Constructional engineering concrete quality detection device and use method thereof

By designing a device for concrete quality inspection, single-person operation and efficient cleaning are achieved, and the problems of human resource occupation and detection interference in the prior art are solved, ensuring the accuracy of detection and effective utilization of resources.

CN119147739AInactive Publication Date: 2024-12-17SHANDONG RUIXING ENG CONSULTING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411516191.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-29
Publication Date
2024-12-17
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing concrete slump detection method requires at least two people to operate, occupy more human resources, and it is difficult to effectively clean the concrete and slurry on the surface of the conveyor belt, affecting the accuracy of the detection.

Method used

A concrete quality inspection device for construction engineering is designed, including a conical cylinder, conveyor belt, winding roller and mounting seat. The concrete slump detection can be completed by one operator, and the magnetic suction block and limit seat are used to achieve the Limit and adjust the position of the steel belt to ensure the accuracy of detection.

Benefits of technology

A single-person concrete slump detection is realized, saving human resources, and by cleaning the concrete and slurry on the surface of the conveyor belt, preventing interference, ensuring the accuracy of the detection results, while allowing the collection and reuse of the concrete used for inspection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119147739A_ABST
    Figure CN119147739A_ABST
Patent Text Reader

Abstract

The invention discloses a constructional engineering concrete quality detection device and a use method thereof, and relates to the technical field of concrete quality detection.The constructional engineering concrete quality detection device comprises a fixed box, a driving cavity is formed in the fixed box, and a first rotating roller is rotationally connected to the interior of the driving cavity. According to the concrete slump detection device, the mounting frame, the screw and the conical barrel are arranged, so that the concrete slump detection device can be operated by one worker so as to detect the concrete slump, manpower resources are saved, and meanwhile, concrete and slurry on the surface of the conveying belt can be cleaned before the conical barrel is pulled out so as to prevent the concrete and the slurry from interfering with the slump detection; after slump detection, concrete on the surface of the conveying belt can be cleaned so as to facilitate subsequent slump detection, and meanwhile, the concrete used for the detection can be collected so as to be taken out and reused.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of concrete quality detection, in particular to a construction engineering concrete quality detection device and a use method thereof. Background Art

[0002] Concrete slump mainly refers to the plasticization and pumpability of concrete. The factors that affect the slump of concrete mainly include gradation changes, water content, weighing deviation of scales, dosage of admixtures, and the temperature of cement, which is easily overlooked. Slump refers to the workability of concrete, specifically to ensure the normal progress of construction, including the water retention, fluidity and cohesion of concrete. The test method of concrete slump: use a trumpet-shaped slump bucket with an upper opening of 100mm, a lower opening of 200mm, and a height of 300mm, and fill it with concrete in three times. After each filling, use a tamping hammer to hit the barrel wall evenly from the outside to the inside for 25 times. After tamping, smooth it. Then pull up the barrel, the concrete collapses due to its own weight. The height of the highest point of the concrete after collapse is subtracted from the barrel height (300mm), which is called slump. If the difference is 100mm, the slump is 100. During the test, at least two people are required to work together. For example, one person is required to press the slump while the other person cleans the concrete and mud on the ground nearby to prevent interference with the concrete slump test, which takes up more human resources. Summary of the invention

[0003] In view of the deficiencies in the prior art, the present invention provides a construction engineering concrete quality detection device and a method of using the same, which solves the problems raised in the above-mentioned background technology.

[0004] To achieve the above objectives, the present invention is implemented through the following technical solutions: a construction engineering concrete quality detection device, comprising a fixed box, a driving chamber is provided inside the fixed box, a first roller is rotatably connected inside the driving chamber, a second roller is rotatably connected inside the driving chamber and located on one side of the first roller, a conveyor belt is wrapped around the outside of the first roller, one end of the conveyor belt is connected to the outside of the second roller, a support plate is fixedly connected inside the driving chamber and located below the conveyor belt, an entry groove is provided on the top of the fixed box, a scraper is fixedly connected to the bottom of the driving chamber and located on one side of the first roller and the second roller, one end of the scraper is in contact with the surface of the conveyor belt Contact, a collecting drawer is placed inside the fixed box and below the driving cavity, a falling groove is opened inside the fixed box and below the scraper block, the falling grooves are communicated with the inside of the collecting drawer, one side of the fixed box is fixedly connected to the driving box, one end of the first roller and the second roller extend to the inside of the driving box and are fixedly sleeved with a worm gear, one side of the inner cavity of the driving box is rotatably connected to a transmission rod, and a worm segment drivingly connected to the worm gear is provided on the outside of the transmission rod and below the worm gear, a storage drawer is placed inside the fixed box, a vertical ruler is placed inside the storage drawer, a tamping rod is placed inside the storage drawer and on one side of the vertical ruler, and a protective box is hinged on one side of the fixed box.

[0005] Optionally, a rotating rod is rotatably connected inside the driving box, and the outer sides of the rotating rod and the transmission rod are fixedly sleeved with meshing first bevel gears, and one end of the rotating rod extends to the outside of the driving box.

[0006] The top of the inner cavity of the first connecting box is rotatably connected to the first threaded rod, and the bottom of the inner cavity of the first connecting box is rotatably connected to the second threaded rod. The second threaded rod is rotatably connected to the second threaded rod, and the second threaded rod is rotatably connected to the second threaded rod. The first end of the connecting rod passes through the first connecting box and the driving box and extends to the outside of the driving box. The outer side of the first threaded rod is threadedly connected to the first limit block, one end of the first limit block extends to the inside of the guide rail, and one end of the moving block extends to the inside of the guide rail.

