Multi-terminal direct current system flexibility planning method for offshore wind power cluster
By building a multi-terminal DC system model, optimizing the location and capacity of the converter station, combined with Monte Carlo sampling and control strategies, the problem of insufficient flexibility in offshore wind power VSC-MTDC system in large-scale grid connection is solved, and economic and flexibility is achieved The balance of nature improves the grid connection flexibility and system stability of wind power.
Patent Information
- Application Number
- CN202411197140.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-29
- Publication Date
- 2024-12-06
AI Technical Summary
The existing offshore wind farm AC system planning is mainly aimed at economics, and it has failed to effectively analyze the coupling relationship between VSC-MTDC system planning and control mode, control performance, as well as the stable operation interval and operation flexibility boundary under random airport scenarios. This leads to insufficient flexibility in offshore wind power VSC-MTDC system in large-scale grid connection.
Using the multi-end DC system model, a planning model including network topology, electrical parameters, control parameters and other multi-factor coupling relationships are constructed through methods such as fuzzy clustering and Monte Carlo sampling, to optimize the position and capacity of the converter station to ensure the stability and capacity of the system. A balance between flexibility, using master-slave control and sag control strategies, upper-level planning decisions and lower-level operation simulations are carried out to verify the feasibility of the planning scheme.
The optimal planning results of multi-terminal DC systems are achieved, economical and operational flexibility are ensured, and the grid connection flexibility of offshore wind power cluster VSC-MTDC systems are improved, which significantly broadens the operating boundaries of wind power power and reduces the planning scheme. Rationality.
Smart Images

Figure CN119093458A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of power transmission, and in particular to a multi-terminal direct current system flexibility planning method for offshore wind power clusters. Background Art
[0002] From the perspective of offshore wind power development, it shows obvious characteristics of clustering and deep sea. The multi-terminal flexible direct current transmission (VSC-MTDC) method has advantages such as economy and controllability in long-distance and large-capacity power transmission, and is considered to be an important choice for future large-capacity and long-distance offshore wind power cluster power transmission. The VSC-MTDC system provides another flexibility adjustment method for offshore wind power grid connection from the perspective of volatility distribution and control. How to plan a scientific and reasonable offshore wind power cluster VSC-MTDC grid connection system and improve the flexibility of large-scale offshore wind power grid connection has become one of the urgent problems to be solved in large-scale and high-proportion offshore wind power grid connection and consumption.
[0003] The existing AC system planning of offshore wind farms takes economy as the main goal. As the planning of offshore wind power VSC-MTDC system is affected by the coupling of system operation control mode and control parameters as electrical system planning, it is urgent to analyze the coupling relationship between VSC-MTDC system planning and control mode, control performance, and stable operation range and operation flexibility boundary under random scenarios from the perspective of optimization planning, and establish the offshore wind power VSC-MTDC system planning model and method including grid-connected power flexibility. Summary of the invention
[0004] The purpose of the present invention is to overcome the defects of the above-mentioned prior art and provide a multi-terminal DC system flexibility planning method for offshore wind power clusters.
[0005] The purpose of the present invention can be achieved by the following technical solutions:
[0006] A multi-terminal DC system flexibility planning method for offshore wind power clusters further includes the following steps:
[0007] S1: Obtain the wind speed probability density distribution, wind farm unit location coordinates and common coupling point location coordinates in a given sea area, and build a multi-terminal DC system model;
[0008] S2: According to the location coordinates of the wind farm units, the multi-terminal DC system model is used to optimize the location and capacity of the offshore rectifier station based on fuzzy clustering, and a planning scheme with the lowest unit flexibility cost is formulated. The planning scheme includes the power generation of the offshore wind power station, the active power command value of the onshore inverter station, and the location of the offshore rectifier station;
[0009] S3: According to the planning scheme and wind speed probability density distribution, a wind power fluctuation scenario is constructed based on Monte Carlo sampling;
[0010] S4: Based on the planning scheme and wind power fluctuation scenario, when there is a deviation between the power generation of the offshore wind power station and the active power command value of the onshore inverter station, a steady-state operating point calculation including a change in the converter station control mode is performed; if the calculation result is that each converter station enters the current limiting mode or there is a voltage over-limit, the planning scheme is unreasonable, and return to S2 to re-formulate the planning scheme; otherwise, the optimal planning scheme is output.
