Multi-scene collaborative configuration arrangement management method and system based on communication network

By adopting the procurement and control plug-in technology, rule engine and OPENAPI technology in the communication network, we realize multi-scenario automatic configuration, which solves the problems of large workload, long cycle and poor scalability under traditional configuration methods, and improves the automated configuration of 5G network equipment Efficiency and fault management capabilities.

CN119094323AInactive Publication Date: 2024-12-06HANGZHOU HUASI COMM TECH CO LTD

Patent Information

Application Number
CN202411587377.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-08
Publication Date
2024-12-06
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Traditional network equipment configuration methods are difficult to adapt to in large-scale operation of 5G networks and diversified business scenarios, resulting in large workload, long development cycle, poor scalability, and inability to achieve automated system configuration and rapid response.

Method used

It adopts IP network-based procurement and control plug-in technology, complex scene functions componentization of rule engines, and OPENAPI application atomic fusion orchestration technology to realize automated configuration and scene rule orchestration of multi-network, multi-type, multi-manufacturer, and multi-model equipment.

Benefits of technology

It reduces the cost and time of manual intervention, reduces the development cycle, improves the scalability and management efficiency of the system, can quickly identify peak faults and formulate early management measures to reduce the incidence of failures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119094323A_ABST
    Figure CN119094323A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of communication network management, and particularly discloses a multi-scene collaborative configuration arrangement management method and system based on a communication network, and the method specifically comprises the following steps: 1, achieving the fusion access of multiple networks, multiple types, multiple manufacturers, multiple models and multiple protocols based on an IP network collection and control plug-in technology; wherein the acquisition and control plug-in technology is utilized to acquire and process the alarm fault data of the network equipment, and the management is optimized. According to the method and the system, automatic configuration of equipment of different manufacturers and models is realized, so that the cost and time of manual intervention are reduced, the workload is reduced, the development period is shortened, and scene rules are arranged based on an OPENAPI application atomization fusion arrangement technology, so that different service function requirements can be met, the expandability is improved, and the development efficiency is improved. And the development response is quicker.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of communication network management, and in particular to a method and system for collaborative configuration and orchestration management based on multiple scenarios of a communication network. Background Art

[0002] There are thousands of business scenarios for metro cloud network hybrid networking. Under traditional network operation and maintenance methods (corresponding to L2 and lower level self-intelligent networks), code development is required to implement automatic business configuration functions in these scenarios. With the large-scale operation of 5G networks and the increasing demand for "end-cloud-network" collaboration, traditional network equipment configuration methods (such as SNMP and CLI commands) are becoming increasingly difficult to adapt to network operation needs. This is mainly reflected in the following aspects: (1) Large workload: The traditional CLI command method for configuring network devices requires understanding the sequence of each command, the input value of each command, the format and rules of the return value, and then customizing and developing according to these rules. However, due to the large number of 5G user scenarios and the flexible corresponding service configuration, the configuration complexity of the traditional method has increased significantly, resulting in an increase in the development workload of the traditional method to achieve system automation configuration; (2) Long development cycle: The traditional approach is to carry out targeted development for a certain business or scenario. The development, testing, and launch time is long, generally taking more than one month, which affects the rapid launch of 5G business applications. (3) Poor scalability: In traditional methods, various configuration templates are tightly coupled, and it is impossible to flexibly expand the services and scenarios supported by the system by automatically arranging atomic capabilities. In view of this, we propose a method and system for collaborative configuration and orchestration management based on multi-scenario communication networks. Summary of the invention

[0003] The purpose of the present invention is to provide a method and system for collaborative configuration and orchestration management based on multiple scenarios of a communication network to solve the technical problems in the above background.

[0004] The purpose of the present invention can be achieved through the following technical solutions: In a first aspect, the present invention provides a method for collaborative configuration and orchestration management based on a communication network in multiple scenarios, which specifically includes the following steps: Step 1: Based on IP network acquisition and control plug-in technology, realize the integrated access of multiple networks, multiple types, multiple manufacturers, multiple models and multiple protocols; Among them, the acquisition and control plug-in technology is used to obtain and process the alarm fault data of network equipment and optimize the management. The specific process is as follows: A1: Obtain alarm fault data of network equipment in the communication network from historical data, analyze and process it, and output a degree judgment value; A2: Determine the peak period of failure by combining the degree judgment value with the degree judgment threshold; A3: Based on the fault peak period, analyze the interval values ​​of adjacent fault peak periods to determine the changing trend of the interval values ​​of the fault peak periods; Among them, the changing trends of the interval value during the fault peak period include: stable trend, linear change trend, and nonlinear change trend; A4: Based on the changing trend of the peak interval value, predict the future peak hours and formulate proactive management measures; Step 2: Based on the complex scenario functional componentization technology of the rule engine, various types of data are divided into functional components, and the rule engine and scripts are introduced to realize the complex scenario functional componentization based on the rule engine; Step 3: Use the atomic fusion orchestration technology based on OPENAPI to orchestrate the scene rules.