[0007] Optionally, a second fixed plate is placed on the top of the fixed box, a top groove is opened on the top of the second fixed plate, a hopper is placed inside the top groove, a conical cylinder is inserted at the bottom of the hopper, both sides of the conical cylinder are fixedly connected with mounting blocks, the bottom of the second fixed plate and both sides of the conical cylinder are fixedly connected with a second connecting box, the inside of the second connecting box is rotatably connected with a second threaded rod, the outer side of the second threaded rod is threadedly connected with a push rod, the bottom end of the push rod extends to the bottom of the second connecting box and is fixedly connected with a mounting frame, the mounting frame is sleeved on the outer side of the mounting block, and the mounting frame One side is threadedly connected with a screw, one end of the screw is screwed into the inside of the mounting block and is threadedly connected to the inside of the mounting block, the top of the second fixing plate and the outside of the two second connecting boxes are fixedly connected with an annular sleeve, the inner cavity of the annular sleeve and one side of the second threaded rod are rotatably connected with a transmission column, the transmission column and the outside of the second threaded rod are fixedly sleeved with a second pulley connected by a belt drive, the top of the annular sleeve is slidably connected with a driving ring, the inner cavity of the driving ring is fixedly connected with a gear ring, the top of the transmission column extends into the inside of the driving ring and is fixedly sleeved with a transmission gear matching the gear ring.

[0008] The top of the fixing plate is fixedly connected to the two guide posts, and the top of the fixing box and the side of the guide post are fixedly connected to a column, and the outer side of the column is slidably connected to a second limit block, one end of the second limit block is fixedly connected to the limit rod, and one end of the limit rod is inserted into the guide post, and the inner cavity of the column is rotatably connected to a third threaded rod, and the outer side of the third threaded rod is threadedly connected to a finger block, and one side of the inner cavity of the column is fixedly connected to a scale, one end of the two finger blocks extends to the outside of the column, and one side of the finger block is fixedly connected to a winding box, the top of the inner cavity of the winding box is rotatably connected to a winding roller, and a spring is provided at the bottom of the inner cavity of the winding box, one end of the winding roller is connected to the spring, a steel belt is wound around the outer side of the winding roller, and one end of the steel belt extends to the outside of the winding box and is fixedly connected to a mounting seat.

[0009] Optionally, a mounting groove is provided on one side of the mounting seat, a connecting groove is provided inside the mounting seat and above the mounting groove, an unlocking rod is slidably connected inside the connecting groove, a fixing rod is fixedly connected to the bottom of the unlocking rod, a first magnetic block is fixedly connected to the bottom end of the fixing rod, a fixing spring is slidably connected to the inner cavity of the connecting groove and located on the outer side of the fixing rod, the bottom end of the fixing spring is fixedly connected to the bottom of the inner cavity of the connecting groove, the top of the fixing spring is fixedly connected to the bottom of the unlocking rod, and the bottom end of the first magnetic block extends into the mounting groove.

[0010] Optionally, one end of another finger block is fixedly connected to a limit seat, and the bottom of the inner cavity of the limit seat is fixedly connected to a second magnetic block that matches the first magnetic block.

[0011] Optionally, one side of the column is fixedly connected to a third connecting box, the interior of the third connecting box is rotatably connected to a fourth threaded rod, the outer side of the fourth threaded rod is threadedly connected to a clamping column, one end of the clamping column extends to the inside of the guide column, the other end of the fourth threaded rod extends to the outside of the third connecting box, the top of the third threaded rod extends to the top of the column, and the columns are made of transparent material.

[0012] Optionally, the method for using the construction engineering concrete quality detection device comprises the following steps: Step 1: Move the device to a flat position, then open the protection box, then place the conical cylinder on the top of the fixed box, then pull the mounting seat to pull out the steel belt, and check whether the bottom of the steel belt touches the top of the conical cylinder. If not, turn the third threaded rod to drive the finger block and the winding box to move downward, adjust the height of the winding box and the steel belt until the bottom of the steel belt touches the top of the conical cylinder, check the scale on the scale pointed by the finger block through the column, and get the moving position of the winding box, then the operator adjusts the position of the limit seat, and by turning the third threaded rod, the third threaded rod drives the finger block to drive the limit seat and the second magnetic block to move to an appropriate height, and then releases the mounting seat. At this time, the spring drives the winding roller to wind the steel belt, so that the steel belt drives the mounting seat to reset and move; Step 2: The operator rotates the limit rod, and then places the guide column on the top of the fixed box, so that one end of the limit rod is inserted into the inside of the guide column, and then the operator rotates the fourth threaded rod, so that the fourth threaded rod drives one end of the clamping column to be inserted into the inside of the guide column to fix the position of the guide column, and then the operator rotates one end of the screw to screw it into the inside of the mounting block, and then the operator rotates the driving ring, so that the driving ring drives the gear ring to move in a circle around the transmission gear, so that the driving ring drives the gear ring to move, so that the gear ring drives the transmission gear to drive the transmission column to rotate, so that the transmission column drives the second pulley to drive the second threaded rod to rotate, so that the second threaded rod drives the push rod and the mounting frame and the mounting block to move downward, so that the mounting block applies pressure to the conical cylinder, and then the hopper is inserted into the inside of the conical cylinder, and then the concrete is added into the inside of the conical cylinder in multiple times, and each time a layer of concrete is added, the operator tamps it with a tamping rod; Step 3: When the feeding is completed, the operator removes the hopper and scrapes the top of the cone to make the concrete fall on the surface of the conveyor belt. Then the operator rotates the connecting rod, so that the connecting rod drives the first threaded rod to rotate through the second bevel gear, so that the first threaded rod drives one end of the first limit block to move out of the guide rail. Then the operator rotates the rotating rod, so that the rotating rod drives the transmission rod to drive the worm segment to rotate through the first bevel gear, so that the worm segment drives the worm wheel to rotate, and the worm wheel drives the first roller and the second roller to rotate. First, the first roller reels the conveyor belt, and the second roller The conveyor belt is released, and the concrete on the surface of the conveyor belt on the left side of the conical cylinder is cleaned. When the second roller has released the conveyor belt, the rotating rod continues to rotate back and forth. At this time, the operator resets and rotates the rotating rod, so that the first roller and the second roller are reset and rotated, so that the second roller rewinds the conveyor belt. The first roller releases the conveyor belt, and the concrete on the surface of the conveyor belt is scraped into the inside of the drop groove by the scraper block, and then falls into the inside of the collecting bin until the rotating rod cannot be rotated. At this time, the residual concrete and slurry on the surface of the conveyor belt are cleaned, and then the operator resets and rotates the fourth threaded rod so that the fourth The threaded rod drives one end of the card column to move out of the guide column, and then pulls the second fixing plate up, so that the second fixing plate drives the tapered tube to move up through the second connecting box, screws, mounting frame and mounting block, so that the guide column moves along one end of the limit rod to prevent torque and shaking, until the tapered tube is out of contact with the concrete cone, at this time the limit rod is disengaged from the inside of the guide column, and then the second fixing plate and the tapered tube are placed on one side of the fixing box, and then the mounting seat is pulled out, so that the steel belt is released from the outside of the winding roller, so that one end of the limit seat is inserted into the mounting groove, at this time the second magnetic block is connected with the first The magnetic attraction between the magnetic blocks causes the first magnetic block to drive one end of the fixed rod to be inserted into the limit seat, and the position of the mounting seat and the steel belt is limited. Then the ruler is taken out and used vertically. The ruler is placed on one side of the steel belt to measure the highest point of the concrete cone after collapse, and the record is made. Then the operator pulls the unlocking lever, so that the unlocking lever drives the fixed rod and the first magnetic block to move out of the limit seat. Then the operator moves the mounting seat, so that the spring drives the winding roller to reset and rotate, so that the winding roller rewinds the steel belt, so that the steel belt drives the mounting seat to reset and move to the initial position. Step 4: According to the above steps, the conveyor belt is reeled in by the first roller, and the concrete on the surface of the conveyor belt is cleaned and collected in the collecting bin until the rotating rod cannot be rotated. Then the operator resets the rotating connecting rod, so that the connecting rod drives the first threaded rod to rotate through the second bevel gear, so that the first threaded rod drives the top end of the first limit block to be inserted into the guide rail. Then the operator resets the rotating connecting rod, so that the second roller reels the conveyor belt until the moving block touches the first limit block. At this time, the rotating rod cannot continue to rotate, so that the middle part of the conveyor belt is in the use position, and then the collecting bin is taken out, and the concrete inside the collecting bin is taken out for recycling. Then the second fixed plate is placed on the top of the fixed box, and then the protective box is closed and fixed between the protective box and the fixed box. Then the device can be pulled to move.

