Metal veneer double-pier-head anchoring device and anchoring method thereof

The double-pier head anchoring device for metal decorative panels addresses stability issues by using reverse anchoring with implanted steel bars and combined assemblies, enhancing anchoring strength and preventing wall bulging.

CN119122120APending Publication Date: 2024-12-13ANHUI HUAJU BUILDING MATERIALS TECH CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411550493.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-01
Publication Date
2024-12-13

AI Technical Summary

Technical Problem

Traditional exterior wall insulation methods face issues of poor stability and anchoring system wear, leading to wall hollowing and resource waste when updating insulation systems.

Method used

A double-pier head anchoring device for metal decorative panels, utilizing a reverse anchoring method with anchor steel bars implanted in the structural layer, combined with a side anchoring assembly and corner code assembly, enhancing anchoring force and stability.

Benefits of technology

The double-pier head anchoring technology significantly improves anchoring strength, achieving 15 times the national standard single-point force and 20 times the suspension force per unit area, preventing bulging and improving anchoring reliability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119122120A_ABST
    Figure CN119122120A_ABST
Patent Text Reader

Abstract

The invention discloses a metal veneer double-pier-head anchoring device and an anchoring method thereof, and relates to the technical field of fabricated walls and building energy conservation in the building field, the metal veneer double-pier-head anchoring device comprises a metal panel, the periphery of the top end of the metal panel is fixedly connected with a metal folding edge, and the bottom end of the inner side of the metal folding edge is fixedly connected with a metal bonding layer; a heat preservation plate is fixedly installed at the top end of the metal panel, anchoring corner connectors are fixedly installed on the outer side of the heat preservation plate, and a plurality of anchor bolt bottom plates are fixedly connected to the inner side of the metal panel. Meanwhile, during use, the reverse anchoring technology is adopted, the anchoring steel bars are implanted into the structural layer in advance, sampling detection can be conducted after the anchoring steel bars are implanted, the reliability of the anchoring assembly is improved, the single-point anchoring force of the anchoring assembly can be greatly improved through the double-pier-head reverse anchoring technology, and the measured value can reach 4.5 kN and is 15 times that of the national standard.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of assembled walls and building energy-saving technologies in the construction field, and in particular to a double-pier-head anchoring device for a metal decorative panel and an anchoring method thereof. Background Art

[0002] Traditional exterior wall insulation is the "post-anchoring and pasting method", that is, first make the exterior wall structure, then fix the insulation layer directly with rivets, and then cover the insulation layer with plaster, commonly known as "thin plastering". The service life of the "thin plastering" insulation technology is 25 years, and it has gradually reached or is approaching its service life. At this time, the performance indicators of the insulation board are basically intact, but some anchoring and bonding systems are no longer suitable for continued work, resulting in wall hollowing. There is a huge stock of such buildings. If the exterior wall insulation system is updated and redone, the project will be huge and will inevitably cause a waste of resources.

[0003] The prior art discloses a local reinforcement device for an external insulation wall with application number CN202122737096.8, which is fixedly connected to the external wall body by a ring bottom. The ring bottom is connected to a flange through a support column, and the diameter of the flange is larger than the outer diameter of the support column.

[0004] However, the solutions in the prior art adopt a positive anchoring method for anchoring during use. This anchoring method has the problem of poor stability, such as poor contact of the anchor rod head and wear of the anchor rod head threads. There is also a problem that the anchor connection layer is heavy, which affects the anchor life. Summary of the invention

[0005] In order to solve the deficiencies mentioned in the above background technology, the object of the present invention is to provide a double-pier head anchoring device for a metal decorative panel and an anchoring method thereof.

[0006] The purpose of the present invention can be achieved through the following technical solutions:

[0007] A double-pier head anchoring device for a metal veneer panel and an anchoring method thereof, comprising a metal panel, wherein the top of the metal panel is fixedly connected with a metal folding edge around the periphery, and the inner bottom end of the metal folding edge is fixedly connected with a metal bonding layer;

[0008] The top of the metal panel is fixedly installed with an insulation board, the outer side of the insulation board is fixedly installed with an anchoring angle code, and the inner side of the metal panel is fixedly connected with a plurality of anchor bolt bottom plates;

[0009] The top of the anchor bolt bottom plate is fixedly connected with an anchor sleeve, the top of the anchor sleeve is provided with an anchor groove, and the outer side of the anchor groove is provided with four bite openings;

[0010] An adhesive layer is fixedly installed on the top of the thermal insulation board, and a main body connecting layer is fixedly connected to the top of the adhesive layer.

