Garden road laying device
By using upper fixed conveyor belts in garden road construction, the stacking and falling off problems caused by different sizes of pebbles is solved, and the construction quality and efficiency are improved to meet the needs of different sizes and materials.
Patent Information
- Application Number
- CN202411540856.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-31
- Publication Date
- 2024-12-31
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In garden road construction, pebbles have different movement speeds due to different sizes, and overlapping the upper and lower surfaces after stacking or too small contact surfaces cause falling off, which reduces the quality of the project and requires manual adjustment, which affects the construction efficiency and quality.
Design a garden road paving device, using an upper fixed conveyor belt to press down and fix the pebbles on the top of the second conveyor belt to avoid gathering overlap and falling off, and adjust the conveyor belt position through adjustable flat plates and drive motors to adapt to different Size pebbles.
Keep pebbles scattered, avoid stacking and falling off, improve project quality, reduce manual adjustment needs, and adapt to different material planning.
Smart Images

Figure CN119221354A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of road construction equipment, and in particular to a garden road paving device. Background Art
[0002] In the design and construction of garden roads in some parks, pebbles and concrete are used to pave some uneven roads. When children walk on the uneven roads paved with pebbles, the raised pebbles can stimulate the soles of children's feet, promote the development of their arches, and reduce the development of flat feet.
[0003] During the paving of existing cobblestone roads, the paving device guides the cobblestones to move and fall onto the concrete below through an inclined plate frame. However, in the process of the cobblestones moving along the inclined plate frame, the cobblestones will move at different speeds due to their different sizes. The cobblestones at the back will catch up with the cobblestones in the front, causing the cobblestones to be stacked together. After the cobblestones are stacked, they will overlap up and down. The cobblestones at the bottom are too deep in the concrete and the protrusions are too small to achieve the designed effect. The cobblestones at the top will fall off very easily due to the small contact surface with the concrete, which reduces the quality of the project and requires personnel to manually adjust the stacked cobblestones. Summary of the invention
[0004] The disclosed embodiment relates to a garden road paving device, in which an upper fixed conveyor belt presses down and fits the pebbles on the top of the second conveyor belt to fix them, so that the pebbles on the top of the second conveyor belt remain dispersed during the paving process, avoiding the pebbles from rolling along the inclined second conveyor belt and overlapping each other, avoiding the pebbles from stacking up and down after gathering, maintaining the beauty of the paving of the pebbles, avoiding the situation where only a small amount of pebbles on the upper layer contact with concrete and are easy to loosen and fall off, and eliminating the need for personnel to manually adjust the stacked pebbles.
[0005] According to a first aspect of the present disclosure, a garden road paving device is provided, which specifically includes: a first paving frame, a second paving frame, an upper auxiliary frame and a third paving frame. The first paving frame, the second paving frame, the upper auxiliary frame and the third paving frame are all provided with wheel hubs. The second paving frame is fixedly provided on the rear side of the first paving frame, the third paving frame is fixedly connected to the rear side of the second paving frame, an upper auxiliary frame is provided above the second paving frame, a material discharge hopper is fixedly provided on the front upper side of the first paving frame, an upper blocking baffle is vertically slidably provided on the top of the first paving frame, the head end of the upper blocking baffle is screwed to a first lifting screw, a middle transmission roller of the first paving frame is tightly engaged with a first conveyor belt, and the transmission roller of the first paving frame is driven to rotate by a motor.
[0006] In at least some embodiments, the lower end of the first lifting screw is rotatably connected to the top of the first laying frame, the upper blocking baffle is located above the first conveyor belt, the bottom of the upper blocking baffle is spaced apart from the top of the first conveyor belt, the upper blocking baffle blocks the pebbles stacked on the top of the first conveyor belt, and the upper stacked pebbles are blocked by the upper blocking baffle.
[0007] In at least some embodiments, the middle transmission roller of the second laying frame is tightly engaged with the second conveyor belt, an upper connecting slide column is fixedly provided on the top of the second laying frame, the upper connecting slide column and the upper auxiliary frame are vertically slidably connected, and the transmission roller of the second laying frame and the transmission roller of the first laying frame are connected by a chain to rotate synchronously in the same direction.