[0013] The present invention provides a construction engineering concrete quality detection device and a method for using the same, which have the following beneficial effects: 1. The construction engineering concrete quality detection device and the use method thereof are provided with a mounting frame, screws and a conical cylinder, so that the device can be operated by one staff member to detect the slump of concrete, saving human resources. At the same time, before pulling out the conical cylinder, the concrete and slurry on the surface of the conveyor belt can be cleaned to prevent them from interfering with the slump detection. After the slump detection, the concrete on the surface of the conveyor belt can be cleaned for subsequent slump detection. At the same time, the concrete used for this detection can be collected so that it can be taken out and reused.

[0014] 2. The construction engineering concrete quality detection device and the use method thereof are provided with a winding roller, a steel belt and a mounting seat. The mounting seat is pulled out so that the steel belt is released from the outside of the winding roller, and one end of the limit seat is inserted into the mounting groove. At this time, the magnetic attraction between the second magnetic block and the first magnetic block causes the first magnetic block to drive one end of the fixing rod to be inserted into the limit seat, and the position of the mounting seat and the steel belt is limited. Then, the ruler is taken out, and the ruler is used vertically. The ruler is placed on one side of the steel belt to measure the highest point after the concrete cone collapses, and the highest point is recorded, so that the device can be operated by one staff member to detect the slump of concrete. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the internal structure of the present invention; Figure 2 This is a schematic diagram of the internal structure of the drive box of the present invention; Figure 3 This is a schematic diagram of the internal structure of the installation frame of the present invention from a side view; Figure 4 For the present invention Figure 2 A magnified image of point A; Figure 5 For the present invention Figure 1 The enlarged view of point B; Figure 6 For the present invention Figure 1 Enlarged view of point C; Figure 7 For the present invention Figure 1 Enlarged view of point D.

[0016] In the figure: 1, fixed box; 2, driving chamber; 3, supporting plate; 4, first rotating roller; 5, second rotating roller; 6, conveyor belt; 7, scraping block; 8, falling groove; 9, collecting drawer; 10, driving box; 11, transmission rod; 12, worm gear; 13, worm segment; 14, rotating rod; 15, first bevel gear; 16, first fixed plate; 17, screw rod; 18, first pulley; 19, first connecting box; 20, first threaded rod; 21, first limit block; 22, connecting rod; 23, second bevel gear; 24, moving block; 25, guide rail; 26, second fixed plate; 27, top groove; 28, annular sleeve; 29, second connecting box; 30, second threaded rod; 31, push rod; 32, driving ring; 33, transmission column; 34, first Second pulley; 35, transmission gear; 36, gear ring; 37, tapered cylinder; 38, mounting block; 39, mounting frame; 40, screw; 41, hopper; 42, column; 43, second limit block; 44, limit rod; 45, guide column; 46, third threaded rod; 47, finger block; 48, scale; 49, winding box; 50, winding roller; 51, spring; 52, steel belt; 53, mounting seat; 54, mounting slot; 55, connecting slot; 56, unlocking rod; 57, fixing rod; 58, first magnetic block; 59, fixing spring; 60, limit seat; 61, second magnetic block; 62, third connecting box; 63, fourth threaded rod; 64, clamping column; 65, storage drawer; 66, ruler; 67, tamping rod; 68, protection box. DETAILED DESCRIPTION

