Installation method of crossing network device crossing expressway

Through the worker's traction rope crossing the expressway and using ground anchor anchors, the problem of high cost and low efficiency in overhead transmission lines crossing the expressway is solved, and a fast and safe construction process is achieved.

CN119253481APending Publication Date: 2025-01-03CHINA HYDROPOWER ELEVENTH ENG BUREAU (ZHENGZHOU) CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411435116.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-15
Publication Date
2025-01-03

AI Technical Summary

Technical Problem

In the prior art, overhead transmission lines crossing highways have problems such as high cost, low efficiency and complex construction process, especially in mountainous areas where terrain is limited and drones are difficult to effectively transport traction ropes in densely-wooded areas, resulting in construction efficiency. low.

Method used

Using a method without the help of spanning frames and drones, three workers traction ropes cross the highway, connecting the main bearing ropes and transverse ropes and gradually pulling them to the other side, using ground anchors for anchoring, simplifying the construction process and improving efficiency.

Benefits of technology

It realizes the installation of cross-network in a short time, reduces construction costs and complexity, ensures construction safety, and is suitable for mountainous areas with limited terrain.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119253481A_ABST
    Figure CN119253481A_ABST
Patent Text Reader

Abstract

The invention discloses an installation method of a crossing net device crossing an expressway, and belongs to the technical field of crossing nets of expressways. A mounting method of a crossing net device crossing an expressway comprises the steps that construction preparation is conducted, specifically, a winding device wound with a main force bearing rope, a net pulling rope, a U-shaped hanging ring, a ground anchor, a traction device, a transverse rope and a polyamide rope are prepared according to the actual situation of a site before construction; main force bearing rope traction: three workers respectively pull one traction rope to pass through the expressway to transfer the traction rope to an operator opposite to the expressway, and connect the traction rope with one end of the main force bearing rope, and crossing net weaving: connecting a transverse rope with a plurality of main force bearing ropes through U-shaped hanging rings; according to the method, when the main bearing rope is dragged, an operation worker is arranged to replace an unmanned aerial vehicle to penetrate through the expressway to reach the opposite tower, the time for crossing the expressway is saved, it is guaranteed that the traction of crossing the high-speed main bearing rope and a net pulling rope is completed within effective time, and a crossing net customized in the past is abandoned.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of a highway spanning network, and in particular to an installation method of a highway spanning network device. Background Art

[0002] As far as current technology is concerned, overhead transmission line crossing types are mainly divided into crossing methods with crossing frames and crossing methods without crossing frames. The types of crossing frames include bamboo, wooden crossing frames, steel pipe crossing frames, and metal structure wire crossing frames. The crossing system without crossing frames mainly uses auxiliary beams to set up the crossing network, and the main load-bearing rope is generally pulled by drones. Judging from the current types of overhead transmission line crossings, they are generally characterized by high cost, great terrain restrictions, low efficiency, and complex construction processes.

[0003] There are many restrictions on overhead power transmission lines located in mountainous areas and crossing highways. First, the site in the mountainous area is narrow and there are many trees blocking the view, making it difficult to set up a crossing frame and weave the crossing net. Second, crossing the highway requires approval from the local transportation bureau, and the highway is often closed for a short time. If drones are used to transport the traction rope, there is no guarantee that it will be completed in a short time, and drones are prone to emergencies in mountainous areas with dense trees.

[0004] In view of these regional restrictions, a rapid construction method suitable for overhead lines crossing highways in mountainous areas without the use of crossing frames and drones was invented. Summary of the invention

[0005] The purpose of the present invention is to solve the problems of low efficiency, high cost and complicated construction process in the prior art, and to propose a method for installing a spanning net device across a highway.

[0006] In order to achieve the above object, the present invention adopts the following technical solutions: A method for installing a cross-highway network device comprises the following steps: Step 1: Construction preparation: Before construction, prepare the winding device wrapped with the main load-bearing rope, the net rope, the U-shaped hanging ring, the anchor, the traction device, the transverse rope and the nylon rope according to the actual situation on site.

[0007] Step 2: Pulling the main load-bearing rope: Three workers pull a traction rope respectively across the highway, pass the traction rope to the operator on the opposite side of the highway, and connect it to one end of the main load-bearing rope.

[0008] Step 3: Weaving the spanning net: Connect the transverse ropes to multiple main load-bearing ropes through U-shaped hanging rings, then use multiple traction devices to gradually pull the main load-bearing ropes to the other side of the highway through traction ropes, and at the same time tie multiple transverse ropes in sequence until the entire spanning net covers the highway.

[0009] Step 4: Anchoring the main load-bearing rope and the net-pulling rope: Fix the net-pulling rope to the main load-bearing rope, and use a ground anchor to anchor the other end of the net-pulling rope so that the air height of the spanning net is at a normal height. After tightening multiple main load-bearing ropes through traction devices, use ground anchors to anchor them to the ground.

