Cable inspection path generation system and method based on historical inspection data

By calculating the weight and priority of the cable inspection path based on historical inspection data, the problem of intricate and complex cable lines is solved, and timely detection and maintenance of cable abnormalities is realized to ensure the safe operation of the power system.

CN119146958APending Publication Date: 2024-12-17GUANGZHOU PANYU CABLE WORKS
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411078901.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-07
Publication Date
2024-12-17

AI Technical Summary

Technical Problem

In the existing cable inspection technology, complex cable lines have led to a large number of meaningless inspections, poor inspection efficiency, resulting in untimely abnormal cable discovery, affecting the safe operation of the power system.

Method used

Generate cable inspection paths based on historical inspection data. By obtaining historical inspection path information and result information of the area to be inspected, calculate the weight and wiring complexity of each inspection sub-path, determine the inspection priority, and generate efficient inspections. Search path.

Benefits of technology

Improve the efficiency of cable inspection, timely discover and repair abnormalities, ensure normal operation of the cable, and improve the safety of the power system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119146958A_ABST
    Figure CN119146958A_ABST
Patent Text Reader

Abstract

The embodiment of the invention discloses a cable inspection path generation system and method based on historical inspection data, and the method comprises the steps: obtaining an area to be inspected and corresponding historical inspection path information and historical inspection result information, the historical inspection path information comprises the connection relation of a plurality of inspection sub-paths and the number of inspection times; determining a first weight of the inspection sub-path based on the inspection frequency and the historical inspection result information, screening and dividing the inspection sub-path according to the first weight to obtain a to-be-connected combination, determining a plurality of inspection paths and corresponding second weights based on the to-be-connected combination and the connection relationship, and determining the actual wiring complexity of the inspection paths, and determining inspection priorities of the inspection paths based on the second weight and the actual wiring complexity, and generating corresponding inspection paths in sequence according to the inspection priorities. According to the scheme, the cable routing inspection path is generated through the historical routing inspection data, cable routing inspection efficiency can be improved, cable abnormity can be timely inspected and maintained, and normal operation of the cable is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The embodiments of the present application relate to the field of cable inspection technology, and in particular, to a system and method for generating a cable inspection path based on historical inspection data. Background Art

[0002] In modern society, power supply is essential to the normal operation of various industries and life. As an important part of power transmission, cables may cause power outages, equipment damage, and even catastrophic consequences if they fail. Therefore, timely finding and solving cable faults has become a vital task. Regular cable inspections can effectively solve this problem. Cable inspections specifically refer to patrolling and checking the operation of cable lines and all ancillary equipment. Regular cable inspections can promptly detect and eliminate abnormalities and defects in cable lines and all ancillary equipment, prevent accidents, and ensure the safe operation of cable lines.

[0003] In related cable inspection technologies, the inspection path is usually fixed or randomly generated according to the cable line diagram. This method will cause a large number of meaningless inspections for complex cable lines, resulting in poor inspection efficiency, untimely detection of cable anomalies, and affecting the safe operation of the power system. Summary of the invention

[0004] The embodiments of the present invention provide a cable inspection path generation system and method based on historical inspection data, which solves the problem that the existing cable inspection technology will cause a large number of meaningless inspections for complex cable lines, the inspection efficiency is poor, and cable abnormalities are not discovered in time, affecting the safe operation of the power system. The cable inspection efficiency can be improved, cable abnormalities can be inspected in time and repaired, and the normal operation of the cable can be ensured.

[0005] In a first aspect, an embodiment of the present invention provides a method for generating a cable inspection path based on historical inspection data, comprising:

[0006] Obtaining the area to be inspected and the corresponding historical inspection path information and historical inspection result information, wherein the historical inspection path information includes the connection relationship of multiple inspection sub-paths and the corresponding inspection times;

[0007] Determine a first weight of each inspection sub-path in the to-be-inspected area based on the inspection times and the historical inspection result information;

[0008] The inspection sub-paths are screened and divided according to the first weights to obtain combinations to be connected, multiple inspection paths and corresponding second weights are determined based on the combinations to be connected and the connection relationships, and the actual wiring complexity of the inspection paths is determined, the inspection priorities of the inspection paths are determined based on the second weights and the actual wiring complexity, and corresponding inspection paths are generated in sequence according to the inspection priorities.

[0009] Optionally, the historical inspection result information includes the fault type of the inspection sub-path and the corresponding number of type faults, and determining the first weight of each inspection sub-path in the to-be-inspected area based on the number of inspections and the historical inspection result information includes:

[0010] Calculating the total number of failures of the inspection subpath according to the number of failures of the type, calculating the proportion of the total number of failures based on the inspection number and the total number of failures, and calculating the failure assessment value according to the failure type and the corresponding number of failures of the type;

[0011] The total fault frequency ratio and the fault assessment value are multiplied and superimposed with the corresponding preset weight to obtain the first weight of the inspection sub-path.