[0011] Furthermore, the multi-terminal DC system model includes the system stable and flexible operation domain Ω DR , the system stable and flexible operation domain is composed of the equipment operation feasible domain Ω RE And the system stable operation domain Ω SD The expressions of the multi-terminal DC system model are composed of two parts:
[0012]
[0013] stΩ DR =Ω RE ∩Ω SD
[0014] In the formula, F t Indicates the difference between the upper and lower limits of active power operation of all grid-connected points. For stable and flexible operation domain Ω DR The upper limit of active power operation of converter station i at time t under the constraint is: For stable and flexible operation domain Ω DR The lower limit of active power operation of converter station i at time t under the constraint.
[0015] Furthermore, the expression of the constraints included in the feasible domain of equipment operation is:
[0016] I dc =[Y]U dc
[0017]
[0018] In the formula, I dc Indicates the operating current of the converter station, U dc represents the operating voltage of the converter station, [Y] is the admittance matrix; is the current flowing through the submarine cable between converter station i and converter station j, I s,max P is the upper limit of the current carrying capacity of the submarine cable; i is the active power output by the i-th converter station, is the rated active power of the i-th converter station; is the lower limit of the operating voltage of converter station i, is the upper limit of the operating voltage of converter station i; is the operating current limit value of converter station i.
[0019] Furthermore, when the multi-terminal DC system model adopts the master-slave control strategy, the master-slave control mode is expressed as:
[0020]
[0021] Where m, n and q represent the number of constant voltage control converter stations, constant active power control converter stations and wind farm side converter stations respectively; U ref_conV,1 is the voltage reference value of the constant voltage control converter station; U dc_conP and P ref_conP The voltage and active power reference value of the converter station is controlled to determine the active power; U dc_wf and P wfN is the voltage and rated active power of the wind farm converter station, k f are the slope parameters of the active frequency controller of the wind farm converter station, f and f N are the real-time frequency and rated frequency of the AC system on the wind farm side, respectively. When the wind farm system frequency is the rated value, that is, f = f N .
[0022] Furthermore, when the multi-terminal DC system model adopts the droop control strategy, the droop control mode is expressed as:
[0023]
[0024] Where m, n and q represent the number of constant voltage control converter stations, constant active power control converter stations and wind farm side converter stations respectively, P ref_condroop,p is the power of the pth droop control station, D p is the droop control coefficient of the pth droop control station, U ref_condroop,p is the voltage reference value of the pth droop control station, U dc_condroop,n is the actual voltage value of the droop control station, k f are the slope parameters of the active frequency controller of the wind farm converter station, f and f N are the real-time frequency and rated frequency of the AC system on the wind farm side, respectively. When the wind farm system frequency is the rated value, that is, f = f N .
[0025] Furthermore, the expression of the constraints included in the stable operation domain of the system is:
[0026] D con,j,min ≤D con,j ≤D con,j,min
[0027] maxRe{λ[A sys (D con,j )]}<0
[0028] Where D con,j represents the control parameter of converter station j, and its value needs to be within the feasible range of the converter station control parameter [D con,j,min ,D con,j,max ], the value boundary of the control parameter is affected by the design capacity of the converter station; A sys is the state space matrix of the DC system affected by the control parameters, λ(A sys ) is the eigenvalue of the state space matrix; Re(λ) represents the real part of the eigenvalue λ.
[0029] Furthermore, the multi-terminal DC system model includes an upper layer and a lower layer. The upper layer is a planning and decision-making layer, which takes economy and flexibility as optimization goals, and uses converter station location, converter station capacity, topological wiring, and cable model as decision variables to determine the network topology of the multi-terminal DC system and pass the planning scheme to the lower layer; the lower layer is an operation simulation layer, which performs operation simulation under power fluctuation scenarios in the network topology determined by the upper layer to verify the feasibility of the planning scheme when the control instructions do not match the actual output after power fluctuations, and returns the verification results to the upper layer.
