Engineering digital management platform based on BIM model and management method thereof

By building a BIM model in the engineering management system and adopting intelligent file management and VR/AR technology, the shortcomings of document management and virtual construction guidance are solved, real-time emergency response is achieved, and the management efficiency and emergency response speed of engineering projects are improved.

CN119107046AActive Publication Date: 2024-12-10BAISE HUB GENERAL AVIATION INVESTMENT CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202411277011.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-12
Publication Date
2024-12-10
Estimated Expiration
2044-09-12

AI Technical Summary

Technical Problem

When the existing engineering management system combines BIM technology, the document management is not intelligent enough, the virtual construction guidance capabilities are insufficient, the emergency response is not timely, and the data in the BIM model cannot be fully utilized for real-time risk assessment and emergency plan generation.

Method used

By building a BIM model, using intelligent file management strategies for semantic analysis, automatically extracting key information and model associations, using VR/AR technology to build an immersive construction scenario, and monitoring potential disaster risks through sensors to automatically generate emergency response plans.

Benefits of technology

It has improved the intelligence level of information management, enhanced the virtual guidance capabilities of the construction process, achieved real-time emergency response, and significantly improved the project's collaboration efficiency and emergency response speed.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119107046A_ABST
    Figure CN119107046A_ABST
Patent Text Reader

Abstract

The invention discloses an engineering digital management platform based on a BIM model and a management method thereof, and relates to the technical field of engineering project management, and the method comprises the following steps: constructing a BIM model of an engineering project, and importing a document related to the project; constructing an intelligent archive management strategy, performing semantic analysis on the imported project document, automatically extracting key information, and binding the information with related components in the BIM model; constructing an immersive construction scene by using virtual reality VR and augmented reality AR technologies; continuously performing semantic analysis on the new document, and automatically updating related information in the BIM model; once potential disaster risks are detected, a corresponding emergency response scheme is automatically generated according to design specifications and document information in the BIM model. Through semantic analysis and natural language processing technologies, document key information is automatically extracted and intelligently bound with the BIM model, and automation and precision of information management are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of engineering project management, and in particular to an engineering digital management platform based on a BIM model and a management method thereof. Background Art

[0002] As the scale of modern engineering projects continues to expand, the complexity of engineering project management has also increased significantly. The traditional engineering management model mainly relies on two-dimensional drawings, paper documents and manual collaboration, which leads to problems such as untimely information transmission, inconsistent data, and poor communication. This management method cannot meet the current needs of efficient, accurate and collaborative management of engineering projects.

[0003] To solve the above problems, BIM technology has been gradually introduced into engineering project management. BIM technology integrates various data such as building geometry information, material information, construction process, etc. in the form of three-dimensional digital models, providing strong support for project design, construction and operation. However, existing BIM applications are mainly concentrated in the design and construction stages, and support for document management, on-site construction guidance, emergency response, etc. is still not perfect.

[0004] The existing engineering management system has the following deficiencies when combined with BIM technology:

[0005] Document management is not smart enough: Existing systems usually process and manage project documents manually, lack automated information extraction and analysis capabilities, and cannot efficiently and intelligently associate key information with BIM models.

[0006] Insufficient virtual construction guidance capabilities: Although existing systems can use BIM models for three-dimensional visualization, their application in immersive construction scene simulation and AR on-site guidance is not mature enough, resulting in poor virtual drills and increased risks of errors and delays in actual construction.

[0007] Untimely emergency response: Traditional emergency response relies on post-event analysis and manual decision-making, which makes it difficult to respond to emergencies in a timely manner and unable to fully utilize the data in the BIM model for real-time risk assessment and emergency plan generation. Summary of the invention

[0008] The purpose of this section is to summarize some aspects of embodiments of the present invention and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and the specification abstract and the invention title of this application to avoid blurring the purpose of this section, the specification abstract and the invention title, and such simplifications or omissions cannot be used to limit the scope of the present invention.

[0009] In view of the problems existing in the above-mentioned existing engineering digital management platform based on BIM model and its management method, the present invention is proposed.

