Power system phase modifier configuration method and system based on short circuit ratio

Through the short-circuit ratio method, the camera configuration of the power system is optimized, and the problem of insufficient reliability and accuracy of the camera configuration in the prior art is solved, and more efficient resource utilization and scientific configuration solutions are achieved.

CN119093516APending Publication Date: 2024-12-06STATE GRID HUNAN ELECTRIC POWER COMPANY LIMITED +2
View PDF 0 Cites 4 Cited by

Patent Information

Application Number
CN202411191766.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The existing power system camera configuration scheme relies on empirical methods, resulting in insufficient reliability and accuracy, and easily resulting in waste of resources.

Method used

Using the power system camera configuration method based on short-circuit ratio, by obtaining the target power system data, establishing a simplified model for grid connection between new energy units, calculating the short-circuit ratio of new energy stations, building a camera site selection and capacity setting model, and optimizing the camera adjustment Configure to achieve the goals of minimum capacity and lowest cost.

Benefits of technology

It improves the reliability and accuracy of camera adjustment configuration, avoids waste of resources, and achieves a more scientific and objective camera adjustment configuration in the power system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119093516A_ABST
    Figure CN119093516A_ABST
Patent Text Reader

Abstract

The invention discloses a short-circuit ratio-based power system phase modifier configuration method. The method comprises the following steps of: acquiring data information of a target power system; establishing a new energy unit grid-connected simplified model of the target power system; calculating a new energy station short-circuit ratio of the target power system; a phase modifier site selection model is constructed and solved, and phase modifier site selection of the target power system is completed; constructing an annual value index of the phase modifier; a phase modifier constant volume model is constructed and solved, and phase modifier constant volume of the target power system is completed; and completing the phase modifier configuration of the target power system according to the phase modifier site selection scheme and the constant volume scheme. The invention also discloses a system for realizing the power system phase modifier configuration method based on the short-circuit ratio. According to the method, through modeling of the target power system and separate modeling and optimization of site selection and capacity of the phase modifier, optimization configuration of the phase modifier of the power system based on the short-circuit ratio is achieved, reliability is higher, accuracy is better, and meanwhile the method is more objective and scientific.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of electrical automation, and in particular relates to a method and system for configuring a phase regulator of a power system based on a short-circuit ratio. Background Art

[0002] With the development of economy and technology and the improvement of people's living standards, electricity has become an indispensable secondary energy source in people's production and life, bringing endless convenience to people's production and life. Therefore, ensuring the stable and reliable supply of electricity has become one of the most important tasks of the power system.

[0003] At present, environmental problems are becoming more and more serious, so more and more new energy power generation systems are beginning to be connected to the power grid and generate electricity. New energy power generation systems are generally connected to the grid through power electronic devices. This grid connection method means that the new energy power generation system cannot provide sufficient reactive power support for the power system. Therefore, the power system usually adopts the method of equipping phase regulators to achieve reactive power support for the power system.

[0004] At present, the traditional configuration scheme of the phase shifter in the power system (including the location and capacity selection of the phase shifter) is often still based on the empirical method: the access location and capacity of the phase shifter are directly selected based on the experience of the power system operation and maintenance personnel and the simulation data of the power system. However, this manual configuration scheme not only cannot guarantee reliability and accuracy, but also often has the problem of waste of resources caused by over-configuration capacity. Summary of the invention

[0005] One of the purposes of the present invention is to provide a short-circuit ratio-based phase regulator configuration method for a power system which has high reliability, good accuracy and is objective and scientific.

[0006] A second object of the present invention is to provide a system for implementing the power system phase regulator configuration method based on short-circuit ratio.

[0007] The power system phase regulator configuration method based on short-circuit ratio provided by the present invention comprises the following steps:

[0008] S1. Obtain data information of the target power system;

[0009] S2. According to the data information obtained in step S1, a simplified grid-connected model of new energy units in the target power system is established;

[0010] S3. Calculate the short-circuit ratio of the new energy station of the target power system according to the model established in step S2;

[0011] S4. Taking the minimum phase-shifting capacity as the objective function and the short-circuit ratio of multiple renewable energy stations as the constraint condition, a phase-shifting site selection model is constructed and solved to complete the phase-shifting site selection of the target power system;

[0012] S5. Construct the equivalent annual value index of the phase regulator based on the cost data of the phase regulator;

[0013] S6. Taking the minimum equal annual value of the phase-shifting device as the objective function and the short-circuit ratio of multiple renewable energy stations as the constraint condition, a phase-shifting device sizing model is constructed and solved to complete the phase-shifting device sizing of the target power system;

[0014] S7. According to the phase regulator site selection plan obtained in step S4 and the phase regulator capacity determination plan obtained in step S6, the phase regulator configuration of the target power system is completed.

[0015] Step S2, according to the data information obtained in step S1, establishes a simplified grid-connected model of new energy units in the target power system, which specifically includes the following steps:

[0016] Based on the interaction between several new energy devices at the sending end, the active output of n new energy stations is set as P RE,1 ~P RE,n , the reactive power output of n new energy stations is Q RE,1 ~Q RE,n , the corresponding machine-end bus voltage is U RE,1 ~U RE,n ; From the perspective of the new energy machine, the corresponding Thevenin equivalent voltage source is E1~E n ;

[0017] The simplified model of new energy units connected to the grid in the target power system is established as follows:

[0018] The i-th new energy station, the i-th machine-end bus, the i-th self-impedance and the i-th Thevenin equivalent voltage source are connected in series in sequence; the ij-th impedance is connected between the i-th machine-end bus and the j-th machine-end bus;

[0019] The value of the i-th self-impedance is the system-side equivalent impedance between the main grid equivalent power source i and the corresponding grid connection point; the value of the ij-th impedance is the equivalent impedance between the grid connection point i and the grid connection point j; the output active power of the i-th new energy station is P RE,i , the output reactive power is Q RE,i ; The value of the i-th Thevenin equivalent voltage source is E i ; The voltage of the busbar at the i-th machine end is U RE,i .