[0011] Furthermore, a plurality of screw hole groups are provided on the outer side of the metal folded edge, each screw hole group includes two fixing screw holes, and each fixing screw hole is installed with a fixing screw installed inside.

[0012] Furthermore, an angle code connection groove is opened at the position corresponding to each group of screw holes on the outer side of the insulation board, a side anchor hole is opened at the position corresponding to the angle code connection groove on the top of the insulation board, and a center anchor hole is opened at the middle position of the top of the insulation board.

[0013] Furthermore, an angle code screw hole is provided at a position corresponding to the fixing screw hole on the outer side of the anchoring angle code, and an anchor bolt hole is provided at the top of the anchoring angle code.

[0014] Furthermore, reinforcing ribs are fixedly connected to the top and bottom of the bite, a thermal insulation pad is fixedly connected to the bottom inner end of the anchor groove, threaded steel bars are installed on the top of the thermal insulation pad, and a grouting connection layer is fixedly installed on the outer side of the threaded steel bars.

[0015] Furthermore, a side anchoring groove is provided on the outer side of the adhesive layer at a position corresponding to the anchoring angle code, and a central anchoring groove is provided on the inner side of the adhesive layer at a position corresponding to the anchoring sleeve.

[0016] Furthermore, corresponding anchor connection holes are opened at the positions of the side anchor holes and the center anchor holes at the top of the main connecting layer, the threaded steel bars and the grouting connection layer are installed inside the anchor connection holes, the bottom end of the main connecting layer is fixedly connected to a foamed polyurethane filling layer, the bottom end of the foamed polyurethane filling layer is fixedly connected to a PE foam strip, and the bottom end of the PE foam strip is fixedly connected to a silicone structural adhesive.

[0017] A double-pier head anchoring method for a metal veneer panel comprises the following steps:

[0018] Step 1: First, clean the inside of the metal fold at the top of the metal panel to be processed, and then install the metal bonding layer on the inside of the metal fold;

[0019] Step 2: Clean the dust on the insulation board, drill holes at the corresponding side anchor holes and center anchor holes, and install the center anchor bolt base plate;

[0020] Step 3: Place the insulation board and the anchor bottom plate on top of the metal bonding layer, apply pressure by mechanical pressure to assist the bonding and curing of the metal bonding layer, and remove the pressure after the metal bonding layer is cured;

[0021] Step 4: Install the anchor angle code at the position corresponding to the fixing screw hole at the top of the metal fold, and fix the anchor angle code and the metal panel with fixing screws. The bottom end of the anchor hole of each anchor angle code corresponds to the anchor bottom plate;

[0022] Step 5: Pour the grouting connection layer into the anchor connection hole, then insert the threaded steel bar into the grouting connection layer, calibrate the position and verticality of the steel bar before the grouting connection layer solidifies and hardens, and sample and test the anchoring strength of the threaded steel bar after the grouting connection layer hardens;

[0023] Step 6: Apply the adhesive layer on the top of the insulation board, pour the grouting connection layer in the anchor groove, match the adhesive layer of the metal panel to the main connection layer, match the threaded steel bar to the anchor groove, press the metal panel to make the adhesive layer stick to the main connection layer, and insert the threaded steel bar into the anchor groove;

[0024] Step 7: After waiting for the bonding layer and the grouting connection layer to solidify and harden, fill the foamed polyurethane glue filling layer on the inner side of the gap between the multiple metal panels close to the main connection layer, fill the PE foam strip on the end of the foamed polyurethane glue filling layer away from the main connection layer, and fill the silicone structural adhesive on the side of the PE foam strip away from the foamed polyurethane glue filling layer to complete the anchoring filling.