[0008] In at least some embodiments, a second lifting screw is rotatably provided on both sides of the upper auxiliary frame, the upper part of the upper auxiliary frame is rotatably connected to the middle transmission shaft, a conveyor belt drive shaft is rotatably provided on the inner side of the upper auxiliary frame, the conveyor belt drive shaft is driven to rotate by a motor, a sub-auxiliary frame is slidably connected to the front part of the upper auxiliary frame, a conveyor belt drive shaft is rotatably provided on the inner side of the sub-auxiliary frame, and the conveyor belt drive shaft is tightly meshed with the inner side of the upper fixed conveyor belt.
[0009] In at least some embodiments, the second laying frame is inclined with a lower tail height, the upper auxiliary frame and the second laying frame are inclined at the same angle and are arranged parallel to each other, the upper fixed conveyor belt is above the second conveyor belt, the second conveyor belt and the upper fixed conveyor belt are arranged parallel, the middle roller shaft is between the conveyor belt driving shafts, and the upper fixed conveyor belt protrudes to press down and fix the pebbles on the top of the second conveyor belt, so that the inclined second conveyor belt keeps the position of the top pebbles fixed during the conveying process.
[0010] In at least some embodiments, the second lifting screws on both sides of the upper auxiliary frame are respectively meshed with the gears at the head and tail ends of the middle transmission shaft, and the inner lower part of the conveyor belt driving shaft is meshed with a middle roller shaft, and both ends of the middle roller shaft are rotatably connected to the inner lifting connecting frame, and the side lifting connecting frames are slidably connected on both sides of the inner lifting connecting frame, and the side lifting connecting frame and the top cylinder of the upper auxiliary frame are axially slidably connected, and a middle connecting elastic piece is provided before the side lifting connecting frame at the rear of the inner lifting connecting frame and the upper auxiliary frame, and a middle connecting elastic piece is provided before the side lifting connecting frame at the front of the inner lifting connecting frame and the auxiliary auxiliary frame, the second lifting screw moves axially synchronously along the upper connecting sliding column, the second lifting screw and the upper auxiliary frame move synchronously, and the upper fixed conveyor belt moves with the upper auxiliary frame.
[0011] In at least some embodiments, the lower part of the second lifting screw is threadedly connected to the upper connecting slide column, a second lifting screw is rotatably arranged on the inner side of one of the side lifting connecting frames on both sides of the inner lifting connecting frame, the second lifting screw of the side lifting connecting frame is threadedly connected to the side lifting connecting frame, and the inner lifting connecting frame and the side lifting connecting frame are fixed in position by the second lifting screw of the inner lifting connecting frame.
[0012] In at least some embodiments, a driving motor is fixedly installed on the upper part of the third laying frame, the main shaft of the driving motor is fixedly connected to the head end of the rotating rod, the middle part of the rotating rod is slidably connected to a middle connecting rotating frame, the middle part of the rotating rod is rotatably connected to a middle connecting screw, and the middle connecting rotating frame and the slide groove of the upper slide groove frame are slidably connected.
[0013] In at least some embodiments, the middle connecting screw and the middle connecting rotating frame are threadedly connected, the lower part of the upper slide frame and the flat plate are fixed, the flat plate slides vertically on the inner side of the third laying frame, the third laying frame is horizontally arranged, and the thread of the middle connecting screw guides the middle connecting rotating frame to move, and the displacement of the middle connecting rotating frame from the main shaft of the driving motor is expanded or reduced, and the position of the middle connecting rotating frame is adjusted, and the circumferential radius of the rotation of the middle connecting rotating frame is expanded or reduced.
[0014] The present invention provides a garden road paving device, which has the following beneficial effects:
[0015] The upper fixed conveyor belt presses down and fixes the pebbles on the top of the second conveyor belt, so that the pebbles on the top of the second conveyor belt remain dispersed during the paving process, avoiding the pebbles from rolling along the inclined second conveyor belt and overlapping each other, and avoiding the pebbles from stacking up and down after gathering, thereby maintaining the beauty of the paving of the pebbles and avoiding the situation where only a small amount of pebbles on the upper layer contact the concrete and are easy to loosen and fall off, eliminating the need for personnel to manually adjust the stacked pebbles.