[0030] Furthermore, the expression of the planning decision layer is:
[0031]
[0032] In the formula, the total cost C in the optimization objective is Total The cost of offshore converter station C off 、Cost of onshore converter station on , Cable cost C cable And the wind curtailment loss cost C in the whole life cycle wp Four components, and denote the converter valve equipment cost of the i-th offshore / onshore converter station, and represents the cost of supporting electrical equipment and control and protection devices for the i-th offshore / onshore converter station, represents the cost of the offshore platform of the i-th offshore converter station, c cable,k,ij is the unit length cost of the submarine cable k connecting converter station i and converter station j, L ij represents the length of the submarine cable, n represents the number of planned scenarios, and α t represents the probability of occurrence of the t-th wind speed scenario, c w is the on-grid electricity price of offshore wind power, N on is the number of onshore converter stations, N off 、x off,i ,y off,i Respectively represent the number and location coordinates of offshore converter stations, P off,i and P on,jDenotes the capacity of the offshore / onshore converter station, D net represents the adjacency matrix of the offshore DC line, S k Indicates the submarine cable model, N wf is the number of offshore wind farms, A se represents the plannable area of the offshore converter station, P wf,m represents the output power of wind farm m, S cable is the candidate set of DC submarine cables.
[0033] Furthermore, the computational expression for running the simulation layer is:
[0034]
[0035] In the formula, I dc ′ and U dc ′ respectively represent the current and voltage matrices of the converter station under the wind power fluctuation scenario, and they also need to meet the operation constraints of the converter station; Mod represents the control method of the converter station, It indicates that the control mode of each converter station is not all current limiting control mode.
[0036] Furthermore, in the optimization of offshore rectifier station site selection and sizing based on fuzzy clustering, the upper limit of the number of clusters is the number of wind farms.
[0037] Compared with the prior art, the present invention has the following beneficial effects:
[0038] 1) The present invention obtains the optimal planning results from the perspectives of economy and operational flexibility by constructing a multi-terminal DC system model that includes a coupling relationship between multiple factors such as network topology, electrical parameters, and control parameters. The multi-terminal DC system model continuously optimizes the scheme through the process of upper-layer optimization and lower-layer verification, verifies the feasibility of the planning scheme in actual control, and obtains a system planning result with high feasibility.
[0039] 2) The planning method proposed in the present invention not only ensures better economic efficiency, but also takes into account the flexibility requirements of the power grid for large-scale renewable energy grid connection, which is more in line with actual engineering needs. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 This is a schematic diagram of an offshore wind power cluster.
[0041] Figure 2 It is the probability density distribution diagram of wind speed.
[0042] Figure 3 To optimize the flow chart.
[0043] Figure 4a This is the optimization result of the traditional method.
[0044] Figure 4bThis is the optimization result of the method of the present invention.
[0045] Figure 5 Comparison chart of cost and flexibility indicators for different optimization results.
[0046] Figure 6 This is a typical scenario daily wind speed curve.
[0047] Figure 7a This is a comparison diagram of the adjustable boundary of the grid-connected power of the PCC1 node.
[0048] Figure 7b This is a comparison diagram of the adjustable boundary of the grid-connected power of the PCC2 node.
[0049] Figure 7c This is a comparison diagram of the adjustable boundary of the grid-connected power of the PCC3 node. DETAILED DESCRIPTION
[0050] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is implemented based on the technical solution of the present invention, and provides a detailed implementation method and specific operation process, but the protection scope of the present invention is not limited to the following embodiments.
[0051] Example 1
[0052] The present invention is a multi-terminal DC system flexibility planning method for offshore wind power clusters, comprising the following steps:
[0053] S1: Obtain the wind speed probability density distribution, wind farm unit location coordinates and common coupling point location coordinates in a given sea area, and build a multi-terminal DC system model;
[0054] like Figure 1 As shown in the figure, the offshore wind power cluster with a total installed capacity of 3064MW selected in this embodiment includes 6 offshore wind farms. The offshore wind farm is about 100km away from the shore, and the onshore power grid provides a total of 3 common coupling points (PCC). The wind speed probability density distribution is as follows: Figure 2 shown.