[0017] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0018] Embodiment 1 See also Figures 1 to 7The present invention provides a technical solution: a construction engineering concrete quality detection device, comprising a fixed box 1, a driving chamber 2 is provided inside the fixed box 1, a first roller 4 is rotatably connected inside the driving chamber 2, a second roller 5 is rotatably connected inside the driving chamber 2 and located on one side of the first roller 4, a conveyor belt 6 is wound around the outside of the first roller 4, one end of the conveyor belt 6 is connected to the outside of the second roller 5, a support plate 3 is fixedly connected inside the driving chamber 2 and located below the conveyor belt 6, an entry groove is provided on the top of the fixed box 1, a scraper 7 is fixedly connected to the bottom of the inner cavity of the driving chamber 2 and located on one side of the first roller 4 and the second roller 5, one end of the scraper 7 is in contact with the surface of the conveyor belt 6, the fixed box 1 is located inside the driving chamber 2 is placed below a collecting drawer 9, a falling groove 8 is provided inside the fixed box 1 and below the scraper block 7, and the falling groove 8 is communicated with the inside of the collecting drawer 9, a driving box 10 is fixedly connected to one side of the fixed box 1, one end of the first roller 4 and the second roller 5 are extended to the inside of the driving box 10 and are fixedly sleeved with a worm gear 12, a transmission rod 11 is rotatably connected to one side of the inner cavity of the driving box 10, and a worm segment 13 connected to the worm gear 12 is provided on the outside of the transmission rod 11 and below the worm gear 12, a storage drawer 65 is placed inside the fixed box 1, a vertical ruler 66 is placed inside the storage drawer 65, a tamping rod 67 is placed inside the storage drawer 65 and on one side of the vertical ruler 66, and a protective box 68 is hinged on one side of the fixed box 1.

[0019] Among them, a rotating rod 14 is rotatably connected inside the driving box 10, and the outer sides of the rotating rod 14 and the transmission rod 11 are fixedly sleeved with a meshing first bevel gear 15, and one end of the rotating rod 14 extends to the outside of the driving box 10, so that the operator can rotate the rotating rod 14 conveniently.

[0020] Among them, two first fixed plates 16 are fixedly connected to the bottom of the inner cavity of the driving box 10, a screw rod 17 is rotatably connected between the two first fixed plates 16, and the outer sides of the screw rod 17 and the transmission rod 11 are fixedly sleeved with a first pulley 18 connected by belt transmission, a guide rail 25 is fixedly connected between the two first fixed plates 16 and below the screw rod 17, a first connecting box 19 is fixedly connected to the bottom of the guide rail 25, a moving block 24 is threadedly connected to the outer side of the screw rod 17, a first threaded rod 20 is rotatably connected to the top of the inner cavity of the first connecting box 19, and the first connecting A connecting rod 22 is rotatably connected to the bottom of the inner cavity of the box 19, and a second bevel gear 23 is fixedly sleeved on the outer side of the connecting rod 22 and the first threaded rod 20. One end of the connecting rod 22 passes through the first connecting box 19 and the driving box 10 and extends to the outer side of the driving box 10. The outer side of the first threaded rod 20 is threadedly connected to a first limit block 21, and one end of the first limit block 21 extends to the inside of the guide rail 25. One end of the moving block 24 extends to the inside of the guide rail 25 so as to adjust the middle part of the conveyor belt 6 to the working position so as to clean the concrete on the surface of the conveyor belt 6.

[0021] Among them, a second fixing plate 26 is placed on the top of the fixing box 1, a top groove 27 is opened on the top of the second fixing plate 26, a hopper 41 is placed inside the top groove 27, a conical cylinder 37 is inserted at the bottom of the hopper 41, and mounting blocks 38 are fixedly connected on both sides of the conical cylinder 37. A second connecting box 29 is fixedly connected to the bottom of the second fixing plate 26 and on both sides of the conical cylinder 37. A second threaded rod 30 is rotatably connected inside the second connecting box 29, and a push rod 31 is threadedly connected to the outside of the second threaded rod 30. The bottom end of the push rod 31 extends to the bottom of the second connecting box 29 and is fixedly connected to a mounting frame 39. The mounting frame 39 is sleeved on the outside of the mounting block 38, and a screw 40 is threadedly connected to one side of the mounting frame 39. One end of the screw 40 is screwed into the inside of the mounting block 38 and is The annular sleeve 28 is connected to the internal thread of the mounting block 38, and the top of the second fixed plate 26 and the outer sides of the two second connecting boxes 29 are fixedly connected with an annular sleeve 28. The inner cavity of the annular sleeve 28 and one side of the second threaded rod 30 are rotatably connected with a transmission column 33. The transmission column 33 and the outer side of the second threaded rod 30 are fixedly sleeved with a second pulley 34 connected by a belt drive. The top of the annular sleeve 28 is slidably connected with a driving ring 32, and the inner cavity of the driving ring 32 is fixedly connected with a gear ring 36. The top ends of the transmission columns 33 extend into the inside of the driving ring 32 and are fixedly sleeved with a transmission gear 35 matching the gear ring 36. The transmission gear 35 can drive the mounting frame 39 and the mounting block 38 to move, and pressure is applied to the mounting block 38 and the conical cylinder 37 through the mounting frame 39 to prevent the conical cylinder 37 from moving.

[0022] Among them, two guide pillars 45 are fixedly connected to the bottom of the second fixed plate 26, and the top of the fixed box 1 and one side of the guide pillar 45 are fixedly connected to the pillars 42, and the outer side of the pillars 42 are slidably connected to the second limit block 43, one end of the second limit block 43 is fixedly connected to the limit rod 44, and one end of the limit rod 44 is inserted into the guide pillar 45. The inner cavity of the pillar 42 is rotatably connected to the third threaded rod 46, and the outer side of the third threaded rod 46 is threadedly connected to the finger block 47, and one side of the inner cavity of the pillar 42 is fixedly connected to the engraved A ruler 48, one end of two finger blocks 47 extend to the outside of the column 42, one side of one finger block 47 is fixedly connected to a winding box 49, the top of the inner cavity of the winding box 49 is rotatably connected to a winding roller 50, a spring 51 is provided at the bottom of the inner cavity of the winding box 49, one end of the winding roller 50 is connected to the spring 51, a steel belt 52 is wound around the outside of the winding roller 50, one end of the steel belt 52 extends to the outside of the winding box 49 and is fixedly connected to a mounting seat 53, the steel belt 52 can be adjusted to a position consistent with the height of the conical cylinder 37.