[0025] Beneficial effects of the present invention:

[0026] 1. The present invention adopts reverse anchoring technology to implant anchoring steel bars in the structural layer in advance. After the anchoring steel bars are implanted, sampling inspection can be carried out to improve the reliability of the anchoring assembly;

[0027] 2. Compared with the existing technology, the double pier head reverse anchoring technology can greatly improve the single-point anchoring force of the anchoring component. The measured value can reach 4.5 kilonewtons, which is 15 times the national standard;

[0028] 3. With the double pier head reverse anchoring technology, a single anchor assembly can provide a suspension force of 0.5 kN. The suspension force per unit area is more than 20 times the plate load. Compared with the anchor assembly with a very small suspension force value in the existing technology, it has a better use effect;

[0029] 4. A central anchoring assembly is provided to effectively solve the problem of bulging on the metal surface integrated panel;

[0030] 5. The combined anchoring technology of the side anchoring assembly and the corner code assembly is adopted, so that the anchoring pier head is locked at the corner code, which increases the anchoring effect of the anchoring assembly with the metal panel and insulation. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] The present invention will be further described below in conjunction with the accompanying drawings.

[0032] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0033] Figure 2 is a schematic diagram of a metal decorative panel of the present invention;

[0034] Figure 3 It is a schematic diagram of the thermal insulation board of the present invention;

[0035] Figure 4 It is a schematic diagram of the anchor angle code of the present invention;

[0036] Figure 5 is a schematic diagram of the anchor base plate of the present invention;

[0037] Figure 6 is a schematic diagram of the side anchor bolt bottom plate of the present invention;

[0038] Figure 7 This is an exploded view of the internal structure of the anchor bolt of the present invention;

[0039] Figure 8 is a schematic diagram of the bonding layer of the present invention;

[0040] Fig. 9 It is a schematic diagram of the main connecting layer of the present invention;

[0041] Fig.10 It is a schematic diagram of the double pier head connection state of the present invention.

[0042] In the figure: 1. Metal panel; 11. Metal folding edge; 12. Metal bonding layer; 13. Fixing screw hole; 14. Fixing screw; 2. Insulation board; 21. Angle code connection groove; 22. Side anchor hole; 23. Center anchor hole; 3. Anchor angle code; 31. Angle code screw hole; 32. Anchor bolt hole; 4. Anchor bolt base plate; 41. Anchor sleeve; 42. Anchor groove; 43. Engagement; 44. Reinforcement rib; 45. Insulation pad; 46. Threaded steel bar; 47. Grouting connection layer; 5. Adhesive layer; 51. Side anchor groove; 52. Center anchor groove; 6. Main body connection layer; 61. Anchor connection hole; 62. Foamed polyurethane adhesive filling layer; 63. PE foam strip; 64. Silicone structural adhesive. DETAILED DESCRIPTION

[0043] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0044] A double-pier head anchoring device for a metal veneer panel and an anchoring method thereof, such as Figure 1 As shown, it includes a metal panel 1, a heat preservation board 2 is fixedly installed on the top of the metal panel 1, an anchoring angle code 3 is fixedly installed on the outside of the heat preservation board 2, a plurality of anchor base plates 4 are fixedly connected to the inside of the metal panel 1, an adhesive layer 5 is fixedly installed on the top of the heat preservation board 2, and a main body connection layer 6 is fixedly connected to the top of the adhesive layer 5.

[0045] By using the insulation board 2 in conjunction with the anchor angle code 3 and the anchor bolt base plate 4, the metal panel 1 can be connected to the bottom of the adhesive layer 5 and the main connecting layer 6, and the metal panel 1 is anchored and fixed by using the adhesive layer 5 and the main connecting layer 6 in conjunction with the anchor bolt base plate 4.

[0046] like Figure 2 As shown, a metal folding edge 11 is fixedly connected around the top of the metal panel 1, a metal adhesive layer 12 is fixedly connected to the bottom inner end of the metal folding edge 11, and a plurality of screw hole groups are provided on the outer side of the metal folding edge 11, each screw hole group includes two fixing screw holes 13, and each fixing screw hole 13 is installed with a fixing screw 14 installed inside.

[0047] The metal bonding layer 12 on the inner side of the metal panel 1 cooperates with the support insulation board 2 and the anchoring angle code 3 to fix the anchor bolt base plate 4.