[0016] The flat pressing plate presses the pebbles into the concrete. By adjusting the position of the middle connecting rotating frame, the pressing height of the flat pressing plate can be adjusted. The depth of the pebbles pressed into the concrete can be adjusted according to the size of the pebbles, which is better compatible with the different material planning of different garden roads.
[0017] The upper fixed conveyor belt moves up and down with the upper auxiliary frame, and the distance between the upper fixed conveyor belt and the second conveyor belt is adjusted to adapt to the downward pressing and fitting operation of pebbles of different sizes, thereby improving the compatibility with pebbles of different sizes.
[0018] The upper blocking baffle blocks the pebbles stacked on the top of the first conveyor belt to avoid wasteful stacking. The pebbles on the top of the first conveyor belt are in a single layer and pass through the bottom space of the upper blocking baffle. The height of the upper blocking baffle is adjusted to accommodate the stacking and blocking operation of larger or smaller pebbles. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the technical solution of the embodiment of the present invention, the drawings of the embodiment are briefly introduced below.
[0020] The drawings described below are only related to some embodiments of the present invention, but are not intended to limit the present invention.
[0021] In the attached picture:
[0022] Figure 1 A schematic diagram showing the overall structure of the present application;
[0023] Figure 2 A schematic diagram showing a second laying frame structure of the present application is shown;
[0024] Figure 3 A schematic diagram showing a third laying frame structure of the present application is shown;
[0025] Figure 4 A schematic diagram showing a second conveyor belt structure of the present application is shown;
[0026] Figure 5 A schematic diagram of the structure of the upper auxiliary frame of the present application is shown;
[0027] Figure 6 A schematic diagram of the structure of the upper slide frame of the present application is shown;
[0028] Figure 7 A schematic diagram of the cross-sectional structure of the upper slide frame and the flat pressing plate of the present application is shown;
[0029] Figure 8 A schematic diagram of a half-section structure of the upper fixed conveyor belt of the present application is shown;
[0030] Reference numerals list
[0031] 1. First laying frame; 101. Unloading hopper; 102. Upper blocking baffle; 103. First lifting screw; 104. First conveyor belt;
[0032] 2. Second laying frame; 201. Second conveyor belt; 202. Upper connecting slide column;
[0033] 3. Upper auxiliary frame; 301. Second lifting screw; 302. Middle transmission shaft; 303. Conveyor belt drive shaft; 304. Upper fixed conveyor belt; 305. Auxiliary auxiliary frame; 306. Middle connecting elastic piece; 307. Inner lifting connecting frame; 308. Middle roller shaft; 309. Side lifting connecting frame;
[0034] 4. The third laying frame; 401. The driving motor; 402. The rotating rod; 403. The middle connecting rotating frame; 404. The middle connecting screw rod; 405. The upper slide frame; 406. The flat pressing plate. DETAILED DESCRIPTION
[0035] In order to make the purpose, technical solution and advantages of the embodiment of the present invention clearer, the technical solution of the embodiment of the present invention will be clearly and completely described below in conjunction with the drawings of the embodiment of the present invention. Obviously, the described embodiment is a part of the embodiment of the present invention, not all of the embodiments. Based on the described embodiment of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0036] Example 1: Please refer to Figures 1 to 8 :
[0037] The present invention proposes a garden road paving device, comprising: a first paving frame 1, a second paving frame 2, an upper auxiliary frame 3 and a third paving frame 4, wherein the first paving frame 1, the second paving frame 2, the upper auxiliary frame 3 and the third paving frame 4 are all provided with wheel hubs, a material discharge hopper 101 is fixedly provided on the front upper side of the first paving frame 1, an upper blocking baffle 102 is vertically slidably provided on the top of the first paving frame 1, the head end of the upper blocking baffle 102 is screwed to a first lifting screw 103, a middle driving roller of the first paving frame 1 is tightly engaged with a first conveyor belt 104, and the first paving frame 1 is provided with a plurality of conveyor belts 106, wherein the conveyor belts 107 are provided on the first paving frame 1, and the conveyor belts 108 are provided on the first paving frame 1. The driving roller of the frame 1 is driven to rotate by the motor, the lower end of the first lifting screw 103 