[0012] Optionally, the calculating the fault assessment value according to the fault type and the corresponding number of type faults includes:

[0013] When there are multiple fault types, the ratio of the number of type faults to the number of inspections is calculated, and a type fault assessment value mapping table corresponding to the fault type is queried according to the ratio to obtain a type fault assessment value, and the type fault assessment values ​​are superimposed to obtain a fault assessment value.

[0014] Optionally, the screening and dividing the inspection sub-paths according to the first weights to obtain combinations to be connected includes:

[0015] Determine whether the first weight satisfies a preset weight condition, determine the inspection sub-path corresponding to the first weight that satisfies the preset weight condition as a path to be connected, and determine the paths to be connected with the same first weight as a combination to be connected.

[0016] Optionally, the determining a plurality of inspection paths and corresponding second weights based on the combination to be connected and the connection relationship includes:

[0017] Randomly selecting a path to be connected from the combination to be connected, determining a first connection path connected to the path to be connected in the combination to be connected according to the connection relationship, connecting the path to be connected with the first connection path to determine a patrol path, and determining the first weight of the path to be connected as the second weight of the patrol path;

[0018] The corresponding inspection path connection is continued for the unconnected paths to be connected in the combination to be connected until all the paths to be connected in the combination to be connected are connected.

[0019] Optionally, after connecting the path to be connected with the first connection path, the method further includes:

[0020] In the combination to be connected, when a second connection path having the connection relationship with the first connection path is determined, the first connection path is connected to the second connection path until there is no connection relationship between the connection paths in the combination to be connected.

[0021] Optionally, the determining the inspection priority of the inspection path based on the second weight and the actual wiring complexity includes:

[0022] The plurality of inspection paths are prioritized in descending order according to the second weights. When the second weights of the inspection paths are the same, the inspection path with a greater actual wiring complexity is arranged in front.

[0023] In a second aspect, an embodiment of the present invention further provides a cable inspection path generation system based on historical inspection data, comprising:

[0024] An acquisition module, used to acquire the area to be inspected and the corresponding historical inspection path information and historical inspection result information, wherein the historical inspection path information includes the connection relationship of multiple inspection sub-paths and the corresponding inspection times;

[0025] A weight determination module, used to determine a first weight of each inspection sub-path in the to-be-inspected area based on the inspection times and the historical inspection result information;

[0026] A combination determination module, configured to screen and divide the inspection sub-paths according to the first weights to obtain a combination to be connected;

[0027] A path information determination module is used to determine multiple inspection paths and corresponding second weights based on the combination to be connected and the connection relationship, and determine the actual wiring complexity of the inspection path, and determine the inspection priority of the inspection path based on the second weight and the actual wiring complexity.

[0028] The path generation module is used to generate corresponding inspection paths in sequence according to the inspection priorities.

[0029] In a third aspect, an embodiment of the present invention further provides a cable inspection path generation device based on historical inspection data, the device comprising:

[0030] one or more processors;

[0031] a storage device for storing one or more programs,

[0032] When the one or more programs are executed by the one or more processors, the one or more processors implement the cable inspection path generation method based on historical inspection data described in an embodiment of the present invention.

[0033] In a fourth aspect, an embodiment of the present invention further provides a storage medium storing computer executable instructions, which, when executed by a computer processor, are used to execute the cable inspection path generation method based on historical inspection data described in an embodiment of the present invention.

[0034] In an embodiment of the present invention, the area to be inspected and the corresponding historical inspection path information and historical inspection result information are obtained, the historical inspection path information includes the connection relationship of multiple inspection sub-paths and the corresponding inspection times, the first weight of each inspection sub-path in the area to be inspected is determined based on the inspection times of the inspection sub-paths and the historical inspection result information, the inspection sub-paths are screened and divided according to the first weights of the inspection sub-paths to obtain a combination to be connected, multiple inspection paths and corresponding second weights are determined based on the combination to be connected and the connection relationship of the inspection sub-paths, and the actual wiring complexity of the inspection path is determined, the inspection priority of the inspection path is determined based on the second weight of the inspection path and the actual wiring complexity, and the corresponding inspection paths are generated in sequence according to the inspection priority. This solution generates a cable inspection path through historical inspection data, which solves the problem that the existing cable inspection technology will cause a large number of meaningless inspections for complex cable lines, the inspection efficiency is poor, and the cable abnormality is not discovered in time, which affects the safe operation of the power system. It can improve the cable inspection efficiency, timely inspect the cable abnormality and perform repairs, and ensure the normal operation of the cable. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] Figure 1 A flow chart of a method for generating a cable inspection path based on historical inspection data provided by an embodiment of the present invention;

[0036] Figure 2 A flowchart of a method for determining a first weight of each inspection sub-path in an area to be inspected provided by an embodiment of the present invention;

[0037] Figure 3 A flowchart of a method for determining multiple inspection paths and corresponding second weights provided by an embodiment of the present invention;

[0038] Figure 4 A module structure block diagram of a cable inspection path generation system based on historical inspection data provided by an embodiment of the present invention;

[0039] Figure 5 A schematic structural diagram of a cable inspection path generation device based on historical inspection data provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0040] The embodiments of the present invention are further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the embodiments of the present invention, rather than to limit the embodiments of the present invention. It is also necessary to explain that, for ease of description, only parts related to the embodiments of the present invention are shown in the accompanying drawings, rather than all structures.