[0055] The key factors affecting the flexible operation boundary of the offshore DC transmission system can be summarized as the system stability constraint restrictions brought about by the operation and control characteristics of the DC system and the equipment operation capacity restrictions brought about by the equipment safety operation requirements. In this regard, the stable and flexible operation domain Ω of the offshore wind power multi-terminal DC system model constructed by the present invention is DR The feasible domain Ω is run by the device RE And the system stable operation domain Ω SD It consists of two parts.
[0056] S2: According to the location coordinates of the wind farm units, through the multi-terminal DC system model, the fuzzy clustering-based offshore rectifier station site selection and capacity optimization is performed to formulate a planning scheme with the lowest unit flexibility cost, which includes the power generation of the offshore wind power station, the active power command value of the onshore inverter station and the location of the offshore rectifier station;
[0057] The upper limit of the number of clusters is the number of wind farms, that is, the number of offshore rectifier stations N off Less than or equal to the number of wind farms N wf The capacity allocation of the onshore inverter station is optimized according to the total capacity of the offshore rectifier station, and then the offshore DC topology is optimized accordingly. wf ) and develop a planning scheme with the lowest unit flexibility cost.
[0058]
[0059] stΩ DR =Ω RE ∩Ω SD
[0060] In the formula, F t Indicates the difference between the upper and lower limits of active power operation of all grid-connected points. For stable and flexible operation domain Ω DR The upper limit of active power operation of converter station i at time t under the constraint is: For stable and flexible operation domain Ω DR The lower limit of active power operation of converter station i at time t under the constraint.
[0061] 1) Equipment operation feasible domain Ω RE
[0062] The basis of operational flexibility is the flexibility of nodes within the system. Relying on the control capability of each converter station node within the VSC-MTDC system, the flexible operating boundary of the system is constrained by the equipment capacity. The equipment feasible domain represents the physical limitations of the flexible DC network. Specifically, it is limited by the current carrying capacity of the submarine cable, the capacity of the converter station, and the operating voltage and current of the converter station. The calculation expression is:
[0063]
[0064] I dc =[Y]U dc
[0065]
[0066] In the formula, I dc Indicates the operating current of the converter station, U dc represents the operating voltage of the converter station, [Y] is the admittance matrix; is the current flowing through the submarine cable between converter station i and converter station j, I s,max P is the upper limit of the current carrying capacity of the submarine cable; i is the active power output by the i-th converter station, is the rated active power of the i-th converter station; is the lower limit of the operating voltage of converter station i, is the upper limit of the operating voltage of converter station i; is the operating current limit value of converter station i.
[0067] In the constraints of the equipment operation feasible domain, the characteristic equation of the normal operation of the offshore DC transmission system is related to the control mode of each converter station. When the system adopts master-slave control, the master station adopts constant voltage control and is responsible for controlling the DC voltage of the offshore DC transmission system. The slave station adopts constant active power control for constant power transmission between the DC system and the AC power grid. The master-slave control mode can be expressed as:
[0068]
[0069] Where m, n and q represent the number of constant voltage control converter stations, constant active power control converter stations and wind farm side converter stations respectively, P ref_condroop,p is the power of the pth droop control station, D p is the droop control coefficient of the pth droop control station, U ref_condroop,p is the voltage reference value of the pth droop control station, U dc_condroop,n is the actual voltage value of the droop control station, k f are the slope parameters of the active frequency controller of the wind farm converter station, f and f N are the real-time frequency and rated frequency of the AC system on the wind farm side, respectively. When the wind farm system frequency is the rated value, that is, f = f N .
[0070] When the system adopts the droop control strategy, each droop control station controls the DC voltage at multiple points in the DC system, and uses the slope relationship between the given converter station power and the DC voltage to realize the control of the DC voltage by multiple converter stations. The droop control mode can be expressed as:
[0071]
[0072] Where m, n and q represent the number of constant voltage control converter stations, constant active power control converter stations and wind farm side converter stations respectively, P ref_condroop,p is the power of the pth droop control station, D p is the droop control coefficient of the pth droop control station, U ref_condroop,p is the voltage reference value of the pth droop control station, U dc_condroop,nis the actual voltage value of the droop control station, k f are the slope parameters of the active frequency controller of the wind farm converter station, f and f N are the real-time frequency and rated frequency of the AC system on the wind farm side, respectively. When the wind farm system frequency is the rated value, that is, f = f N .
