Wind power tower drum cable laying device and method
Through the wind power tower cable laying device, the spliced rails and cart automatic moving cables, combined with position sensors and encoder control, the problem of long working cycles and safety hazards of on-site cable laying in the wind farm is solved, and efficiency and safety are improved.
Patent Information
- Application Number
- CN202411293316.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-14
- Publication Date
- 2024-12-13
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing technology has a long working cycle for on-site cable laying in the wind farm, a lot of personnel investment, safety hazards, and low work efficiency, resulting in muscle injury and mechanical damage.
The cable laying device of wind power tower is adopted, including spliced tracks, trolleys and fixing mechanisms, move the cable along the track through the trolleys, and automatically control the cable length with position sensors and encoders, reduce manual operation, and adjust the mounting frame to adapt to different cable disc specifications. .
It greatly improves work efficiency, reduces personnel investment, reduces labor costs, ensures safety, and avoids cable waste and mechanical damage.
Smart Images

Figure CN119134137A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a wind power tower cable laying device and method, belonging to the technical field of wind power generator assembly. Background Art
[0002] Since the specifications of the on-site electrical cables of the wind farm are too large, and the weight of a single meter varies from about 2kg to 4kg, and the length of each cable varies from 30 to 40 meters, and the length is about 100 meters, the weight of a single cable is as high as hundreds of kilograms, and the specifications of the cable reels are also different. The current placement of cable racks is to place different cable reels on different cable racks, with many types and too many types involved. The existing wiring method is to use hand winches and guide devices for wiring. The wiring personnel are a group of 4 to 6 people, including 1 to 2 people next to the cable rack, 1 person for the guide device, and 2 to 3 people pulling cables at the hand winch. And each time the cables can only be pulled one by one, the work efficiency is low, and pulling heavy cables for a long time will cause muscle strain to the personnel. Each time the wiring is carried out, the hand winch needs to be checked to prevent mechanical damage and personnel pulling empty.
[0003] In the prior art, when laying cables at a wind farm site, manual work is usually used, which results in a long working cycle, too many people involved, potential safety hazards, and other problems, which affect the working effect of cable laying. Summary of the invention
[0004] The purpose of the present invention is to overcome the deficiencies in the prior art and to provide a wind power tower cable laying device and method to solve the problem that in the prior art, when laying cables at a wind farm site, manual laying is usually used, the work cycle is too long, too many people are involved, and there are safety hazards.
[0005] In order to solve the above technical problems, the present invention is implemented by adopting the following technical solutions: In a first aspect, the present invention provides a wind power tower cable laying device, comprising a mounting mechanism, a spliced track, and a trolley matching the spliced track, wherein one end of the trolley is provided with a fixing mechanism for fixing the cable, a cable drum is rotatably connected to the inner side of the mounting mechanism, and the outer wall of the cable drum is provided with the cable; Baffles for guiding the trolley are symmetrically arranged on both sides of the top of the spliced track.
[0006] Furthermore, the trolley includes an outer shell, and a plurality of rotating shafts are rotatably connected inside the outer shell. Both ends of the rotating shafts extend to the outside of the outer shell and are provided with wheels. The fixing mechanism is detachably connected to the outer wall of the outer shell through a hook, and a driving mechanism for driving one of the rotating shafts to rotate is provided inside the outer shell.
[0007] Furthermore, the driving mechanism includes a motor disposed inside the housing, wherein an outer wall of one of the rotating shafts is sleeved with a first gear, and an output end of the motor is provided with a second gear on one side of the first gear, and the second gear is meshed with the first gear.
[0008] Furthermore, a heat dissipation fan is provided on the inner wall of the housing at one side of the motor.
[0009] Furthermore, a position sensor is provided at one end of the spliced track, and the position sensor is electrically connected to the motor.
[0010] Furthermore, the mounting mechanism includes two mounting frames, a fixing block is vertically arranged inside the mounting frame, a sliding block is slidably connected to the outer wall of the fixing block, a same perforated shaft is arranged between the two sliding blocks, and an adjustment mechanism is arranged between the two mounting frames.
[0011] Furthermore, the adjustment mechanism includes a sliding rod and a sleeve slidably connected to the sliding rod, the sliding rod and the sleeve are respectively arranged on adjacent sides of the outer walls of the two mounting frames, the sliding rod is provided with a plurality of first openings on the top, and the sleeve is provided with a plurality of second openings matching the first openings on the top.
