Combined assembly type hoisting process for indoor prefabricated bare concrete wallboard

By combining prefabricated hoisting technology, the hoisting equipment and guide chains are used to achieve efficient and low-cost hoisting of prefabricated wall panels in narrow spaces, solving the problem of difficult installation of prefabricated wall panels and improving construction efficiency.

CN119266556APending Publication Date: 2025-01-07SHAANXI CONSTR ENG DINGSHENG DECORATION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411664653.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-20
Publication Date
2025-01-07

AI Technical Summary

Technical Problem

The precast wall panels are installed indoors with limited hoisting space and installation conditions. The wall panels are large and heavy, and telescopic forklifts cannot meet the on-site hoisting and adjustment needs, resulting in high mechanical and labor costs and failure to meet the construction schedule requirements.

Method used

The modular hoisting process is adopted, which involves installing hoisting devices between the structural beams and the top slab structural beams, using chain guides and moving vehicles to accurately position and adjust the wall panels, and using steel load-bearing brackets and reinforcing mechanisms to provide support, thereby reducing the cost of using machinery.

Benefits of technology

It enables efficient and low-cost wall panel hoisting in confined spaces, reduces machinery usage costs, improves construction efficiency, and meets project deadlines.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119266556A_ABST
    Figure CN119266556A_ABST
Patent Text Reader

Abstract

The invention discloses a combined assembly type hoisting process for an indoor prefabricated bare concrete wallboard, and relates to the field of hoisting technologys.The combined assembly type hoisting process comprises the steps that firstly, a hoisting device is fixedly installed between a structural beam and a top plate structural beam, and a guide chain is installed on the hoisting device, and secondly, one end of the guide chain is used for being connected with a wallboard body, and the other end of the guide chain is manually pulled; and thirdly, a moving trolley is arranged at the bottom end of the wallboard body and matched with the wallboard body for supporting and moving, the wallboards are hoisted through the indoor prefabricated bare concrete wallboard combination assembly type hoisting system, the construction period is greatly shortened, and the construction efficiency is greatly improved, especially for the non-construction area of a civil engineering structure wall. The indoor prefabricated fair-faced concrete wallboard combined assembly type hoisting system is installed between a structural beam and a top plate structural beam, construction does not need to be conducted after structural wall construction is completed, and the construction efficiency is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of hoisting technology, in particular to a combined assembly type hoisting technology for indoor prefabricated plain concrete wall panels. Background Art

[0002] Prefabricated wall panels are prefabricated wall components with the advantages of lightness, high strength and fast construction speed. The prefabricated wall panel hoisting process refers to the process of installing and fixing the prefabricated wall panels through lifting equipment.

[0003] Since the installation location of prefabricated wall panels is indoors, and the finished surface of the hanging panels is only 20cm away from the floor, the hoisting space is narrow and the installation conditions are limited. In addition, the indoor prefabricated wall panels are large and heavy, and millimeter-level precision adjustment is required during installation. Telescopic arm forklifts cannot meet the needs of on-site hoisting and adjustment, and the machinery and labor costs are high, which cannot meet the construction period requirements.

[0004] Therefore, it is necessary to propose a combined assembly hoisting process for indoor prefabricated plain concrete wall panels to solve the above problems. Summary of the invention

[0005] The purpose of the present invention is to provide a combined assembly hoisting process for indoor prefabricated plain concrete wall panels, so as to solve the problem that the installation position of prefabricated wall panels is all indoors, and the finished surface of the hanging panel is only 20 cm away from the floor, the hoisting space is narrow, and the installation conditions are limited. Indoor prefabricated wall panels are large and heavy, and millimeter-level precision adjustment is required during installation. Telescopic arm forklifts cannot meet the needs of on-site hoisting and adjustment, and the machinery cost and labor cost are high, which cannot meet the construction period requirements.

