Formwork erecting structure of group pipe through-wall hole and construction method of formwork erecting structure
By using a combination structure of hole opening formwork, backing, inner bracelet and backing strip in construction, a simple form-supporting method for group pipe penetration holes is realized, and the complex construction and leakage problems in the existing technology are solved. Improve the quality of concrete pouring and construction efficiency.
Patent Information
- Application Number
- CN202411477787.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-22
- Publication Date
- 2024-12-31
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In construction, it is difficult for the prior art to achieve the problem of slurry leakage and structural losses of the group pipe penetration holes with simple structure, good casting effect, and inaccurate formwork cutting.
Using a combination structure of hole opening template, backing, inner bracelet and backing strip, the mold support method is realized from the outside by reserved holes and pasting backing, and installing inner bracelet and backing strips, and simplifying the construction process. And ensure the flatness of the concrete.
This method simplifies construction operations, improves the quality of concrete pouring, reduces subsequent repair problems, is suitable for wall-through pipes of different shapes and sizes, and can use residual construction materials, which is green and environmentally friendly.
Smart Images

Figure CN119221700A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, and in particular to a formwork structure for a group of pipe-through-wall openings and a construction method thereof. Background Art
[0002] During the construction process, when mechanical and electrical, fire protection, HVAC and other professional pipelines pass through cast-in-place walls, it is often necessary to leave through-wall pipes; when the through-wall pipes of cast-in-place walls in a certain area are relatively concentrated, the usual practices for the formwork support are: 1. Cut the wooden formwork according to the diameter and position of the group of pipes for support. This method is complicated to construct, and it is difficult to accurately open the holes in the wooden formwork, resulting in leakage and loss of the formwork; 2. Use formwork with holes around the group of pipes, and use small pieces of formwork or foam boards and other materials to block the pipes. This method can easily cause uneven surfaces of components, requiring secondary chiseling, and even lead to insufficient structural dimensions.
[0003] Therefore, how to provide a formwork structure and a construction method for a group of pipe-through-wall openings that are simple in formwork, good in pouring effect, and not prone to leakage is a technical problem that needs to be urgently solved by those skilled in the art. Summary of the invention
[0004] The present invention provides a formwork structure for a group of pipes penetrating a wall and a construction method thereof, so as to solve the above technical problems.
[0005] In order to solve the above technical problems, the present invention provides a formwork structure for a group of pipes passing through a wall, comprising:
[0006] A hole-opening template, through which each pipeline passes;
[0007] A backing is laid in the reserved hole, and on the side where the casting surface is located, the backing and the hole-opening template are located in the same plane; the edge of the backing extends into the reserved hole and is adhered to the outer facade of the hole-opening template;
[0008] Internal support bars are supported in the reserved holes between the backing and the pipes and between the pipes; and
[0009] The back ribs are installed on the outer facade of the opening template and are inserted between the pipes around the reserved opening.
[0010] Preferably, the reserved opening is a regular pattern and is located in the middle of the opening template.
[0011] Preferably, the backing is made of reverse-adhesive waterproof coiled material.
[0012] Preferably, the diameter of the hole on the backing for passing the pipe is smaller than the diameter of the pipe.
[0013] Preferably, the back ribs are mounted on the outer facade of the opening template by nails.
[0014] Preferably, the inner support bars and back rib bars are made of the leftover material of the hole-opening template.
[0015] The present invention also provides a construction method for the formwork structure of the group pipe wall opening as described above, comprising the following steps:
[0016] Step 1: When the template is set up, the opening template is set according to the position of the pipeline, so that each pipeline passes through the middle of the opening template;
[0017] Step 2: according to the diameter and position of the pipe, holes of corresponding size and position are opened on the backing, and the backing is pasted;
[0018] Step 3: installing the inner support bar in the gap between the opening template and the pipe to support the casting surface of the backing and the opening template to be located in the same plane;
[0019] Step 4: Laying the backing strips around the pipe on the outer facade of the opening template;
[0020] Step 5: After the concrete strength reaches the demolding strength, the formwork is removed and the uneven concrete around the pipe is cleaned.