[0041] The terms "first", "second", etc. in the specification and claims of this application are used to distinguish similar objects, and are not used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable under appropriate circumstances, so that the embodiments of the present application can be implemented in an order other than those illustrated or described here, and the objects distinguished by "first", "second", etc. are generally of one type, and the number of objects is not limited. For example, the first object can be one or more. In addition, "and or or" in the specification and claims represents at least one of the connected objects, and the character "or" generally indicates that the objects associated before and after are in an "or" relationship.

[0042] The cable inspection path generation method based on historical inspection data provided in the embodiment of the present application can be applied to the generation scenario of the cable inspection path. The cable inspection path generation method based on historical inspection data provided in the embodiment of the present application, the execution subject of each step can be a computer device, which refers to any electronic device with data calculation, processing and storage capabilities, such as mobile phones, PCs (Personal Computers), tablet computers and other terminal devices, and can also be servers and other devices, which are not limited in the embodiment of the present application.

[0043] Figure 1 A flowchart of a method for generating a cable inspection path based on historical inspection data provided by an embodiment of the present invention is shown in FIG. Figure 1 As shown, specifically including:

[0044] Step S101: Acquire the area to be inspected and the corresponding historical inspection path information and historical inspection result information, wherein the historical inspection path information includes the connection relationship between multiple inspection sub-paths and the corresponding inspection times.

[0045] Among them, the area to be inspected is used to represent the area of ​​the cable line to be inspected, and the historical inspection path information is used to represent the various relevant data of the path during the historical cable inspection, which can be the inspection path information recorded before the preset time to the current time, or the inspection path information of a fixed period of time; the historical inspection result information is used to represent the cable status data detected during the historical inspection of the cable; the inspection sub-path is used to represent a path segment in a complete historical inspection path, and the path segment can be divided according to the preset length or inflection point and other conditions; the connection relationship is used to represent whether each inspection sub-path is connected; the number of inspections is used to represent the number of times the inspection sub-path is detected in the historical inspection. Obtaining the area to be inspected and the corresponding historical inspection path information and historical inspection result information can use the historical inspection data of the area to be inspected as the basis for generating the cable inspection path, making the cable inspection path more reasonable.

[0046] Step S102: determining a first weight of each inspection sub-path in the area to be inspected based on the inspection times and the historical inspection result information.

[0047] Among them, the first weight is used to characterize the importance of the inspection of the inspection sub-path. In one embodiment, the first weight of the inspection sub-path is obtained by querying the pre-stored first weight comparison table according to the inspection times of the inspection sub-path and the historical inspection result information. Optionally, the inspection result information includes the fault type of the inspection sub-path and the corresponding type fault times. The fault type is used to characterize the type of fault that occurs in the inspection sub-path, which can be a short circuit type, a high temperature type, and the type fault times are used to characterize the number of occurrences of the same fault type on the inspection sub-path. A first weight determination method can be: calculate the total number of faults of the inspection sub-path according to the type fault times of the inspection sub-path, calculate the proportion of the total number of faults based on the inspection times and the total number of faults of the inspection sub-path, and calculate the fault evaluation value according to the fault type of the inspection sub-path and the corresponding type fault times, multiply the proportion of the total number of faults and the fault evaluation value with the corresponding preset weight and superimpose to obtain the first weight of the inspection sub-path. By calculating the weight of the inspection sub-path through the inspection times and fault data of the inspection sub-path, the accuracy and rationality of the weight of the inspection sub-path can be improved.

[0048] Step S103: Screen and divide the inspection sub-paths according to the first weights to obtain combinations to be connected.

[0049] Among them, the combination to be connected is used to characterize the combination of inspection sub-paths waiting to be connected. In one embodiment, the inspection sub-paths with the same first weight are screened out, and the inspection sub-paths with the same first weight are divided into a combination to be connected. Optionally, it is determined whether the first weight of the inspection sub-path meets the preset weight condition, and the inspection sub-path corresponding to the first weight that meets the preset weight condition is determined as the path to be connected, and the paths to be connected with the same first weight are determined as a combination to be connected, which can screen out inspection sub-paths with low inspection importance, reduce unnecessary inspections, and improve inspection efficiency. An exemplary embodiment may be that the preset weight condition is that the first weight is greater than 0.5. There are currently 10 inspection sub-paths, namely sub-path 1 to sub-path 10, wherein the first weights of sub-paths 1, 2, and 3 are all 0.8, the first weights of sub-paths 4, 5, and 6 are all 0.7, the first weights of sub-paths 7, 8, 9, and 10 are all 0.4, the first weights of sub-paths 1, 2, and 3 are greater than 0.5 and are the same, and the first weights of sub-paths 4, 5, and 6 are greater than 0.5 and are the same, then sub-paths 1, 2, and 3 are determined as one combination to be connected, and sub-paths 4, 5, and 6 are determined as another combination to be connected.