[0020] The step S3 of calculating the short-circuit ratio of the new energy station of the target power system according to the model established in the step S2 specifically includes the following steps:

[0021] Set the current injected into the AC system by each renewable energy grid-connected busbar to I1~I n , then the machine end bus voltage U RE1 ~U REn The calculation formula is

[0022]

[0023] Where Z eq,nn is the self-impedance of each machine-side bus node; Z eq,ij is the mutual impedance of the bus nodes at each machine end;

[0024] The following formula is used to calculate the short-circuit ratio MRSCR of the new energy station at the i-th generator end bus: i :

[0025]

[0026] In the formula is the voltage vector at the busbar at the i-th machine end; is the nominal voltage vector of the i-th grid-connected bus node; is the self-impedance vector at the i-th grid connection point; is the apparent power vector injected into the bus node of the i-th renewable energy grid-connected point; X is the equivalent reactance of the renewable energy grid-connected point looking at the system; R is the equivalent resistance of the renewable energy grid-connected point looking at the system; is the active power vector injected into the bus node of the i-th renewable energy grid connection point; is the mutual impedance vector between the ith grid connection point and node j; is the actual operating voltage vector of the i-th grid-connected bus node.

[0027] The phase-shifting system site selection model described in step S4 is constructed and solved with the minimum phase-shifting system configuration capacity as the objective function and the short-circuit ratio of multiple renewable energy stations as the constraint condition, so as to complete the phase-shifting system site selection of the target power system, which specifically includes the following steps:

[0028] A. Establish a simulation model of the target power system based on the component model parameters and power flow operation status of the target power grid;

[0029] B. Based on the simulation model established in step A, calculate the short-circuit ratio of each new energy station under the condition of a feasible solution of the power flow of the target power system;

[0030] C. Install additional phase regulators at the renewable energy stations with the lowest short-circuit ratio in the target power system;

[0031] D. Recalculate the short-circuit ratio of each new energy station under the feasible solution of the power flow of the target power system;

[0032] E. Determine the short-circuit ratio of each new energy station obtained in step D:

[0033] If the short-circuit ratios of all renewable energy stations meet the set constraints, the phase-shifting station site selection is completed;

[0034] Otherwise, return to step C and proceed to the next round of phase adjustment site selection;

[0035] The constraint condition is MRSCR i >MRSCR i,min , where MRSCR i,min is the minimum short-circuit ratio of the new energy station at the i-th generator-end bus;

[0036] F. Based on the phase shifter site selection results obtained in step E, complete the phase shifter site selection for the target power system.

[0037] The step S5 of constructing the equivalent annual value index of the phase regulator according to the cost data of the phase regulator specifically includes the following steps:

[0038] The following formula is used as the equivalent annual value index A of the phase regulator:

[0039]

[0040] Where C inv is the investment cost of the phase-shifting machine; IR is the interest rate; R ope is the annual operation and maintenance fee rate of the condenser; R dep is the annual loss rate of the phase regulator; S SC is the phase regulator capacity; T mh is the annual maximum operating time; E is the electricity price.

[0041] The step S6 takes the minimum equivalent annual value of the phase-shifting device as the objective function and the short-circuit ratio of multiple renewable energy stations as the constraint condition to construct and solve the phase-shifting device sizing model, and completes the phase-shifting device sizing of the target power system, which specifically includes the following steps:

[0042] a. According to the performance parameters of the phase regulator, determine the configuration priority of the phase regulator: first configure 300MVar centralized phase regulator, then configure 50MVar distributed phase regulator;

[0043] b. The short-circuit ratio constraints of new energy stations are expanded to grid-side constraints and generator-side constraints; the generator-side constraints are satisfied first, and then the grid-side constraints;

[0044] The machine side constraint is expressed as MRSCR Gi >MRSCR Gi,min , where MRSCR Gi is the short-circuit ratio of the generator-side renewable energy station at the i-th generator-side busbar, MRSCR Gi,minis the minimum short-circuit ratio of the generator-side renewable energy station at the i-th generator-end bus;

[0045] The network side constraint is expressed as MRSCR Sj >MRSCR Sj,min , where MRSCR Sj is the short-circuit ratio of the grid-side renewable energy station at the i-th generator-end busbar, MRSCR Sj,min is the minimum short-circuit ratio of the grid-side renewable energy station at the i-th generator-end bus;

[0046] c. Calculate the short-circuit ratio of each new energy station on the generator side and make judgments:

[0047] If the short-circuit ratio of the generator-side renewable energy station satisfies the generator-side constraint, the generator-side renewable energy station is not equipped with a phase regulator, and the process goes to step f;

[0048] If the short-circuit ratio of the generator-side renewable energy station does not meet the generator-side constraints, a 300MVar centralized phase regulator with an H-station will be configured on the generator side of the renewable energy station until the generator-side constraints are met;

[0049] d. For the configured H 300MVar centralized phase regulators, reduce the number of 300MVar centralized phase regulators by 1, and increase the number of 50MVar distributed phase regulators until the machine-side constraints are met;

[0050] e. Repeat step d until the number of 300MVar centralized phase regulators is 0; record H+1 schemes for all machine-side configuration phase regulators, and calculate the equivalent annual value index of each machine-side configuration scheme;

[0051] f. Calculate the grid-side new energy station short-circuit ratio of each new energy station and make judgments:

[0052] If the short-circuit ratio of the grid-side renewable energy station meets the grid-side constraint, the grid-side of the renewable energy station is not equipped with a phase regulator, and the process goes to step i;