[0021] Compared with the prior art, the formwork structure and construction method of the group pipe wall opening provided by the present invention have the following advantages:
[0022] 1. The present invention adopts a formwork method of plugging from the outside, which does not require cutting the formwork according to the shape of the group pipes. The construction operation is simple and fast, and the concrete pouring quality is good. It is not easy to cause hollowing, leakage and other problems, reducing the subsequent rework and repair problems;
[0023] 2. The materials used in the present invention are relatively common at the construction site, and are easy to obtain. In addition, some construction waste materials can be used, which is green and environmentally friendly;
[0024] 3. The formwork structure and method provided by the present invention are applicable to wall-penetrating pipes of different shapes and sizes, with less damage to the formwork and can be recycled and reused. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1a It is an elevation view of a hole-opening template in a specific embodiment of the present invention;
[0026] Figure 1b It is a cross-sectional view of a hole-opening template in a specific embodiment of the present invention;
[0027] Figure 2a It is a vertical view after pasting the backing in a specific embodiment of the present invention;
[0028] Figure 2b It is a cross-sectional view after the backing is attached in a specific embodiment of the present invention;
[0029] Figure 3a It is a vertical view after the inner support bar is installed in a specific embodiment of the present invention;
[0030] Figure 3b It is a cross-sectional view after the inner support bar is installed in a specific embodiment of the present invention;
[0031] Figure 4a It is an elevation view of the formwork structure of the group pipe wall openings in a specific embodiment of the present invention;
[0032] Figure 4b The present invention is a cross-sectional view of a formwork structure for a group of pipe-through-wall openings in a specific embodiment of the present invention.
[0033] In the figure: 10-hole template, 11-reserved hole, 20-backing, 30-inner support bar, 40-back rib bar, 50-pipe. DETAILED DESCRIPTION
[0034] In order to describe the technical solution of the above invention in more detail, specific embodiments are listed below to demonstrate the technical effects; it should be emphasized that these embodiments are used to illustrate the present invention but not to limit the scope of the present invention.
[0035] The formwork structure of the group pipe wall opening provided by the present invention is as follows: Figures 1a to 4b As shown, including:
[0036] The hole-opening template 10, each pipe 50 passes through the reserved hole 11 of the hole-opening template 10;
[0037] The backing 20 is laid in the reserved hole 11, and on the side where the casting surface is located, the backing 20 and the hole-opening template 10 are located in the same plane, that is, the entire casting surface is flush; the edge of the backing 20 extends into the reserved hole 11 and is pasted on the outer facade of the hole-opening template 10;
[0038] The inner support bar 30 is supported between the backing 20 and the pipe 50 and between the pipes 50 in the reserved hole 11 to provide sufficient support for the backing 20;
[0039] And the back ribs 40 are installed on the outer facade of the hole-opening template 10, and are inserted between the pipes 50 around the reserved hole 11 to reinforce the entire formwork structure.
[0040] The present invention adopts a method of supporting formwork by blocking from the outside, and there is no need to cut the formwork according to the shape of the group of pipes. The construction operation is simple and quick, and the concrete pouring quality is good. It is not easy to cause problems such as hollowing and leakage, and reduces the subsequent rework and repair problems.
[0041] In some embodiments, please refer to Figure 1a , 1b The reserved hole 11 is a regular shape, such as a rectangle, a circle, etc. The hole size should not be too large to facilitate the subsequent template construction; and the reserved hole 11 is located in the middle of the opening template 10 to ensure that the subsequent backing 20 can be firmly pasted and evenly stressed.
[0042] In some embodiments, the backing 20 may be made of reverse-adhesive waterproofing membrane to provide it with a certain strength to prevent the backing 20 from sinking and deforming inward during the concrete pouring process.
[0043] In some embodiments, please refer to Figure 2a , 2b The diameter of the hole on the backing 20 for passing the pipe 50 is smaller than the diameter of the pipe 50 to ensure that the backing 20 can fit tightly against the surface of the pipe 50.
[0044] In some embodiments, the inner support bar 30 and the back rib bar 40 can be made of the leftover material of the hole template 10, which can save materials on the one hand, and make the thickness of the inner support bar 30 the same as that of the hole template 10 on the other hand, so as to ensure that the casting surface of the backing 20 and the hole template 10 are flush. The materials used in the present invention are relatively common at the construction site, easy to obtain, and can use some of the construction leftovers, which is green and environmentally friendly.
[0045] In some embodiments, the back ribs 40 can be installed on the outer facade of the hole template 10 by nails, so that the back ribs 40 are firmly connected to the hole template 10.
[0046] Please continue to refer to Figures 1a to 4b The present invention also provides a construction method for the formwork structure of the group pipe through-wall opening as described above, comprising the following steps:
[0047] Step 1: When the template is set up, the opening template 10 is set according to the position of the pipeline 50, so that each pipeline 50 passes through the reserved hole 11 in the middle of the opening template 10, such as Figure 1a , 1b shown.
[0048] Step 2: If Figure 2a , 2bAs shown, according to the diameter and position of the pipe 50, holes of corresponding size and position are opened on the backing 20 to facilitate the subsequent pasting of the backing 20; when pasting the backing 20, the size of the backing 20 should be larger than the size of the reserved hole 11 to facilitate the subsequent installation of the inner support bar 30, while preventing leakage of slurry from the edge of the reserved hole 11 or damage to the backing 20.