[0050] Step S104: determining a plurality of inspection paths and corresponding second weights based on the combination to be connected and the connection relationship.

[0051] Among them, the inspection path is used to characterize the path that the inspection cable passes through, and the second weight is used to characterize the inspection importance of the inspection path. In one embodiment, the paths to be connected in the combination to be connected are connected based on the connection relationship and the preset connection rules to obtain an inspection path, and the first weight corresponding to the combination to be connected is determined as the second weight of the inspection path. Optionally, a path to be connected is randomly selected in the combination to be connected, and the first connection path connected to the selected path to be connected in the combination to be connected is determined according to the connection relationship between the inspection sub-paths, and the selected path to be connected is connected with the first connection path to determine an inspection path, and the first weight of the path to be connected is determined as the second weight of the inspection path, and the corresponding inspection path connection is continued for the unconnected paths to be connected in the combination to be connected until all the paths to be connected in the combination to be connected are connected. The inspection sub-paths with the same weight and connection relationship are connected and determined as the inspection path, which can unify the weights of each section in the inspection path, which is beneficial to cable inspection.

[0052] Step S105: determine the actual wiring complexity of the inspection path, determine the inspection priority of the inspection path based on the second weight and the actual wiring complexity, and generate corresponding inspection paths in sequence according to the inspection priority.

[0053] Among them, the actual wiring complexity is used to characterize the complexity of the cable line on the inspection path, and the inspection priority is used to characterize the order in which the inspection path is inspected. A method for determining the actual wiring complexity may be to determine the average value of the pre-stored wiring complexity of each inspection sub-path in the inspection path as the actual wiring complexity of the inspection path, or to compare the inspection path with the pre-stored path, and determine the pre-stored wiring complexity corresponding to the successfully compared pre-stored path as the complexity of the inspection path. In one embodiment, the sub-wiring complexity of each inspection sub-path in the recorded inspection path is obtained, and the average value of the sub-wiring complexity is determined as the actual wiring complexity of the inspection path. The comprehensive evaluation value of the inspection path is calculated according to the second weight and the actual wiring complexity, and the priority of the inspection path is determined according to the order of the comprehensive evaluation value from large to small, and the corresponding inspection path is generated in sequence according to the inspection priority of the inspection path. Optionally, a method for determining inspection priority may also be to prioritize multiple inspection paths in order of second weights from large to small. When the second weights of the inspection paths are the same, the inspection paths with greater actual wiring complexity are arranged in front, so that inspection paths with higher inspection importance and more complex wiring can be prioritized to improve inspection efficiency. An exemplary embodiment may be that there are five inspection paths, namely path a, path b, path c, path d and path e, and the corresponding second weights are 0.8, 0.7, 0.9, 0.6, and 0.8, respectively, wherein the second weights of path a and path e are the same, the actual wiring complexity of path a is 60%, and the actual wiring complexity of path e is 80%, and the actual wiring complexity of path e is greater than that of path a, then path e is arranged in front of path a, and the priority ranking obtained in order of the second weights from large to small is path c, path e, path a, path b, and path d.

[0054] As can be seen from the above, the area to be inspected and the corresponding historical inspection path information and historical inspection result information are obtained. The historical inspection path information includes the connection relationship of multiple inspection sub-paths and the corresponding inspection times. The first weight of each inspection sub-path in the area to be inspected is determined based on the inspection times of the inspection sub-paths and the historical inspection result information. The inspection sub-paths are screened and divided according to the first weights of the inspection sub-paths to obtain a combination to be connected. Based on the combination to be connected and the connection relationship of the inspection sub-paths, multiple inspection paths and corresponding second weights are determined, and the actual wiring complexity of the inspection path is determined. The inspection priority of the inspection path is determined based on the second weight of the inspection path and the actual wiring complexity, and the corresponding inspection paths are generated in sequence according to the inspection priority. This solution generates cable inspection paths through historical inspection data, which solves the problem that the existing cable inspection technology will cause a large number of meaningless inspections for complex cable lines, and the inspection efficiency is poor, resulting in untimely detection of cable anomalies, which affects the safe operation of the power system. It can improve the efficiency of cable inspections, timely inspect cable anomalies and perform repairs, and ensure the normal operation of the cable.

[0055] Figure 2 A flowchart of a method for determining a first weight of each inspection sub-path in an area to be inspected provided by an embodiment of the present invention, such as Figure 2 As shown, specifically including:

[0056] Step S201: Acquire the area to be inspected and the corresponding historical inspection path information and historical inspection result information, wherein the historical inspection path information includes the connection relationship between multiple inspection sub-paths and the corresponding inspection times.