[0053] If the short-circuit ratio of the grid-side renewable energy station does not meet the grid-side constraints, a V-station 300MVar centralized phase regulator will be preferentially configured on the grid side of the renewable energy station until the grid-side constraints are met;

[0054] g. For the configured V 300MVar centralized phase regulators, reduce the number of 300MVar centralized phase regulators by 1, and increase the number of 50MVar distributed phase regulators until the grid-side constraints are met;

[0055] h. Repeat step g until the number of 300MVar centralized phase regulators is 0; record V+1 schemes for all grid-side configuration phase regulators, and calculate the equivalent annual value index of each grid-side configuration scheme;

[0056] i. Based on the obtained equivalent annual value indicators of the generator-side configuration plan and the grid-side configuration plan, the plan with the lowest equivalent annual value indicator is selected as the final phase-shifting sizing plan for the target power system.

[0057] The present invention also provides a system for implementing the method for configuring phase shifters in an electric power system based on short-circuit ratio, comprising a data acquisition module, a model building module, a short-circuit ratio calculation module, a phase shifter site selection module, an index building module, a phase shifter capacity determination module and a phase shifter configuration module; the data acquisition module, the model building module, the short-circuit ratio calculation module, the phase shifter site selection module, the index building module, the phase shifter capacity determination module and the phase shifter configuration module are connected in series in sequence; the data acquisition module is used to acquire data information of a target electric power system, and upload the data information to the model building module; the model building module is used to establish a simplified grid-connected model of a new energy unit of a target electric power system according to the received data information and the acquired data information, and upload the data information to the short-circuit ratio calculation module; the short-circuit ratio calculation module is used to calculate the short-circuit ratio of a new energy station of a target electric power system according to the received data information and the established model, and upload the data information to the phase shifter site selection module; The phase-modulator site selection module is used to construct and solve the phase-modulator site selection model based on the received data information, with the minimum phase-modulator configuration capacity as the objective function and the short-circuit ratio of multiple renewable energy stations as the constraint condition, so as to complete the phase-modulator site selection of the target power system and upload the data information to the indicator construction module; the indicator construction module is used to construct the equivalent annual value index of the phase-modulator based on the received data information and the cost data of the phase-modulator, and upload the data information to the phase-modulator capacity determination module; the phase-modulator capacity determination module is used to construct and solve the phase-modulator capacity determination model based on the received data information, with the minimum equivalent annual value of the phase-modulator as the objective function and the short-circuit ratio of multiple renewable energy stations as the constraint condition, so as to complete the phase-modulator capacity determination of the target power system and upload the data information to the phase-modulator configuration module; the phase-modulator configuration module is used to complete the phase-modulator configuration of the target power system based on the received data information, the obtained phase-modulator site selection plan and the phase-modulator capacity determination plan obtained in step S6.

[0058] The method and system for configuring phase regulators in an electric power system based on short-circuit ratio provided by the present invention not only realizes the optimal configuration of phase regulators in an electric power system based on short-circuit ratio by modeling the target electric power system and separately modeling and optimizing the siting and capacity of the phase regulators, but also has higher reliability, better accuracy, and is more objective and scientific. BRIEF DESCRIPTION OF THE DRAWINGS

[0059] Figure 1 The figure is a schematic diagram of the method flow of the present invention.

[0060] Figure 2 The figure is a simplified model diagram of the grid-connected new energy unit according to the method of the present invention.

[0061] Figure 3 Schematic diagram comparing the effects of various types of phase regulators on system voltage according to the method of the present invention.

[0062] Figure 4 The schematic diagram of the power grid at the sending end with a high proportion of wind power access according to the method embodiment of the present invention is shown.

[0063] Figure 5 Schematic diagram of the voltage at the WT5 node according to the method embodiment of the present invention.

[0064] Figure 6 Schematic diagram of the voltage at the WT2 node according to the method embodiment of the present invention.

[0065] Figure 7 Schematic diagram of the voltage at the WT19 node according to an embodiment of the method of the present invention.

[0066] Figure 8 FIG. 1 is a schematic diagram of the voltage at node 1013 according to an embodiment of the method of the present invention.

[0067] Fig. 9 FIG. 1 is a schematic diagram of the voltage at node 1022 according to an embodiment of the method of the present invention.

[0068] Fig.10 Schematic diagram of the functional modules of the system of the present invention. DETAILED DESCRIPTION

[0069] like Figure 1 The method flow chart of the method of the present invention is shown as follows: the power system phase regulator configuration method based on short-circuit ratio disclosed in the present invention comprises the following steps:

[0070] S1. Obtain data information of the target power system;

[0071] S2. According to the data information obtained in step S1, a simplified model of the grid connection of new energy units in the target power system is established; specifically, the following steps are included:

[0072] Based on the interaction between several new energy devices at the sending end, the active output of n new energy stations is set as P RE,1 ~P RE,n , the reactive power output of n new energy stations is Q RE,1 ~Q RE,n , the corresponding machine-end bus voltage is U RE,1 ~U RE,n ; From the perspective of the new energy machine, the corresponding Thevenin equivalent voltage source is E1~E n ;

[0073] Establish a simplified model of the target power system's new energy unit grid connection. Figure 2 As shown, specifically:

[0074] The i-th new energy station, the i-th machine-end bus, the i-th self-impedance and the i-th Thevenin equivalent voltage source are connected in series in sequence; the ij-th impedance is connected between the i-th machine-end bus and the j-th machine-end bus;

[0075] The value of the i-th self-impedance is the system-side equivalent impedance between the main grid equivalent power source i and the corresponding grid connection point; the value of the ij-th impedance is the equivalent impedance between the grid connection point i and the grid connection point j; the output active power of the i-th new energy station is P RE,i , the output reactive power is Q RE,i ; The value of the i-th Thevenin equivalent voltage source is E i ; The voltage of the busbar at the i-th machine end is U RE,i ;