is rotatably connected to the top of the first laying frame 1, the upper blocking baffle 102 is above the first conveyor belt 104, the bottom of the upper blocking baffle 102 and the top of the first conveyor belt 104 are spaced apart, the upper blocking baffle 102 blocks the pebbles stacked on the top of the first conveyor belt 104, the upper stacked pebbles are blocked by the upper blocking baffle 102, the multi-layer stacked pebbles pass through the upper blocking baffle 102 to become a single layer of pebbles, and move with the first conveyor belt 104, the first laying A second laying frame 2 is fixedly arranged on the rear side of the frame 1, and a second conveyor belt 201 is tightly engaged with a middle driving roller of the second laying frame 2. An upper connecting slide column 202 is fixedly arranged on the top of the second laying frame 2. The upper connecting slide column 202 is vertically slidably connected to the upper auxiliary frame 3. The driving roller of the second laying frame 2 and the driving roller of the first laying frame 1 are synchronously rotated in the same direction through a chain. The second laying frame 2 is an inclined setting with a lower tail height. The upper auxiliary frame 3 and the second laying frame 2 are inclined at the same angle and are arranged parallel to each other. The upper fixed conveyor belt 304 is in the second conveyor Above the belt 201, the second conveyor belt 201 and the upper fixed conveyor belt 304 are arranged in parallel, the middle roller shaft 308 is between the conveyor belt drive shaft 303, and the upper fixed conveyor belt 304 protrudes to press down the pebbles on the top of the second conveyor belt 201 to fit and fix them, so that the second conveyor belt 201 in an inclined state can keep the position of the top pebbles fixed during the conveying process, so that the top pebbles of the second conveyor belt 201 can be kept in a dispersed state during the laying process, so as to avoid the situation where the pebbles roll along the inclined second conveyor belt 201 and then gather and overlap;
[0038] The rear side of the second laying frame 2 is fixedly connected with the third laying frame 4, the upper part of the third laying frame 4 is fixedly provided with a driving motor 401, the main shaft of the driving motor 401 is fixedly connected to the head end of the rotating rod 402, the middle part of the rotating rod 402 is slidably connected with a middle connecting rotating frame 403, the middle part of the rotating rod 402 is rotatably connected with a middle connecting screw 404, the middle connecting rotating frame 403 and the slide groove of the upper slide groove frame 405 are slidably connected, and an upper auxiliary frame 3 is provided above the second laying frame 2. A second lifting screw 301 is rotatably provided on both sides of the upper auxiliary frame 3, the upper part of the upper auxiliary frame 3 is rotatably connected to the middle transmission shaft 302, a conveyor belt drive shaft 303 is rotatably provided on the inner side of the upper auxiliary frame 3, and the conveyor belt drive shaft 303 is driven to rotate by a motor, a sub-auxiliary frame 305 is slidably connected to the front part of the upper auxiliary frame 3, a conveyor belt drive shaft 303 is rotatably provided on the inner side of the sub-auxiliary frame 305, and the conveyor belt drive shaft 303 is tightly meshed with the inner side of the upper fixed conveyor belt 304.
[0039] In the embodiment of the present disclosure, the second lifting screws 301 on both sides of the upper auxiliary frame 3 are respectively meshed with the gears at the first and tail ends of the middle transmission shaft 302, and the inner lower part of the conveyor belt driving shaft 303 is meshed with a middle roller shaft 308. Both ends of the middle roller shaft 308 are rotatably connected to the inner lifting connecting frame 307, and the side lifting connecting frames 309 are slidably connected on both sides of the inner lifting connecting frame 307. The side lifting connecting frame 309 is axially slidably connected to the top cylinder of the upper auxiliary frame 3, and a middle connecting elastic member 306 is provided between the side lifting connecting frame 309 at the rear of the inner lifting connecting frame 307 and the upper auxiliary frame 3, and a middle connecting elastic member 306 is provided between the side lifting connecting frame 309 at the front of the inner lifting connecting frame 307 and the auxiliary auxiliary frame 305. The second lifting screw 301 moves axially synchronously along the upper connecting slide column 202, and the second lifting screw 301 moves synchronously with the upper auxiliary frame 3. The upper fixed conveyor belt 304 moves with the upper auxiliary frame 3 to adjust the distance between the upper fixed conveyor belt 304 and the second conveyor belt 201.