[0005] As a further solution of the present invention: the process of obtaining the degree judgment value is: Analyze the number of faults and fault time to obtain the proportion of single fault duration, fault frequency and time interval average proportion; Substitute into the formula , the degree judgment value CD is calculated, where CX represents the proportion of single fault duration, PL represents the fault frequency, JG represents the proportion of the mean time interval, and a1, a2, and a3 are preset proportional coefficients.

[0006] As a further solution of the present invention: the process of obtaining the proportion of single fault duration, fault frequency and time interval mean proportion is as follows: Preset monitoring period, obtain fault data of network equipment in the communication network within several continuous monitoring periods in historical data, wherein the alarm fault data includes the number of faults and the fault time; During the monitoring period, the number of faults is taken inversely to obtain the fault frequency; The duration of each fault is obtained, marked as the single fault duration, the single fault durations are summed and averaged to obtain the mean single fault duration, and the single fault duration mean is compared with the monitoring period to obtain the proportion of single fault duration; Calculate the time interval between two adjacent fault times, sum and average all the time interval values ​​to obtain the time interval mean, and compare the time interval mean with the monitoring period to obtain the time interval mean ratio.

[0007] As a further solution of the present invention: the process of obtaining the peak fault period is as follows: Obtaining a degree judgment value during a monitoring period, and comparing the degree judgment value with a degree judgment threshold; If the degree judgment value is greater than the degree judgment threshold, the monitoring period is marked as a fault peak period.

[0008] As a further solution of the present invention: the process of obtaining the stable trend is: Obtain the fault peak period, calculate the time interval between two adjacent fault peak periods, and mark them as a single interval value; Sum and average all single interval values ​​to obtain the single interval mean, calculate the difference between all single interval values ​​and the single interval mean, take the absolute value of the difference, and obtain the single interval deviation value; All single interval deviation values ​​are summed and averaged to obtain the single interval deviation mean, and the single interval deviation value is compared with the single interval deviation mean; If the single interval deviation value is less than or equal to the single interval deviation mean, it is marked as a valid value; If the single interval deviation value is greater than the single interval deviation mean, it is marked as an invalid value; Obtain the number of valid values ​​and the number of invalid values, sum them up to get the total number, perform ratio processing on the number of valid values ​​and the total number to get the valid ratio value; The effective proportion value is compared with the effective proportion threshold. If the effective proportion value is greater than the effective proportion threshold, a stable signal is generated, which is a stable trend.

[0009] As a further solution of the present invention: the process of obtaining the linear change trend or the nonlinear change trend is: The overlap length ratio and the non-overlap length ratio are analyzed to obtain a linear judgment value, and the linear judgment value is compared with a linear judgment threshold; If the linear judgment value is greater than the linear judgment threshold, a linear signal is generated, which is a linear change trend; If the linear judgment value is less than or equal to the linear judgment threshold, a nonlinear signal is generated, which is a nonlinear change trend.

[0010] As a further solution of the present invention: the process of obtaining the linear judgment value is: The fault interval value curve is analyzed to obtain the coincidence length ratio and non-coincidence length ratio; By formula , the linear judgment value PD is calculated, where CH represents the overlapping length ratio, FC represents the non-overlapping length ratio, and s1 and s2 are preset proportional coefficients.

[0011] As a further solution of the present invention: the process of obtaining the overlap length ratio and the non-overlap length ratio is: With time as the X-axis and the fault peak period interval value as the Y-axis, a two-dimensional model is established. The starting time value of each fault peak period is the horizontal coordinate, and the corresponding peak period interval value is the vertical coordinate. Points are drawn in the two-dimensional model, and all coordinate points are connected with a smooth curve to obtain the fault period interval value curve; Connect the two end points of the fault period interval value curve and mark them as control line segments; Extract the overlapping line segments of the fault period interval value curve and the reference line segment, calculate the length value of the overlapping line segment, perform ratio processing on the overlapping length value of the line segment and the length of the reference line segment to obtain the overlapping length ratio; The non-overlapping curve between the fault period interval value curve and the reference line segment is extracted, and the non-overlapping curve is divided into several sub-curve segments. The vertical length value between the center point of each sub-curve segment and the reference line segment is calculated, and the sum and average are taken to obtain the mean value of the length deviation. The mean value of the length deviation is ratioed with the length value of the reference line segment to obtain the non-overlapping length ratio.