[0076] S3. According to the model established in step S2, the short-circuit ratio of the new energy station of the target power system is calculated; specifically, the steps include:

[0077] Set the current injected into the AC system by each renewable energy grid-connected busbar to I1~I n , then the machine end bus voltage U RE,1 ~U RE,n The calculation formula is

[0078]

[0079] Where Z eq,nn is the self-impedance of each machine-side bus node; Z eq,ij is the mutual impedance of the bus nodes at each machine end;

[0080] The short-circuit ratio of multiple renewable energy stations based on voltage, the short-circuit ratio of renewable energy stations at the i-th generator end bus in the system MRSCR i Expressed as

[0081] Let the actual operating voltage of the i-th grid-connected bus node be U i , multiply the numerator and denominator together Then there is is the complex power conversion factor between the new energy grid-connected busbars i and j, reflecting the phase and amplitude differences between the electrical quantities at the grid-side access points of each new energy power generation equipment / new energy station grid-connected points;

[0082] When the system impedance ratio X / R>10, the influence of X / R on the short-circuit ratio RSCR is less than 1%. The influence of the resistance part in the system equivalent impedance can be ignored in engineering calculations; therefore, the following formula is finally used to calculate the short-circuit ratio MRSCR of the new energy station at the i-th machine-end busbar: i :

[0083]

[0084] In the formula is the voltage vector at the busbar at the ith machine end; is the nominal voltage vector of the i-th grid-connected bus node; is the self-impedance vector at the i-th grid connection point; is the apparent power vector injected into the bus node of the i-th renewable energy grid-connected point; X is the equivalent reactance of the renewable energy grid-connected point looking at the system; R is the equivalent resistance of the renewable energy grid-connected point looking at the system; is the active power vector injected into the bus node of the i-th renewable energy grid connection point; is the mutual impedance vector between the ith grid connection point and node j; is the actual operating voltage vector of the i-th grid-connected bus node;

[0085] in, represents the self-impedance vector of the ith grid connection point, Z eq,ii represents the self-impedance modulus value of the ith grid connection point;

[0086] S4. Taking the minimum phase-shifting capacity as the objective function and the short-circuit ratio of multiple renewable energy stations as the constraint condition, a phase-shifting site selection model is constructed and solved to complete the phase-shifting site selection of the target power system; specifically, the following steps are included:

[0087] A. Establish a simulation model of the target power system based on the component model parameters and power flow operation status of the target power grid;

[0088] B. Based on the simulation model established in step A, calculate the short-circuit ratio of each new energy station under the condition of a feasible solution of the power flow of the target power system;

[0089] C. Install additional phase regulators at the renewable energy stations with the lowest short-circuit ratio in the target power system;

[0090] D. Recalculate the short-circuit ratio of each new energy station under the feasible solution of the power flow of the target power system;

[0091] E. Determine the short-circuit ratio of each new energy station obtained in step D:

[0092] If the short-circuit ratios of all renewable energy stations meet the set constraints, the phase-shifting station site selection is completed;

[0093] Otherwise, return to step C and proceed to the next round of phase adjustment site selection;

[0094] The constraint condition is MRSCR i >MRSCR i,min , where MRSCR i,min is the minimum short-circuit ratio of the new energy station at the i-th generator-end bus;

[0095] F. According to the phase shifter site selection result obtained in step E, complete the phase shifter site selection of the target power system;

[0096] S5. Based on the cost data of the phase regulator, construct the equivalent annual value index of the phase regulator; specifically, the steps include:

[0097] The costs of civil construction, operation and maintenance of phase-shifters are the main reasons for the slow development of phase-shifters. In recent years, due to the rapid development of new energy and high-voltage direct current transmission, the problem of reactive power regulation has become very difficult, so phase-shifters have re-entered people's field of vision; Under the premise of ensuring safety, investing as little phase-shifter capacity as possible and improving the economic efficiency of operation have become important prerequisites for the reasonable configuration of phase-shifters; In order to comprehensively consider the investment costs, operation and maintenance costs and loss costs of phase-shifters of different capacities, the equal annual value method is used to evaluate the economic efficiency of the configuration plan; the equal annual value method is a decision analysis method based on the present value of the annual cash flow calculated on average during the utility period and the cash flow of the investment plan to conduct economic evaluation of relevant plans;

[0098] The following formula is used as the equivalent annual value index A of the phase regulator:

[0099]

[0100] Where C inv is the investment cost of the phase-shifting machine; IR is the interest rate; R ope is the annual operation and maintenance fee rate of the condenser; R dep is the annual loss rate of the phase regulator; S SC is the phase regulator capacity; T mh is the annual maximum operating time; E is the electricity price;

[0101] S6. Taking the minimum equal annual value of the phase-shifting device as the objective function and the short-circuit ratio of multiple renewable energy stations as the constraint condition, a phase-shifting device sizing model is constructed and solved to complete the phase-shifting device sizing of the target power system; specifically, the following steps are included:

[0102] a. According to the performance parameters of the phase regulator, determine the configuration priority of the phase regulator: first configure 300MVar centralized phase regulator, then configure 50MVar distributed phase regulator;

[0103] In specific implementation, synchronous condensers can be mainly divided into 300MVar centralized condensers and 50MVar distributed condensers according to reactive capacity; centralized condensers are often used for high voltage bus voltage support, and distributed condensers are often used for on-site compensation of new energy stations. The two have the same principle, and the main difference lies in the adjustment ability and cost caused by different parameters of their body.