[0010] In order to solve the above technical problems, the present invention provides the following technical solutions:

[0011] A method for digital engineering management based on a BIM model comprises the following steps:

[0012] Step 1: Build the BIM model of the project and import project-related documents;

[0013] Build an intelligent archive management strategy to perform semantic analysis on imported project documents, automatically extract key information, and bind this information to relevant components in the BIM model;

[0014] Step 2: Based on the BIM model that has undergone semantic analysis and associated document information, use virtual reality VR and augmented reality AR technology to build an immersive construction scene;

[0015] Step 3: Continue to perform semantic analysis on new documents and automatically update relevant information in the BIM model;

[0016] Step 4: Use sensors to monitor disaster risks during the project implementation phase. Once potential disaster risks are detected, the corresponding emergency response plan will be automatically generated based on the design specifications and document information in the BIM model. Managers can also use VR equipment to rehearse emergency plans in advance and optimize personnel scheduling and operating procedures.

[0017] As a preferred solution of the engineering digital management method based on BIM model described in the present invention, the intelligent archive management strategy includes the following steps:

[0018] S11: Document D is analyzed using a deep learning model i Perform semantic analysis to extract key information including construction specifications, material safety, and safety standards, and form an information set S(D i );

[0019] S12: Associate and bind the extracted relationship information set with the specific components in the BIM model and express it as a mapping function T(S(D i )); and normalize it, denoted as Φ(T(S(D i )));

[0020] S13: Evaluate the processing efficiency of the imported documents, that is, the overall efficiency of processing the kth group within time t is expressed as ψ(k,t);

[0021] S14: Calculate and evaluate the semantic distance between documents to obtain a distance E;

[0022]

[0023] S5: Finally, all document processing and binding processes within the entire time period T are cumulatively calculated to obtain the total efficiency M of the association between the entire project document and the BIM model;

[0024]

[0025] Among them, exp(-λ·t) represents the modeling time decay effect, that is, the efficiency of processing documents decreases over time.

[0026] As a preferred solution of the engineering digital management method based on BIM model described in the present invention, wherein: the mapping function T(S(D i )) is calculated as:

[0027]

[0028] Where C is the total number of components in the BIM model, γ C is the information weight associated with the component, Sim(S(D i ),M C ) is the similarity between the extracted information and the components.

[0029] As a preferred solution of the engineering digital management method based on the BIM model described in the present invention, the calculation formula of the overall efficiency ψ(k, t) is:

[0030]

[0031] Among them, Q(k) is the processing quality of the k-th group of documents, that is, the accuracy of the extracted information, P(k) is the processing volume of the k-th group of documents, that is, the number of document pages or the amount of information processed, α and β are coefficients for adjusting the weights of quality and processing volume, and δ is the time decay coefficient.

[0032] As a preferred solution of the engineering digital management method based on BIM model described in the present invention, the specific method of generating the corresponding emergency response plan in the process of step 4 is as follows:

[0033] S41: Assess the severity and likelihood of potential disaster risks and generate corresponding risk scores based on document information;

[0034] S42: Calculate the priorities of different emergency response measures, combining risk assessment results and resource allocation;

[0035] S43: Optimize resource allocation to maximize the effectiveness of emergency response;

[0036] S44: Integrate risk assessment, response priorities and resource optimization to generate the final emergency response plan.

[0037] As a preferred solution of the engineering digital management method based on BIM model described in the present invention, the expression of risk score is:

[0038]

[0039] Among them, D j is a set of document information related to the risk, S is a set of design specifications, and w i is the weight of different risk categories, Prob(r i ) and Impact(r i ) are the probability and impact of the ith risk respectively;

[0040] The priority of the emergency response is expressed as:

[0041]

[0042] Among them, β k is the resource allocation weight of the kth emergency response measure, and M is the number of all emergency measures;

[0043] The effectiveness maximization of the emergency response can be expressed as:

[0044]

[0045] Among them, ε k is the expected effect of the kth emergency response measure;

[0046] C k (t) is the cost of the kth emergency response measure.

[0047] As a preferred solution of the engineering digital management method based on BIM model described in the present invention, the final emergency response plan is expressed as;

[0048]

[0049] This value reflects the effectiveness score of a comprehensive emergency response plan. The higher the score, the better the emergency response plan generated by the system is under limited resources.