[0010] In some embodiments, in step one, the winding device wrapped with the main load-bearing rope, U-shaped hanging ring, nylon rope and transverse rope need to be placed on one side of the highway, while the traction device is placed on the other side of the highway, and at the same time, a number of ground anchors and a number of net ropes are placed on both sides of the highway.

[0011] In some embodiments, before pulling the traction rope in step 2, the winding device and the traction device are fixed to the ground using ground anchors respectively, and after the traction rope is handed over to the operator on the opposite side of the highway, the traction device needs to be started to wind the traction rope, leaving the traction rope and the main load-bearing rope in the air.

[0012] In some embodiments, in step three, nylon rope is used to securely tie the transverse rope and the main load-bearing rope to ensure that the transverse ropes are separated by a certain distance and do not slide together. The interval between multiple transverse ropes is 4-5 meters. In step four, a U-shaped hanging ring is used to fix the net rope and the main load-bearing rope.

[0013] In some embodiments, one end of the traction rope is fixedly connected to a buckle, and the traction rope is connected to one end of the main load-bearing rope through the buckle.

[0014] In some embodiments, the winding device includes a support frame, and a first winding disk is rotatably connected to the surface of the support frame via a bearing.

[0015] In some embodiments, a limiting assembly is provided on the side of the support frame, and the limiting assembly includes a fixing plate, a surface of the fixing plate is slidably connected to a limiting rod, and a plurality of limiting holes are opened on the side of the first winding disk.

[0016] In some embodiments, the traction device includes a shell, a second winding drum is rotatably connected to the surface of the shell through a bearing, a traction rope is wrapped around the surface of the second winding drum, a motor is fixedly connected to the side of the shell, one end of the motor output shaft is fixedly connected to the surface of the second winding drum, a wheel rangefinder is fixedly connected to the surface of the shell, and the traction rope is overlapped on the surface of the wheel rangefinder.

[0017] In some embodiments, a guide ring is fixedly connected to the side of the wheeled rangefinder.

[0018] In some embodiments, two mounting plates are fixedly connected to both sides of the shell and both sides of the support frame respectively.

[0019] Compared with the prior art, the present invention provides a method for installing a spanning network device across a highway, which has the following beneficial effects.

[0020] 1. The present invention saves the time of crossing the highway by arranging workers to replace drones to cross the highway to the opposite tower when pulling the main load-bearing rope, ensures that the pulling of the main load-bearing rope and the net rope across the highway is completed within an effective time, and abandons the previously customized crossing net.

[0021] 2. The present invention, by adopting the method of on-site preparation of the spanning net, solves the problem that the spanning net is not suitable for the actual construction site to a large extent, and has the characteristics of high efficiency and simple preparation engineering. According to the advantage of uneven terrain on both sides of the highway in the mountainous area, the main load-bearing rope is anchored by direct ground anchor after being tightened by a traction device, which simplifies the construction process.

[0022] The parts not involved in the device are the same as the existing technology or can be implemented by the existing technology. The present invention solves the problem that the crossing frame cannot be erected due to terrain restrictions. It uses the terrain advantage to replace the drone to pull the main load-bearing rope and the net rope to ensure that the highway is crossed in a short time. The crossing net is compiled on-site to ensure the construction safety of the wire laying project. The main load-bearing rope is anchored by direct ground anchoring, which simplifies the construction process, improves construction efficiency and reduces construction costs.

[0023] Other advantages, objectives and features of the present invention will be described in part in the following description; and in part, will be apparent to those skilled in the art based on an examination of the following; or, may be taught from the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a front view structural schematic diagram of the present invention.

[0025] Figure 2 For the present invention Figure 1 Enlarged structural diagram at A in the middle.

[0026] Figure 3 For the present invention Figure 1 Enlarged structural diagram at B in the middle.

[0027] Figure 4 It is a schematic structural diagram of the winding device in the present invention.

[0028] Figure 5 It is a front view structural schematic diagram of the traction device in the present invention.

[0029] Figure 6 It is a side structural schematic diagram of the traction device in the present invention.

[0030] In the figure: 1. Main load-bearing rope; 2. Horizontal rope; 3. Net pulling rope; 4. U-shaped hanging ring; 5. Winding device; 501. Support frame; 502. First winding drum; 6. Limiting assembly; 601. Fixed plate; 602. Limiting rod; 603. Limiting hole; 7. Traction device; 701. Shell; 702. Second winding drum; 703. Traction rope; 704. Motor; 705. Wheel distance meter; 8. Buckle; 9. Guide ring; 10. Mounting plate. DETAILED DESCRIPTION

[0031] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0032] Reference Figure 1-6 A method for installing a cross-highway network device comprises the following steps: Step 1, construction preparation: before construction, prepare the winding device 5, the net rope 3, the U-shaped hanging ring 4, the ground anchor, the traction device 7, the transverse rope 2 and the nylon rope wrapped with the main load-bearing rope 1 according to the actual situation on site. Place the winding device 5, the U-shaped hanging ring 4, the nylon rope and the transverse rope 2 wrapped with the main load-bearing rope 1 on one side of the highway, and the traction device 7 on the other side of the highway. At the same time, place several ground anchors and several net ropes 3 on both sides of the highway.