[0048] like Figure 3 As shown, an angle code connection groove 21 is opened at the position corresponding to each group of screw holes on the outer side of the insulation board 2, a side anchor hole 22 is opened at the position corresponding to the angle code connection groove 21 at the top of the insulation board 2, and a center anchor hole 23 is opened at the middle position of the top of the insulation board 2.

[0049] The side anchoring holes 22 and the central anchoring holes 23 at the top of the insulation board 2 are used to install the anchor bolt base plate 4, and the anchoring angle code 3 is installed by using the angle code connecting groove 21.

[0050] like Figure 4 As shown, an angle code screw hole 31 is provided at a position corresponding to the fixing screw hole 13 on the outer side of the anchoring angle code 3 , and an anchor bolt hole 32 is provided at the top of the anchoring angle code 3 .

[0051] The fixing screw 14 is installed through the angle code screw hole 31 matching the fixing screw hole 13 , so that the fixing screw 14 can fix the anchoring angle code 3 and the metal panel 1 .

[0052] like Figure 5 , 6 As shown in Figure 7, an anchor sleeve 41 is fixedly connected to the top of the anchor base plate 4, an anchor groove 42 is opened at the top of the anchor sleeve 41, four bite openings 43 are opened on the outside of the anchor groove 42, reinforcing ribs 44 are fixedly connected to the top and bottom ends of the bite openings 43, a thermal insulation pad 45 is fixedly connected to the bottom end of the inner side of the anchor groove 42, a threaded steel bar 46 is installed on the top of the thermal insulation pad 45, and a grouting connection layer 47 is fixedly installed on the outside of the threaded steel bar 46.

[0053] By injecting grouting liquid into the anchor groove 42, allowing the liquid to flow out through the bite opening 43, allowing the bite opening 43 to fill the outside of the anchor sleeve 41, and allowing the solidified liquid to be installed and fixed in conjunction with the reinforcing ribs 44, the position of the anchor sleeve 41 is fixed, and the thermal insulation pad 45 is used to support the threaded steel bar 46, and the grouting connection layer 47 on the outside of the threaded steel bar 46 is used for fixing.

[0054] like Figure 8 As shown, a side anchoring groove 51 is provided at the outer side of the adhesive layer 5 corresponding to the position of the anchoring angle code 3 , and a central anchoring groove 52 is provided at the inner side of the adhesive layer 5 corresponding to the position of the anchoring sleeve 41 .

[0055] The bonding layer 5 is connected by mortar, and the connection layer formed by the mortar is used for anchoring.

[0056] The side anchoring groove 51 is used to cooperate with the anchoring angle code 3 and the anchor bolt base plate 4 to bond the insulation board 2 to the main body connecting layer 6 at the top to achieve fixation.

[0057] like Fig. 9 As shown, corresponding anchor connection holes 61 are opened at the positions of the side anchor holes 22 and the center anchor holes 23 at the top of the main connecting layer 6, the threaded steel bars 46 and the grouting connection layer 47 are installed inside the anchor connection holes 61, and the bottom end of the main connecting layer 6 is fixedly connected to a foamed polyurethane adhesive filling layer 62, the bottom end of the foamed polyurethane adhesive filling layer 62 is fixedly connected to a PE foam strip 63, and the bottom end of the PE foam strip 63 is fixedly connected to a silicone structural adhesive 64.

[0058] The foamed polyurethane adhesive filling layer 62 at the bottom of the main connecting layer 6 is filled, and the PE foam strip 63 and the silicone structural adhesive 64 at the bottom of the foamed polyurethane adhesive filling layer 62 are allocated and fixed to the gap of the side wall of the metal panel 1 .

[0059] A double-pier head anchoring method for a metal veneer panel comprises the following steps:

[0060] Step 1: First, clean the inside of the metal fold 11 at the top of the metal panel 1 to be processed, and then install the metal bonding layer 12 inside the metal fold 11;

[0061] Determine the position and size of the integrated panel according to the required exterior decoration design.

[0062] The border line of each metal panel 1 pops up according to the layout segmentation size.

[0063] Step 2: clean the dust on the insulation board 2, drill holes at the positions corresponding to the side anchor holes 22 and the center anchor holes 23, and install the center anchor bolt base plate 4;

[0064] The position of each pier head is determined, and holes are drilled according to the determined positions of the fixing screw holes 13 .