[0050] A BIM model-based engineering digital management platform, the platform includes:

[0051] BIM model building and management module supports the creation, import and editing of BIM models for engineering projects. Users can import project documents such as design drawings, construction specifications, and material lists into the platform and associate them with various components in the BIM model;

[0052] Intelligent document management and semantic analysis module, which performs semantic analysis on imported project documents, automatically extracts key information, and intelligently associates this information with relevant components in the BIM model;

[0053] The virtual reality and augmented reality module builds a virtual construction scene based on the BIM model associated with document information, supports all parties in the project to conduct virtual drills, check construction steps and identify potential problems before construction, and provides AR functions to help on-site construction personnel obtain real-time construction guidance and specification requirements;

[0054] Real-time monitoring and sensor integration module, integrating field sensors, real-time monitoring of various parameters during project implementation, and transmitting these data to the platform for analysis in real time;

[0055] The emergency response plan generation and simulation module automatically generates an emergency response plan based on the design specifications and document information in the BIM model when potential disaster risks are detected.

[0056] A computer device includes a memory and a processor, wherein the memory stores a computer program, and is characterized in that when the processor executes the computer program, the steps of the above-mentioned engineering digital management method based on the BIM model are implemented.

[0057] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the above-mentioned engineering digital management method based on the BIM model.

[0058] Beneficial effects of the present invention:

[0059] The present invention proposes a digital engineering management platform and management method based on BIM model, which solves the problems of low intelligence level of information management, insufficient support for virtual construction and delayed emergency response in the prior art by introducing intelligent document management strategy, VR / AR technology, real-time monitoring and emergency response generation algorithm. Specifically, it includes:

[0060] 1. Improve the intelligence of information management: Through semantic analysis and natural language processing technology, key information of documents can be automatically extracted and intelligently bound to BIM models, thus achieving automation and precision of information management;

[0061] 2. Enhance the virtual guidance capability of the construction process: Using VR / AR technology to build immersive construction scenes and real-time on-site guidance significantly improves the collaboration efficiency of all parties involved in the project and reduces errors and risks in construction;

[0062] 3. Realize real-time emergency response: By combining BIM model data, risk assessment and resource optimization algorithms, emergency response plans are automatically generated, which significantly improves the response speed and decision-making quality of emergencies and ensures the smooth implementation of the project. BRIEF DESCRIPTION OF THE DRAWINGS

[0063] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them:

[0064] Figure 1 A schematic diagram of a process of a digital engineering management method based on a BIM model proposed by the present invention;

[0065] Figure 2 This is a schematic diagram of an expansion framework of an engineering digital management platform based on a BIM model proposed by the present invention;

[0066] Figure 3 This is a schematic diagram for comparing the effects of a digital engineering management method based on a BIM model proposed in the present invention. DETAILED DESCRIPTION

[0067] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.

[0068] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.

[0069] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.

[0070] Reference Figure 1-Figure 3 , is an embodiment of the present invention, and provides a BIM model-based engineering digital management platform and a management method thereof, the method comprising the following steps:

[0071] Step 1: Build a BIM model for the project and import project-related documents, including design drawings, construction specifications, and material lists.

[0072] Build an intelligent archive management strategy, perform semantic analysis on imported project documents, and automatically extract key information including construction specifications, material requirements, and safety standards, and bind this information to related components in the BIM model. For example, the installation instructions for a structural component can be automatically associated with the specific component nodes in the BIM model.

[0073] Specifically, the intelligent archive management strategy includes the following steps:

[0074] S11: Document D is analyzed using a deep learning model i Perform semantic analysis to extract key information including construction specifications, material safety, and safety standards, and form an information set S(D i );

[0075] S12: Associate and bind the extracted relationship information set with the specific components in the BIM model and express it as a mapping function T(S(D i )); the mapping function T(S(D i )) is calculated as:

[0076]

[0077] Where C is the total number of components in the BIM model, γ C is the information weight associated with the component, Sim(S(D i ),M C ) is the similarity between the extracted information and the components.

