Convenient sealing construction method for middle partition plate of prefabricated flue

By designing partition sealing connections to use cement mortar for sealing connection in prefabricated flue, the problem of poor sealing in prefabricated flue construction is solved, construction efficiency and quality are improved, and flue gas backflow and return flow are reduced.

CN119177778AInactive Publication Date: 2024-12-24CHINA MCC22 GROUP CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411534984.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-31
Publication Date
2024-12-24
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the construction of prefabricated flue, due to the small construction space, the cement mortar batch scraping construction cannot be carried out between the partition plate, resulting in poor sealing and ineffective isolation of flue gas, resulting in the problem of flue gas backflow and return of flue gas.

Method used

A partition sealing connection piece is designed, including an upper fixing part and a lower fixing part, and sealing connections are made in these parts using cement mortar. The positioning is adjusted by measuring and positioning devices to ensure vertical installation and improve the sealing effect.

Benefits of technology

The connection construction of prefabricated flue has been greatly simplified, the sealing effect has been improved, the backflow and return of flue gas has been reduced, and the construction efficiency and quality have been improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119177778A_ABST
    Figure CN119177778A_ABST
Patent Text Reader

Abstract

The invention relates to the field of building construction, in particular to a convenient sealing construction method for a middle partition plate of a prefabricated flue. The convenient sealing construction method comprises the steps that a partition plate sealing connecting piece is manufactured, the partition plate sealing connecting piece comprises a groove-shaped upper fixing part and a groove-shaped lower fixing part, a groove opening of the upper fixing part faces upwards, and a groove opening of the lower fixing part faces downwards; the prefabricated flues are sequentially installed from bottom to top, the first section of the prefabricated flue is firstly installed, cement mortar is smeared on the inner side of a lower fixing part in the partition plate sealing connecting piece, and then the partition plate sealing connecting piece is installed in the mode that the lower fixing part is clamped on the partition plate; cement mortar is smeared on the inner side of the upper fixing part in the partition plate sealing connecting piece, the second section of prefabricated flue is hoisted, and a partition plate of the second section of prefabricated flue is clamped into the upper fixing part; and subsequent prefabricated flues are installed according to the construction modes of the first section of prefabricated flue and the second section of prefabricated flue. The connection construction of the prefabricated flue is greatly simplified, the construction efficiency is improved, the sealing effect of the flue is enhanced, and the possibility that smoke flows backwards and flows back is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, and in particular to a method for conveniently sealing a partition in a prefabricated flue. Background Art

[0002] With the development of construction technology, flue construction often uses prefabricated flues for construction in the air shaft. In order to avoid exhaust smoke backflow and cross-flow, a partition is added in the middle of the prefabricated flue to form a main and auxiliary flue. After the exhaust smoke enters the auxiliary flue, it enters the main flue through a vent that is higher than the exhaust port due to a certain buoyancy, which fundamentally avoids the situation where the smoke flows back through the exhaust port and flows back into the room, causing odor in the room. During the construction process, cement mortar is used to block the flues, but due to the small construction space between the partitions, cement mortar cannot be applied. The construction site often uses on-site materials for simple blocking or even no blocking, resulting in poor sealing between the main and auxiliary flues, which cannot isolate the smoke. Summary of the invention

[0003] In view of the above problems, an embodiment of the present invention provides a method for conveniently sealing a partition in the middle of a prefabricated flue.

[0004] An embodiment of the present invention provides a method for conveniently sealing a prefabricated flue intermediate partition, comprising: Making a partition sealing connector, the partition sealing connector includes an upper fixing part and a lower fixing part in a groove shape, wherein the groove of the upper fixing part faces upward and the groove of the lower fixing part faces downward; After the construction of the air shaft except the flue is completed, the garbage at the bottom of the air shaft is cleaned up, the prefabricated flue is placed in the installation position according to the requirements and the cement mortar caulking material is prepared; The prefabricated flue is installed in order from bottom to top. The first section of the prefabricated flue is installed first. The measuring and positioning device is used to adjust the first section of the prefabricated flue to the designed position. After applying cement mortar on the inner side of the lower fixing part of the partition sealing connector, the partition sealing connector is installed in a way that the lower fixing part is clamped on the partition. During the installation process, the position of the partition sealing connector is adjusted to ensure that it meets the vertical standard. Apply cement mortar on the inner side of the upper fixing part of the partition sealing connector, lift the second section of the prefabricated flue and insert the partition of the second section of the prefabricated flue into the upper fixing part, and adjust the position and verticality of the second section of the flue before the cement mortar begins to set; Refer to the construction methods of the prefabricated flues in Sections 1 and 2 to install subsequent prefabricated flues until all prefabricated flues are installed, and perform perimeter sealing of the flue to complete the flue installation project.

[0005] Compared with the prior art, the beneficial effects of the present invention are: the use of independently designed partition sealing connectors for construction greatly simplifies the connection construction of prefabricated flues, improves construction efficiency, and enhances the sealing effect of flues; avoids the problems of difficult connection, difficult sealing, and poor sealing effect of partitions in traditional construction methods, and reduces the possibility of smoke backflow and reflux; improves construction consistency, and greatly improves construction efficiency and construction quality.

[0006] Optionally, the upper fixing portion is in an inverted trapezoidal shape as a whole, and the lower fixing portion and the upper fixing portion are in a mirror image structure.

[0007] Optionally, a connecting portion is provided between the upper fixing portion and the lower fixing portion.