[0073] 2) System stable operation domain Ω SD
[0074] The DC transmission topology directly affects the steady-state power flow distribution in the DC system, changes the propagation and distribution of the dynamic interaction process in the DC system, and thus affects the stability. The premise for the flexible operation of the offshore DC transmission system is that the entire system remains stable. The stable operation domain of the offshore DC transmission system is constructed, and the calculation expression is:
[0075]
[0076] D con,j,min ≤D con,j ≤D con,j,min
[0077] maxRe{λ[A sys (D son,j )]}<0
[0078] Where D con,j represents the control parameter of converter station j, and its value needs to be within the feasible range of the converter station control parameter [D con,j,min ,D con,j,max ], the value boundary of the control parameter is affected by the design capacity of the converter station; A sys is the state space matrix of the DC system affected by the control parameters, λ(A sys ) is the eigenvalue of the state space matrix; Re(λ) represents the real part of the eigenvalue λ.
[0079] S3: According to the planning scheme and wind speed probability density distribution, a wind power fluctuation scenario is constructed based on Monte Carlo sampling;
[0080] The power fluctuation scenario mainly includes two elements: the output of each wind farm and the power demand of each PCC point. There is a certain error between the total output of wind farms and the total power demand of each PCC point to reflect the power forecast deviation.
[0081] The present invention aims to construct a stable-flexible domain model of an offshore wind power VSC-MTDC system that includes a coupling relationship of multiple factors such as VSC-MTDC network topology, electrical parameters, and control parameters, and to seek the optimal planning of offshore wind power cluster VSC-MTDC systems from the two perspectives of economy and operational flexibility. The present invention establishes a two-layer planning model and method that proposes upper-level steady-state scenario planning and lower-level fluctuation scenario verification. The upper-level planning decision layer uses the location of the converter station, the capacity of the converter station, the topological wiring, and the cable model as decision variables to determine the VSC-MTDC network topology and pass the planning scheme to the lower layer; the lower layer is the operation simulation layer, which performs operation simulation under the power fluctuation scenario in the power grid structure determined by the upper layer to verify the feasibility of the planning scheme when the control instructions do not match the actual output after the power fluctuation, and returns the verification results to the upper layer. The model is continuously carried out through the process of upper-level optimization and lower-level verification. The specific flow chart is as follows: Figure 3 shown.
[0082] A flexibility planning model for multi-terminal DC systems of offshore wind power clusters is established. The upper layer is the planning decision layer, which takes economy and flexibility as optimization goals, and uses converter station location, converter station capacity, topological wiring, and cable model as decision variables to determine the VSC-MTDC network topology and pass the planning scheme to the lower layer; the lower layer is the operation simulation layer, which performs operation simulation under power fluctuation scenarios in the power grid structure determined by the upper layer to verify the feasibility of the planning scheme when the control instructions do not match the actual output after power fluctuations, and returns the verification results to the upper layer. The model continuously performs the process of upper-layer optimization and lower-layer verification to achieve the optimization solution of the planning scheme.
[0083] The expression of the planning decision layer is:
[0084]
[0085] Where: The total cost C in the optimization objective Total The cost of offshore converter station C off 、Cost of onshore converter station on , Cable cost C cable And the wind curtailment loss cost C in the whole life cycle wp Four components. and denote the converter valve equipment cost of the i-th offshore / onshore converter station, and represents the cost of supporting electrical equipment and control and protection devices for the i-th offshore / onshore converter station, represents the cost of the offshore platform of the i-th offshore converter station, c cable,k,ij is the unit length cost of the submarine cable k connecting converter station i and converter station j, L ij represents the length of the submarine cable. n represents the number of planning scenarios, α trepresents the probability of occurrence of the t-th wind speed scenario, c w is the on-grid electricity price of offshore wind power. on is the number of onshore converter stations, N off , x off,i ,y off,i Respectively represent the number and location coordinates of offshore converter stations, P off,i and P on,j Denotes the capacity of the offshore / onshore converter station, D net represents the adjacency matrix of the offshore DC line, S k Indicates the submarine cable model; N wf is the number of offshore wind farms, A se represents the plannable area of the offshore converter station, P wf,m represents the output power of wind farm m, S cable is the candidate set of DC submarine cables.