[0040] In the embodiment of the present disclosure, the lower part of the second lifting screw 301 is screwed to the upper connecting slide column 202, and the second lifting screw 301 is rotatably set on the inner side of one of the side lifting connecting frames 309 on both sides of the inner lifting connecting frame 307. The second lifting screw 301 of the side lifting connecting frame 309 is screwed to the side lifting connecting frame 309, and the position of the inner lifting connecting frame 307 and the side lifting connecting frame 309 is fixed by the second lifting screw 301 of the inner lifting connecting frame 307, and the middle connecting spring 306 of the side lifting connecting frame 309 is adjusted to apply buffering pressure to the inner lifting connecting frame 307 and the side lifting connecting frame 309 to press the pebbles.
[0041] In the embodiment of the present disclosure, the middle connecting screw 404 and the middle connecting rotating frame 403 are screwed through, the lower part of the upper slide frame 405 and the flat pressing plate 406 are fixed, the flat pressing plate 406 slides vertically on the inner side of the third laying frame 4, and the third laying frame 4 is horizontally arranged. The thread of the middle connecting screw 404 guides the middle connecting rotating frame 403 to move, and the displacement of the middle connecting rotating frame 403 from the main shaft of the driving motor 401 is enlarged or reduced, and the position of the middle connecting rotating frame 403 is adjusted. The circumferential radius of the rotation of the middle connecting rotating frame 403 is enlarged or reduced, so that the downward pressing height of the flat pressing plate 406 can be adjusted to be higher or lower, and the flat pressing plate 406 is pressed down lower to adapt to the downward pressure on small pebbles.
[0042] Embodiment 2, on the basis of embodiment 1, the unloading funnel 101 and the first laying frame 1 are connected by springs or rubber blocks, and a vibration motor is arranged on the outside of the unloading funnel 101, and the vibration motor drives the unloading funnel 101 to vibrate, thereby promoting the unloading funnel 101 to carry out the operation of discharging pebbles downward, and the number of pebbles from the unloading funnel 101 falling to the first conveyor belt 104 is more stable.
[0043] The working principle of this embodiment is as follows: the unloading funnel 101 contains pebbles, which fall to the top of the first conveyor belt 104, and the first conveyor belt 104 transports the pebbles. When the pebbles on the top of the first conveyor belt 104 pass through the upper blocking baffle 102, only the pebbles smaller than the space between the upper blocking baffle 102 and the first conveyor belt 104 can pass through. The space between the upper blocking baffle 102 and the first conveyor belt 104 is greater than the maximum height of the pebbles. The upper blocking baffle 102 blocks the pebbles stacked on the top of the first conveyor belt 104, and the upper stacked pebbles are blocked by the upper blocking baffle 102. The multi-layer stacked pebbles pass through the upper blocking baffle 102 to become a single layer of pebbles. The pebbles move with the first conveyor belt 104, so as to avoid the stacking of pebbles during transportation, resulting in multiple layers of pebbles on the concrete in the later stage, which leads to the waste of pebbles. It also avoids the situation that after multiple layers of pebbles fall on the concrete, only a small amount of pebbles on the upper layer contact the concrete, which makes them easy to loosen and fall off, eliminating the need for personnel to manually adjust the stacked pebbles. The pebbles on the top of the first conveyor belt 104 are a single layer passing through the bottom space of the upper blocking baffle 102. The first lifting screw 103 rotates, and the thread of the first lifting screw 103 guides the upper blocking baffle 102 to move vertically. The distance between the upper blocking baffle 102 and the first conveyor belt 104 is adjusted and changed to adapt to the stacking and blocking operation of larger or smaller pebbles.