[0012] Furthermore, it also includes a support rod and a support tube slidably connected to the support rod, wherein the support rod and the support tube are respectively arranged on adjacent sides of the outer walls of the two mounting frames; The outer wall of the fixed block is provided with a plurality of third openings, and the outer wall of the sliding block is provided with a fourth opening matching the third openings; An encoder is provided on one side of the outer wall of one of the mounting frames.
[0013] Furthermore, the fixing mechanism includes a first fastener and a second fastener, the first fastener and the second fastener are detachably connected, and the first fastener and the second fastener can be assembled to form a through hole for passing the cable; An arc block is provided on one side of the inner wall of the second fastener, a flexible rubber belt is provided on one end of the arc block, a first pin for fixing the flexible rubber belt is provided on one side of the outer wall of the first fastener, and a pull ring for rotational connection is provided on one side of the outer wall of the first fastener.
[0014] In a second aspect, the present invention provides a method for laying cables in a wind turbine tower. Based on the wind turbine tower cable laying device described in the first aspect, the method specifically comprises: Step a: adjusting the length of the spliced track according to the length of the wind turbine tower, and fixing the spliced track with the help of the edge of the wind turbine tower; Assign two personnel to the starting and ending points of the spliced track; Set the installation mechanism at the starting point of the spliced track; Step b: The person at the starting point of the spliced track fixes one end of the cable on the outer wall of the cable drum to the fixing mechanism, and starts the trolley to move along the spliced track; When the trolley moves to the end of the spliced track, the person at the end of the spliced track stops the movement of the trolley and sends a message to the person at the starting point of the spliced track; After receiving the information, the personnel at the starting point of the spliced track cut the cable pulled out by the trolley; The personnel at the end of the spliced track removes one end of the cut cable from the fixing mechanism and starts the trolley to move in the reverse direction along the spliced track to the original position; Step c: Repeat step b until the cable laying work is completed.
[0015] Compared with the prior art, the present invention has the following beneficial effects: 1. The cable laying device for wind power tower can pull out the cable and move it to the required position through the spliced track, trolley and fixing mechanism. The staff only needs to cut the cable and control the trolley to return to the original route, and repeat the above operation to complete the wiring, thereby reducing the wiring team of four to six people to two people, and no need to equip hand winches and other components, which greatly saves working hours and improves work efficiency. At the same time, it ensures the safety of personnel, reduces personnel investment, reduces labor costs, and ensures the working effect of the device; 2. This application uses an encoder and a position sensor to prevent the cable outlet length from being inconsistent and the wiring position from being uneven, which does not meet the process requirements and leads to cable waste, thereby ensuring the working effect of the device; 3. The present application can adjust the relative distance between the two mounting frames and the height of the perforating shaft, so that the present application is compatible with cable reels of various specifications and models, thereby ensuring the practicability of the present device. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 is a schematic diagram of the main structure of a vehicle provided according to an embodiment of the present invention; Figure 2 is a top cross-sectional schematic diagram of a trolley provided according to an embodiment of the present invention; Figure 3 is a schematic diagram of the three-dimensional structure of a mounting mechanism provided according to an embodiment of the present invention; Figure 4 is a schematic diagram of the three-dimensional structure of a fixing mechanism provided according to an embodiment of the present invention; Figure 5 It is a schematic diagram of the three-dimensional structure of a hand-operated box provided according to an embodiment of the present invention.
[0017] In the figure: 1. spliced track; 11. baffle; 2. trolley; 21. housing; 22. rotating shaft; 23. wheel; 24. hook; 25. motor; 26. first gear; 27. second gear; 28. cooling fan; 3. fixing mechanism; 31. first fastener; 32. second fastener; 33. arc block; 34. flexible rubber belt; 35. first pin; 36. pull ring; 4. mounting mechanism; 41. mounting frame; 42. fixing block; 43. slider; 44. perforated shaft; 45. slide bar; 46. sleeve; 47. support rod; 48. support tube; 5. position sensor; 6. controller housing; 7. forward button; 8. reverse button; 9. cooling fan start button; 10. display; 11. standby light; 12. connection button; 13. power start switch; 14. handle. DETAILED DESCRIPTION
[0018] The present invention will be further described below in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and cannot be used to limit the protection scope of the present invention.