[0012] As a further solution of the present invention: the process of predicting the future peak period is: If a stable signal is generated, the single interval mean is obtained and marked as the fault peak period cycle value, the end value of the previous fault peak period at the current time point is obtained, and added to the fault peak period cycle value to obtain the predicted fault peak period; If a linear signal is generated, the linear model of the control line segment is calculated using the least squares method; Substitute the current time point as the X value into the linear model, calculate the corresponding Y value, which is the current peak period interval value, obtain the end value of the previous fault peak period at the current time point, and add it to the current peak period interval value to get the predicted fault peak period; If a nonlinear signal is generated, the minimum value in the single interval mean is extracted, the end value of the previous fault peak period at the current time point is obtained, and it is added to the minimum value in the single interval mean to obtain the predicted fault peak period.

[0013] In a second aspect, the present invention provides a multi-scenario collaborative configuration and orchestration management system based on a communication network, the system comprising: Data acquisition and processing module: obtains the alarm fault data of network equipment in the communication network from the historical data, analyzes and processes it, and outputs the degree judgment value; Peak period acquisition module: the degree judgment value and the degree judgment threshold are combined to determine the peak period of failure; Change trend judgment module: Based on the fault peak period, the interval values ​​of adjacent fault peak periods are analyzed to judge the change trend of the interval values ​​of the fault peak periods; Among them, the changing trends of the interval value during the fault peak period include: stable trend, linear change trend, and nonlinear change trend; Time prediction module: Based on the changing trend of the peak period interval value, predict the future peak period and formulate advance management measures.

[0014] Beneficial effects of the present invention: (1) The present invention realizes the automatic configuration of equipment of different manufacturers and models, thereby reducing the cost and time of manual intervention, reducing the workload, and shortening the development cycle; (2) The present invention uses the application atomic fusion orchestration technology based on OPENAPI to orchestrate scenario rules, thereby meeting different business function requirements, improving scalability and developing faster response; (3) The present invention obtains alarm fault data of multiple continuous monitoring periods in historical data, the fault data includes the number of faults and the fault time, calculates the degree judgment value, compares the degree judgment value with the degree judgment threshold, and if it is less than or equal to the degree judgment threshold, it is marked as a fault trough period, otherwise, it is marked as a fault peak period, so that the fault peak and trough periods can be effectively identified, and further trend analysis is performed based on the obtained fault peak period. Based on the analysis results, the monitoring strategy is adjusted and management measures are formulated to reduce the occurrence of faults and improve system stability, while improving management efficiency; (4) The present invention obtains the time interval values ​​of the historical fault peak periods, analyzes all the time interval values, calculates the effective proportion value, and determines whether the interval value of the fault peak period presents a periodic stable change or a non-periodic change. Based on the non-periodic change, an in-depth analysis is performed to draw a fault period interval value curve to determine whether it is a linear change or a non-linear change, and obtain the predicted time of the fault peak period. Based on the change trend analysis of the time interval value of the fault peak period, the future peak period can be predicted, and then targeted management measures can be taken in advance based on the prediction, thereby reducing the occurrence rate of faults and improving management efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The present invention will be further described below in conjunction with the accompanying drawings.

[0016] Figure 1 It is a flowchart of a method for collaborative configuration and orchestration management based on multi-scenario communication networks of the present invention; Figure 2 It is a flowchart of the acquisition and processing of alarm fault data of network equipment in a method for collaborative configuration and orchestration management based on multiple scenarios of a communication network according to the present invention; Figure 3 It is a flowchart of a multi-scenario collaborative configuration and orchestration management system based on a communication network according to the present invention. DETAILED DESCRIPTION