[0033] Step 2, pulling the main load-bearing rope 1: three workers pull a traction rope 703 respectively across the expressway and pass the traction rope 703 to the operator on the opposite side of the expressway, and connect it to one end of the main load-bearing rope 1. Before pulling the traction rope 703, the winding device 5 and the traction device 7 are fixed to the ground with anchors respectively. After passing the traction rope 703 to the operator on the opposite side of the expressway, the traction device 7 needs to be started to wind the traction rope 703, so that the traction rope 703 and the main load-bearing rope 1 are suspended in the air.

[0034] Step 3, weaving the spanning net: connect the transverse rope 2 with multiple main load-bearing ropes 1 through U-shaped hanging rings 4, and use nylon ropes to firmly tie the transverse ropes 2 and the main load-bearing ropes 1 to ensure that the transverse ropes 2 are separated by a certain interval and do not slide together. The interval between multiple transverse ropes 2 is 4-5 meters. Then, multiple traction devices 7 use traction ropes 703 to gradually pull the main load-bearing ropes 1 to the other side of the highway, and tie multiple transverse ropes 2 in turn until the entire spanning net covers the highway.

[0035] Step 4, anchoring the main load-bearing rope 1 and the net-pulling rope 3: Use a U-shaped hanging ring 4 to fix the net-pulling rope 3 and the main load-bearing rope 1, and use a ground anchor to anchor the other end of the net-pulling rope 3, so that the height of the spanning net in the air is at a normal height. After tightening the multiple main load-bearing ropes 1 through the traction device 7, use ground anchors to anchor them to the ground respectively.

[0036] It can be understood that by arranging workers to replace drones to cross the highway to the other side when towing the main load-bearing rope 1, the time for crossing the highway is saved, and the towing of the main load-bearing rope 1 and the pulling net rope 3 across the highway is ensured to be completed within an effective time. The previously customized spanning net is abandoned, and the method of on-site compilation of the spanning net is adopted. The problem that the spanning net is not suitable for the actual construction site is solved to a large extent. It has the characteristics of high efficiency and simple compilation engineering, and is based on the advantages of uneven terrain on both sides of the highway in mountainous areas.

[0037] Specifically, the length of the transverse rope 2 is 8-9 meters, one end of the traction rope 703 is fixedly connected with a buckle 8, and the traction rope 703 is connected to one end of the main load-bearing rope 1 through the buckle 8.

[0038] It can be understood that by using the buckle 8, the connection or separation efficiency between the traction rope 703 and the main load-bearing rope 1 can be improved.

[0039] Specifically, the winding device 5 includes a support frame 501, and a first winding disk 502 is rotatably connected to the surface of the support frame 501 via a bearing.

[0040] It can be understood that by providing the winding device 5, the first winding drum 502 is used to wind up the main load-bearing rope 1, thereby achieving the purpose of easy carrying and recycling.

[0041] Specifically, a limit assembly 6 is disposed on the side of the support frame 501 , and the limit assembly 6 includes a fixed plate 601 , a surface of the fixed plate 601 is slidably connected to a limit rod 602 , and a plurality of limit holes 603 are opened on the side of the first winding disk 502 .

[0042] It is understandable that by providing the limiting assembly 6 , the limiting rod 602 is inserted into the limiting hole 603 , thereby limiting the rotation of the first winding drum 502 , thereby facilitating limiting the unfolding length of the main load-bearing rope 1 .

[0043] Specifically, the traction device 7 includes a shell 701, a second winding drum 702 is rotatably connected to the surface of the shell 701 through a bearing, a traction rope 703 is wound around the surface of the second winding drum 702, a motor 704 is fixedly connected to the side of the shell 701, one end of the output shaft of the motor 704 is fixedly connected to the surface of the second winding drum 702, a wheeled rangefinder 705 is fixedly connected to the surface of the shell 701, the traction rope 703 is overlapped on the surface of the wheeled rangefinder 705, and a guide ring 9 is fixedly connected to the side of the wheeled rangefinder 705.

[0044] It can be understood that by setting up the traction device 7, the motor 704 drives the second winding disk 702 to rotate, so that the traction rope 703 drives the main load-bearing rope 1 to move gradually, which is convenient for on-site weaving. By setting up the wheel rangefinder 705, it is convenient to detect the moving distance of the traction rope 703, and it is convenient to control the moving distance of the main load-bearing rope 1, so as to ensure that the spacing between the transverse ropes 2 is equal.

