Cement industry laboratory sheet printing method, device and system

By automatically generating test sheets and adding watermarks and electronic seals to the test sheet management of the cement industry, the problems of fast paper usage rate and low vehicle traffic efficiency in the test sheet management of cement plant test sheets are solved, and data safety and printing paper saving are achieved.

CN119105713APending Publication Date: 2024-12-10YONGDENG QILIANSHAN CEMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411279563.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-12
Publication Date
2024-12-10

AI Technical Summary

Technical Problem

The existing cement plant test form management has problems such as fast paper usage rate, low vehicle traffic efficiency and easy data tampering.

Method used

The automated test form generation method is adopted to generate test form by receiving the pick-up operation information, and add watermarks and electronic seals to the test form, allowing drivers to choose to print or not print at the smart terminal, limiting the number of printing times to save paper.

Benefits of technology

Improve vehicle traffic efficiency, avoid data tampering, save printing paper, and reduce printing error rate.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119105713A_ABST
    Figure CN119105713A_ABST
Patent Text Reader

Abstract

The invention discloses a cement industry laboratory sheet printing method, device and system, and the method comprises the following steps: responding to the received delivery operation information which comprises driver information and order information, and sending prompt information to a corresponding terminal account according to the driver information; responding to received query information which comprises order information and a terminal IP, calling a corresponding laboratory test report template and cement test related experimental data according to the order information to calculate and generate a laboratory test report, adding a watermark and an electronic seal on the laboratory test report, storing the laboratory test report, and adding a label; sending the laboratory sheet to the terminal IP; in response to the received printing information, the printing information comprises a laboratory test report label, and the printing frequency of the laboratory test report is judged according to the laboratory test report label; if the printing frequency is smaller than or equal to a threshold value, generating a laboratory sheet printing instruction. By adopting the method, the problem of data tampering can be avoided, a driver does not need to wait for a laboratory sheet when leaving a factory, traffic jam is avoided, the vehicle passing efficiency is improved, and printing paper is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of test report management, and in particular relates to a method, device and system for printing test reports in the cement industry. Background Art

[0002] The management of test sheets in existing cement plants is mainly done manually, which has many problems: 1. The paper usage rate is fast; 2. Manual filling in of the form will cause vehicles to queue up when leaving the factory, resulting in low vehicle traffic efficiency; 3. The data on the test report is easily altered by humans when filling in the form manually, which affects the credibility of the test report. Summary of the invention

[0003] In order to solve the problems of fast paper usage, low vehicle traffic efficiency and easy tampering in the existing test report filled out manually, the present invention proposes a method, device and system for printing test reports in the cement industry.

[0004] The objective of the present invention is achieved through the following technical solutions: The first aspect of the present invention discloses a method for printing a test report in the cement industry, comprising the following steps: In response to receiving the pickup operation information, the pickup operation information includes driver information and order information, sending a prompt message to a corresponding terminal account according to the driver information; In response to receiving the query information, the query information includes the order information and the terminal IP, the corresponding test sheet template and cement test related experimental data are retrieved according to the order information to calculate and generate the test sheet, and after adding a watermark and an electronic seal to the test sheet, the test sheet is stored and a label is added; Sending the test report to the terminal IP; In response to receiving printing information, the printing information includes a test sheet label, and determining the number of times the test sheet is printed according to the test sheet label; In response to the number of printing times being less than or equal to a threshold, a test sheet printing instruction is generated.

[0005] The second aspect of the present invention discloses a cement industry test report printing device, comprising a memory unit and a controller unit which are communicatively connected in sequence, wherein a computer program is stored in the memory unit, and the controller unit is used to read the computer program and execute the cement industry test report printing method described in the first aspect.

[0006] The third aspect of the present invention discloses a cement industry test sheet printing system, comprising: A cargo management device, the cargo management device is used to manage the delivery status of the delivery order to generate delivery operation information after the order information is delivered; An experimental device, wherein the experimental device is used to test various indicators of cement to obtain experimental data related to cement testing; A database, the database is used to store cement testing related experimental data, driver information, and order information; Printing device; At least one intelligent terminal; The second aspect is a cement industry test report printing device, wherein the cement industry test report printing device is connected to the database, the printing device, the cargo management device and the intelligent terminal signal.