[0104] Taking a simple AC system as an example, phase regulators with the same capacity are configured at the 500kV side AC busbar to perform short-circuit fault simulation;

[0105] Solution 1 is to configure one 300MVar centralized phase regulator, and solution 2 is to configure six 50MVar distributed phase regulators. In steady state, the reactive output of the two reactive compensation devices is set to 0. When a three-phase short circuit occurs in the system, the system voltage response corresponding to each configuration scheme is as follows: Figure 3 As shown;

[0106] according to Figure 3 Under the premise of the same capacity, the ability of 300MVar centralized phase regulator configured at the same node to improve voltage fluctuations at the moment of fault and in the transition process after the fault is significantly stronger than that of 50MVar distributed phase regulator. This is because the configuration of multiple 50MVar phase regulators has node coupling, and the excitation systems of each 50MVar phase regulator cannot cooperate with each other in time. The large-capacity 300MVar phase regulator has a relatively small coupling effect due to the small number of configurations. Therefore, under the premise of the same capacity, only from the perspective of voltage stability, qualitative analysis should give priority to the configuration of 300MVar phase regulators;

[0107] b. The short-circuit ratio constraints of new energy stations are expanded to grid-side constraints and generator-side constraints; the generator-side constraints are satisfied first, and then the grid-side constraints;

[0108] The machine side constraint is expressed as MRSCR Gi >MRSCR Gi,min , where MRSCR Gi is the short-circuit ratio of the generator-side renewable energy station at the i-th generator-side busbar, MRSCR Gimin is the minimum short-circuit ratio of the generator-side renewable energy station at the i-th generator-side busbar (the preferred empirical value is 1.5);

[0109] The network side constraint is expressed as MRSCR Sj >MRSCR Sj,min , where MRSCR Sj is the short-circuit ratio of the grid-side renewable energy station at the i-th generator-end busbar, MRSCR Sj,min is the minimum short-circuit ratio of the grid-side renewable energy station at the i-th generator-end bus (the preferred empirical value is 2);

[0110] c. Calculate the short-circuit ratio of each new energy station on the generator side and make judgments:

[0111] If the short-circuit ratio of the generator-side renewable energy station satisfies the generator-side constraint, the generator-side renewable energy station is not equipped with a phase regulator, and the process goes to step f;

[0112] If the short-circuit ratio of the generator-side renewable energy station does not meet the generator-side constraints, a 300MVar centralized phase regulator with an H-station will be configured on the generator side of the renewable energy station until the generator-side constraints are met;

[0113] d. For the configured H 300MVar centralized phase regulators, reduce the number of 300MVar centralized phase regulators by 1, and increase the number of 50MVar distributed phase regulators until the machine-side constraints are met;

[0114] e. Repeat step d until the number of 300MVar centralized phase regulators is 0; record H+1 schemes for all machine-side configuration phase regulators, and calculate the equivalent annual value index of each machine-side configuration scheme;

[0115] f. Calculate the grid-side new energy station short-circuit ratio of each new energy station and make judgments:

[0116] If the short-circuit ratio of the grid-side renewable energy station meets the grid-side constraint, the grid-side of the renewable energy station is not equipped with a phase regulator, and the process goes to step i;

[0117] If the short-circuit ratio of the grid-side renewable energy station does not meet the grid-side constraints, a V-station 300MVar centralized phase regulator will be preferentially configured on the grid side of the renewable energy station until the grid-side constraints are met;

[0118] g. For the configured V 300MVar centralized phase regulators, reduce the number of 300MVar centralized phase regulators by 1, and increase the number of 50MVar distributed phase regulators until the grid-side constraints are met;

[0119] h. Repeat step g until the number of 300MVar centralized phase regulators is 0; record V+1 schemes for all grid-side configuration phase regulators, and calculate the equivalent annual value index of each grid-side configuration scheme;

[0120] i. According to the obtained equivalent annual value indicators of the generator-side configuration scheme and the grid-side configuration scheme, the scheme with the lowest equivalent annual value indicator is selected as the final phase-shifting sizing scheme of the target power system;

[0121] S7. According to the phase regulator site selection plan obtained in step S4 and the phase regulator capacity determination plan obtained in step S6, the phase regulator configuration of the target power system is completed.

[0122] The method of the present invention is further described below in conjunction with embodiments:

[0123] The example analysis is carried out using the sending-end power grid formed by the modified Nordic equivalent external area and the northern area. The power grid structure is as follows: Figure 4As shown. The original 11 synchronous units of the system (except the balancing machine G20) are all replaced with doubly-fed wind turbines with the same output, and the power is transmitted through two external transmission channels. The ratio of wind power output to total power output in the power supply is 89.01%, forming a sending-end power grid with a high proportion of wind power. According to the short-circuit ratio requirements of new energy sites, the short-circuit ratio of wind turbines must be greater than 1.5. According to the above short-circuit ratio standards, the phase regulator of the wind farm in the sending-end power grid is configured, and the unified electromechanical transient modeling of wind turbines is constructed through the PSD-BPA simulation platform to verify the effectiveness of the proposed phase regulator configuration strategy.

[0124] Before the phase regulator is connected, the MRSCR values ​​of each wind turbine in the sending-end grid are shown in Table 1. Among them, the units that do not meet the requirement of MRSCR greater than 1.5 are WT2, WT4, WT5, WT11, WT12 and WT19. The MRSCR of unit WT5 is the smallest, which is 0.919. The voltage support capacity of the entire sending-end grid is weak, showing a weak sending-end grid form.

[0125] Table 1 Schematic diagram of MRSCR of wind turbines in the power grid at the sending end when phase regulator is not configured

[0126] Wind turbines MRSCR Wind turbines MRSCR WT1 1.749 WT9 1.782 WT2 1.093 WT10 1.651 WT3 1.654 WT11 1.25 WT4 1.451 WT12 1.169 WT5 0.919 WT19 1.115 WT8 2.841

[0127] Select the lowest short-circuit ratio, configure the phase regulator at this node until the constraints are met, then select the lowest short-circuit ratio at this time and repeat the process.