[0023] Among them, a mounting groove 54 is opened on one side of the mounting seat 53, and a connecting groove 55 is opened inside the mounting seat 53 and above the mounting groove 54, an unlocking rod 56 is slidably connected inside the connecting groove 55, a fixing rod 57 is fixedly connected to the bottom of the unlocking rod 56, and a first magnetic block 58 is fixedly connected to the bottom of the fixing rod 57. A fixing spring 59 is slidably connected in the inner cavity of the connecting groove 55 and located on the outer side of the fixing rod 57, the bottom end of the fixing spring 59 is fixedly connected to the bottom of the inner cavity of the connecting groove 55, and the top of the fixing spring 59 is fixedly connected to the bottom of the unlocking rod 56, and the bottom end of the first magnetic block 58 extends to the inside of the mounting groove 54. The position of the mounting seat 53 and the steel belt 52 can be limited by the first magnetic block 58 and the second magnetic block 61.

[0024] Among them, one end of the other finger block 47 is fixedly connected to the limiting seat 60, and the bottom of the inner cavity of the limiting seat 60 is fixedly connected with the second magnetic block 61 that cooperates with the first magnetic block 58, so that the first magnetic block 58 and the fixing rod 57 can be attracted to the inside of the limiting seat 60 through the magnetic attraction force between the second magnetic block 61 and the first magnetic block 58, so as to limit and fix the position of the mounting seat 53 and the steel belt 52.

[0025] Among them, one side of the column 42 is fixedly connected to the third connecting box 62, the inside of the third connecting box 62 is rotatably connected to the fourth threaded rod 63, the outer side of the fourth threaded rod 63 is threadedly connected to the clamping column 64, one end of the clamping column 64 extends to the inside of the guide column 45, the other end of the fourth threaded rod 63 extends to the outside of the third connecting box 62, the top of the third threaded rod 46 extends to the top of the column 42, and the column 42 is made of transparent material, so that the scale on the scale 48 pointed to by the finger block 47 can be viewed through the column 42 to obtain the height position of the steel belt 52.

[0026] Embodiment 2 See also Figures 1 to 7 The present invention provides a technical solution: a method for using a construction engineering concrete quality detection device, comprising the following steps: Step 1: Move the device to a flat position, then open the protection box 68, then place the conical tube 37 on the top of the fixed box 1, then pull the mounting seat 53 to pull out the steel belt 52, and check whether the bottom of the steel belt 52 touches the top of the conical tube 37. If not, rotate the third threaded rod 46 to drive the finger block 47 and the winding box 49 to move downward, and adjust the height of the winding box 49 and the steel belt 52 until the bottom of the steel belt 52 touches the conical tube 37. The operator then checks the scale on the scale 48 pointed to by the finger block 47 through the column 42 to obtain the moving position of the winding box 49, and then adjusts the position of the limit seat 60. By rotating the third threaded rod 46, the third threaded rod 46 drives the finger block 47 to drive the limit seat 60 and the second magnetic block 61 to move to a proper height, and then releases the mounting seat 53. At this time, the spring 51 drives the winding roller 50 to wind the steel belt 52, so that the steel belt 52 drives the mounting seat 53 to reset and move; Step 2: The operator rotates the limit rod 44, and then places the guide column 45 on the top of the fixed box 1, so that one end of the limit rod 44 is inserted into the guide column 45, and then the operator rotates the fourth threaded rod 63, so that the fourth threaded rod 63 drives one end of the clamping column 64 to be inserted into the guide column 45, and the position of the guide column 45 is fixed, and then the operator rotates one end of the screw 40 to screw it into the mounting block 38, and then the operator rotates the drive ring 32, so that the drive ring 32 drives the gear ring 36 to move in a circle around the transmission gear 35 , so that the driving ring 32 drives the gear ring 36 to move, so that the gear ring 36 drives the transmission gear 35 to drive the transmission column 33 to rotate, so that the transmission column 33 drives the second pulley 34 to drive the second threaded rod 30 to rotate, so that the second threaded rod 30 drives the push rod 31 and the mounting frame 39 and the mounting block 38 to move downward, so that the mounting block 38 applies pressure to the conical cylinder 37, and then the hopper 41 is inserted into the conical cylinder 37, and then concrete is added to the conical cylinder 37 in multiple times. After each layer of concrete is added, the operator tamps it with the tamping rod 67; Step 3: After the feeding is completed, the operator removes the hopper 41 and scrapes the top of the conical cylinder 37 flat, so that the concrete falls on the surface of the conveyor belt 6. Then the operator rotates the connecting rod 22, so that the connecting rod 22 drives the first threaded rod 20 to rotate through the second bevel gear 23, so that the first threaded rod 20 drives one end of the first limit block 21 to move out of the guide rail 25. Then the operator rotates the rotating rod 14, so that the rotating rod 14 drives the transmission rod 11 to drive the worm segment 13 to rotate through the first bevel gear 15, so that the worm segment 13 drives the worm wheel 12 to rotate, so that the worm wheel 12 drives the first roller 4 and the second roller 5 to rotate. First, the first roller 4 reels the conveyor belt 6, and the second roller 5 reels the conveyor belt 6. 5 releases the conveyor belt 6, and cleans the concrete on the surface of the conveyor belt 6 located on the left side of the conical cylinder 37. After the second roller 5 has released the conveyor belt 6, the rotating rod 14 continues to rotate back and forth. At this time, the operator resets and rotates the rotating rod 14, so that the first roller 4 and the second roller 5 are reset and rotated, so that the second roller 5 rewinds the conveyor belt 6. The first roller 4 releases the conveyor belt 6, and the concrete on the surface of the conveyor belt 6 is scraped into the inside of the drop groove 8 by the scraper block 7, and then falls into the inside of the collecting bin 9, until the rotating rod 14 cannot be rotated. At this time, the residual concrete and slurry on the surface of the conveyor belt 6 are cleaned, and then the operator resets and rotates the fourth threaded rod 63, so that the fourth threaded rod 63 drives one side of the clamping column 64. The second fixing plate 26 is then pulled upward, so that the second fixing plate 26 drives the cone 37 upward through the second connection box 29, the screw 40, the mounting frame 39 and the mounting block 38, so that the guide column 45 moves along one end of the limiting rod 44 to prevent torsion and shaking, until the cone 37 is out of contact with the concrete cone, at which time the limiting rod 44 is disengaged from the inside of the guide column 45, and then the second fixing plate 26 and the cone 37 are placed on one side of the fixing box 1, and then the mounting seat 53 is pulled out, so that the steel belt 52 is released from the outside of the winding roller 50, so that one end of the limiting seat 60 is inserted into the mounting groove 54, and at this time the second magnetic block 61 and the first magnetic block 58 are The magnetic attraction between them causes the first magnetic block 58 to drive one end of the fixing rod 57 to be inserted into the limiting seat 60, and the position of the mounting seat 53 and the steel belt 52 is limited. Then the ruler 66 is taken out and used vertically. The ruler 66 is placed on one side of the steel belt 52 to measure the highest point of the concrete cone after collapse, and the record is made. Then the operator pulls the unlocking rod 56, so that the unlocking rod 56 drives the fixing rod 57 and the first magnetic block 58 to move out of the limiting seat 60. Then the operator moves the mounting seat 53, so that the spring 51 drives the winding roller 50 to reset and rotate, so that the winding roller 50 rewinds the steel belt 52, so that the steel belt 52 drives the mounting seat 53 to reset and move to the initial position. Step 4: According to the above steps, the conveyor belt 6 is reeled in by the first roller 4, and the concrete on the surface of the conveyor belt 6 is cleaned and collected in the collecting bin 9 until the rotating rod 14 cannot be rotated. Then the operator resets and rotates the connecting rod 22, so that the connecting rod 22 drives the first threaded rod 20 to rotate through the second bevel gear 23, so that the first threaded rod 20 drives the top end of the first limit block 21 to be inserted into the guide rail 25. Then the operator resets and rotates the rotating rod 14, so that the second roller 5 reels the conveyor belt 6 until the moving block 24 touches the first limit block 21. At this time, the rotating rod 14 cannot continue to rotate, so that the middle part of the conveyor belt 6 is in the use position, and then the collecting bin 9 is taken out, and the concrete inside the collecting bin 9 is taken out for recycling. Then the second fixed plate 26 is placed on the top of the fixed box 1, and then the protective box 68 is closed, and the protective box 68 is fixed to the fixed box 1. Then the device can be pulled to move.