[0086] The calculation expression for running the simulation layer is:
[0087]
[0088] Where: I dc ′ and U dc ′ respectively represent the current and voltage matrices of the converter station under the wind power fluctuation scenario, and they also need to meet the operation constraints of the converter station; Mod represents the control method of the converter station, It indicates that the control mode of each converter station is not all current limiting control mode, that is, not all converter stations enter current limiting control.
[0089] S4: Based on the planning scheme and wind power fluctuation scenario, when there is a deviation between the offshore wind power output and the active power command value of the onshore inverter station, a steady-state operating point calculation including a change in the converter station control mode is performed; if the calculation result is that each converter station enters the current limiting mode or there is a voltage over-limit, the planning scheme is unreasonable, and return to S2 to re-formulate the planning scheme; otherwise, the optimal planning scheme is output.
[0090] The planning results of traditional optimization methods that do not consider flexibility are as follows Figure 4a As shown; through the optimization method proposed by the present invention, the results obtained are as follows Figure 4b As shown. Without considering the flexibility of the system, the number of submarine cables in the planned scheme is reduced. Wind farms 4, 5 and 6 are directly connected to the onshore inverter station 1 through the rectifier station 1; wind farms 2 and 3 perform power conversion and power transmission through the rectifier station 2; wind farm 1 is connected to the DC side of the rectifier station 2 through the rectifier station 3, and then centrally transmitted to the onshore inverter station 2 through the large-capacity DC submarine cable. The onshore inverter stations 1 and 2, and 2 and 3 are also connected to each other through DC lines.
[0091] However, if the optimization method proposed in the present invention is used, the offshore wind power is collected and transmitted through three offshore rectifier stations, wherein the wind power of rectifier station 3 is incorporated into rectifier station 2, rectifier station 2 is connected to rectifier station 1 through a DC submarine cable, and then connected to onshore inverter stations 1 and 3 respectively through two bipolar DC submarine cables; the three onshore inverter stations are also connected through DC lines to distribute the wind power; a ring connection is formed between the two offshore rectifier stations and the three onshore inverter stations.
[0092] Depend on Figure 5 It can be seen that the optimization method proposed in this patent, after considering the flexibility of the system, the total cost of the planning scheme is increased by about 6.7% compared with the scheme without considering flexibility, while the flexibility index of the system is improved by about 23.56%.
[0093] The flexible regulation performance of grid-connected power under typical operation scenarios is analyzed, and the comparison is as follows: Figure 6 As shown. Overall, the flexible operation performance of the optimization method proposed in this patent is better than that of the traditional scheme. The proposed method is significantly better than the traditional planning scheme in the upper limit of the grid-connected power adjustable at the PCC3 node and the lower limit of the grid-connected power adjustable at the PCC1 node, and the flexible operation boundary is significantly widened.
[0094] This case shows that the method proposed in this patent is effective and feasible, and can effectively broaden the flexible operation boundaries of offshore wind power grid connection, providing guidance for the construction of offshore wind power DC access systems in the future.
[0095] Aiming at the problem of multi-terminal DC grid-connected planning of offshore wind power clusters, the present invention innovatively constructs a stable-flexible domain model of an offshore wind power VSC-MTDC system that includes the coupling relationship of multiple factors such as VSC-MTDC network topology, electrical parameters, and control parameters, and describes the relationship between the DC access planning scheme and the flexibility of grid-connected power. With the goal of minimizing the unit stable-flexible domain cost, the capacity optimization and topology optimization of the converter station of the VSC-MTDC system are carried out. In order to ensure the safe and stable operation of the system under the offshore wind power fluctuation scenario, a two-layer planning method of upper-level steady-state scenario planning and lower-level fluctuation scenario verification is proposed. While ensuring the investment cost of the planning scheme, it provides flexible and adjustable wind power to the onshore power grid as much as possible, which can provide a reference for the engineering design of offshore wind power grid connection via multi-terminal flexible direct current.
