consumptions, and a plurality of the second power consumptions.
9. A device for optimizing a distribution network, characterized in that: For implementing the optimization method according to any one of claims 1 to 8, the optimization device comprises: A weather acquisition unit is used to acquire historical weather data of the area to be planned and preset weather in a preset time period in the future; A power usage scenario acquisition unit, used to acquire a power usage scenario in a future preset time period, and obtain the number and duration of whole power usage and the number and duration of fragmented power usage according to the power usage scenario; A connection circuit acquisition unit, used to acquire a current connection circuit of an electric load node in a transmission line; A processor, the processor is connected to the weather acquisition unit, the power usage scenario acquisition unit and the connection circuit acquisition unit, and is used to acquire the impact value of the preset weather on the power demand according to the historical weather data, and to obtain a load curve representing the load characteristics in different time periods according to the number and duration of the whole block power usage and the number and duration of the fragmented block power usage; and is also used to: determine the reliability of the current connection line according to the load curve and the impact value; If the reliability is less than a first preset value, adjusting the current connection line by adding a contact line according to the load curve and the impact value; If the reliability is less than the second preset value and greater than the first preset value, adjusting the power supply path of the current connection line according to the load curve and the impact value; If the reliability is greater than a second preset value, the current connection line is not adjusted.
10. A readable storage medium, characterized in that: The readable storage medium stores a program or instruction, and when the program or instruction is executed by a processor, the steps of the optimization method according to any one of claims 1 to 8 are implemented.
Citation Information
Patent Citations
Power distribution network planning method under energy internet
CN110535129A
Power distribution network frame optimization method based on energy internet
CN114066101A
Method and device for determining planning result of power distribution network, equipment and medium
CN116167589A
Load-adjustable power distribution network planning strategy optimization method and system
CN117175543A
Power distribution network frame planning method considering investment operation cost and photovoltaic consumption
CN117649070A
Cited By
Regional power grid load prediction method and system based on deep learning
CN120473977A