[0019] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and the like are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", and the like may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.
[0020] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances. Embodiment 1:
[0021] like Figure 1-2As shown, the present invention provides a cable laying device for a wind power tower, comprising an installation mechanism 4, a spliced track 1 and a trolley 2 matching the spliced track 1, one end of the trolley 2 is provided with a fixing mechanism 3 for fixing the cable, the inner side of the installation mechanism 4 is rotatably connected to a cable drum, and the outer wall of the cable drum is sleeved with the cable; baffles 11 for guiding the trolley 2 are symmetrically provided on both sides of the top of the spliced track 1.
[0022] Specifically, the path of the trolley 2 adopts a spliced track 1, which can be adjusted according to the length of the tower and fixed with a clamp at the edge of the tower to prevent the track deviation of the trolley 2 during operation, resulting in unstable wiring length. The baffle 11 plays a guiding role in the movement of the trolley 2. When working, first fix the cable drum on the installation mechanism 4. The on-site electrical wiring is coordinated by two people, one of whom is at the cable drum and the other is at the tower. The two people are respectively located at the two ends of the spliced track 1. The person at the cable drum controls the forward and backward movement of the trolley 2 by manual operation. After the cable drum is fixed, Fix one end of the cable on the cable reel on the fixing mechanism 3 so that the trolley 2 can drive the cable to move, and then start the trolley 2 to move along the spliced track 1. When the trolley 2 moves to the end of the spliced track 1, another person controls the trolley 2 to stop and sends a signal to the person at the cable reel. After receiving the signal from the person at the tower, the person at the cable reel cuts the cable pulled out by the trolley 2, and then the person at the tower releases the cable through the fixing mechanism 3. After releasing the cable, the person at the tower controls the trolley 2 to return to its original position along the spliced track 1, and repeats the back and forth process to complete the cable wiring work.
[0023] The present invention cooperates with the spliced track 1, the trolley 2 and the fixing mechanism 3, and the cable can be pulled out and moved to the desired position through the trolley 2. The staff only needs to cut the cable, control the trolley 2 to return to the original path, and repeat the above operation to complete the wiring, thereby reducing the wiring team of four to six people to two people, and there is no need to equip components such as hand winches, which greatly saves working hours and improves work efficiency. At the same time, it ensures the safety of personnel, reduces personnel investment, reduces labor costs, and ensures the working effect of the device.
[0024] like Figure 2As shown, in one embodiment, the trolley 2 includes a shell 21, and a plurality of rotating shafts 22 are rotatably connected inside the shell 21, both ends of the rotating shafts 22 extend to the outside of the shell 21 and are sleeved with wheels 23, the fixing mechanism 3 is detachably connected to the outer wall of the shell 21 through a hook 24, and a driving mechanism for driving one of the rotating shafts 22 to rotate is provided inside the shell 21, and the driving mechanism includes a motor 25 provided inside the shell 21, and a first gear 26 is sleeved on the outer wall of one of the rotating shafts 22, and a second gear 27 is provided on the output end of the motor 25 on one side of the first gear 26, and the second gear 27 is meshed with the first gear 26, and a heat dissipation fan 28 is provided on the inner wall of the shell 21 on one side of the motor 25.
[0025] Specifically, the housing 21 supports the rotating shaft 22. When the trolley 2 moves, the motor 25 can be started, and the motor 25 drives the second gear 27 to rotate, and the second gear 27 drives the first gear 26 to rotate, thereby driving one of the rotating shafts 22 to rotate, and the corresponding two wheels 23 rotate with the rotating shaft 22, thereby driving the trolley 2 to move, so that the trolley 2 can move along the spliced track 1 to complete the cable wiring work; optionally, the motor 25 is a servo motor, and the first gear 26 and the second gear 27 are both bevel gears. When the trolley 2 moves, the cooling fan 28 moves at the same time to dissipate heat for the motor 25, thereby ensuring the stability of the device during operation. The fixing mechanism 3 is hung on the housing 21 through the hook 24, so that the fixing mechanism 3 is easy to disassemble, thereby ensuring the convenience of the device.
[0026] In one embodiment, a position sensor 5 is provided at one end of the spliced track 1, and the position sensor 5 is electrically connected to the motor 25, and an encoder is provided on one side of the outer wall of one of the mounting brackets 41.