[0128] It can be seen from Table 1 that the short circuit of WT2, WT5, and WT19 on the machine side is relatively low. At the same time, the corresponding short circuit ratio on the grid side is calculated as shown in Table 2.

[0129] Table 2 Schematic diagram of MRSCR of wind turbines in the power grid at the sending end when phase regulator is not configured

[0130] New energy grid-connected nodes MRSCR Wind turbines MRSCR 1012(WT1) 2.31 4011(WT9) 2.62 1013(WT2) 1.64 4012(WT10) 2.15 1014(WT3) 2.17 4021(WT11) 1.94 1021(WT4) 2.04 4031(WT12) 2.06 1022(WT5) 1.58 4071(WT19) 1.92 2032(WT8) 4.72

[0131] It can be seen from Table 2 that the short circuit ratios of the grid-side nodes 1013 and 1022 are relatively low and do not meet the requirements. Therefore, these five nodes are selected as the simulated access nodes of the phase regulator.

[0132] According to the configuration principle of the generator side first and the grid-connected side later, WT2, WT5, and WT19 are configured first. Taking the configuration of WT5 as an example, three configuration schemes are provided as follows:

[0133] Solution 1: Configure 2 300MVar phase regulators;

[0134] Solution 2: Configure one 300MVar phase condenser and four 50MVar phase condensers;

[0135] Option 3: Configure 1 300MVar phase condenser and 5 50MVar phase condensers.

[0136] The corresponding fixed capacity indicators calculated for each configuration scheme are shown in Table 3:

[0137] Table 3 Parameters of WT5 phase condenser configuration scheme

[0138] WT5 MRSCR5 MRSCR'5 A / 100 million yuan Solution 1 0.919 1.66 0.668 Solution 2 0.919 1.37 0.586 Solution 3 0.919 1.62 0.649

[0139] For the convenience of analysis, the interest rate IR is taken as 0.15 and the annual maximum utilization hours are taken as 1500 hours in the calculation of equal annual value. MRSCR5 and MRSCR'5 in the table refer to the MRSCR values ​​of WT5 before and after configuration, respectively.

[0140] As shown in Table 3, Scheme 2 does not meet the constraint conditions and cannot meet the voltage support strength of the grid on the renewable energy side. Although both Schemes 1 and 3 meet the reactive strength requirements, the equal annual value of Scheme 3 is smaller than that of Scheme 1, and the configuration scheme is more economical. Therefore, the configuration scheme of WT5 on the renewable energy side is: configure 1 300MVar and 5 50MVar phase shifters. Similarly, the parameters of the other four node configuration schemes are shown in Table 4. The MRSCR of each node after configuration is calculated respectively, and it can be seen that the reactive strength of each node after configuration meets the capacity configuration requirements.

[0141] Table 4 Parameters of WT5 phase condenser configuration scheme

[0142] Installation location WT2 WT19 Node 1013 Node 1022 Configuration Scheme 2*300+5*50 2*300+1*50 2*300+4*50 2*300+5*50 MRSCR' 1.71 1.99 2.81 2.47 A / 100 million yuan 0.983 0.731 0.920 0.983

[0143] In summary, the phase condenser configuration scheme considering the configuration cost is as follows: WT5 on the new energy machine side is configured with 1 300MVar phase condenser and 5 50MVar phase condensers; WT2 is configured with 2 300MVar phase condensers and 5 50MVar phase condensers; WT19 is configured with 2 300MVar phase condensers and 1 50MVar phase condenser; Node 1013 on the grid side is configured with 2 300MVar phase condensers and 4 50MVar phase condensers; Node 1022 is configured with 2 300MVar and 5 50MVar. The voltage of each node before and after configuration is as follows Figures 5 to 9 As shown in the figure, at the moment of fault occurrence, the transient voltage fluctuations of each configuration node were large before configuration, and there were steady-state voltage errors of varying degrees after recovery to steady state. After configuration, taking WT5 as an example, the dynamic voltage fluctuation was significantly improved, and compared with before configuration, the steady-state error was reduced from 1.5% to 0.2%, and the steady-state process was significantly improved.

[0144] like Fig.10The functional module schematic diagram of the system of the present invention is shown as follows: the system disclosed in the present invention for realizing the method for configuring phase shifters of a power system based on short-circuit ratio comprises a data acquisition module, a model building module, a short-circuit ratio calculation module, a phase shifter site selection module, an indicator construction module, a phase shifter capacity determination module and a phase shifter configuration module; the data acquisition module, the model building module, the short-circuit ratio calculation module, the phase shifter site selection module, the indicator construction module, the phase shifter capacity determination module and the phase shifter configuration module are connected in series in sequence; the data acquisition module is used to acquire data information of the target power system, and upload the data information to the model building module; the model building module is used to establish a simplified model for grid-connected new energy units of the target power system according to the received data information and the acquired data information, and upload the data information to the short-circuit ratio calculation module; the short-circuit ratio calculation module is used to calculate the short-circuit ratio of the new energy station of the target power system according to the received data information and the established model, and upload the data information to the short-circuit ratio calculation module Phase-modulator site selection module; the phase-modulator site selection module is used to construct and solve the phase-modulator site selection model based on the received data information, with the minimum phase-modulator configuration capacity as the objective function and the short-circuit ratio of multiple renewable energy stations as the constraint condition, to complete the phase-modulator site selection of the target power system, and upload the data information to the indicator construction module; the indicator construction module is used to construct the equivalent annual value index of the phase-modulator based on the received data information and the cost data of the phase-modulator, and upload the data information to the phase-modulator sizing module; the phase-modulator sizing module is used to construct and solve the phase-modulator sizing model based on the received data information, with the minimum equivalent annual value of the phase-modulator as the objective function and the short-circuit ratio of multiple renewable energy stations as the constraint condition, to complete the phase-modulator sizing of the target power system, and upload the data information to the phase-modulator configuration module; the phase-modulator configuration module is used to complete the phase-modulator configuration of the target power system based on the received data information, the obtained phase-modulator site selection plan and the phase-modulator sizing plan obtained in step S6.