[0018] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0019] Embodiment 1: See also Figure 1 As shown, a method for collaborative configuration and orchestration management based on a communication network in multiple scenarios according to an embodiment of the present invention specifically includes the following steps: Step 1: Based on IP network acquisition and control plug-in technology, realize the integrated access of multiple networks, multiple types, multiple manufacturers, multiple models and multiple protocols; The acquisition and control plug-in is mainly responsible for various data interactions and control interaction capabilities between network devices. From the capability level, it includes acquisition services, control services and integration acceptance; Collection services include but are not limited to: task reception, protocol adaptation, data collection, data processing and push, and information reporting; For example, task reception: receiving the collection service tasks issued by the collection framework, access authentication: providing the collection framework with user access authentication capabilities, token recognition: identifying the collection framework with user legitimacy, Channel allocation: provide network channels for the collection task distribution of the collection framework; ranking change: dynamically adjust the order of collection tasks according to the scheduling strategy of the collection framework; protocol adaptation: adapt the corresponding protocol according to the collection source and collection template of the collection framework; data detection: provide data validity detection; data processing: normalize the collected data; data push: push the processed data to the upper system; Control services include but are not limited to: command reception, protocol adaptation, sequence control, connection management, and asynchronous callback; Exemplarily, receiving instructions: receiving real instructions issued by the control framework, controlling traffic: controlling the parallel access volume of the service according to the parallel access volume or TPS of the accessed network element / network management, encapsulating instructions: encapsulating the real instructions provided by the control framework, inside the queue: scheduling logic inside the queue, managing connections: providing online management functions, and centrally presenting the connections of the currently executing operations, adapting protocols: adapting to the corresponding protocols according to the task information of the control framework, controlling sequence: supporting the control capability of one or more instructions, such as using the extraction result of the previous instruction execution or query to provide a basis for the processing of the next instruction, to perform sequential processing or jump processing of multiple instructions, etc., parsing results: parsing the device execution status, asynchronous callback: returning the device execution status to the control framework; Integration and acceptance: Converged access supports multiple networks (such as IP network, IPRAN, new metropolitan area network, PON access network), multiple types (such as CR, BAS, Switch, Router, OLT, ONU, etc.), multiple manufacturers (such as Huawei, ZTE, FiberHome, H3C, Ruisikonda, etc.), multiple models (referring to multiple different models of equipment under each manufacturer), and multiple protocols (such as SSH, Telent, NETCONF, TL1, SNMP and other various equipment interaction protocols); It should be noted that based on the above step 1, the automatic configuration of equipment of different manufacturers and models is realized, thereby reducing the cost and time of manual intervention and reducing the workload; Step 2: Based on the complex scenario functional componentization technology of the rule engine, various types of data are divided into functional components, and the rule engine and scripts are introduced to realize the complex scenario functional componentization based on the rule engine; Through OPENAPI, microservice calls are made and componentized business APIs are uniformly registered on the DCOOS capability gateway to achieve rapid updates and iterations. Based on the calling requirements, the acquisition and control platform directly translates the business OPENAPI into the issuing instructions of the corresponding manufacturer, model and version of the equipment through virtual-real instruction conversion, thus improving the configuration efficiency; Step 3: Use the OPENAPI-based application atomic fusion orchestration technology to orchestrate the scene rules; In some embodiments, the fusion orchestration technology including the four-level structure of "scenario - virtual instruction set - virtual instruction - real instruction" can flexibly orchestrate the capabilities required by various application scenarios; Among them, real instructions are instructions that can be recognized by network devices. At the real instruction level, a series of instruction libraries are provided for devices of different manufacturers, models, and versions; Virtual instructions are a business logic translation of real instructions, which can help network maintenance personnel understand the meaning of instructions more intuitively. The virtual instruction set is used for multiple calls of a single device. The virtual instruction set can arrange multiple virtual instructions in sequence to generate a virtual instruction set with certain functional properties, which is convenient for upper-layer applications to arrange. Generally, virtual instructions to be issued multiple times on a device are uniformly arranged into a virtual instruction set. In this way, when calling, the device only needs to log in once to issue all the real instructions corresponding to all virtual instructions, without the need to log in every time. Too many logins to the device will affect the concurrent performance of the network device. A scenario is a complex functional application. An application needs to interact with multiple devices simultaneously (in parallel) or sequentially (in serial). In this case, it is necessary to choreograph the scenario. A scenario can choreograph multiple virtual instruction sets together according to certain processes, rules, and fork conditions, so as to realize the fully automatic, end-to-end calling and execution of all devices corresponding to the scenario. The technical solution of the embodiment of the present invention is mainly: by realizing the automatic configuration of equipment of different manufacturers and models, the cost and time of manual intervention are reduced, the workload is reduced, and the development cycle is shortened; Based on the application atomic fusion orchestration technology of OPENAPI, when there are new manufacturers and new models of equipment to be connected and supported, it is only necessary to add the virtual instructions and real instructions corresponding to the equipment in the collaborative platform to support it, without the need to develop code first and then upgrade the system to support it as in the traditional way. The development response is faster. Through the "scenario-virtual instruction set-virtual instruction-real instruction" fusion orchestration model, various scenarios based on complex applications can be flexibly added and modified. After the scenario orchestration is completed and approved, it will take effect. In the traditional way, it is necessary to first customize the development according to the requirements of the scenario and equipment, and then arrange time to upgrade the code. Therefore, this low-code, configurable implementation method has strong scalability and can quickly support complex scenarios of self-intelligent networks and 5G services. At the same time, the alarm fault data is acquired and processed, and management measures are optimized based on the acquired and processed results to reduce the occurrence of faults.