[0006] To achieve the above object, the present invention provides the following technical solution: a combined assembly type hoisting process for indoor prefabricated plain concrete wall panels, comprising the following steps:

[0007] The first step is to fix and install the lifting device between the structural beam and the top plate structural beam, install the guide chain on the lifting device, and manually lift and fix the lifting device according to the height between different structural beams and the top plate structural beam;

[0008] Step 2: One end of the guide chain is used to connect the wall panel body, and the other end of the guide chain is manually pulled to locate the wall panel body position and installation height by pulling back and forth;

[0009] Step 3: A moving vehicle is provided at the bottom of the wall panel body to support and move the wall panel body;

[0010] The hoisting device comprises two steel-shaped load-bearing brackets, a long rod is installed between the top ends of the two steel-shaped load-bearing brackets, a sliding sleeve is provided on the outer sliding sleeve of the long rod, a hanging ear is provided at the bottom end of the sliding sleeve, and the guide chain is suspended and installed on the hanging ear;

[0011] The steel load-bearing support includes two vertical rods, a horizontal rod is fixed between the top ends of the two vertical rods, and rectangular sleeves are slidably sleeved between the outer sides of the two vertical rods, a connecting rod is fixed between the opposite sides of the two rectangular sleeves, the top end of the horizontal rod is supported on the bottom end of the top plate structural beam, and the connecting rod is supported on the top end of the structural beam.

[0012] Preferably, the two vertical rods and the connecting rod are in a U-shaped structure, and the two vertical rods are respectively attached to two sides of the structural beam.

[0013] Preferably, second screws are provided on the outer sides of the two rectangular sleeves, and the two second screws are respectively pressed tightly on the outer sides of the corresponding vertical rods.

[0014] Preferably, a reinforcing mechanism is provided at the top of the two cross bars, and the reinforcing mechanism includes a square wood, which is fixed to the top of the cross bar, and U-shaped seats are fixed on both sides of the bottom of the square wood. The two U-shaped seats are respectively provided on both sides of the cross bar, and anti-dumping columns are fixed at the bottom of the two U-shaped seats.

[0015] Preferably, a telescopic rod is telescopically provided at the bottom end of the anti-dumping column, a support plate is fixed to the bottom end of the telescopic rod, the top end of the square wood is supported on the bottom end of the top plate structural beam, and the support plate is supported on the top end of the structural beam.

[0016] Preferably, a telescopic slot is provided at the bottom end of the anti-dumping column, the telescopic rod is slidably arranged inside the telescopic slot, and a first screw is provided on the outer side of the anti-dumping column, and the first screw is pressed tightly against the outer side of the telescopic rod.

[0017] The long rods are distributed in parallel along the length direction of the structural beam and the top plate structural beam.

[0018] Preferably, the two steel load-bearing brackets are of the same height.

[0019] Preferably, the square timbers and the corresponding cross bars are distributed at vertical angles, and the square timbers are arranged in the middle of the cross bars.

[0020] Preferably, an electric slide rail is fixed to the bottom end of the long rod along the length direction, a slider is slidably fitted on the electric slide rail, and the guide chain is installed at the bottom end of the slider.

[0021] Technical effects and advantages of the present invention:

[0022] 1. The introduction of the present invention provides a safe and firm support mechanism for the guide chain by installing the device according to the structural beam at the installation site, which is convenient for hoisting the wall panel body. At the same time, it can solve the problem of limited use of large mechanical equipment in indoor space and realize the hoisting construction of large indoor prefabricated plain concrete wall panels.

[0023] 2. Compared with automobile cranes and telescopic forklifts, the combined assembly type lifting system of this method greatly reduces the cost of using machinery, and the installation and disassembly of this device are relatively simple, and the production cost is low.

[0024] 3. The wall panels are hoisted by the indoor prefabricated plain concrete wall panel combined assembly hoisting process, which greatly saves construction time, especially in the area where the civil structure wall is not constructed. The indoor prefabricated plain concrete wall panel combined assembly hoisting system is installed between the structural beam and the top plate structural beam. There is no need to wait until the structural wall construction is completed before construction, which greatly improves construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a schematic diagram of the hoisting process of the wall panel body of the present invention.

[0026] Figure 2 It is a schematic diagram of the structure of the lifting device of the present invention.

[0027] Figure 3 It is a structural schematic diagram of the steel load-bearing support of the present invention.