Claims

1. A method for configuring a phase regulator in a power system based on a short-circuit ratio, comprising the following steps: S1. Obtain data information of the target power system; S2. According to the data information obtained in step S1, a simplified grid-connected model of new energy units in the target power system is established; S3. Calculate the short-circuit ratio of the new energy station of the target power system according to the model established in step S2; S4. Taking the minimum phase-shifting capacity as the objective function and the short-circuit ratio of multiple renewable energy stations as the constraint condition, a phase-shifting site selection model is constructed and solved to complete the phase-shifting site selection of the target power system; S5. Construct the equivalent annual value index of the phase regulator based on the cost data of the phase regulator; S6. Taking the minimum equal annual value of the phase-shifting device as the objective function and the short-circuit ratio of multiple renewable energy stations as the constraint condition, a phase-shifting device sizing model is constructed and solved to complete the phase-shifting device sizing of the target power system; S7. According to the phase regulator site selection plan obtained in step S4 and the phase regulator capacity determination plan obtained in step S6, the phase regulator configuration of the target power system is completed.

2. The method for configuring a phase regulator in a power system based on a short-circuit ratio according to claim 1, characterized in that Step S2, according to the data information obtained in step S1, establishes a simplified grid-connected model of new energy units in the target power system, which specifically includes the following steps: Based on the interaction between several new energy devices at the sending end, the active output of n new energy stations is set as P RE,1 ~P RE,n , the reactive power output of n new energy stations is Q RE,1 ~Q RE,n , the corresponding machine-end bus voltage is U RE,1 ~U RE,n ; From the perspective of the new energy machine, the corresponding Thevenin equivalent voltage source is E1~E n ; The simplified model of new energy units connected to the grid in the target power system is established as follows: The i-th new energy station, the i-th machine-end bus, the i-th self-impedance and the i-th Thevenin equivalent voltage source are connected in series in sequence; the ij-th impedance is connected between the i-th machine-end bus and the j-th machine-end bus; The value of the i-th self-impedance is the system-side equivalent impedance between the main grid equivalent power source i and the corresponding grid connection point; The value of the ijth impedance is the equivalent impedance between the grid connection point i and the grid connection point j; The output power of the i-th new energy station is P RE,i , the output reactive power is Q RE,i ; The value of the i-th Thevenin equivalent voltage source is E i ; The voltage of the busbar at the i-th machine end is U RE,i .

3. The method for configuring a phase regulator in a power system based on a short-circuit ratio according to claim 2, characterized in that The step S3 of calculating the short-circuit ratio of the new energy station of the target power system according to the model established in the step S2 specifically includes the following steps: Set the current injected into the AC system by each renewable energy grid-connected busbar to I1~I n , then the machine end bus voltage U RE1 ~U REn The calculation formula is Where Z eq,nn is the self-impedance of each machine-side bus node; Z eq,ij is the mutual impedance of the bus nodes at each machine end; The following formula is used to calculate the short-circuit ratio MRSCR of the new energy station at the i-th generator end bus: i : In the formula is the voltage vector at the busbar at the ith machine end; is the nominal voltage vector of the i-th grid-connected bus node; is the self-impedance vector at the i-th grid connection point; is the apparent power vector injected into the bus node of the i-th renewable energy grid-connected point; X is the equivalent reactance of the renewable energy grid-connected point looking at the system; R is the equivalent resistance of the renewable energy grid-connected point looking at the system; is the active power vector injected into the bus node of the i-th renewable energy grid connection point; is the mutual impedance vector between the ith grid connection point and node j; is the actual operating voltage vector of the i-th grid-connected bus node.

4. The method for configuring phase regulators in a power system based on short-circuit ratio according to claim 3 is characterized in that The phase-shifting system site selection model described in step S4 is constructed and solved with the minimum phase-shifting system configuration capacity as the objective function and the short-circuit ratio of multiple renewable energy stations as the constraint condition, so as to complete the phase-shifting system site selection of the target power system, which specifically includes the following steps: A. Establish a simulation model of the target power system based on the component model parameters and power flow operation status of the target power grid; B. Based on the simulation model established in step A, calculate the short-circuit ratio of each new energy station under the condition of a feasible solution of the power flow of the target power system; C. Install additional phase regulators at the renewable energy stations with the lowest short-circuit ratio in the target power system; D. Recalculate the short-circuit ratio of each new energy station under the feasible solution of the power flow of the target power system; E. Determine the short-circuit ratio of each new energy station obtained in step D: If the short-circuit ratios of all renewable energy stations meet the set constraints, the phase-shifting station site selection is completed; Otherwise, return to step C and proceed to the next round of phase adjustment site selection; The constraint condition is MRSCR i >MRSCR i,min , where MRSCR i,min is the minimum short-circuit ratio of the new energy station at the i-th generator-end bus; F. Based on the phase shifter site selection results obtained in step E, complete the phase shifter site selection for the target power system.

5. The method for configuring phase regulators in a power system based on short-circuit ratio according to claim 4, characterized in that The step S5 of constructing the equivalent annual value index of the phase regulator according to the cost data of the phase regulator specifically includes the following steps: The following formula is used as the equivalent annual value index A of the phase regulator: Where C inv is the investment cost of the phase-shifter; IR is the interest rate; R ope is the annual operation and maintenance fee rate of the condenser; R dep is the annual loss rate of the phase regulator; S SC is the phase regulator capacity; T mh is the annual maximum operating time; E is the electricity price.