[0057] Step S202: calculate the total number of failures of the inspection sub-path according to the number of failures of the type, calculate the proportion of the total number of failures based on the inspection times and the total number of failures, and calculate the failure assessment value according to the failure type and the corresponding number of failures of the type, multiply the proportion of the total number of failures and the failure assessment value with the corresponding preset weights and superimpose them to obtain the first weight of the inspection sub-path.

[0058] Among them, the inspection result information includes the fault type of the inspection sub-path and the corresponding number of type faults. A method for determining the first weight may be: calculating the total number of faults of the inspection sub-path according to the number of type faults of the inspection sub-path, calculating the proportion of the total number of faults based on the number of inspections and the total number of faults of the inspection sub-path, and calculating the fault assessment value according to the fault type of the inspection sub-path and the corresponding number of type faults, multiplying the proportion of the total number of faults and the fault assessment value with the corresponding preset weight and superimposing them to obtain the first weight of the inspection sub-path. An optional method for calculating the fault assessment value may be, when there are multiple fault types in the inspection sub-path, calculating the ratio of the number of type faults to the number of inspections, querying the type fault assessment value mapping table corresponding to the fault type according to the ratio to obtain the type fault assessment value, and superimposing the type fault assessment values ​​to obtain the fault assessment value. An exemplary example may be that the currently determined inspection subpath is inspection subpath a, the number of inspections of inspection subpath a is 20 times, the fault types include high temperature type and high humidity type, the number of high temperature type faults is 5 times, the number of high humidity type faults is 4 times, then the total number of faults of inspection subpath a is 9 times (5+4), the total number of faults accounts for 0.45 (9 / 20), the ratio of high temperature type faults to inspection times is 0.25, and the ratio of high humidity type faults to inspection times is 0. .2, the query obtains that the weight corresponding to the high temperature type fault assessment value mapping table accounting for 0.25 is 0.35, and the high humidity type fault assessment value corresponding to the high humidity type fault assessment value mapping table accounting for 0.2 is 0.25, then the fault assessment value is 0.6 (0.35 + 0.25), the preset weight of the total number of faults is 0.6, and the preset weight of the fault assessment value is 0.4, then the first weight of the inspection sub-path a is calculated to be 0.51 (0.45 * 0.6 + 0.6 * 0.4). In another embodiment, a method for calculating the fault assessment value can be to input the fault type of the inspection sub-path and the corresponding number of type faults into a trained fault assessment model, and output the fault assessment value of the inspection sub-path.

[0059] Step S203: Screen and divide the inspection sub-paths according to the first weights to obtain combinations to be connected.

[0060] Step S204: determine a plurality of inspection paths and corresponding second weights based on the combination to be connected and the connection relationship.

[0061] Step S205: determine the actual wiring complexity of the inspection path, determine the inspection priority of the inspection path based on the second weight and the actual wiring complexity, and generate corresponding inspection paths in sequence according to the inspection priority.

[0062] As can be seen from the above, the total number of faults of the inspection subpath is calculated according to the number of type faults of the inspection subpath, the proportion of the total number of faults is calculated based on the number of inspections of the inspection subpath and the total number of faults, and the fault assessment value is calculated according to the fault type of the inspection subpath and the corresponding number of type faults, and the proportion of the total number of faults and the fault assessment value are multiplied and superimposed with the corresponding preset weight to obtain the first weight of the inspection subpath. This solution calculates the weight of the inspection subpath through the inspection number of the inspection subpath and the fault data, which can improve the accuracy and rationality of the weight of the inspection subpath.

[0063] Figure 3 A flowchart of a method for determining multiple inspection paths and corresponding second weights provided by an embodiment of the present invention, such as Figure 3 As shown, specifically including:

[0064] Step S301: Acquire the area to be inspected and the corresponding historical inspection path information and historical inspection result information, wherein the historical inspection path information includes the connection relationship between multiple inspection sub-paths and the corresponding inspection times.

[0065] Step S302: Determine a first weight of each inspection sub-path in the area to be inspected based on the inspection times and the historical inspection result information.

[0066] Step S303: Screen and divide the inspection sub-paths according to the first weights to obtain combinations to be connected.

[0067] Step S304: randomly select a path to be connected in the combination to be connected, determine a first connection path connected to the path to be connected in the combination to be connected according to the connection relationship, connect the path to be connected with the first connection path to determine an inspection path, and determine the first weight of the path to be connected as the second weight of the inspection path, and continue to perform corresponding inspection path connections on the unconnected paths to be connected in the combination to be connected until all the paths to be connected in the combination to be connected are connected.