[0027] Specifically, the position sensor 5 is located at the end of the spliced track 1 away from the cable drum, with the end of the spliced track 1 close to the cable drum as the starting point and the end close to the tower as the end point. When the trolley 2 drives the cable to move to the end point, the trolley 2 moves to one side of the position sensor 5, and the position sensor 5 controls the motor 25 to cut off the power, thereby stopping the movement of the trolley 2. There is no need for personnel to control the stopping of the trolley 2, thereby ensuring the convenience of the device. In addition, the present application uses an encoder to check the length of the cable pulled out by the trolley 2. Combined with the above-mentioned position sensor 5, the present application uses an encoder and a position sensor 5 to prevent the cable outlet length from being inconsistent and the wiring position from being uneven, which does not meet the process requirements and leads to cable waste, thereby ensuring the working effect of the device.
[0028] like Figure 3As shown, in an embodiment, the mounting mechanism 4 includes two mounting frames 41, a fixed block 42 is vertically provided in the mounting frame 41, a sliding block 43 is slidably connected to the outer wall of the fixed block 42, a same perforated shaft 44 is provided between the two sliding blocks 43, an adjusting mechanism is provided between the two mounting frames 41, and the adjusting mechanism includes a sliding rod 45 and a sleeve 46 slidably connected to the sliding rod 45, the sliding rod 45 and the sleeve 46 are respectively arranged on adjacent sides of the outer walls of the two mounting frames 41, a plurality of first openings are opened on the top of the sliding rod 45, a plurality of second openings matching the first openings are opened on the top of the sleeve 46, and the adjusting mechanism also includes a support rod 47 and a support tube 48 slidably connected to the support rod 47, the support rod 47 and the support tube 48 are respectively arranged on adjacent sides of the outer walls of the two mounting frames 41; a plurality of third openings are opened on the outer wall of the fixed block 42, and a fourth opening matching the third opening is opened on the outer wall of the sliding block 43.
[0029] Specifically, the relative distance between the two mounting frames 41 can be adjusted according to actual work requirements. When the adjustment work is in progress, the slide bar 45 and the sleeve 46 slide relative to each other, and the support rod 47 and the support tube 48 slide relative to each other. When the adjustment of the two mounting frames 41 is completed, the position of one of the first openings is aligned with the position of one of the second openings, and the second pin can be fixed to the corresponding first opening and second opening to fix the relative position of the slide bar 45 and the sleeve 46, thereby completing the distance adjustment work of the two mounting frames 41. The support rod 47 and the support tube 48 play a supporting role for the two mounting frames 41. Use; similarly, the slider 43 and the fixed block 42 can be controlled to slide relative to each other, and the fourth opening can be aligned with the position of one of the third openings, so as to adjust the height of the perforating shaft 44. When the perforating shaft 44 is adjusted to the required height, the second pin can be fixed in the corresponding third opening and fourth opening to complete the adjustment of the perforating shaft 44. The cable drum is installed on the outer wall of the perforating shaft 44; the present application can adjust the relative distance between the two mounting frames 41 and adjust the height of the perforating shaft 44, so that the present application is compatible with cable drums of various specifications and models, thereby ensuring the practicality of the present device.
[0030] like Figure 4 As shown, in one embodiment, the fixing mechanism 3 includes a first fastener 31 and a second fastener 32, the first fastener 31 and the second fastener 32 are detachably connected, and the first fastener 31 and the second fastener 32 can be assembled to form a through hole for passing the cable; an arc block 33 is provided on one side of the inner wall of the second fastener 32, a flexible rubber belt 34 is provided on one end of the arc block 33, a first pin 35 for fixing the flexible rubber belt 34 is provided on one side of the outer wall of the first fastener 31, and a pull ring 36 for rotatable connection is provided on one side of the outer wall of the first fastener 31.
[0031] When in use, the first fastener 31 and the second fastener 32 are assembled, and one end of the cable is passed through the through hole, and the cable is located on one side of the arc block 33. Then, the cable on one side of the arc block 33 is wrapped and tightened multiple times by the flexible rubber belt 34. Finally, the other end of the flexible rubber belt 34 is fixed to the first pin 35, so that the cable is fixed inside the through hole. Finally, the pull ring 36 is put on the hook 24, so that the trolley 2 can drive the cable to move; when the cable needs to be removed, only the first pin 35 needs to be removed, which ensures the convenience of the present application.