[0044] The first conveyor belt 104 conveys the pebbles to the second conveyor belt 201. The second conveyor belt 201 and the upper fixed conveyor belt 304 are set to rotate in opposite directions. The side lifting connection frame 309 is pulled down by the middle connecting elastic member 306. The side lifting connection frame 309 and the inner lifting connection frame 307 and the middle roller shaft 308 move down synchronously. The middle roller shaft 308 pushes the lower part of the upper fixed conveyor belt 304 to protrude downward. When the upper fixed conveyor belt 304 protrudes, it will pull the conveyor belt driving shafts 303 at both ends to move toward the middle. The upper auxiliary frame 3 and the sub-auxiliary frame 305 move close to each other synchronously to ensure that the upper fixed conveyor belt 304 maintains a tight state. The pebbles on the top of the second conveyor belt 201 are pressed down and fixed, so that the second conveyor belt 201 in the inclined state keeps the position of the top pebbles fixed during the conveying process, so that the pebbles on the top of the second conveyor belt 201 remain in a dispersed state during the paving process, so as to avoid the pebbles rolling along the inclined second conveyor belt 201 and overlapping each other, avoid the pebbles stacking up and down after gathering, and avoid the situation that after multiple layers of pebbles fall on the concrete, only a small amount of pebbles on the upper layer contact the concrete and are easy to loosen and fall off, so as to maintain the beauty of the paving of pebbles, and the pebbles are transported by the second conveyor belt 201 and fall into the concrete below;
[0045] The first laying frame 1, the second laying frame 2, the upper auxiliary frame 3 and the third laying frame 4 move through the wheel hub, and the flat plate 406 moves to the top of the cobblestones with the third laying frame 4, and the driving motor 401 drives the rotating rod 402 to rotate in the circumferential direction, and the rotating rod 402 and the middle connecting rotating frame 403 rotate in the circumferential direction synchronously, and the middle connecting rotating frame 403 drives the upper slide frame 405 and the flat plate 406 to reciprocate vertically synchronously, and the flat plate 406 moves downward to press the cobblestones into the concrete, so as to realize the combination of the cobblestones and the concrete, and complete the paving of the cobblestone road surface, and the middle connecting screw 404 is rotated. , the thread of the middle connecting screw 404 guides the middle connecting rotating frame 403 to move, the displacement of the middle connecting rotating frame 403 from the main shaft of the driving motor 401 is enlarged or reduced, the position of the middle connecting rotating frame 403 is adjusted, and the circumferential radius of the rotation of the middle connecting rotating frame 403 is enlarged or reduced, so that the pressing height of the flat pressing plate 406 is adjusted to be higher or lower, and the flat pressing plate 406 is pressed lower to adapt to the pressing of small pebbles, and the depth of the pebbles pressed into the concrete can be adjusted according to the size of the pebbles, so as to be more compatible with the planning of pebbles of different sizes for different garden roads;
[0046] The second lifting screw 301 of the upper auxiliary frame 3 rotates, and the second lifting screw 301 moves axially synchronously along the upper connecting slide column 202. The second lifting screw 301 and the upper auxiliary frame 3 move synchronously, and the upper fixed conveyor belt 304 moves up and down with the upper auxiliary frame 3. The distance between the upper fixed conveyor belt 304 and the second conveyor belt 201 is adjusted to adapt to the downward pressing and fitting operation of pebbles of different sizes, thereby improving the compatibility with pebbles of different sizes.
[0047] In this article, there are a few points to note:
[0048] 1. The drawings of the embodiments of the present disclosure only involve structures related to the embodiments of the present disclosure, and other structures may refer to general designs.
[0049] 2. In the absence of conflict, the embodiments of the present disclosure and the features therein may be combined with each other to obtain new embodiments.
[0050] The above are only specific embodiments of the present disclosure, but the protection scope of the present disclosure is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present disclosure, which should be included in the protection scope of the present disclosure. Therefore, the protection scope of the present disclosure should be based on the protection scope of the claims.