[0008] Optionally, the groove lengths of the upper fixing portion and the lower fixing portion are the same as the length of the partition in the prefabricated flue. BRIEF DESCRIPTION OF THE DRAWINGS

[0009] The drawings described herein are used to provide a further understanding of the present invention, constitute a part of the present application, and do not constitute a limitation of the present invention. In the drawings: Figure 1 A schematic cross-sectional view of the convenient sealing construction of the middle partition of the prefabricated flue provided in an embodiment of the present invention; Figure 2 A schematic structural diagram of a partition sealing connector provided in an embodiment of the present invention.

[0010] Among them, 1. partition sealing connector; 2. upper fixing part; 3. lower fixing part; 4. prefabricated flue; 5. partition; 6. connecting part. DETAILED DESCRIPTION

[0011] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the embodiments and the accompanying drawings. Here, the illustrative embodiments of the present invention and their descriptions are used to explain the present invention, but are not intended to limit the present invention.

[0012] An embodiment of the present invention provides a method for conveniently sealing a prefabricated flue intermediate partition, comprising: Make the bulkhead seal connector 1, see Figure 2 , the partition sealing connector 1 includes an upper fixing portion 2 and a lower fixing portion 3 in a groove shape, and the groove of the upper fixing portion 2 faces upward, and the groove of the lower fixing portion 3 faces downward; After the construction of the air shaft except the flue is completed, the garbage at the bottom of the air shaft is cleaned up, the prefabricated flue 4 is placed to the installation position as required and cement mortar caulking material is prepared; The prefabricated flue 4 is installed in order from bottom to top. The first section of the prefabricated flue is installed first. The first section of the prefabricated flue is adjusted to the designed position using a measuring and positioning device such as a plumb line. After applying cement mortar on the inner side of the lower fixing portion 3 in the partition sealing connector 1, the partition sealing connector 1 is installed in a manner that the lower fixing portion 3 is clamped on the partition 5. During the installation process, the position of the partition sealing connector 1 is adjusted to ensure that it meets the vertical standard. Apply cement mortar on the inner side of the upper fixing part 2 of the partition sealing connector 1, lift the second section of the prefabricated flue and insert the partition 5 of the second section of the prefabricated flue into the upper fixing part 2, and adjust the position and verticality of the second section of the flue before the cement mortar begins to set. The effect after construction is as follows: Figure 1 As shown; Refer to the construction method of the prefabricated flues 4 in the first and second sections to install subsequent prefabricated flues 4 until all prefabricated flues 4 are installed, and perform the flue periphery sealing construction to complete the flue installation project.

[0013] In practice, the upper fixing portion 2 is in an inverted trapezoidal shape as a whole, and the lower fixing portion 3 and the upper fixing portion 2 are in a mirror image structure.

[0014] A connecting portion 6 is provided between the upper fixing portion 2 and the lower fixing portion 3 to facilitate the subsequent sealing of the outer periphery of the flue with fillers.

[0015] The groove lengths of the upper fixing portion 2 and the lower fixing portion 3 are the same as the length of the partition plate 5 in the prefabricated flue 4 .

[0016] The solution provided by the embodiment of the present invention utilizes independently designed partition sealing connectors for construction, which greatly simplifies the connection construction of the prefabricated flue, improves the construction efficiency, and enhances the sealing effect of the flue; avoids the problems of difficult connection, difficult sealing, and poor sealing effect of the partitions in the traditional construction method, and reduces the possibility of smoke backflow and reflux; improves construction consistency, and greatly improves construction efficiency and construction quality.

[0017] The above description is only a preferred embodiment of the present invention and is not intended to limit the protection scope of the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention are included in the protection scope of the present invention.

Claims

1. A convenient sealing construction method for a prefabricated flue intermediate partition, characterized in that: include: Making a partition sealing connector, the partition sealing connector includes an upper fixing part and a lower fixing part in a groove shape, wherein the groove of the upper fixing part faces upward and the groove of the lower fixing part faces downward; After the construction of the air shaft except the flue is completed, the garbage at the bottom of the air shaft is cleaned up, the prefabricated flue is placed in the installation position according to the requirements and the cement mortar caulking material is prepared; The prefabricated flue is installed in order from bottom to top. The first section of the prefabricated flue is installed first. The measuring and positioning device is used to adjust the first section of the prefabricated flue to the designed position. After applying cement mortar on the inner side of the lower fixing part of the partition sealing connector, the partition sealing connector is installed in a way that the lower fixing part is clamped on the partition. During the installation process, the position of the partition sealing connector is adjusted to ensure that it meets the vertical standard. Apply cement mortar on the inner side of the upper fixing part of the partition sealing connector, lift the second section of the prefabricated flue and insert the partition of the second section of the prefabricated flue into the upper fixing part, and adjust the position and verticality of the second section of the flue before the cement mortar begins to set; Refer to the construction methods of the prefabricated flues in Sections 1 and 2 to install subsequent prefabricated flues until all prefabricated flues are installed, and perform perimeter sealing of the flue to complete the flue installation project.

2. The method for convenient sealing construction of the middle partition of the prefabricated flue as claimed in claim 1, characterized in that: The upper fixing part is in an inverted trapezoidal shape as a whole, and the lower fixing part and the upper fixing part are in a mirror image structure.

3. The method for convenient sealing construction of the middle partition of the prefabricated flue as claimed in claim 1, characterized in that: A connecting portion is arranged between the upper fixing portion and the lower fixing portion.

4. The method for convenient sealing construction of the middle partition of the prefabricated flue as claimed in claim 1, characterized in that: The groove lengths of the upper fixing portion and the lower fixing portion are the same as the length of the partition plate in the prefabricated flue.