[0065] Step 3: Place the insulation board 2 and the anchor bottom plate 4 on top of the metal bonding layer 12, apply pressure by mechanical pressure to assist the bonding and curing of the metal bonding layer 12, and remove the pressure after the metal bonding layer is cured;

[0066] Step 4: Install the anchoring angle code 3 at the position corresponding to the fixing screw hole 13 at the top of the metal folding edge 11, and use the fixing screws 14 to fix the anchoring angle code 3 and the metal panel 1. The bottom end of the anchor hole 32 of each anchoring angle code 3 corresponds to the anchor base plate 4.

[0067] Step 5: pouring a grouting connection layer 47 into the anchor connection hole 61, and then inserting the threaded steel bar 46 into the grouting connection layer 47, calibrating the position and verticality of the steel bar before the grouting connection layer 47 solidifies and hardens, and sampling and testing the anchoring strength of the threaded steel bar 46 after the grouting connection layer 47 hardens;

[0068] Step 6: Apply the adhesive layer 5 on the top of the insulation board 2, pour the grouting connection layer 47 into the anchor groove 42, match the adhesive layer 5 of the metal panel 1 to the main connection layer 6, match the threaded steel bar 46 to the anchor groove 42, press the metal panel 1 to make the adhesive layer 5 stick to the main connection layer 6, and insert the threaded steel bar 46 into the anchor groove 42;

[0069] Step seven: After waiting for the adhesive layer 5 and the grouting connection layer 47 to solidify and harden, fill the foamed polyurethane glue filling layer 62 on the inner side of the gap between the multiple metal panels 1 near the main connection layer 6, fill the PE foam strip 63 on the end of the foamed polyurethane glue filling layer 62 away from the main connection layer 6, and fill the silicone structural adhesive 64 on the side of the PE foam strip 63 away from the foamed polyurethane glue filling layer 62 to complete the anchoring filling.

[0070] In actual anchoring work, the heat insulation pads 45 at both ends of the threaded steel bar 46 are used for anchoring. During operation, one end is set inside the anchoring groove 42, and the other end is set in the opening of the wall. The double-head anchoring is achieved by using the pier head formed by the grouting connection layer 47 at one end inside the wall and the pier head formed on the anchor bolt bottom plate 4. At the same time, the anchoring angle code 3 is used in conjunction with the fixing screw 14 to achieve auxiliary anchoring, and the anchoring process is reinforced from two directions, which has a better anchoring effect.

[0071] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, and these changes and improvements all fall within the scope of the present invention to be protected.

Claims

1. A double-head anchoring device for a metal veneer panel, comprising a metal panel (1), It is characterized in that The top of the metal panel (1) is fixedly connected with a metal folding edge (11) around its periphery, and the inner bottom end of the metal folding edge (11) is fixedly connected with a metal bonding layer (12); A heat preservation plate (2) is fixedly mounted on the top of the metal panel (1), an anchoring angle code (3) is fixedly mounted on the outside of the heat preservation plate (2), and a plurality of anchor bolt base plates (4) are fixedly connected to the inside of the metal panel (1); The top of the anchor bolt base plate (4) is fixedly connected with an anchor sleeve (41), the top of the anchor sleeve (41) is provided with an anchor groove (42), and the outer side of the anchor groove (42) is provided with four bite holes (43); The top of the thermal insulation board (2) is fixedly mounted with an adhesive layer (5), and the top of the adhesive layer (5) is fixedly connected with a main body connection layer (6).

2. A double-head anchoring device for metal veneer panels according to claim 1, It is characterized in that The outer side of the metal fold (11) is provided with a plurality of screw hole groups, each screw hole group comprises two fixing screw holes (13), and each fixing screw hole (13) is provided with a fixing screw (14) installed inside.

3. A double-head anchoring device for metal veneer panels according to claim 1, It is characterized in that An angle code connection groove (21) is provided on the outer side of the insulation board (2) at a position corresponding to each group of screw holes, a side anchor hole (22) is provided at a position corresponding to the angle code connection groove (21) at the top end of the insulation board (2), and a center anchor hole (23) is provided at a middle position of the top end of the insulation board (2).

