GIS arrangement mode selection method and system based on life cycle cost

Through the analysis of the full life cycle cost, combined with historical inspection costs and construction and retirement costs, the most economical arrangement method of GIS equipment was selected, which solved the problem of lack of scientific data support for the layout selection of GIS equipment in the existing technology, and achieved effective cost reduction and optimized resource utilization.

CN119151506APending Publication Date: 2024-12-17ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID SHANDONG ELECTRIC POWER COMPANY +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411168608.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2024-12-17

Smart Images

  • Figure CN119151506A_ABST
    Figure CN119151506A_ABST
Patent Text Reader

Abstract

The invention provides a GIS arrangement mode selection method and system based on life cycle cost, and relates to the field of operation and maintenance of high-voltage equipment, and the method comprises the steps: obtaining the historical operation and maintenance cost of GISs in different arrangement modes in an area where the GISs are to be arranged, and employing a regression analysis mode to obtain the historical operation and maintenance cost of the GISs in different arrangement modes; carrying out data fitting on the change curve of the operation and maintenance cost of the GIS in different arrangement modes along with the operation age limit; on the basis of the data fitting result, the operation cost of the GIS to be arranged in the whole life cycle is estimated, and the operation cost, the construction cost and the decommissioning cost form the whole life cycle cost of the GIS to be arranged; selecting a final GIS arrangement mode according to the whole life cycle cost; according to the method, the operation cost of the GIS to be arranged is estimated based on the actual operation data of the GIS in operation, the whole life cycle cost is formed by the operation cost, the construction cost and the decommissioning cost, and the most economical arrangement mode is selected according to the whole life cycle cost, so that the cost investment is effectively reduced, and the resource waste is reduced.