[0028] In the figure: 1. lifting device; 2. wall panel body; 3. mobile vehicle; 4. guide chain; 5. steel load-bearing bracket; 6. square wood; 7. U-shaped seat; 8. anti-dumping column; 9. telescopic rod; 10. support plate; 11. first screw; 12. long rod; 13. sliding sleeve; 14. vertical rod; 15. horizontal rod; 16. rectangular sleeve; 17. second screw; 18. connecting rod. DETAILED DESCRIPTION

[0029] The following will be combined with the drawings in the embodiments of the present invention to clarify the technical solutions in the embodiments of the present invention; it is clearly described in detail. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0030] Example 1

[0031] The present invention provides Figure 1 to Figure 3 The combined assembly hoisting process for indoor prefabricated plain concrete wall panels shown includes the following steps:

[0032] S1. A lifting device 1 is fixedly installed between the structural beam and the top plate structural beam, and a guide chain 4 is installed on the lifting device 1. Specifically, the positions of the structural beam and the top plate structural beam are as follows: Figure 1 As shown;

[0033] S2, one end of the guide chain 4 is used to connect the wall panel body 2, and the other end of the guide chain 4 is manually pulled to position the wall panel body 2 by pulling back and forth, and the hoisting device 1 is manually raised and lowered according to the height between different structural beams and the top plate structural beam;

[0034] S3. A mobile vehicle 3 is provided at the bottom of the wall panel body 2 to support and move the wall panel body 2, so as to facilitate supporting the wall panel body 2, reduce the physical exertion of personnel, and facilitate the transportation of the wall panel body 2;

[0035] Specifically, after the wall panel body 2 is transported to the bottom of the lifting point by the mobile vehicle 3, the wall panel body 2 is lifted by the lifting device 1, and one end of the guide chain 4 is connected to the top of the wall panel body 2. By pulling the other end of the guide chain 4, the position and angle of the wall panel body 2 are adjusted to facilitate subsequent installation.

[0036] The hoisting device 1 comprises two steel-shaped load-bearing brackets 5, a long rod 12 is installed between the top ends of the two steel-shaped load-bearing brackets 5, a sliding sleeve 13 is provided on the outer sliding sleeve of the long rod 12, a hanging ear is provided at the bottom end of the sliding sleeve 13, and the guide chain 4 is suspended and installed on the hanging ear;

[0037] The steel load-bearing support 5 includes two vertical rods 14, a horizontal rod 15 is fixed between the top ends of the two vertical rods 14, and a rectangular sleeve 16 is slidably sleeved between the outer sides of the two vertical rods 14, a connecting rod 18 is fixed between the opposite sides of the two rectangular sleeves 16, the top end of the horizontal rod 15 is supported on the bottom end of the top plate structural beam, and the connecting rod 18 is supported on the top end of the structural beam.

[0038] A reinforcing mechanism is provided at the top of the two cross bars 15, and the reinforcing mechanism includes a square wood 6, which is fixed to the top of the cross bar 15, and U-shaped seats 7 are fixed on both sides of the bottom of the square wood 6. The two U-shaped seats 7 are respectively provided on both sides of the cross bar 15, and anti-dumping columns 8 are fixed at the bottom of the two U-shaped seats 7.

[0039] The bottom end of the anti-dumping column 8 is telescopically provided with a telescopic rod 9, the bottom end of the telescopic rod 9 is fixed with a support plate 10, the top end of the square wood 6 is supported on the bottom end of the top plate structural beam, and the support plate 10 is supported on the top end of the structural beam.

[0040] In the actual operation of the present invention, two steel-shaped load-bearing brackets 5 are installed depending on the spacing between the structural beams and the top plate structural beams at the installation site, so that the hoisting device 1 can be fixed, and the guide chain 4 can be installed on the sliding sleeve 13 outside the long rod 12, and the guide chain 4 can be used to hoist the wall panel body 2, and adjust the installation angle and position;

[0041] The specific installation method is: a person manually pulls the other end of the guide chain 4 to make the wall panel body 2 reach the required height. Before lifting, a traction rope can be fixed behind the wall panel body 2, and other personnel manually assist in tightening the lower part of the wall panel body 2 to prevent the mobile vehicle from moving 3 too fast and the wall panel body 2 from tipping left or right. The upper back corner of the wall panel body 2 is protected by a multi-layer board or a plastic soft corner guard to prevent the top of the panel from wearing against the wire rope.