[0068] Among them, a path to be connected is randomly selected in the combination to be connected, and the first connection path connected to the selected path to be connected in the combination to be connected is determined according to the connection relationship between the inspection sub-paths, and the selected path to be connected is connected with the first connection path. Optionally, in the combination to be connected, when a second connection path that has a connection relationship with the first connection path is determined, the first connection path is connected with the second connection path until there is no connection relationship between the connection paths in the combination to be connected, so as to determine a patrol path, and the first weight of the path to be connected is determined as the second weight of the patrol path, and the corresponding patrol path connection is continued for the unconnected paths to be connected in the combination to be connected until all the paths to be connected in the combination to be connected are connected. An exemplary example may be that the current connection is to-be-connected combination 1, the first weight of the to-be-connected path in the to-be-connected combination 1 is 0.6, the to-be-connected combination 1 includes to-be-connected paths a, b, c, d, e, f, g, h, a to-be-connected path a is randomly selected, and it is determined according to the connection relationship that the path to-be-connected path in the to-be-connected combination 1 is connected to the to-be-connected path b, then the to-be-connected path a is connected to the to-be-connected path b, and it is determined according to the connection relationship that the path to-be-connected path is connected to the to-be-connected path c, then the to-be-connected path c is connected to the to-be-connected path b, and it is not determined that there is a path to-be-connected path in the to-be-connected combination c has a connection relationship between the paths to be connected, then the paths to be connected a-path to be connected b-path to be connected c are determined as a patrol path, and similarly, the unconnected paths to be connected d, e, f, g, h in the combination to be connected are connected as patrol paths, and the patrol paths obtained are path to be connected d-path to be connected e-path to be connected f, path to be connected g, and path to be connected h, wherein the paths to be connected g and the paths to be connected h do not have a connection relationship in the combination to be connected, then the paths to be connected g and the paths to be connected h are directly determined as patrol paths respectively, and the second weights of the determined patrol paths are all 0.6. In another embodiment, the paths to be connected that have a connection relationship in the combination to be connected are connected to obtain a plurality of path segments to be connected in series, the positions of the path segments to be connected in series are determined, and the path segments to be connected in series are connected according to the principle of connecting the paths in series at the nearest preset positions to obtain the patrol path.

[0069] Step S305: determine the actual wiring complexity of the inspection path, determine the inspection priority of the inspection path based on the second weight and the actual wiring complexity, and generate corresponding inspection paths in sequence according to the inspection priority.

[0070] As can be seen from the above, a path to be connected is randomly selected in the combination to be connected, and the first connection path connected to the selected path to be connected in the combination to be connected is determined according to the connection relationship between the inspection sub-paths, and the selected path to be connected is connected with the first connection path to determine a patrol path, and the first weight of the path to be connected is determined as the second weight of the patrol path, and the corresponding patrol path connection is continued for the unconnected paths to be connected in the combination to be connected until all the paths to be connected in the combination to be connected are connected. This solution can unify the weights of each section in the patrol path by connecting the patrol sub-paths with the same weight and connection relationship and determining them as patrol paths, which is beneficial to cable patrol.

[0071] Figure 4 The module structure block diagram of a cable inspection path generation system based on historical inspection data provided by an embodiment of the present invention is used to execute the cable inspection path generation method based on historical inspection data provided by the above embodiment, and has the corresponding functional modules and beneficial effects of the execution method. Figure 4 As shown, the system specifically includes:

[0072] The acquisition module 101 is used to acquire the area to be inspected and the corresponding historical inspection path information and historical inspection result information, wherein the historical inspection path information includes the connection relationship of multiple inspection sub-paths and the corresponding inspection times;

[0073] A weight determination module 102, configured to determine a first weight of each inspection sub-path in the area to be inspected based on the inspection times and the historical inspection result information;

[0074] A combination determination module 103, configured to screen and divide the inspection sub-paths according to the first weights to obtain a combination to be connected;

[0075] The path information determination module 104 determines multiple inspection paths and corresponding second weights based on the combination to be connected and the connection relationship, determines the actual wiring complexity of the inspection path, and determines the inspection priority of the inspection path based on the second weight and the actual wiring complexity.

[0076] The path generation module 105 is used to generate corresponding inspection paths in sequence according to the inspection priorities.

[0077] It can be seen from the above scheme that the area to be inspected and the corresponding historical inspection path information and historical inspection result information are obtained. The historical inspection path information includes the connection relationship of multiple inspection sub-paths and the corresponding inspection times. The first weight of each inspection sub-path in the area to be inspected is determined based on the inspection times of the inspection sub-paths and the historical inspection result information. The inspection sub-paths are screened and divided according to the first weights of the inspection sub-paths to obtain a combination to be connected. Based on the combination to be connected and the connection relationship of the inspection sub-paths, multiple inspection paths and corresponding second weights are determined, and the actual wiring complexity of the inspection path is determined. The inspection priority of the inspection path is determined based on the second weight of the inspection path and the actual wiring complexity, and the corresponding inspection paths are generated in sequence according to the inspection priority. This scheme generates cable inspection paths through historical inspection data, which solves the problem that the existing cable inspection technology will cause a large number of meaningless inspections for complex cable lines, and the inspection efficiency is poor, resulting in untimely detection of cable anomalies, which affects the safe operation of the power system. It can improve the efficiency of cable inspections, timely inspect cable anomalies and perform repairs, and ensure the normal operation of the cable.