[0020] Embodiment 2: Based on Example 1, please refer to Figure 2 As shown, the method for coordinating and managing multi-scenario collaborative configuration based on a communication network according to an embodiment of the present invention further includes the following steps: Using acquisition and control plug-in technology, the alarm and fault data of network equipment is acquired and processed, and management is optimized. The specific process is as follows: A1: Obtain the alarm fault data of network equipment in the communication network from the historical data, analyze and process it, and calculate the degree judgment value; In some embodiments, a monitoring period is preset, and fault data of network devices in the communication network within several consecutive monitoring periods in historical data are obtained, wherein the alarm fault data includes the number of faults and the time of the fault; It should be noted that network equipment failures include, but are not limited to, abnormal traffic, packet loss, and delay; During the monitoring period, the number of faults is taken inversely to obtain the fault frequency; The duration of each fault is obtained, marked as the single fault duration, the single fault durations are summed and averaged to obtain the mean single fault duration, and the single fault duration mean is compared with the monitoring period to obtain the proportion of single fault duration; Calculate the time interval between two adjacent faults, sum and average all the time interval values ​​to obtain the time interval mean, and perform ratio processing on the time interval mean and the monitoring period to obtain the time interval mean ratio; Substitute into the formula , the degree judgment value CD is calculated, where CX represents the proportion of single fault duration, PL represents the fault frequency, JG represents the proportion of the mean time interval, a1, a2, and a3 are preset proportional coefficients, a1 is 0.42, a2 ​​is 0.37, and a3 is 0.31; It should be explained that the meaning reflected by the degree judgment value is: the degree judgment value is calculated by the proportion of the duration of a single fault, the fault frequency and the average proportion of the time interval, wherein the greater the proportion of the duration of a single fault, the greater the degree judgment value, the greater the persistence of the fault in the corresponding monitoring period, and the more serious the degree of the fault; the smaller the fault frequency, the greater the degree judgment value, the more times the fault occurs in the corresponding monitoring period, and the more serious the degree of the fault; the smaller the proportion of the average time interval, the greater the degree judgment value, the smaller the interval of the fault in the corresponding monitoring period, and the more serious the degree of the fault; A2: Determine the peak period of failure by combining the degree judgment value with the degree judgment threshold; In some embodiments, the degree judgment value of the monitoring period is obtained, and the degree judgment value is compared with the degree judgment threshold, wherein the degree judgment threshold is set by a person skilled in the art based on a summary of multiple historical experimental data; If the severity judgment value is less than or equal to the severity judgment threshold, it means that the fault during the monitoring period is relatively minor, and the monitoring period is marked as a fault low period; If the severity judgment value is greater than the severity judgment threshold, it means that the fault during the monitoring period is more serious, and the monitoring period is marked as a fault peak period; The technical solution of the embodiment of the present invention is mainly as follows: by obtaining alarm fault data of multiple continuous monitoring time periods in historical data, the fault data includes the number of faults and the fault time, the fault data is analyzed, and the proportion of single fault duration, the proportion of fault frequency and the average proportion of time interval are calculated, and the degree judgment value is calculated according to the proportion of single fault duration, the proportion of fault frequency and the average proportion of time interval. The degree judgment value is compared with the degree judgment threshold. If it is less than or equal to the degree judgment threshold, it is marked as a fault trough period, otherwise, it is marked as a fault peak period, so that the fault peak and trough periods can be effectively identified, and then further trend analysis is performed according to the obtained fault peak period, and based on the analysis results, the monitoring strategy is adjusted and management measures are formulated to reduce the occurrence of faults and improve system stability, while improving management efficiency.