[0042] After pulling the guide chain 4 to make the wall panel body 2 reach the required height, pull the guide chain 4 in the opposite direction to gradually lower the wall panel body 2, and use the rope tightener to adjust the left and right and depth positions of the wall panel body 2 so that the upper ear slots are placed in the hook seats installed on the load-bearing base. At this time, the wall panel body 2 is in a suspended state, and the left and right positions and elevations of the wall panel body 2 are adjusted again to make them in the correct position. After the position is correct, install the wall panel body 2 in the correct position.

[0043] When the wall panel body 2 is installed, the steel support 5 and the guide chain 4 can be removed and moved to the next panel installation location. Other panels can be installed in the same way.

[0044] Furthermore, the guide chain 4 can slide on the long rod 12 following the sliding sleeve 13. According to the installation position, the personnel can change the position of the sliding sleeve 13. It should be noted that a third screw is provided on the outside of the sliding sleeve 13. When the position of the sliding sleeve 13 is determined, the sliding sleeve 13 can be fixed by the third screw.

[0045] The other two reinforcing mechanisms can enhance the supporting strength of the steel load-bearing bracket 5 between the structural beam and the top plate structural beam. At the same time, the anti-dumping column 8 can be extended and retracted according to the height between the different structural beams and the top plate structural beams to adjust the length between the anti-dumping column 8 and the telescopic rod 9, so as to adapt to different installation needs. Similarly, the rectangular sleeves 16 on the outside of the two vertical rods 14 can also be adjusted according to the needs. The height at which it is located on the vertical rod 14.

[0046] The two vertical rods 14 and the connecting rod 18 are in a U-shaped structure, and the two vertical rods 14 are respectively attached to the two sides of the structural beam.

[0047] Second screws 17 are disposed on the outer sides of the two rectangular sleeves 16 . The two second screws 17 are respectively pressed against the outer sides of the corresponding vertical rods 14 . The second screws 17 are used to press and fix the positions of the rectangular sleeves 16 .

[0048] A telescopic slot is provided at the bottom end of the anti-dumping column 8, and the telescopic rod 9 is slidably arranged inside the telescopic slot. A first screw 11 is provided on the outside of the anti-dumping column 8, and the first screw 11 is pressed tightly against the outside of the telescopic rod 9. The first screw 11 facilitates fixing the position of the telescopic rod 9 after it retracts and extends out of the telescopic slot.

[0049] The long rods 12 are distributed in parallel along the length direction of the structural beams and the top plate structural beams.

[0050] The heights of the two steel load-bearing brackets 5 are consistent, the square timber 6 and the corresponding cross bar 15 are distributed at a vertical angle, and the square timber 6 is arranged in the middle of the cross bar 15. The top end of the square timber 6 will contact the bottom end of the top plate structural beam, which can prevent the cross bar 15 and the long rod 12 from directly contacting the top plate structural beam surface, and act as a protective pad.

[0051] Example 2

[0052] An electric slide rail is fixed to the bottom end of the long rod 12 along the length direction, a slider is slidably matched on the electric slide rail, and the guide chain 4 is installed at the bottom end of the slider.

[0053] In this embodiment, by installing an electric slide rail, personnel can remotely control the movement of the slider, thereby driving the guide chain 4 to move, making it easy to adjust the position of the guide chain 4 and position and hoist the wall panel body 2 at different positions. This is more labor-saving and simpler than manually adjusting the position of the slide sleeve 13.