[0027] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A construction engineering concrete quality detection device, comprising a fixing box (1), characterized in that: The fixed box (1) is provided with a driving chamber (2) inside, a first roller (4) is rotatably connected inside the driving chamber (2), a second roller (5) is rotatably connected inside the driving chamber (2) and located on one side of the first roller (4), a conveyor belt (6) is wound around the outside of the first roller (4), one end of the conveyor belt (6) is connected to the outside of the second roller (5), a support plate (3) is fixedly connected inside the driving chamber (2) and located below the conveyor belt (6), an entry groove is provided at the top of the fixed box (1), a scraper block (7) is fixedly connected at the bottom of the inner cavity of the driving chamber (2) and located on one side of the first roller (4) and the second roller (5), one end of the scraper block (7) is in contact with the surface of the conveyor belt (6), a collecting drawer (9) is placed inside the fixed box (1) and located below the driving chamber (2), the fixed box (1) A drop-in groove (8) is provided inside and below the scraper block (7), and the drop-in groove (8) is communicated with the inside of the collecting drawer (9). A driving box (10) is fixedly connected to one side of the fixed box (1). One end of the first roller (4) and the second roller (5) extend into the inside of the driving box (10) and are fixedly sleeved with a worm gear (12). A transmission rod (11) is rotatably connected to one side of the inner cavity of the driving box (10). A worm segment (13) drivingly connected to the worm gear (12) is provided on the outside of the transmission rod (11) and below the worm gear (12). A storage drawer (65) is placed inside the fixed box (1), a vertical ruler (66) is placed inside the storage drawer (65), a tamping rod (67) is placed inside the storage drawer (65) and on one side of the vertical ruler (66), and a protection box (68) is hingedly connected to one side of the fixed box (1).

2. A construction engineering concrete quality detection device according to claim 1, characterized in that: A rotating rod (14) is rotatably connected inside the driving box (10), and a meshing first bevel gear (15) is fixedly sleeved on the outer sides of the rotating rod (14) and the transmission rod (11), and one end of the rotating rod (14) extends to the outer side of the driving box (10).

3. A construction engineering concrete quality detection device according to claim 2, characterized in that: Two first fixing plates (16) are fixedly connected to the bottom of the inner cavity of the driving box (10), a screw rod (17) is rotatably connected between the two first fixing plates (16), a first pulley (18) connected by a belt drive is fixedly sleeved on the outer sides of the screw rod (17) and the transmission rod (11), a guide rail (25) is fixedly connected between the two first fixing plates (16) and below the screw rod (17), a first connecting box (19) is fixedly connected to the bottom of the guide rail (25), a moving block (24) is threadedly connected to the outer side of the screw rod (17), and the top of the inner cavity of the first connecting box (19) is fixedly connected to the bottom of the guide rail (25). A first threaded rod (20) is rotatably connected, and a connecting rod (22) is rotatably connected to the bottom of the inner cavity of the first connecting box (19), and a second bevel gear (23) is fixedly sleeved on the outer sides of the connecting rod (22) and the first threaded rod (20), one end of the connecting rod (22) passes through the first connecting box (19) and the driving box (10) and extends to the outer side of the driving box (10), and a first limit block (21) is threadedly connected to the outer side of the first threaded rod (20), and one end of the first limit block (21) extends to the inside of the guide rail (25), and one end of the moving block (24) extends to the inside of the guide rail (25).