[0078] And normalize it, denoted as Φ(T(S(D i )));

[0079] The normalization function here, the normalization function Φ(x), ensures that the key information between different documents is consistent and comparable. This function can be defined based on the minimum-maximum normalization;

[0080] Right now

[0081] S13: Evaluate the processing efficiency of the imported documents, that is, the overall efficiency of processing the kth group within time t is expressed as ψ(k,t);

[0082] The calculation formula of the overall efficiency ψ(k,t) is:

[0083]

[0084] Among them, Q(k) is the processing quality of the k-th group of documents, that is, the accuracy of the extracted information, P(k) is the processing volume of the k-th group of documents, that is, the number of document pages or the amount of information processed, α and β are coefficients for adjusting the weights of quality and processing volume, and δ is the time decay coefficient.

[0085] S14: Calculate and evaluate the semantic distance between documents to obtain a distance E;

[0086]

[0087] S5: Finally, all document processing and binding processes within the entire time period T are cumulatively calculated, and the total efficiency M of the association between the entire project document and the BIM model is finally obtained; the larger the M value, the more efficient the binding between the document information and the BIM model and the closer the association; conversely, a smaller value indicates a lower binding efficiency or a poorer association.

[0088]

[0089] Among them, exp(-λ·t) represents the modeling time decay effect, that is, the efficiency of processing documents decreases over time.

[0090] Step 2: Based on the BIM model that has undergone semantic analysis and associated document information, use virtual reality VR and augmented reality AR technology to build an immersive construction scene; this scene can be used by all parties in the project to conduct virtual drills, check construction steps, and identify potential problems before construction. Through AR equipment, on-site construction personnel can obtain relevant construction instructions and specification requirements in real time to ensure that actual operations meet project standards.

[0091] Step 3: Continue to perform semantic analysis on new documents and automatically update relevant information in the BIM model;

[0092] Step 4: Use sensors to monitor disaster risks during the project implementation phase. Once potential disaster risks are detected, the corresponding emergency response plan is automatically generated based on the design specifications and document information in the BIM model. Managers can also use VR equipment to rehearse emergency plans in advance and optimize personnel scheduling and operating procedures.

[0093] Furthermore, the specific method for generating the corresponding emergency response plan is:

[0094] S41: Assess the severity and likelihood of potential disaster risks and generate corresponding risk scores based on document information;

[0095] The risk score expression is:

[0096]

[0097] Among them, Dj is a set of document information related to the risk, S is a set of design specifications, and w i is the weight of different risk categories, Prob(r i ) and Impact(r i ) are the probability and impact of the ith risk, respectively.

[0098] S42: Calculate the priorities of different emergency response measures, combining risk assessment results and resource allocation;

[0099] The priority of the emergency response is expressed as:

[0100]

[0101] Among them, β k is the resource allocation weight of the kth emergency response measure, and M is the number of all emergency measures.

[0102] S43: Optimize resource allocation to maximize the effectiveness of emergency response;

[0103] The effectiveness maximization of the emergency response can be expressed as:

[0104]

[0105] Among them, ε k is the expected effect of the kth emergency response measure;

[0106] C k (t) is the cost of the kth emergency response measure.

[0107] S44: Comprehensive risk assessment, response priorities and resource optimization to generate the final emergency response plan.

[0108] The final emergency response plan is expressed as;

[0109]

[0110] This value reflects the effectiveness score of a comprehensive emergency response plan. The higher the score, the better the emergency response plan generated by the system is under limited resources.

[0111] Combination Figure 3We can see that, in the context of the present invention, the algorithm optimization effect comparison chart is used to show the difference between the traditional method and the method of the present invention in key performance indicators. Through the visualization effect of the comparison chart, it can be clearly seen that the BIM model management and emergency response generation algorithm introduced by the present invention has significant advantages in efficiency, error reduction, response time, etc. Specifically, the traditional method: the efficiency score is 50, indicating that the traditional method is inefficient in managing BIM models and generating emergency response plans due to the limitations of manual operations and information extraction processes. The method of the present invention: the efficiency score is 80, showing that after applying natural language processing (NLP), deep learning models, and automated semantic analysis and information binding technology, the efficiency of the overall management process has been greatly improved.

[0112] Traditional method: error reduction score is 30. In the traditional method, due to manual operation and inaccurate information processing, a high error rate is prone to occur. The method of the present invention: error reduction score is 10. Thanks to the automated information extraction and association technology, errors caused by manual operation are reduced, making the system more reliable.