[0049] Step 3: In the reserved hole 11, the inner support bar 30 is installed in the gap between the hole template 10 and the pipe 50 to support the casting surface of the backing 20 and the hole template 10 to be located in the same plane, such as Figure 3a , 3b The length and quantity of the inner support bar 30 can be freely adjusted according to the distance between the pipes 50, and the gap between the pipes 50 and the opening template 10 should be covered as much as possible to ensure the flatness of the concrete pouring surface.
[0050] Step 4: Lay the backing strips 40 around the pipe 50 on the outer surface of the opening template 10, such as Figure 4a , 4b The size of the backing strips 40 should be adjusted according to the intervals between the pipes 50 so that the area between the pipes 50 can be reinforced; the number of the backing strips 40 should be adjusted according to the size of the reserved opening 11 and the backing 20, and the entire area of the backing 20 should be reinforced as much as possible to prevent the backing 20 from being damaged during the concrete pouring process.
[0051] Step 5: After the concrete strength reaches the demolding strength, the formwork is removed and the uneven concrete around the pipe 50 is cleaned to facilitate the construction of subsequent projects.
[0052] The above method is applicable to wall-penetrating pipes of different shapes and sizes, causes less damage to the template, and can be reused.
[0053] In summary, the present invention provides a formwork structure for a group of pipe-through-wall openings and a construction method thereof, wherein the formwork structure includes: a hole-opening template 10, wherein each pipe 50 passes through a reserved hole 11 of the hole-opening template 10; a backing 20, which is laid in the reserved hole 11, and on the side where the casting surface is located, the backing 20 and the hole-opening template 10 are located in the same plane; the edge of the backing 20 extends into the reserved hole 11 and is pasted on the outer facade of the hole-opening template 10; an inner support bar 30, which is supported in the reserved hole 11 between the backing 20 and the pipe 50 and between the pipes 50 to provide sufficient support for the backing 20; and a back rib 40, which is installed on the outer facade of the hole-opening template 10 and is interspersed between the pipes 50 around the reserved hole 11 to reinforce the entire formwork structure. The present invention adopts a method of supporting formwork by blocking from the outside, and there is no need to cut the formwork according to the shape of the group of pipes. The construction operation is simple and quick, and the concrete pouring quality is good. It is not easy to cause problems such as hollowing and leakage, and reduces the subsequent rework and repair problems.
[0054] Obviously, those skilled in the art can make various changes and modifications to the invention without departing from the spirit and scope of the invention. Thus, if these modifications and variations of the invention fall within the scope of the claims of the invention and their equivalents, the invention is also intended to include these modifications and variations.
Claims
1. A formwork structure for a group of pipes passing through a wall, characterized in that: include: A hole-opening template, through which each pipeline passes; A backing is laid in the reserved hole, and on the side where the casting surface is located, the backing and the hole-opening template are located in the same plane; the edge of the backing extends into the reserved hole and is adhered to the outer facade of the hole-opening template; Internal support bars are supported in the reserved holes between the backing and the pipes and between the pipes; and The back ribs are installed on the outer facade of the opening template and are inserted between the pipes around the reserved opening.
2. The formwork structure for the group pipe wall openings according to claim 1, characterized in that: The reserved opening is a regular pattern and is located in the middle of the opening template.
3. The formwork structure for the group pipe wall openings according to claim 1, characterized in that: The backing is a reverse-adhesive waterproof coiled material.
4. The formwork structure for the group pipe wall openings according to claim 1, characterized in that: The diameter of the hole on the backing for passing the pipe is smaller than the diameter of the pipe.
5. The formwork structure for the group pipe wall openings according to claim 1, characterized in that: The back ribs are installed on the outer facade of the opening template by nails.
6. The formwork structure for a group of pipes penetrating a wall according to claim 1, characterized in that: The inner support bars and back rib bars are made of the remaining materials of the hole-opening template.
7. A construction method for the formwork structure of a group of pipe-through-wall openings according to any one of claims 1 to 6, characterized in that: The steps include: Step 1: When the template is set up, the opening template is set according to the position of the pipeline, so that each pipeline passes through the middle of the opening template; Step 2: according to the diameter and position of the pipe, holes of corresponding size and position are opened on the backing, and the backing is pasted; Step 3: installing the inner support bar in the gap between the opening template and the pipe to support the casting surface of the backing and the opening template to be located in the same plane; Step 4: Laying the backing strips around the pipe on the outer facade of the opening template; Step 5: After the concrete strength reaches the demolding strength, the formwork is removed and the uneven concrete around the pipe is cleaned.