[0007] The beneficial effects of the present invention are: 1. The present invention automatically generates test sheets, and the data of the test sheets directly obtains the data of the test equipment, thereby avoiding the problem of data tampering. In addition, the driver does not need to wait for the test sheets when leaving the factory, thus avoiding traffic jams and improving vehicle traffic efficiency.

[0008] 2. The present invention automatically generates prompt information after the driver picks up the goods. The driver can choose to automatically print the test report through the terminal. The driver can print or not, which saves printing paper to a certain extent. BRIEF DESCRIPTION OF THE DRAWINGS

[0009] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0010] Figure 1 The figure is a schematic diagram of information interaction between the test report printing device for the cement industry and the intelligent terminal of the present invention. DETAILED DESCRIPTION

[0011] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0012] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0013] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features of the embodiments may be combined with each other.

[0014] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0015] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, or the positions or positional relationships in which the product of the invention is usually placed when in use, or the positions or positional relationships commonly understood by those skilled in the art, which are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.

[0016] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0017] The first aspect of the present invention discloses a method for printing a test report for the cement industry. The method can be executed by, but is not limited to, a test report printing device for the cement industry. The test report printing device for the cement industry can be software, or a combination of software and hardware. The test report printing device for the cement industry can be integrated in smart devices such as smart mobile terminals, tablets, and computers. Specifically, Figure 1As shown, the cement industry test report printing method includes the following steps S01 to S05. It should be noted that the step identifiers in this scheme are only for the convenience of explaining the method and do not constitute a sequence limitation. The sequence of each step is based on its language description and the sequence of each signal.

[0018] Step S01: In response to receiving pickup operation information, the pickup operation information includes driver information and order information, and sending prompt information to a corresponding terminal account according to the driver information.

[0019] Driver information must be registered and permission managed in advance in the cement industry test report printing device.

[0020] After the driver completes the pickup, the warehouse terminal will upload a pickup operation message, indicating that the driver has completed the order. At this time, after receiving the message, the cement industry test sheet printing device sends a prompt message to the terminal account corresponding to the driver information to remind the driver to print the test sheet.

[0021] The corresponding terminal account can be a chat account such as an account for receiving text messages, a WeChat account, a corporate WeChat account, etc. The prompt words for printing the order information test form and the official network address link for printing the test form, after the driver's smart terminal receives the prompt information, he can check the official website according to the link in the prompt information.

[0022] After the driver enters the official website, his driver account ID and password will be verified and then logged in. The corresponding order information under the account ID will be displayed. The driver can click on the order he wants to query to view it.

[0023] Step S02, in response to receiving query information, the query information includes order information and terminal IP, retrieve the corresponding test form template and cement test related experimental data according to the order information, calculate and generate the test form, add a watermark and electronic seal to the test form, store the test form and add a label.

[0024] The driver can click on the order he wants to query to view it, and the cement industry test report printing device will receive the corresponding query information. At this time, the corresponding test report template and cement test-related experimental data are retrieved according to the order information to calculate and generate the test report, add a watermark and electronic seal, and then store it locally.

[0025] Step S03: sending the test report to the terminal IP.

[0026] The cement industry test report printing device sends the final test report to the driver's smart terminal according to the terminal IP, and the driver can view all the test reports under the order. At this time, the driver can choose to only view the test reports, or print one or more test reports.

[0027] If the driver chooses to print a test report, he clicks the relevant print button to send the printing information to the cement industry test report printing device.

[0028] Step S04: In response to receiving printing information, the printing information includes a test form label, and determining the number of times the test form is printed according to the test form label.

[0029] After receiving the printing information, the test report printing device in the cement industry determines the number of times the test report has been printed according to the test report label.

[0030] Step S05: in response to the number of print times being less than or equal to a threshold, generating a test report printing instruction; or, in response to the number of print times being greater than a threshold, sending a prompt message for restricting printing to the terminal IP.