6. The method for configuring phase regulators in a power system based on short-circuit ratio according to claim 5, characterized in that The step S6 takes the minimum equivalent annual value of the phase-shifting device as the objective function and the short-circuit ratio of multiple renewable energy stations as the constraint condition to construct and solve the phase-shifting device sizing model, and completes the phase-shifting device sizing of the target power system, which specifically includes the following steps: a. According to the performance parameters of the phase regulator, determine the configuration priority of the phase regulator: first configure 300MVar centralized phase regulator, then configure 50MVar distributed phase regulator; b. The short-circuit ratio constraints of new energy stations are expanded to grid-side constraints and generator-side constraints; the generator-side constraints are satisfied first, and then the grid-side constraints; The machine side constraint is expressed as MRSCR Gi >MRSCR Gi,min , where MRSCR Gi is the short-circuit ratio of the generator-side renewable energy station at the i-th generator-side busbar, MRSCR Gi,min is the minimum short-circuit ratio of the generator-side renewable energy station at the i-th generator-end bus; The network side constraint is expressed as MRSCR Sj >MRSCR Sj,min , where MRSCR Sj is the short-circuit ratio of the grid-side renewable energy station at the i-th generator-end busbar, MRSCR Sj,min is the minimum short-circuit ratio of the grid-side renewable energy station at the i-th generator-end bus; c. Calculate the short-circuit ratio of each new energy station on the generator side and make judgments: If the short-circuit ratio of the generator-side renewable energy station satisfies the generator-side constraint, the generator-side renewable energy station is not equipped with a phase regulator, and the process goes to step f; If the short-circuit ratio of the generator-side renewable energy station does not meet the generator-side constraints, a 300MVar centralized phase regulator with an H-station will be configured on the generator side of the renewable energy station until the generator-side constraints are met; d. For the configured H 300MVar centralized phase regulators, reduce the number of 300MVar centralized phase regulators by 1, and increase the number of 50MVar distributed phase regulators until the machine-side constraints are met; e. Repeat step d until the number of 300MVar centralized phase regulators is 0; record H+1 schemes for all machine-side configuration phase regulators, and calculate the equivalent annual value index of each machine-side configuration scheme; f. Calculate the grid-side new energy station short-circuit ratio of each new energy station and make judgments: If the short-circuit ratio of the grid-side renewable energy station meets the grid-side constraint, the grid-side of the renewable energy station is not equipped with a phase regulator, and the process goes to step i; If the short-circuit ratio of the grid-side renewable energy station does not meet the grid-side constraints, a V-station 300MVar centralized phase regulator will be preferentially configured on the grid side of the renewable energy station until the grid-side constraints are met; g. For the configured V 300MVar centralized phase regulators, reduce the number of 300MVar centralized phase regulators by 1, and increase the number of 50MVar distributed phase regulators until the grid-side constraints are met; h. Repeat step g until the number of 300MVar centralized phase regulators is 0; record V+1 schemes for all grid-side configuration phase regulators, and calculate the equivalent annual value index of each grid-side configuration scheme; i. Based on the obtained equivalent annual value indicators of the generator-side configuration plan and the grid-side configuration plan, the plan with the lowest equivalent annual value indicator is selected as the final phase-shifting sizing plan for the target power system.

7. A system for implementing the short-circuit ratio-based phase-converter configuration method for a power system according to any one of claims 1 to 6, characterized in that It includes a data acquisition module, a model building module, a short-circuit ratio calculation module, a phase shifter site selection module, an indicator building module, a phase shifter capacity determination module and a phase shifter configuration module; the data acquisition module, the model building module, the short-circuit ratio calculation module, the phase shifter site selection module, the indicator building module, the phase shifter capacity determination module and the phase shifter configuration module are connected in series in sequence; the data acquisition module is used to acquire data information of the target power system and upload the data information to the model building module; The model building module is used to establish a simplified grid-connected model of new energy units in the target power system based on the received data information and the acquired data information, and upload the data information to the short-circuit ratio calculation module; the short-circuit ratio calculation module is used to calculate the short-circuit ratio of the new energy station in the target power system based on the received data information and the established model, and upload the data information to the phase-shifting machine site selection module; the phase-shifting machine site selection module is used to construct and solve the phase-shifting machine site selection model based on the received data information, with the minimum phase-shifting machine configuration capacity as the objective function and the short-circuit ratio of multiple new energy stations as the constraint condition, to complete the phase-shifting machine site selection of the target power system, and upload the data information to the indicator construction Module; the indicator construction module is used to construct the equivalent annual value indicator of the phase regulator according to the received data information and the cost data of the phase regulator, and upload the data information to the phase regulator sizing module; the phase regulator sizing module is used to construct and solve the phase regulator sizing model according to the received data information, with the minimum equivalent annual value of the phase regulator as the objective function and the short-circuit ratio of the new energy multi-station as the constraint condition, to complete the phase regulator sizing of the target power system, and upload the data information to the phase regulator configuration module; the phase regulator configuration module is used to complete the phase regulator configuration of the target power system according to the received data information, the obtained phase regulator site selection plan and the phase regulator sizing plan obtained in step S6.

Citation Information

Cited By

  • Capacity configuration method and device for internal phase modifier of wind power plant

    CN119448406A

  • Site selection and capacity optimization configuration method for distributed phase modifier

    CN119994938A

  • A method for site selection and capacity optimization configuration of a distributed phase modifier

    CN119994938B

  • Reactive equipment multi-target collaborative optimization configuration method and device based on short-circuit ratio

    CN120377284A