[0021] Embodiment 3: Based on Example 1 and Example 2, please refer to Figure 2 As shown, the method for coordinating and managing multi-scenario collaborative configuration based on a communication network according to an embodiment of the present invention further includes the following steps: A3: Based on the fault peak period, analyze the interval values ​​of adjacent fault peak periods to determine the changing trend of the interval values ​​of the fault peak periods; Among them, the changing trends of the interval value during the fault peak period include: stable trend, linear change trend, and nonlinear change trend; In some embodiments, a fault peak period is obtained, and a time interval value between two adjacent fault peak periods is calculated and marked as a single interval value; Sum and average all single interval values ​​to obtain the single interval mean, calculate the difference between all single interval values ​​and the single interval mean, take the absolute value of the difference, and obtain the single interval deviation value; All single interval deviation values ​​are summed and averaged to obtain the single interval deviation mean, and the single interval deviation value is compared with the single interval deviation mean; If the single interval deviation value is less than or equal to the single interval deviation mean, it is marked as a valid value; If the single interval deviation value is greater than the single interval deviation mean, it is marked as an invalid value; Obtain the number of valid values ​​and the number of invalid values, sum them up to get the total number, perform ratio processing on the number of valid values ​​and the total number to get the valid ratio value; Compare the effective proportion value with the effective proportion threshold, wherein the effective proportion threshold is set by a person skilled in the art based on a summary of multiple historical experimental data; If the effective proportion value is greater than the effective proportion threshold, a stable signal is generated, that is, the interval between the peak fault periods is relatively stable, and the interval value between the peak fault periods shows a periodic and stable change, which is a stable trend; If the effective proportion value is less than or equal to the effective proportion threshold, an unstable signal is generated, that is, the interval between the fault peak periods is unstable, and the interval value between the fault peak periods changes non-periodically; Based on the generated unstable signal, the interval value of the fault peak period is further analyzed; In some embodiments, a two-dimensional model is established with time as the X-axis and the fault peak period interval value as the Y-axis, and the start time value of each fault peak period is used as the horizontal coordinate and the corresponding peak period interval value is used as the vertical coordinate. Points are plotted in the two-dimensional model, and all coordinate points are connected with a smooth curve to obtain a fault period interval value curve; Connect the two end points of the fault period interval value curve and mark them as control line segments; Extract the overlapping line segments of the fault period interval value curve and the reference line segment, calculate the length value of the overlapping line segment, perform ratio processing on the overlapping length value of the line segment and the length of the reference line segment to obtain the overlapping length ratio; Extract the non-coincidence curve between the fault period interval value curve and the reference line segment, divide the non-coincidence curve into several sub-curve segments, calculate the vertical length value between the center point of each sub-curve segment and the reference line segment, sum and average them, obtain the mean value of length deviation, perform ratio processing on the mean value of length deviation and the length value of the reference line segment, and obtain the non-coincidence length ratio; By formula , calculate the linear judgment value PD, where CH represents the overlap length ratio, FC represents the non-overlap length ratio, s1 and s2 are preset proportional coefficients, s1 is 1.68, and s2 is 1.37; It should be explained that the linear judgment value is calculated by the overlap length ratio and the non-overlap length ratio, wherein the overlap length ratio is proportional to the linear judgment value, that is, the larger the overlap length ratio is, the higher the overlap between the fault period interval value curve and the control line segment is, and the higher the degree of linearity of the fault period interval value curve is, and the non-overlap length ratio is inversely proportional to the linear judgment value, that is, the smaller the non-overlap length ratio is, the lower the non-overlap between the fault period interval value curve and the control line segment is, and the higher the degree of linearity of the fault period interval value curve is; Compare the linear judgment value with the linear judgment threshold, wherein the linear judgment threshold is set by a person skilled in the art based on a summary of multiple historical experimental data; If the linear judgment value is greater than the linear judgment threshold, a linear signal is generated, which is a linear change trend; If the linear judgment value is less than or equal to the linear judgment threshold, a nonlinear signal is generated, which is a nonlinear change trend; A4: Based on the changing trend of the peak interval value, predict the future peak hours and formulate proactive management measures; In some embodiments, if a stable signal is generated, a single interval mean is obtained, marked as a fault peak period cycle value, an end value of a previous fault peak period at the current time point is obtained, and added to the fault peak period cycle value to obtain a predicted fault peak period; If a linear signal is generated, the linear model of the control line segment is calculated using the least squares method; Substitute the current time point as the X value into the linear model, calculate the corresponding Y value, which is the current peak period interval value, obtain the end value of the previous fault peak period at the current time point, and add it to the current peak period interval value to get the predicted fault peak period; If a nonlinear signal is generated, the minimum value in the single interval mean is extracted, the end value of the previous fault peak period at the current time point is obtained, and it is added to the minimum value in the single interval mean to obtain the predicted fault peak period; It should be explained that the predicted peak failure time period obtained above is for obtaining the predicted peak failure time period in advance, and then taking targeted management measures in advance according to the obtained time to reduce the occurrence rate of failures; Management measures may include, but are not limited to: increasing the frequency of network monitoring, optimizing network configuration, preparing emergency plans, and strengthening personnel training; The technical solution of the embodiment of the present invention is mainly as follows: by obtaining the time interval value of the historical fault peak period, and analyzing all the time interval values, the effective proportion value is calculated, and the effective proportion value is compared with the effective proportion threshold value. If the effective proportion value is greater than the effective proportion threshold value, a stable signal is generated, that is, the intervals between the fault peak periods are relatively stable, and the interval values ​​of the fault peak periods show periodic and stable changes. If the effective proportion value is less than or equal to the effective proportion threshold value, an unstable signal is generated, that is, the intervals between the fault peak periods are unstable, and the interval values ​​of the fault peak periods show non-periodic changes. Based on the non-periodic changes, an in-depth analysis is performed, and a fault period interval value curve is drawn to determine whether it is a linear change or a non-linear change, and the predicted time of the fault peak period is obtained, so that based on the analysis of the changing trend of the time interval value of the fault peak period, the future peak period can be predicted, and then targeted management measures can be taken in advance based on the prediction, thereby reducing the occurrence rate of faults and improving management efficiency.

[0022] Embodiment 4: Based on Example 1, Example 2 and Example 3, please refer to Figure 3 As shown, a multi-scenario collaborative configuration and orchestration management system based on a communication network according to an embodiment of the present invention specifically includes: Data acquisition and processing module: obtains the alarm fault data of network equipment in the communication network from the historical data, analyzes and processes it, and calculates the degree judgment value; Peak period acquisition module: the degree judgment value and the degree judgment threshold are combined to determine the peak period of failure; Change trend judgment module: Based on the fault peak period, the interval values ​​of adjacent fault peak periods are analyzed to judge the change trend of the interval values ​​of the fault peak periods; Among them, the changing trends of the interval value during the fault peak period include: stable trend, linear change trend, and nonlinear change trend; Time prediction module: Based on the changing trend of the peak period interval value, predict the future peak period and formulate advance management measures.