[0113] Traditional method: The response time score is 40. The traditional emergency response plan generation process is time-consuming, especially when facing complex disaster scenarios, the manual evaluation and decision-making process slows down the response speed. The method of the present invention: The response time score is 20. The intelligent algorithm introduced in the present invention can realize automation in risk assessment, priority calculation, resource allocation and other steps, thereby greatly shortening the overall response time and quickly generating an efficient emergency response plan.

[0114] The present invention also discloses a BIM-based engineering digital management platform, which includes:

[0115] BIM model building and management module supports the creation, import and editing of BIM models for engineering projects. Users can import project documents such as design drawings, construction specifications, and material lists into the platform and associate them with various components in the BIM model;

[0116] Intelligent document management and semantic analysis module, which performs semantic analysis on imported project documents, automatically extracts key information, and intelligently associates this information with relevant components in the BIM model;

[0117] The virtual reality and augmented reality module builds a virtual construction scene based on the BIM model associated with document information, supports all parties in the project to conduct virtual drills, check construction steps and identify potential problems before construction, and provides AR functions to help on-site construction personnel obtain real-time construction guidance and specification requirements;

[0118] Real-time monitoring and sensor integration module, integrating field sensors, real-time monitoring of various parameters during project implementation, and transmitting these data to the platform for analysis in real time;

[0119] The emergency response plan generation and simulation module automatically generates an emergency response plan based on the design specifications and document information in the BIM model when potential disaster risks are detected.

[0120] This embodiment also provides a computer device, which is suitable for a BIM model-based engineering digital management platform and a management method thereof, including: a memory and a processor; the memory is used to store computer-executable instructions, and the processor is used to execute computer-executable instructions to implement a BIM model-based engineering digital management platform and a management method thereof as proposed in the above embodiment.

[0121] The computer device may be a terminal, and the computer device includes a processor, a memory, a communication interface, a display screen and an input device connected via a system bus. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The communication interface of the computer device is used to communicate with an external terminal in a wired or wireless manner, and the wireless manner can be achieved through WIFI, an operator network, NFC (near field communication) or other technologies. The display screen of the computer device may be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device may be a touch layer covering the display screen, or a key, trackball or touchpad provided on the housing of the computer device, or an external keyboard, touchpad or mouse, etc.

[0122] The present embodiment also provides a storage medium having a computer program stored thereon, which, when executed by a processor, implements a BIM model-based engineering digital management platform and a management method thereof as proposed in the above embodiment; the storage medium can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (SRAM), electrically erasable programmable read-only memory (EEPROM), erasable programmable read-only memory (EPROM), programmable read-only memory (PROM), read-only memory (ROM), magnetic memory, flash memory, disk or optical disk.

[0123] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.

Claims

1. A digital engineering management method based on BIM model, characterized in that: The following steps are involved: Step 1: Build the BIM model of the project and import project-related documents; Build an intelligent archive management strategy to perform semantic analysis on imported project documents, automatically extract key information, and bind this information to relevant components in the BIM model; Step 2: Based on the BIM model that has undergone semantic analysis and associated document information, use virtual reality VR and augmented reality AR technology to build an immersive construction scene; Step 3: Continue to perform semantic analysis on new documents and automatically update relevant information in the BIM model; Step 4: Use sensors to monitor disaster risks during the project implementation phase. Once potential disaster risks are detected, the corresponding emergency response plan will be automatically generated based on the design specifications and document information in the BIM model. Managers can also use VR equipment to rehearse emergency plans in advance and optimize personnel scheduling and operating procedures.

2. The engineering digital management method based on the BIM model according to claim 1 is characterized by: The intelligent archive management strategy includes the following steps: S11: Document D is analyzed using a deep learning model i Perform semantic analysis to extract key information including construction specifications, material safety, and safety standards, and form an information set S(D i ); S12: Associate and bind the extracted relationship information set with the specific components in the BIM model and express it as a mapping function T(S(D i )); and normalize it, denoted as Φ(T(S(D i ))); S13: Evaluate the processing efficiency of the imported documents, that is, the overall efficiency of processing the kth group within time t is expressed as ψ(k,t); S14: Calculate and evaluate the semantic distance between documents to obtain a distance E; S5: Finally, all document processing and binding processes within the entire time period T are cumulatively calculated to obtain the total efficiency M of the association between the entire project document and the BIM model; Among them, exp(-λ·t) represents the modeling time decay effect, that is, the efficiency of processing documents decreases over time.