[0078] In a possible embodiment, the weight determination module 102 is specifically configured to:

[0079] Calculating the total number of failures of the inspection subpath according to the number of failures of the type, calculating the proportion of the total number of failures based on the inspection number and the total number of failures, and calculating the failure assessment value according to the failure type and the corresponding number of failures of the type;

[0080] The total fault frequency ratio and the fault assessment value are multiplied and superimposed with the corresponding preset weight to obtain the first weight of the inspection sub-path.

[0081] In a possible embodiment, the weight determination module 102 is further configured to:

[0082] When there are multiple fault types, the ratio of the number of type faults to the number of inspections is calculated, and a type fault assessment value mapping table corresponding to the fault type is queried according to the ratio to obtain a type fault assessment value, and the type fault assessment values ​​are superimposed to obtain a fault assessment value.

[0083] In a possible embodiment, the combination determination module 103 is specifically configured to:

[0084] Determine whether the first weight satisfies a preset weight condition, determine the inspection sub-path corresponding to the first weight that satisfies the preset weight condition as a path to be connected, and determine the paths to be connected with the same first weight as a combination to be connected.

[0085] In a possible embodiment, the path information determination module 104 is specifically configured to:

[0086] Randomly selecting a path to be connected from the combination to be connected, determining a first connection path connected to the path to be connected in the combination to be connected according to the connection relationship, connecting the path to be connected with the first connection path to determine a patrol path, and determining the first weight of the path to be connected as the second weight of the patrol path;

[0087] The corresponding inspection path connection is continued for the unconnected paths to be connected in the combination to be connected until all the paths to be connected in the combination to be connected are connected.

[0088] In a possible embodiment, the path information determining module 104 is further configured to:

[0089] In the combination to be connected, when a second connection path having the connection relationship with the first connection path is determined, the first connection path is connected to the second connection path until there is no connection relationship between the connection paths in the combination to be connected.

[0090] In a possible embodiment, the path information determining module 104 is further configured to:

[0091] The plurality of inspection paths are prioritized in descending order according to the second weights. When the second weights of the inspection paths are the same, the inspection path with a greater actual wiring complexity is arranged in front.

[0092] Figure 5 A schematic diagram of the structure of a cable inspection path generation device based on historical inspection data provided by an embodiment of the present invention, such as Figure 5 As shown, the device includes a processor 201, a memory 202, an input device 203 and an output device 204; the number of processors 201 in the device can be one or more. Figure 5 A processor 201 is taken as an example; the processor 201, memory 202, input device 203 and output device 204 in the device can be connected by a bus or other means. Figure 5The example of the connection via bus is taken. The memory 202, as a computer-readable storage medium, can be used to store software programs, computer executable programs and modules, such as program instructions or modules corresponding to the cable inspection path generation method based on historical inspection data in the embodiment of the present invention. The processor 201 executes various functional applications and data processing of the device by running the software programs, instructions and modules stored in the memory 202, that is, realizes the above-mentioned cable inspection path generation method based on historical inspection data. The input device 203 can be used to receive input digital or character information, and generate key signal input related to user settings and function control of the device. The output device 204 may include a display device such as a display screen.

[0093] An embodiment of the present invention further provides a storage medium containing computer executable instructions, wherein the computer executable instructions are used to execute a method for generating a cable inspection path based on historical inspection data when executed by a computer processor, the method comprising:

[0094] Obtaining the area to be inspected and the corresponding historical inspection path information and historical inspection result information, wherein the historical inspection path information includes the connection relationship of multiple inspection sub-paths and the corresponding inspection times;

[0095] Determine a first weight of each inspection sub-path in the to-be-inspected area based on the inspection times and the historical inspection result information;

[0096] The inspection sub-paths are screened and divided according to the first weights to obtain combinations to be connected, multiple inspection paths and corresponding second weights are determined based on the combinations to be connected and the connection relationships, and the actual wiring complexity of the inspection paths is determined, the inspection priorities of the inspection paths are determined based on the second weights and the actual wiring complexity, and corresponding inspection paths are generated in sequence according to the inspection priorities.

[0097] It is worth noting that in the above-mentioned embodiment of the cable inspection path generation method system based on historical inspection data, the various units and modules included are only divided according to functional logic, but are not limited to the above-mentioned division, as long as the corresponding functions can be achieved; in addition, the specific names of the functional units are only for the convenience of distinguishing each other, and are not used to limit the protection scope of the embodiments of the present invention.

[0098] Note that the above are only preferred embodiments of the present invention and the technical principles used. Those skilled in the art will understand that the embodiments of the present invention are not limited to the specific embodiments described herein, and that various obvious changes, readjustments and substitutions can be made by those skilled in the art without departing from the protection scope of the embodiments of the present invention. Therefore, although the embodiments of the present invention are described in more detail through the above embodiments, the embodiments of the present invention are not limited to the above embodiments, and may include more other equivalent embodiments without departing from the concept of the embodiments of the present invention, and the scope of the embodiments of the present invention is determined by the scope of the appended claims.