[0032] To sum up, the path of the trolley 2 adopts the spliced track 1, which can be adjusted according to the length of the tower and fixed with a clamp at the edge of the tower to prevent the track deviation of the trolley 2 during operation, resulting in unstable wiring length; the on-site electrical wiring is coordinated by two people, one of whom is at the cable reel and the other is at the tower, and the forward and backward movement of the trolley 2 is controlled by manual operation. After the cable is fixed, the trolley 2 drives the cable to move along the spliced track 1. When the trolley 2 moves to the end of the spliced track 1, the position sensor 5 detects the signal and controls the trolley 2 to stop. The personnel at the tower send a signal to the personnel at the cable reel. After receiving the signal from the personnel at the tower, the personnel at the cable reel cut the cable pulled out by the trolley 2, and then the personnel at the tower loosen the cable. After releasing the cable, the motor 25 is reversed to make the trolley 2 return to the original route and repeat the cable wiring work back and forth.
[0033] like Figure 5 As shown, an embodiment, the present application also includes a hand operation box, which is electrically connected to the motor 25 through radio waves. The wireless is usually composed of several core components, including a control chip, a wireless transceiver module and a battery, etc. The controller housing 6 plays a role in dust and water resistance. Press the power start switch 13, then the display 10 lights up, press the connection button 12, the hand operation is matched with the motor 25, after the match is successful, the display 10 will show a successful connection, and the standby light 11 of the controller housing 6 will light up, and the device is in standby state. When the forward button 7 is pressed, the car 2 moves forward, and the forward button 7 is pressed. When the reverse button 8 is pressed, the trolley 2 moves backward. During the operation of the trolley 2, the standby light 11 of the controller housing 6 is off. When the trolley 2 moves forward and reaches the position sensor 5, the trolley 2 stops automatically, the forward button 7 or the reverse button 8 is automatically reset, and the standby light 11 of the controller housing 6 is lit. During operation, when the motor 25 of the trolley 2 is working and the battery is discharged, the start and stop of the cooling fan 28 of the trolley 2 can be controlled by pressing the cooling fan start button 9. At the same time, the hand control box is provided with two handles 14, which are convenient for the staff to hold, and can also be hung around the neck through a strap for work. Embodiment 2:
[0034] The present invention provides a method for laying cables in a wind turbine tower. Based on the wind turbine tower cable laying device described in Embodiment 1, the method specifically includes: Step a: adjusting the length of the spliced track 1 according to the length of the wind turbine tower, and fixing the spliced track 1 with the help of the edge of the wind turbine tower; Assign two personnel to the starting point and the end point of the spliced track 1 respectively; The mounting mechanism 4 is arranged at the starting point of the spliced track 1; Step b: The person at the starting point of the spliced track 1 fixes one end of the cable on the outer wall of the cable drum to the fixing mechanism 3, and starts the trolley 2 to move along the spliced track 1; When the trolley 2 moves to the end of the spliced track 1, the person at the end of the spliced track 1 stops the movement of the trolley 2 and sends a message to the person at the starting point of the spliced track 1; After receiving the information, the personnel at the starting point of the spliced track 1 cut the cable pulled out by the trolley 2; The person at the end of the spliced track 1 removes one end of the cut cable from the fixing mechanism 3 and starts the trolley 2 to move in the reverse direction along the spliced track 1 to the original position; Step c: Repeat step b until the cable laying work is completed.
[0035] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A wind power tower cable laying device, characterized in that: It comprises a mounting mechanism (4), a spliced track (1), and a trolley (2) matching the spliced track (1), wherein one end of the trolley (2) is provided with a fixing mechanism (3) for fixing a cable, the inner side of the mounting mechanism (4) is rotatably connected to a cable drum, and the outer wall of the cable drum is provided with the cable; Baffles (11) for guiding the trolley (2) are symmetrically provided on both sides of the top of the spliced track (1).
2. The wind power tower cable laying device according to claim 1, characterized in that: The trolley (2) comprises a shell (21), a plurality of rotating shafts (22) are rotatably connected inside the shell (21), both ends of the rotating shafts (22) extend to the outside of the shell (21) and are sleeved with wheels (23), the fixing mechanism (3) is detachably connected to the outer wall of the shell (21) via a hook (24), and a driving mechanism for driving one of the rotating shafts (22) to rotate is provided inside the shell (21).