3. According to the BIM model-based engineering digital management platform and management method thereof according to claim 2, it is characterized by: The mapping function T(S(D i )) is calculated as: Where C is the total number of components in the BIM model, γ C is the information weight associated with the component, Sim(S(D i ),M C ) is the similarity between the extracted information and the components.

4. According to the BIM model-based engineering digital management platform and management method thereof according to claim 3, it is characterized in that: The calculation formula of the overall efficiency ψ(k,t) is: Among them, Q(k) is the processing quality of the k-th group of documents, that is, the accuracy of the extracted information, P(k) is the processing volume of the k-th group of documents, that is, the number of document pages or the amount of information processed, α and β are coefficients for adjusting the weights of quality and processing volume, and δ is the time decay coefficient.

5. According to the BIM model-based engineering digital management platform and management method thereof according to claim 4, it is characterized in that: In the process of step 4, the specific method of generating the corresponding emergency response plan is: S41: Assess the severity and likelihood of potential disaster risks and generate corresponding risk scores based on document information; S42: Calculate the priorities of different emergency response measures, combining risk assessment results and resource allocation; S43: Optimize resource allocation to maximize the effectiveness of emergency response; S44: Integrate risk assessment, response priorities and resource optimization to generate the final emergency response plan.

6. The engineering digital management platform and management method based on the BIM model according to claim 1, characterized in that: The risk score expression is: Among them, D j is a set of document information related to the risk, S is a set of design specifications, and w i is the weight of different risk categories, Prob(r i ) and Impact(r i ) are the probability and impact of the ith risk respectively; The priority of the emergency response is expressed as: Among them, β k is the resource allocation weight of the kth emergency response measure, and M is the number of all emergency measures; The effectiveness maximization of the emergency response can be expressed as: Among them, ε k is the expected effect of the kth emergency response measure; C k (t) is the cost of the kth emergency response measure.

7. The engineering digital management platform and management method based on the BIM model according to claim 6, characterized in that: The final emergency response plan is expressed as; This value reflects the effectiveness score of a comprehensive emergency response plan. The higher the score, the better the emergency response plan generated by the system is under limited resources.

8. A digital engineering management platform based on a BIM model, according to the digital engineering management method based on a BIM model according to claim 7, characterized in that: The platform includes: BIM model building and management module supports the creation, import and editing of BIM models for engineering projects. Users can import project documents such as design drawings, construction specifications, and material lists into the platform and associate them with various components in the BIM model; Intelligent document management and semantic analysis module, which performs semantic analysis on imported project documents, automatically extracts key information, and intelligently associates this information with relevant components in the BIM model; The virtual reality and augmented reality module builds a virtual construction scene based on the BIM model associated with document information, supports all parties in the project to conduct virtual drills, check construction steps and identify potential problems before construction, and provides AR functions to help on-site construction personnel obtain real-time construction guidance and specification requirements; Real-time monitoring and sensor integration module, integrating field sensors, real-time monitoring of various parameters during project implementation, and transmitting these data to the platform for analysis in real time; The emergency response plan generation and simulation module automatically generates an emergency response plan based on the design specifications and document information in the BIM model when potential disaster risks are detected.

9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of a BIM model-based engineering digital management platform and a management method thereof are implemented as described in any one of claims 1 to 7.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of a BIM model-based engineering digital management platform and a management method thereof are implemented as described in any one of claims 1 to 7.

Citation Information

Patent Citations

  • Method and device for conducting construction simulation on steel truss arch bridge through BIM

    CN104715113A

  • BIM (building information modeling)-based management system for tunnel face of large diameter shield tunnel

    CN106761798A

  • Digital management system and method for project construction processes

    CN107622355A

  • Cantilever type double-argil-plate curtain wall dry hanging construction method based on BIM technology

    CN111737806A

  • Engineering construction digital project management method and system based on BIM technology

    CN117035691A