[0023] The size of the above threshold is set to facilitate comparison. The size of the threshold depends on the amount of sample data and the base number set by the technical personnel in this field for each group of sample data; for example: in the actual process, there are many groups of single fault duration ratios, fault frequencies and time interval average ratios. The single fault duration ratios, fault frequencies and time interval average ratios of many groups are processed to obtain the degree judgment values ​​of the corresponding groups. The staff evaluates the degree of failure in the monitoring period based on the degree judgment values ​​of so many groups, thereby obtaining a corresponding relationship between an abnormality coefficient and the degree of failure in the monitoring period, and then derives and divides the threshold of the degree judgment value according to the degree of failure in the monitoring period, thereby obtaining the degree judgment value threshold, and compares the obtained degree judgment value with the degree judgment threshold, that is, completes the identification of the degree of failure in the monitoring period corresponding to the degree judgment value.

[0024] The above is a detailed description of an embodiment of the present invention, but the content is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.

Claims

1. A method for collaborative configuration and orchestration management based on a communication network in multiple scenarios, characterized in that: The specific steps include: Step 1: Based on IP network acquisition and control plug-in technology, realize the integrated access of multiple networks, multiple types, multiple manufacturers, multiple models and multiple protocols; Among them, the acquisition and control plug-in technology is used to obtain and process the alarm fault data of network equipment and optimize the management. The specific process is as follows: A1: Obtain alarm fault data of network equipment in the communication network from historical data, analyze and process it, and output a degree judgment value; A2: Determine the peak period of failure by combining the degree judgment value with the degree judgment threshold; A3: Based on the fault peak period, analyze the interval values ​​of adjacent fault peak periods to determine the changing trend of the interval values ​​of the fault peak periods; Among them, the changing trends of the interval value during the fault peak period include: stable trend, linear change trend, and nonlinear change trend; A4: Based on the changing trend of the peak interval value, predict the future peak hours and formulate proactive management measures; Step 2: Based on the complex scenario functional componentization technology of the rule engine, various types of data are divided into functional components, and the rule engine and scripts are introduced to realize the complex scenario functional componentization based on the rule engine; Step 3: Use the atomic fusion orchestration technology based on OPENAPI to orchestrate the scene rules.

2. According to claim 1, a method for collaborative configuration and orchestration management based on a communication network in multiple scenarios, characterized in that: The process of obtaining the degree judgment value is as follows: Analyze the number of faults and fault time to obtain the proportion of single fault duration, fault frequency and time interval average proportion; Substitute into the formula , the degree judgment value CD is calculated, where CX represents the proportion of single fault duration, PL represents the fault frequency, JG represents the proportion of the mean time interval, and a1, a2, and a3 are preset proportional coefficients.

3. According to claim 2, a method for collaborative configuration and orchestration management based on a communication network in multiple scenarios is characterized in that: The process of obtaining the proportion of single fault duration, fault frequency and time interval mean proportion is as follows: Preset monitoring period, obtain fault data of network equipment in the communication network within several continuous monitoring periods in historical data, wherein the alarm fault data includes the number of faults and the fault time; During the monitoring period, the number of faults is taken inversely to obtain the fault frequency; The duration of each fault is obtained, marked as the single fault duration, the single fault durations are summed and averaged to obtain the mean single fault duration, and the single fault duration mean is compared with the monitoring period to obtain the proportion of single fault duration; Calculate the time interval between two adjacent fault times, sum and average all the time interval values ​​to obtain the time interval mean, and compare the time interval mean with the monitoring period to obtain the time interval mean ratio.

4. According to claim 1, a method for collaborative configuration and orchestration management based on a communication network in multiple scenarios, characterized in that: The acquisition process of the fault peak period is as follows: Obtaining a degree judgment value during a monitoring period, and comparing the degree judgment value with a degree judgment threshold; If the degree judgment value is greater than the degree judgment threshold, the monitoring period is marked as a fault peak period.

5. According to claim 1, a method for collaborative configuration and orchestration management based on a communication network in multiple scenarios, characterized in that: The process of obtaining the stable trend is as follows: Obtain the fault peak period, calculate the time interval between two adjacent fault peak periods, and mark them as a single interval value; Sum and average all single interval values ​​to obtain the single interval mean, calculate the difference between all single interval values ​​and the single interval mean, take the absolute value of the difference, and obtain the single interval deviation value; All single interval deviation values ​​are summed and averaged to obtain the single interval deviation mean, and the single interval deviation value is compared with the single interval deviation mean; If the single interval deviation value is less than or equal to the single interval deviation mean, it is marked as a valid value; If the single interval deviation value is greater than the single interval deviation mean, it is marked as an invalid value; Obtain the number of valid values ​​and the number of invalid values, sum them up to get the total number, perform ratio processing on the number of valid values ​​and the total number to get the valid ratio value; The effective proportion value is compared with the effective proportion threshold. If the effective proportion value is greater than the effective proportion threshold, a stable signal is generated, which is a stable trend.