4. A construction engineering concrete quality detection device according to claim 3, characterized in that: A second fixing plate (26) is placed on the top of the fixing box (1), a top groove (27) is provided on the top of the second fixing plate (26), a hopper (41) is placed inside the top groove (27), a conical cylinder (37) is inserted at the bottom of the hopper (41), both sides of the conical cylinder (37) are fixedly connected to mounting blocks (38), a second connection box (29) is fixedly connected at the bottom of the second fixing plate (26) and on both sides of the conical cylinder (37), a second threaded rod (30) is rotatably connected inside the second connection box (29), a push rod (31) is threadedly connected to the outer side of the second threaded rod (30), the bottom end of the push rod (31) extends to the bottom of the second connection box (29) and is fixedly connected to a mounting frame (39), the mounting frame (39) is sleeved on the outer side of the mounting block (38), the mounting frame (39) One side of each of the second fixing plates (26) is threadedly connected with a screw (40), one end of each of the screws (40) is screwed into the interior of the mounting block (38) and is threadedly connected to the interior of the mounting block (38); an annular sleeve (28) is fixedly connected to the top of the second fixing plate (26) and located on the outside of the two second connection boxes (29); a transmission column (33) is rotatably connected to the inner cavity of the annular sleeve (28) and located on one side of the second threaded rod (30); a second pulley (34) connected via a belt drive is fixedly sleeved on the outer side of the transmission column (33) and the second threaded rod (30); a driving ring (32) is slidably connected to the top of the annular sleeve (28); a gear ring (36) is fixedly connected to the inner cavity of the driving ring (32); and the top ends of the transmission columns (33) extend into the interior of the driving ring (32) and are fixedly sleeved with a transmission gear (35) matching the gear ring (36).

5. A construction engineering concrete quality detection device according to claim 4, characterized in that: The bottom of the second fixing plate (26) is fixedly connected to two guide pillars (45); the top of the fixing box (1) and one side of the guide pillars (45) are fixedly connected to the upright pillars (42); the outer sides of the upright pillars (42) are slidably connected to the second limit blocks (43); one end of the second limit blocks (43) is fixedly connected to the limit rods (44); one end of the limit rods (44) is inserted into the guide pillars (45); the inner cavities of the upright pillars (42) are rotatably connected to the third threaded rods (46); the outer sides of the third threaded rods (46) are threadedly connected to the finger blocks (47); the upright pillars (42) A scale (48) is fixedly connected to one side of the inner cavity, one end of each of the two finger blocks (47) extends to the outside of the column (42), one side of one of the finger blocks (47) is fixedly connected to a winding box (49), the top of the inner cavity of the winding box (49) is rotatably connected to a winding roller (50), a spring (51) is arranged at the bottom of the inner cavity of the winding box (49), one end of the winding roller (50) is connected to the spring (51), a steel belt (52) is wound around the outer side of the winding roller (50), one end of the steel belt (52) extends to the outside of the winding box (49) and is fixedly connected to a mounting seat (53).

6. A construction engineering concrete quality detection device according to claim 5, characterized in that: A mounting groove (54) is provided on one side of the mounting seat (53); a connecting groove (55) is provided inside the mounting seat (53) and located above the mounting groove (54); an unlocking rod (56) is slidably connected inside the connecting groove (55); a fixing rod (57) is fixedly connected to the bottom of the unlocking rod (56); a first magnetic block (58) is fixedly connected to the bottom end of the fixing rod (57); a fixing spring (59) is slidably connected inside the inner cavity of the connecting groove (55) and located outside the fixing rod (57); the bottom end of the fixing spring (59) is fixedly connected to the bottom of the inner cavity of the connecting groove (55); the top end of the fixing spring (59) is fixedly connected to the bottom of the unlocking rod (56); and the bottom end of the first magnetic block (58) extends into the mounting groove (54).

7. A construction engineering concrete quality detection device according to claim 6, characterized in that: One end of the other finger block (47) is fixedly connected to a limit seat (60), and the bottom of the inner cavity of the limit seat (60) is fixedly connected to a second magnetic block (61) that matches the first magnetic block (58).

8. A construction engineering concrete quality detection device according to claim 7, characterized in that: One side of the upright post (42) is fixedly connected to a third connection box (62), the interior of the third connection box (62) is rotatably connected to a fourth threaded rod (63), the outer side of the fourth threaded rod (63) is threadedly connected to a clamping column (64), one end of the clamping column (64) extends to the interior of the guide post (45), the other end of the fourth threaded rod (63) extends to the outside of the third connection box (62), the top end of the third threaded rod (46) extends to the top of the upright post (42), and the upright post (42) is made of a transparent material.