4. A double-head anchoring device for metal veneer panels according to claim 2, It is characterized in that An angle code screw hole (31) is provided at a position corresponding to the fixing screw hole (13) on the outside of the anchoring angle code (3), and an anchor bolt hole (32) is provided at the top of the anchoring angle code (3).

5. A double-head anchoring device for metal veneer panels according to claim 3, It is characterized in that The top and bottom ends of the bite opening (43) are fixedly connected with reinforcing ribs (44), the bottom end of the inner side of the anchor groove (42) is fixedly connected with a heat insulation pad (45), the top end of the heat insulation pad (45) is installed with a threaded steel bar (46), and the outer side of the threaded steel bar (46) is fixedly installed with a grouting connection layer (47) used as an anchoring material.

6. A double-head anchoring device for metal veneer panels according to claim 5, It is characterized in that A side anchoring groove (51) is provided on the outside of the adhesive layer (5) at a position corresponding to the anchoring angle code (3), and a center anchoring groove (52) is provided on the inside of the adhesive layer (5) at a position corresponding to the anchoring sleeve (41).

7. A double-head anchoring device for metal veneer panels according to claim 5, It is characterized in that A corresponding anchoring connection hole (61) is provided at the top of the main connecting layer (6) at positions corresponding to the side anchoring holes (22) and the center anchoring hole (23); the threaded steel bar (46) and the grouting connection layer (47) are installed inside the anchoring connection hole (61); the bottom end of the main connecting layer (6) is fixedly connected to a foamed polyurethane adhesive filling layer (62); the bottom end of the foamed polyurethane adhesive filling layer (62) is fixedly connected to a PE foam strip (63); and the bottom end of the PE foam strip (63) is fixedly connected to a silicone structural adhesive (64).

8. A method for anchoring a metal veneer panel with a double pier head, based on the metal veneer panel with a double pier head anchoring device as claimed in any one of claims 1 to 7, It is characterized in that The following steps are involved: Step 1: First, clean the inside of the metal fold (11) at the top of the metal panel (1) to be processed, and then install the metal bonding layer (12) on the inside of the metal fold (11); Step 2: clean the dust on the insulation board (2), drill holes at the positions corresponding to the side anchor holes (22) and the center anchor holes (23), and install the center anchor bolt base plate (4); Step 3: placing the insulation board (2) and the anchor base plate (4) on top of the metal bonding layer (12), applying pressure by mechanical pressure to assist the bonding and curing of the metal bonding layer (12), and removing the pressure after the metal bonding layer is cured; Step 4: Install the anchoring angle code (3) at the position corresponding to the fixing screw hole (13) at the top of the metal folded edge (11), and use the fixing screw (14) to fix the anchoring angle code (3) and the metal panel (1). The bottom end of the anchor hole (32) of each anchoring angle code (3) corresponds to the anchor base plate (4); Step 5: pouring a grouting connection layer (47) into the anchoring connection hole (61), inserting the threaded steel bar (46) into the grouting connection layer (47), calibrating the position and verticality of the steel bar before the grouting connection layer (47) solidifies and hardens, and sampling and testing the anchoring strength of the threaded steel bar (46) after the grouting connection layer (47) hardens; Step 6: Apply an adhesive layer (5) on the top of the insulation board (2), pour a grouting connection layer (47) into the anchor groove (42), match the adhesive layer (5) of the metal panel (1) to the main connection layer (6), match the threaded steel bar (46) to the anchor groove (42), press the metal panel (1) so that the adhesive layer (5) is attached to the main connection layer (6), and insert the threaded steel bar (46) into the anchor groove (42); Step 7: After waiting for the adhesive layer (5) and the grouting connection layer (47) to solidify and harden, a foamed polyurethane adhesive filling layer (62) is filled on one side of the inner side of the gap between the plurality of metal panels (1) close to the main connection layer (6), a PE foam strip (63) is filled on one end of the foamed polyurethane adhesive filling layer (62) away from the main connection layer (6), and a silicone structural adhesive (64) is filled on one side of the PE foam strip (63) away from the foamed polyurethane adhesive filling layer (62), thereby completing the anchoring filling.

Citation Information

Patent Citations

  • Local reinforcing device for external thermal insulation wall surface

    CN216713923U