Claims

1. A cable inspection path generation method based on historical inspection data, characterized in that: include: Obtaining the area to be inspected and the corresponding historical inspection path information and historical inspection result information, wherein the historical inspection path information includes the connection relationship of multiple inspection sub-paths and the corresponding inspection times; Determine a first weight of each inspection sub-path in the to-be-inspected area based on the inspection times and the historical inspection result information; The inspection sub-paths are screened and divided according to the first weights to obtain combinations to be connected, multiple inspection paths and corresponding second weights are determined based on the combinations to be connected and the connection relationships, and the actual wiring complexity of the inspection paths is determined, the inspection priorities of the inspection paths are determined based on the second weights and the actual wiring complexity, and corresponding inspection paths are generated in sequence according to the inspection priorities.

2. The cable inspection path generation method based on historical inspection data according to claim 1 is characterized in that: The historical inspection result information includes the fault type of the inspection sub-path and the corresponding number of type faults, and determining the first weight of each inspection sub-path in the area to be inspected based on the number of inspections and the historical inspection result information includes: Calculating the total number of failures of the inspection subpath according to the number of failures of the type, calculating the proportion of the total number of failures based on the inspection number and the total number of failures, and calculating the failure assessment value according to the failure type and the corresponding number of failures of the type; The total fault frequency ratio and the fault assessment value are multiplied and superimposed with the corresponding preset weight to obtain the first weight of the inspection sub-path.

3. The cable inspection path generation method based on historical inspection data according to claim 2 is characterized in that: The calculating of the fault assessment value according to the fault type and the corresponding number of type faults includes: When there are multiple fault types, the ratio of the number of type faults to the number of inspections is calculated, and a type fault assessment value mapping table corresponding to the fault type is queried according to the ratio to obtain a type fault assessment value, and the type fault assessment values ​​are superimposed to obtain a fault assessment value.

4. The method for generating a cable inspection path based on historical inspection data according to any one of claims 1 to 3, characterized in that: The screening and dividing of the inspection sub-paths according to the first weights to obtain a combination to be connected includes: Determine whether the first weight satisfies a preset weight condition, determine the inspection sub-path corresponding to the first weight that satisfies the preset weight condition as a path to be connected, and determine the paths to be connected with the same first weight as a combination to be connected.

5. The method for generating a cable inspection path based on historical inspection data according to any one of claims 1 to 3, characterized in that: The determining of a plurality of inspection paths and corresponding second weights based on the combination to be connected and the connection relationship includes: Randomly selecting a path to be connected from the combination to be connected, determining a first connection path connected to the path to be connected in the combination to be connected according to the connection relationship, connecting the path to be connected with the first connection path to determine a patrol path, and determining the first weight of the path to be connected as the second weight of the patrol path; The corresponding inspection path connection is continued for the unconnected paths to be connected in the combination to be connected until all the paths to be connected in the combination to be connected are connected.

6. The method for generating a cable inspection path based on historical inspection data according to claim 5, characterized in that: After connecting the path to be connected with the first connection path, the method further includes: In the combination to be connected, when a second connection path having the connection relationship with the first connection path is determined, the first connection path is connected to the second connection path until there is no connection relationship between the connection paths in the combination to be connected.

7. The method for generating a cable inspection path based on historical inspection data according to any one of claims 1 to 6, characterized in that: The determining the inspection priority of the inspection path based on the second weight and the actual wiring complexity includes: The plurality of inspection paths are prioritized in descending order according to the second weights. When the second weights of the inspection paths are the same, the inspection path with a greater actual wiring complexity is arranged in front.

8. A cable inspection path generation system based on historical inspection data, characterized in that: include: An acquisition module, used to acquire the area to be inspected and the corresponding historical inspection path information and historical inspection result information, wherein the historical inspection path information includes the connection relationship of multiple inspection sub-paths and the corresponding inspection times; A weight determination module, used to determine a first weight of each inspection sub-path in the to-be-inspected area based on the inspection times and the historical inspection result information; A combination determination module, configured to screen and divide the inspection sub-paths according to the first weights to obtain a combination to be connected; A path information determination module is used to determine multiple inspection paths and corresponding second weights based on the combination to be connected and the connection relationship, and determine the actual wiring complexity of the inspection path, and determine the inspection priority of the inspection path based on the second weight and the actual wiring complexity. The path generation module is used to generate corresponding inspection paths in sequence according to the inspection priorities.

9. A cable inspection path generation device based on historical inspection data, the device comprising: one or more processors; A storage device for storing one or more programs. When the one or more programs are executed by the one or more processors, the one or more processors implement the cable inspection path generation method based on historical inspection data as described in any one of claims 1-7.

10. A storage medium storing computer executable instructions, wherein the computer executable instructions are used to execute the cable inspection path generation method based on historical inspection data according to any one of claims 1 to 7 when executed by a computer processor.