[0031] When the number of times the test sheet is printed exceeds a threshold, printing is not performed, which limits the number of times the same test sheet is printed, thus avoiding the phenomenon of wasting printing paper.

[0032] After receiving the test report printing instruction, the printing device can print the corresponding test report.

[0033] The second aspect of the present invention discloses a cement industry test sheet printing device, including a memory and a controller that are sequentially connected in communication, a computer program is stored on the memory, and the controller is used to read the computer program and execute a cement industry test sheet printing method described in the first aspect. For example, the memory may include, but is not limited to, a random access memory (RAM), a read-only memory (ROM), a flash memory (Flash Memory), a first-in-first-out memory (FIFO) and or a first-in-last-out memory (FILO), etc.; the controller may not be limited to a microcontroller of the STM32F105 series. In addition, the computer device may also include, but is not limited to, a power supply unit, a display screen and other necessary components.

[0034] Based on the above structure, the third aspect of the present invention discloses a cement industry test sheet printing system, including an experimental device, a database, a printing device, a cargo management device, an intelligent terminal and a cement industry test sheet printing device. Among them, the cargo management device is used to manage the delivery status of the delivery note to generate delivery operation information after the order information is delivered; the experimental class device is used to test various indicators of cement to obtain cement test-related experimental data, and there are multiple experimental devices, and the specific type and quantity are set according to the cement performance test indicators; the database is used to store cement test-related experimental data, driver information, and order information, which can be a cloud database or a local database; the cement industry test sheet printing device is the cement industry test sheet printing device described in the second aspect, and the cement industry test sheet printing device is connected to the database, the cargo management device, the printing device and the intelligent terminal signal.

[0035] The above solution can solve the problems of queue congestion, high paper waste rate of test report, high error rate in printing test reports, high probability of misoperation, etc.

[0036] Those skilled in the art will appreciate that the embodiments described herein are intended to help readers understand the principles of the present invention, and should be understood that the protection scope of the present invention is not limited to such specific statements and embodiments. Those skilled in the art can make various other specific variations and combinations that do not deviate from the essence of the present invention based on the technical revelations disclosed by the present invention, and these variations and combinations are still within the protection scope of the present invention.

Claims

1. A method for printing a test report in the cement industry, characterized in that: The following steps are involved: In response to receiving the pickup operation information, the pickup operation information includes driver information and order information, sending a prompt message to a corresponding terminal account according to the driver information; In response to receiving the query information, the query information includes the order information and the terminal IP, the corresponding test sheet template and cement test related experimental data are retrieved according to the order information to calculate and generate the test sheet, and after adding a watermark and an electronic seal to the test sheet, the test sheet is stored and a label is added; Sending the test report to the terminal IP; In response to receiving printing information, the printing information includes a test sheet label, and determining the number of times the test sheet is printed according to the test sheet label; In response to the number of printing times being less than or equal to a threshold, a test sheet printing instruction is generated.

2. A method for printing a test report in cement industry according to claim 1, characterized in that: In response to the number of printing times being greater than a threshold, a prompt message for restricting printing is sent to the terminal IP.

3. A method for printing a test report in cement industry according to claim 1, characterized in that: The prompt information includes a prompt word including the order information that the test form can be printed and an official network address link for printing the test form.

4. A method for printing a test report in cement industry according to claim 1, characterized in that: The step of responding to receiving the pickup operation information also includes: The driver information is registered and permission managed.

5. A cement industry test report printing device, comprising a controller unit and a memory unit connected in sequence, wherein a computer program is stored in the memory unit, characterized in that: The controller unit is used to read the computer program and execute the method for printing test reports in the cement industry as described in any one of claims 1-4.

6. A cement industry test sheet printing system, characterized in that: include: A cargo management device, the cargo management device is used to manage the delivery status of the delivery order to generate delivery operation information after the order information is delivered; An experimental device, wherein the experimental device is used to test various indicators of cement to obtain experimental data related to cement testing; A database, the database is used to store cement testing related experimental data, driver information, and order information; Printing device; At least one intelligent terminal; A cement industry test report printing device as described in claim 4, wherein the cement industry test report printing device is connected to the database, the printing device, the cargo management device and the intelligent terminal signal.