Claims

1. A combined assembly hoisting process for indoor prefabricated plain concrete wall panels, characterized by: The following steps are involved: S1. A lifting device (1) is fixedly installed between the structural beam and the top plate structural beam, a guide chain (4) is installed on the lifting device (1), and the lifting device (1) is manually raised and lowered according to the height between different structural beams and the top plate structural beam; S2, one end of the guide chain (4) is used to connect the wall panel body (2), and the other end of the guide chain (4) is manually pulled to position the wall panel body (2) and the installation height by pulling back and forth; S3. A moving vehicle (3) is provided at the bottom end of the wall panel body (2) to support and move the wall panel body (2); The hoisting device (1) comprises two steel-shaped load-bearing brackets (5), a long rod (12) is installed between the top ends of the two steel-shaped load-bearing brackets (5), a sliding sleeve (13) is provided on the outer sliding sleeve of the long rod (12), a hanging ear is provided at the bottom end of the sliding sleeve (13), and the guide chain (4) is suspended and installed on the hanging ear; The steel load-bearing support (5) comprises two vertical rods (14), a horizontal rod (15) is fixed between the top ends of the two vertical rods (14), and a rectangular sleeve (16) is slidably sleeved between the outer sides of the two vertical rods (14), a connecting rod (18) is fixed between the opposite sides of the two rectangular sleeves (16), the top end of the horizontal rod (15) is supported on the bottom end of the top plate structural beam, and the connecting rod (18) is supported on the top end of the structural beam.

2. The combined assembly type hoisting process for indoor prefabricated plain concrete wall panels according to claim 1 is characterized in that: The two vertical rods (14) and the connecting rod (18) are in a U-shaped structure, and the two vertical rods (14) are respectively attached to two sides of the structural beam.

3. The combined assembly type hoisting process for indoor prefabricated plain concrete wall panels according to claim 2 is characterized in that: The outer sides of the two rectangular sleeves (16) are each provided with a second screw (17), and the two second screws (17) are respectively pressed tightly against the outer sides of the corresponding vertical rods (14).

4. The combined assembly type hoisting process for indoor prefabricated plain concrete wall panels according to claim 1 is characterized in that: The top ends of the two cross bars (15) are both provided with a reinforcing mechanism, the reinforcing mechanism comprising a square wood (6), the square wood (6) being fixed to the top end of the cross bar (15), U-shaped seats (7) being fixed to both sides of the bottom end of the square wood (6), and the two U-shaped seats (7) being respectively arranged on both sides of the cross bar (15), and anti-dumping columns (8) being fixed to the bottom ends of the two U-shaped seats (7).

5. The combined assembly type hoisting process for indoor prefabricated plain concrete wall panels according to claim 4 is characterized in that: The bottom end of the anti-tipping column (8) is telescopically provided with a telescopic rod (9), the bottom end of the telescopic rod (9) is fixed with a support plate (10), the top end of the square wood (6) is supported on the bottom end of the top plate structural beam, and the support plate (10) is supported on the top end of the structural beam.

6. The combined assembly type hoisting process for indoor prefabricated plain concrete wall panels according to claim 5 is characterized in that: A telescopic slot is provided at the bottom end of the anti-tipping column (8), the telescopic rod (9) is slidably arranged inside the telescopic slot, and a first screw (11) is provided on the outer side of the anti-tipping column (8), and the first screw (11) is pressed tightly against the outer side of the telescopic rod (9).

7. The combined assembly type hoisting process for indoor prefabricated plain concrete wall panels according to claim 1 is characterized in that: The long rods (12) are distributed in parallel along the length direction of the structural beam and the top plate structural beam.

8. The combined assembly type hoisting process for indoor prefabricated plain concrete wall panels according to claim 1 is characterized in that: The two steel-shaped load-bearing brackets (5) are of the same height.

9. The combined assembly type hoisting process for indoor prefabricated plain concrete wall panels according to claim 1, characterized in that: The square wood (6) and the corresponding cross bar (15) are distributed at a vertical angle, and the square wood (6) is arranged in the middle of the cross bar (15).

10. The combined assembly type hoisting process for indoor prefabricated plain concrete wall panels according to claim 1, characterized in that: An electric slide rail is fixed to the bottom end of the long rod (12) along the length direction, a slider is slidably fitted on the electric slide rail, and the guide chain (4) is installed at the bottom end of the slider.