[0045] Specifically, two mounting plates 10 are fixedly connected to both sides of the shell 701 and both sides of the support frame 501, and the main load-bearing rope 1 and the transverse rope 2 are both made of Dyneema rope.

[0046] It can be understood that by providing the mounting plate 10, it is convenient to fix the support frame 501 and the housing 701 on the ground to ensure stability.

[0047] The above are only preferred specific implementation modes of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solutions and inventive concepts of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

[0048] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0049] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.

Claims

1. A method for installing a cross-highway network device, characterized in that: The following steps are involved: Step 1: Construction preparation: Before construction, prepare a reel (5) wound with the main load-bearing rope (1), a net rope (3), a U-shaped hanging ring (4), a ground anchor, a traction device (7), a transverse rope (2) and a nylon rope according to the actual situation on site; Step 2: Pulling the main load-bearing rope (1): three workers pull a traction rope (703) across the expressway respectively, pass the traction rope (703) to the operator on the other side of the expressway, and connect it to one end of the main load-bearing rope (1); Step 3: Weaving the spanning net: connecting the transverse rope (2) and the plurality of main load-bearing ropes (1) via the U-shaped hanging ring (4); then, using the plurality of traction devices (7) to gradually pull the main load-bearing ropes (1) to the other side of the highway via the traction ropes (703); and at the same time, tying the plurality of transverse ropes (2) in sequence until the entire spanning net covers the highway; Step 4: Anchoring the main load-bearing rope (1) and the net-pulling rope (3): The net-pulling rope (3) is fixed to the main load-bearing rope (1), and the other end of the net-pulling rope (3) is anchored with a ground anchor, so that the height of the spanning net above the ground is at a normal height. After tightening the plurality of main load-bearing ropes (1) with a traction device (7), they are anchored to the ground with ground anchors.

2. The method for installing a cross-highway network device according to claim 1, characterized in that: In the step 1, a reeling device (5) wound with a main load-bearing rope (1), a U-shaped hanging ring (4), a nylon rope and a transverse rope (2) need to be placed on one side of the highway, while a traction device (7) is placed on the other side of the highway. At the same time, a plurality of ground anchors and a plurality of net ropes (3) are placed on both sides of the highway.

3. The method for installing a cross-highway network device according to claim 1, characterized in that: In the second step, before pulling the traction rope (703), the winding device (5) and the traction device (7) are respectively fixed to the ground using ground anchors, and after the traction rope (703) is handed over to the operator on the opposite side of the highway, the traction device (7) needs to be started to wind the traction rope (703), so that the traction rope (703) and the main load-bearing rope (1) are suspended in the air.

4. The method for installing a cross-highway network device according to claim 1, characterized in that: In the step 3, a nylon rope is used to securely tie the transverse rope (2) and the main load-bearing rope (1) to ensure that the transverse ropes (2) are spaced at a certain distance and do not slide together. The spacing between the plurality of transverse ropes (2) is 4-5 meters. In the step 4, a U-shaped hanging ring (4) is used to fix the netting rope (3) and the main load-bearing rope (1).

5. The method for installing a cross-highway network device according to claim 1, characterized in that: One end of the traction rope (703) is fixedly connected to a buckle (8), and the traction rope (703) is connected to one end of the main load-bearing rope (1) via the buckle (8).

6. The method for installing a cross-highway network device according to claim 1, characterized in that: The winding device (5) comprises a support frame (501), and a first winding disc (502) is rotatably connected to the surface of the support frame (501) via a bearing.

7. The method for installing a cross-highway network device according to claim 6, characterized in that: A limit assembly (6) is disposed on the side of the support frame (501), the limit assembly (6) comprising a fixing plate (601), the surface of the fixing plate (601) being slidably connected to a limit rod (602), and a plurality of limit holes (603) are formed on the side of the first winding disk (502).

8. The method for installing a cross-highway network device according to claim 1, characterized in that: The traction device (7) comprises a housing (701), a second winding drum (702) being rotatably connected to the surface of the housing (701) via a bearing, a traction rope (703) being wound around the surface of the second winding drum (702), a motor (704) being fixedly connected to the side of the housing (701), one end of the output shaft of the motor (704) being fixedly connected to the surface of the second winding drum (702), a wheeled distance meter (705) being fixedly connected to the surface of the housing (701), and the traction rope (703) being overlapped on the surface of the wheeled distance meter (705).

9. The method for installing a cross-highway network device according to claim 8, characterized in that: A guide ring (9) is fixedly connected to the side of the wheel-type distance meter (705).

10. A method for installing a cross-highway network device according to claim 6 or 8, characterized in that: Two mounting plates (10) are respectively fixedly connected to both sides of the housing (701) and both sides of the support frame (501).