[0096] The preferred specific embodiments of the present invention are described in detail above. It should be understood that a person skilled in the art can make many modifications and changes based on the concept of the present invention without creative work. Therefore, any technical solution that can be obtained by a person skilled in the art through logical analysis, reasoning or limited experiments based on the concept of the present invention on the basis of the prior art should be within the scope of protection determined by the claims.
Claims
1. A multi-terminal DC system flexibility planning method for offshore wind power clusters, characterized in that: The following steps are also included: S1: Obtain the wind speed probability density distribution, wind farm unit location coordinates and common coupling point location coordinates in a given sea area, and build a multi-terminal DC system model; S2: According to the location coordinates of the wind farm units, through the multi-terminal DC system model, the fuzzy clustering-based offshore rectifier station site selection and capacity optimization is performed to formulate a planning scheme with the lowest unit flexibility cost, which includes the power generation of the offshore wind power station, the active power command value of the onshore inverter station and the location of the offshore rectifier station; S3: According to the planning scheme and wind speed probability density distribution, a wind power fluctuation scenario is constructed based on Monte Carlo sampling; S4: Based on the planning scheme and wind power fluctuation scenario, when there is a deviation between the power generation of the offshore wind power station and the active power command value of the onshore inverter station, a steady-state operating point calculation including a change in the converter station control mode is performed; if the calculation result is that each converter station enters the current limiting mode or there is a voltage over-limit, the planning scheme is unreasonable, and return to S2 to re-formulate the planning scheme; otherwise, the optimal planning scheme is output.
2. A multi-terminal DC system flexibility planning method for offshore wind power clusters according to claim 1, characterized in that: The multi-terminal DC system model includes a system stable and flexible operation domain Ω DR The stable and flexible operation domain of the system is composed of the feasible domain of equipment operation Ω RE And the system stable operation domain Ω SD The multi-terminal DC system model consists of two parts. The expression of the multi-terminal DC system model includes: stΩ DR =Oh RE ∩Oh SD In the formula, F t Indicates the difference between the upper and lower limits of active power operation of all grid-connected points. For stable and flexible operation domain Ω DR The upper limit of active power operation of converter station i at time t under the constraint is: For stable and flexible operation domain Ω DR The lower limit of active power operation of converter station i at time t under the constraint.
3. A multi-terminal DC system flexibility planning method for offshore wind power clusters according to claim 2, characterized in that: The expression of the constraints included in the feasible domain of the device operation is: I dc =[Y]U dc In the formula, I dc Indicates the operating current of the converter station, U dc represents the operating voltage of the converter station, [Y] is the admittance matrix; is the current flowing through the submarine cable between converter station i and converter station j, I s,max P is the upper limit of the current carrying capacity of the submarine cable; i is the active power output by the i-th converter station, is the rated active power of the i-th converter station; is the lower limit of the operating voltage of converter station i, is the upper limit of the operating voltage of converter station i; is the operating current limit value of converter station i.
4. A multi-terminal DC system flexibility planning method for offshore wind power clusters according to claim 3, characterized in that: When the multi-terminal DC system model adopts the master-slave control strategy, the master-slave control mode is expressed as: Where m, n and q represent the number of constant voltage control converter stations, constant active power control converter stations and wind farm side converter stations respectively; U ref_conV,1 is the voltage reference value of the constant voltage control converter station; U dc_conP and P ref_conP The voltage and active power reference value of the converter station is controlled to determine the active power; U dc_wf and P wfN is the voltage and rated active power of the wind farm converter station, k f are the slope parameters of the active frequency controller of the wind farm converter station, f and f N are the real-time frequency and rated frequency of the AC system on the wind farm side, respectively. When the wind farm system frequency is the rated value, that is, f = f N .