9. A construction engineering concrete quality detection device according to claim 1, characterized in that: The method for using the construction engineering concrete quality detection device comprises the following steps: Step 1: Move the device to a flat position, then open the protection box (68), then place the conical tube (37) on the top of the fixed box (1), then pull the mounting seat (53) to pull out the steel belt (52), and check whether the bottom of the steel belt (52) touches the top of the conical tube (37). If not, rotate the third threaded rod (46) so that the third threaded rod (46) drives the finger block (47) and the winding box (49) to move downward, and adjust the height of the winding box (49) and the steel belt (52) until the bottom of the steel belt (52) touches the top of the conical tube (37). The operator checks the scale (48) pointed by the finger block (47) through the column (42) to obtain the moving position of the winding box (49), and then adjusts the position of the limit seat (60). By rotating the third threaded rod (46), the third threaded rod (46) drives the finger block (47) to drive the limit seat (60) and the second magnetic block (61) to move to an appropriate height, and then releases the mounting seat (53). At this time, the spring (51) drives the winding roller (50) to wind the steel strip (52), so that the steel strip (52) drives the mounting seat (53) to reset and move; Step 2: The operator rotates the limit rod (44), and then places the guide column (45) on the top of the fixed box (1), so that one end of the limit rod (44) is inserted into the guide column (45), and then the operator rotates the fourth threaded rod (63), so that the fourth threaded rod (63) drives one end of the clamping column (64) to be inserted into the guide column (45), and the position of the guide column (45) is fixed, and then the operator rotates one end of the screw (40) to screw it into the mounting block (38), and then the operator rotates the drive ring (32), so that the drive ring (32) drives the gear ring (36) to move in a circle around the transmission gear (35), so that The drive ring (32) drives the gear ring (36) to move, so that the gear ring (36) drives the transmission gear (35) to drive the transmission column (33) to rotate, so that the transmission column (33) drives the second pulley (34) to drive the second threaded rod (30) to rotate, so that the second threaded rod (30) drives the push rod (31) and the mounting frame (39) and the mounting block (38) to move downward, so that the mounting block (38) applies pressure to the conical cylinder (37), and then the hopper (41) is inserted into the conical cylinder (37), and then concrete is added into the conical cylinder (37) in multiple times. After each layer of concrete is added, the operator tamps it with a tamping rod (67); Step 3: After the material addition is completed, the operator removes the hopper (41) and scrapes the top of the conical cylinder (37) flat so that the concrete falls on the surface of the conveyor belt (6). The operator then rotates the connecting rod (22) so that the connecting rod (22) drives the first threaded rod (20) to rotate through the second bevel gear (23), so that the first threaded rod (20) drives one end of the first limit block (21) to move out of the guide rail (25). The operator then rotates the rotating rod (14) so ​​that the rotating rod (14) drives the transmission rod (11) through the first bevel gear (15) to drive the worm segment (13) to rotate, so that the worm segment (13) drives the worm wheel (12) to rotate, so that the worm wheel (12) drives the first roller (4) and the second roller. (5) rotates, firstly, the first roller (4) reels the conveyor belt (6), and the second roller (5) releases the conveyor belt (6), and the concrete on the surface of the conveyor belt (6) located on the left side of the conical cylinder (37) is cleaned. After the second roller (5) has released the conveyor belt (6), the rotating rod (14) continues to rotate back and forth. At this time, the operator resets the rotating rod (14), so that the first roller (4) and the second roller (5) are reset and rotated, so that the second roller (5) reels the conveyor belt (6), and the first roller (4) releases the conveyor belt (6), and the concrete on the surface of the conveyor belt (6) is scraped into the inside of the drop groove (8) by the scraper (7), and then falls into the inside of the collecting bin (9), until the rotating rod (14) cannot be rotated. When the residual concrete and slurry on the surface of the conveyor belt (6) are cleaned, the operator resets and rotates the fourth threaded rod (63) so that the fourth threaded rod (63) drives one end of the clamping column (64) to move out of the guide column (45), and then pulls the second fixing plate (26) upward, so that the second fixing plate (26) drives the conical cylinder (37) upward through the second connecting box (29), the screw (40), the mounting frame (39) and the mounting block (38), so that the guide column (45) moves along one end of the limiting rod (44) to prevent torsion and shaking, until the conical cylinder (37) is out of contact with the concrete cone, at which time the limiting rod (44) is out of the guide column (45), and then the second fixing plate (26) and the conical cylinder ( 37) is placed on one side of the fixed box (1), and then the mounting seat (53) is pulled out, so that the steel belt (52) is released from the outside of the winding roller (50), so that one end of the limit seat (60) is inserted into the inside of the mounting groove (54). At this time, the magnetic attraction between the second magnetic block (61) and the first magnetic block (58) causes the first magnetic block (58) to drive one end of the fixed rod (57) to be inserted into the inside of the limit seat (60), and the position of the mounting seat (53) and the steel belt (52) is limited. Then, the ruler (66) is taken out, and the ruler (66) is used vertically. The ruler (66) is placed on one side of the steel belt (52) to measure the highest point after the concrete cone collapses, and the highest point is recorded. Then the operator pulls the unlocking lever (56),The unlocking rod (56) drives the fixing rod (57) and the first magnetic attraction block (58) to move out of the limiting seat (60), and then the operator moves the mounting seat (53), so that the spring (51) drives the winding roller (50) to return to rotation, so that the winding roller (50) rewinds the steel belt (52), and the steel belt (52) drives the mounting seat (53) to return to the initial position; Step 4: According to the above steps, the conveyor belt (6) is reeled up by the first roller (4), and the concrete on the surface of the conveyor belt (6) is cleaned and collected in the collecting bin (9) until the rotating rod (14) cannot be rotated anymore. Then, the operator resets the rotating connecting rod (22), so that the connecting rod (22) drives the first threaded rod (20) to rotate via the second bevel gear (23), so that the first threaded rod (20) drives the top end of the first limit block (21) to be inserted into the guide rail (25). Then, the operator resets the rotating connecting rod (14), so that The second roller (5) reels the conveyor belt (6) until the moving block (24) touches the first limit block (21), at which time the rotating rod (14) cannot continue to rotate, so that the middle part of the conveyor belt (6) is located in the use position, and then the collecting drawer (9) is taken out, and the concrete inside the collecting drawer (9) is taken out for recycling, and then the second fixing plate (26) is placed on the top of the fixing box (1), and then the protection box (68) is closed and fixed between the protection box (68) and the fixing box (1), and then the device can be pulled to move.