Claims
1. A garden road paving device, comprising: A first laying frame (1), a second laying frame (2), an upper auxiliary frame (3) and a third laying frame (4); characterized in that the second laying frame (2) is fixedly arranged on the rear side of the first laying frame (1), the third laying frame (4) is fixedly connected to the rear side of the second laying frame (2), an upper auxiliary frame (3) is arranged above the second laying frame (2), second lifting screws (301) are rotatably arranged on both sides of the upper auxiliary frame (3), the upper part of the upper auxiliary frame (3) is rotatably connected to the middle transmission shaft (302), a conveyor belt drive shaft (303) is rotatably arranged on the inner side of the upper auxiliary frame (3), a sub-auxiliary frame (305) is slidably connected to the front part of the upper auxiliary frame (3), a conveyor belt drive shaft (303) is rotatably arranged on the inner side of the sub-auxiliary frame (305), and the conveyor belt drive shaft (303) is tightly meshed with the inner side of the upper fixed conveyor belt (304).
2. A garden road paving device according to claim 1, characterized in that: A material discharge hopper (101) is fixedly arranged on the upper front side of the first laying frame (1); an upper blocking baffle (102) is vertically slidably arranged on the top of the first laying frame (1); the head end of the upper blocking baffle (102) is screwed to a first lifting screw (103); and a first conveyor belt (104) is tightly engaged with a driving roller in the middle of the first laying frame (1).
3. A garden road paving device according to claim 2, characterized in that: The lower end of the first lifting screw (103) is rotatably connected to the top of the first laying frame (1), the upper blocking baffle (102) is located above the first conveyor belt (104), and the bottom of the upper blocking baffle (102) and the top of the first conveyor belt (104) are spaced apart.
4. A garden road paving device according to claim 3, characterized in that: The middle driving roller of the second laying frame (2) is tightly engaged with a second conveyor belt (201), and an upper connecting slide column (202) is fixedly arranged on the top of the second laying frame (2), and the upper connecting slide column (202) and the upper auxiliary frame (3) are vertically slidably connected.
5. A garden road paving device according to claim 4, characterized in that: The second laying frame (2) is inclined with a lower tail height, the upper auxiliary frame (3) and the second laying frame (2) are inclined at the same angle and are arranged parallel to each other, the upper fixed conveyor belt (304) is located above the second conveyor belt (201), the second conveyor belt (201) and the upper fixed conveyor belt (304) are arranged parallel to each other, and the middle roller shaft (308) is located between the conveyor belt drive shafts (303).
6. A garden road paving device according to claim 5, characterized in that: The second lifting screw rods (301) on both sides of the upper auxiliary frame (3) are respectively meshed with the front and rear end gears of the middle transmission shaft (302); the inner lower part of the conveyor belt driving shaft (303) is meshed with a middle roller shaft (308); both ends of the middle roller shaft (308) are rotatably connected to the inner lifting connection frame (307); both sides of the inner lifting connection frame (307) are slidably connected with side lifting connection frames (309); the side lifting connection frame (309) is slidably connected to the top of the upper auxiliary frame (3); a middle connecting elastic member (306) is provided between the side lifting connection frame (309) at the rear of the inner lifting connection frame (307) and the upper auxiliary frame (3); and a middle connecting elastic member (306) is provided between the side lifting connection frame (309) at the front of the inner lifting connection frame (307) and the auxiliary auxiliary frame (305).
7. A garden road paving device according to claim 6, characterized in that: The lower part of the second lifting screw (301) is screwed to the upper connecting slide column (202), and the second lifting screw (301) is rotatably arranged inside one of the side lifting connecting frames (309) on both sides of the inner lifting connecting frame (307), and the second lifting screw (301) of the side lifting connecting frame (309) is screwed to the side lifting connecting frame (309).
8. A garden road paving device according to claim 7, characterized in that: A driving motor (401) is fixedly arranged on the upper part of the third laying frame (4); the main shaft of the driving motor (401) is fixedly connected to the head end of the rotating rod (402); the middle part of the rotating rod (402) is slidably connected to a middle connecting rotating frame (403); the middle part of the rotating rod (402) is rotatably connected to a middle connecting screw rod (404); the middle connecting rotating frame (403) and the slide groove of the upper slide groove frame (405) are slidably connected.
9. A garden road paving device according to claim 8, characterized in that: The middle connecting screw rod (404) and the middle connecting rotating frame (403) are threadedly connected, the lower part of the upper slide frame (405) and the flat pressing plate (406) are fixed, and the flat pressing plate (406) slides vertically on the inner side of the third laying frame (4).