6. According to claim 1, a method for collaborative configuration and orchestration management based on a communication network in multiple scenarios, characterized in that: The process of obtaining the linear change trend or the nonlinear change trend is as follows: The overlap length ratio and the non-overlap length ratio are analyzed to obtain a linear judgment value, and the linear judgment value is compared with a linear judgment threshold; If the linear judgment value is greater than the linear judgment threshold, a linear signal is generated, which is a linear change trend; If the linear judgment value is less than or equal to the linear judgment threshold, a nonlinear signal is generated, which is a nonlinear change trend.

7. The method for collaborative configuration and orchestration management based on a communication network in multiple scenarios according to claim 6 is characterized in that: The process of obtaining the linear judgment value is as follows: The fault interval value curve is analyzed to obtain the coincidence length ratio and non-coincidence length ratio; By formula , the linear judgment value PD is calculated, where CH represents the overlapping length ratio, FC represents the non-overlapping length ratio, and s1 and s2 are preset proportional coefficients.

8. The method for collaborative configuration and orchestration management based on a communication network in multiple scenarios according to claim 7 is characterized in that: The process of obtaining the overlap length ratio and the non-overlap length ratio is as follows: With time as the X-axis and the fault peak period interval value as the Y-axis, a two-dimensional model is established. The starting time value of each fault peak period is the horizontal coordinate, and the corresponding peak period interval value is the vertical coordinate. Points are drawn in the two-dimensional model, and all coordinate points are connected with a smooth curve to obtain the fault period interval value curve; Connect the two end points of the fault period interval value curve and mark them as control line segments; Extract the overlapping line segments of the fault period interval value curve and the reference line segment, calculate the length value of the overlapping line segment, perform ratio processing on the overlapping length value of the line segment and the length of the reference line segment to obtain the overlapping length ratio; The non-overlapping curve between the fault period interval value curve and the reference line segment is extracted, and the non-overlapping curve is divided into several sub-curve segments. The vertical length value between the center point of each sub-curve segment and the reference line segment is calculated, and the sum and average are taken to obtain the mean value of the length deviation. The mean value of the length deviation is ratioed with the length value of the reference line segment to obtain the non-overlapping length ratio.

9. The method for collaborative configuration and orchestration management based on a communication network in multiple scenarios according to claim 1, characterized in that: The process of predicting the future peak hours is as follows: If a stable signal is generated, the single interval mean is obtained and marked as the fault peak period cycle value, the end value of the previous fault peak period at the current time point is obtained, and added to the fault peak period cycle value to obtain the predicted fault peak period; If a linear signal is generated, the linear model of the control line segment is calculated using the least squares method; Substitute the current time point as the X value into the linear model, calculate the corresponding Y value, which is the current peak period interval value, obtain the end value of the previous fault peak period at the current time point, and add it to the current peak period interval value to get the predicted fault peak period; If a nonlinear signal is generated, the minimum value in the single interval mean is extracted, the end value of the previous fault peak period at the current time point is obtained, and it is added to the minimum value in the single interval mean to obtain the predicted fault peak period.

10. A multi-scenario collaborative configuration and orchestration management system based on a communication network, characterized in that: The system is used to execute the method described in any one of claims 1 to 9, and the system comprises: Data acquisition and processing module: obtains the alarm fault data of network equipment in the communication network from the historical data, analyzes and processes it, and outputs the degree judgment value; Peak period acquisition module: the degree judgment value and the degree judgment threshold are combined to determine the peak period of failure; Change trend judgment module: Based on the fault peak period, the interval values ​​of adjacent fault peak periods are analyzed to judge the change trend of the interval values ​​of the fault peak periods; Among them, the changing trends of the interval value during the fault peak period include: stable trend, linear change trend, and nonlinear change trend; Time prediction module: Based on the changing trend of the peak period interval value, predict the future peak period and formulate advance management measures.

Citation Information

Patent Citations

  • Internet-based outboard electronic control system analysis method

    CN113110393A

  • Method and device for realizing cloud access of acquisition and control access network plug-in

    CN113872800A

  • Network detection method and device, electronic equipment and storage medium

    CN115941527A

  • NFV network automatic operation and maintenance development method

    CN116566836A

  • Service calling method and system, electronic equipment, readable medium and product

    CN116974521A

Cited By

  • Comprehensive management and optimization system of industrial internet

    CN120146842A

  • A comprehensive management and optimization system for the Industrial Internet

    CN120146842B