3. The wind power tower cable laying device according to claim 2, characterized in that: The driving mechanism comprises a motor (25) arranged inside the housing (21), wherein an outer wall of one of the rotating shafts (22) is sleeved with a first gear (26), and an output end of the motor (25) is provided with a second gear (27) on one side of the first gear (26), and the second gear (27) is meshed with the first gear (26).
4. The wind power tower cable laying device according to claim 2, characterized in that: A heat dissipation fan (28) is provided on the inner wall of the housing (21) at one side of the motor (25).
5. The wind power tower cable laying device according to claim 3, characterized in that: A position sensor (5) is provided at one end of the spliced track (1), and the position sensor (5) is electrically connected to the motor (25).
6. The wind power tower cable laying device according to claim 1, characterized in that: The mounting mechanism (4) comprises two mounting frames (41), a fixing block (42) being vertically arranged inside the mounting frame (41), a sliding block (43) being slidably connected to the fixing block (42) on an outer wall thereof, a common perforated shaft (44) being arranged between the two sliding blocks (43), and an adjusting mechanism being arranged between the two mounting frames (41).
7. The wind power tower cable laying device according to claim 6, characterized in that: The adjustment mechanism comprises a sliding rod (45) and a sleeve (46) slidably connected to the sliding rod (45); the sliding rod (45) and the sleeve (46) are respectively arranged on adjacent sides of the outer walls of the two mounting frames (41); a plurality of first openings are formed on the top of the sliding rod (45); and a plurality of second openings matching the first openings are formed on the top of the sleeve (46).
8. The wind power tower cable laying device according to claim 7, characterized in that: It also includes a support rod (47) and a support tube (48) slidably connected to the support rod (47), wherein the support rod (47) and the support tube (48) are respectively arranged on adjacent sides of the outer walls of the two mounting frames (41); The outer wall of the fixed block (42) is provided with a plurality of third openings, and the outer wall of the sliding block (43) is provided with a fourth opening matching the third openings; An encoder is provided on one side of the outer wall of one of the mounting frames (41).
9. The wind power tower cable laying device according to claim 1, characterized in that: The fixing mechanism (3) comprises a first fastener (31) and a second fastener (32), the first fastener (31) and the second fastener (32) being detachably connected, and the first fastener (31) and the second fastener (32) being able to be assembled to form a through hole for passing the cable; An arc block (33) is provided on one side of the inner wall of the second fastener (32), a flexible rubber belt (34) is provided on one end of the arc block (33), a first pin (35) for fixing the flexible rubber belt (34) is provided on one side of the outer wall of the first fastener (31), and a rotatably connected pull ring (36) is provided on one side of the outer wall of the first fastener (31).
10. A method for laying cables in a wind turbine tower, based on the wind turbine tower cable laying device according to any one of claims 1 to 9, characterized in that: The method specifically comprises: Step a: adjusting the length of the spliced track (1) according to the length of the wind turbine tower, and fixing the spliced track (1) with the help of the edge of the wind turbine tower; Assign two persons to be located at the starting point and the end point of the spliced track (1) respectively; Arrange the installation mechanism (4) at the starting point of the spliced track (1); Step b: A person at the starting point of the spliced track (1) fixes one end of the cable on the outer wall of the cable drum to the fixing mechanism (3), and starts the trolley (2) to move along the spliced track (1); When the trolley (2) moves to the end point of the spliced track (1), the person at the end point of the spliced track (1) stops the movement of the trolley (2) and sends a message to the person at the starting point of the spliced track (1); After receiving the information, the personnel at the starting point of the spliced track (1) cut the cable pulled out by the trolley (2); The person at the end of the spliced track (1) removes one end of the cut cable from the fixing mechanism (3) and starts the trolley (2) to move in the reverse direction along the spliced track (1) to the original position; Step c: Repeat step b until the cable laying work is completed.
Citation Information
Patent Citations
Construction device and construction method for laying large-diameter cable in constructional engineering
CN113572080A
Efficient cable laying device and laying method
CN116435915A
Robot for laying signal cable in groove box and matching system
CN117200082A
Cable laying device
CN204905767U
Power assisting device for laying power cable
CN215772273U