5. A multi-terminal DC system flexibility planning method for offshore wind power clusters according to claim 3, characterized in that: When the multi-terminal DC system model adopts the droop control strategy, the droop control mode is expressed as: Where m, n and q represent the number of constant voltage control converter stations, constant active power control converter stations and wind farm side converter stations respectively, P ref_condroop,p is the power of the pth droop control station, D p is the droop control coefficient of the pth droop control station, U ref_condroop,p is the voltage reference value of the pth droop control station, U dc_condroop,n is the actual voltage value of the droop control station, k f are the slope parameters of the active frequency controller of the wind farm converter station, f and f N are the real-time frequency and rated frequency of the AC system on the wind farm side, respectively. When the wind farm system frequency is the rated value, that is, f = f N .
6. A multi-terminal DC system flexibility planning method for offshore wind power clusters according to claim 2, characterized in that: The expression of the constraints included in the stable operation domain of the system is: D con,j,min ≤D con,j ≤D con,j,min maxRe{λ[A sys (D con,j )]}<0 Where D con,j represents the control parameter of converter station j, and its value needs to be within the feasible range of the converter station control parameter [D con,j,min ,D con,j,max ], the value boundary of the control parameter is affected by the design capacity of the converter station; A sys is the state space matrix of the DC system affected by the control parameters, λ(A sys ) is the eigenvalue of the state space matrix; Re(λ) represents the real part of the eigenvalue λ.
7. A multi-terminal DC system flexibility planning method for offshore wind power clusters according to claim 1, characterized in that: The multi-terminal DC system model includes an upper layer and a lower layer. The upper layer is a planning and decision-making layer, which takes economy and flexibility as optimization goals, and uses converter station location, converter station capacity, topological wiring, and cable model as decision variables to determine the network topology of the multi-terminal DC system and pass the planning scheme to the lower layer; the lower layer is an operation simulation layer, which performs operation simulation under a power fluctuation scenario in the network topology determined by the upper layer to verify the feasibility of the planning scheme when the control instruction does not match the actual output after the power fluctuation, and returns the verification result to the upper layer.
8. A multi-terminal DC system flexibility planning method for offshore wind power clusters according to claim 7, characterized in that: The expression of the planning decision layer is: In the formula, the total cost C in the optimization objective is Total The cost of offshore converter station C off 、Cost of onshore converter station on , Cable cost C cable And the wind curtailment loss cost C in the whole life cycle wp Four components, and denote the converter valve equipment cost of the i-th offshore / onshore converter station, and represents the cost of supporting electrical equipment and control and protection devices for the i-th offshore / onshore converter station, represents the cost of the offshore platform of the i-th offshore converter station, c cable,k,ij is the unit length cost of the submarine cable k connecting converter station i and converter station j, L ij represents the length of the submarine cable, n represents the number of planned scenarios, and α t represents the probability of occurrence of the t-th wind speed scenario, c w is the on-grid electricity price of offshore wind power, N on is the number of onshore converter stations, N off 、x off,i ,y off,i Respectively represent the number and location coordinates of offshore converter stations, P off,i and P on,j Denotes the capacity of the offshore / onshore converter station, D net represents the adjacency matrix of the offshore DC line, S k Indicates the submarine cable model, N wf is the number of offshore wind farms, A se represents the plannable area of the offshore converter station, P wf,m represents the output power of wind farm m, S cable is the candidate set of DC submarine cables.
9. A multi-terminal DC system flexibility planning method for offshore wind power clusters according to claim 7, characterized in that: The calculation expression of the operation simulation layer is: In the formula, I dc ′ and U dc ′ respectively represent the current and voltage matrices of the converter station under the wind power fluctuation scenario, and they also need to meet the operation constraints of the converter station; Mod represents the control method of the converter station, It indicates that the control mode of each converter station is not all current limiting control mode.
10. The method for flexibility planning of a multi-terminal DC system for an offshore wind power cluster according to claim 1, characterized in that: In the offshore rectifier station site selection and capacity optimization based on fuzzy clustering, the upper limit of the number of clusters is the number of wind farms.