Energy pile snow melting and anti-icing device based on geothermal energy and energy storage

Through the energy pile snow melting anti-ice device based on geothermal energy and energy storage, using geothermal collection, energy storage and generator technologies, the problems of high corrosion and operation costs of chloride salt snow melting agent on the road surface in the existing technology are solved, and high efficiency is achieved , environmentally friendly snow-melt anti-ice effect.

CN119268149AInactive Publication Date: 2025-01-07LUDONG UNIVERSITY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411560092.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-04
Publication Date
2025-01-07
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the existing snow melting and anti-ice technology, the use of chloride salt snow melting agent has a corrosive effect on the road surface, resulting in huge harm to the road surface for long-term use and high operating costs.

Method used

Adopt energy pile snow melting anti-ice device based on geothermal energy and energy storage. Through the combination of geothermal collection device, energy storage device and anti-freeze device, heat exchange pipes, steam compressors, vacuum pumps, refrigerant storage tanks, generators and batteries. , collect and store geothermal energy, and heat the road surface in rainy and snowy weather to achieve snow melting and anti-ice.

Benefits of technology

It effectively reduces operating costs, improves resource utilization, reduces corrosion damage to the road surface, and realizes the function of melting snow and preventing ice in time in winter.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119268149A_ABST
    Figure CN119268149A_ABST
Patent Text Reader

Abstract

The invention provides an energy pile snow melting and anti-icing device based on geothermal energy and energy storage, and relates to the field of snow melting and anti-icing devices. The energy pile snow-melting and anti-icing device based on geothermal energy and energy storage comprises a geothermal collecting device, an energy storage device and an anti-freezing device, the geothermal collecting device is arranged at the front end of the energy storage device, the anti-freezing device is arranged at the top end of the energy storage device, and a steam discharge pipe is fixedly connected to the bottom end of a steam compressor. A vacuum pump is fixedly connected to the position, close to the upper portion, of the side wall of the energy pile, a refrigerant storage tank is fixedly connected to the other end of the S-shaped coil pipe, a refrigerant adding pipe is fixedly connected to the middle of the bottom end of the refrigerant storage tank, and the inner side wall of the heat exchange pipe is filled with a heat medium. By arranging the terrestrial heat collecting device, the utilization rate of resources is effectively increased, by arranging the energy storage device, heat energy is preliminarily converted into mechanical energy, convenience is provided for energy storage, and by arranging the anti-freezing device, the operation cost of snow removal on the road surface in winter is effectively reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of snow melting and ice prevention devices, and in particular to an energy pile snow melting and ice prevention device based on geothermal energy and energy storage. Background Art

[0002] The energy pile snow melting and ice prevention device based on geothermal energy and energy storage is a system that uses shallow underground geothermal energy to prevent road icing. The principle of this system is to extract shallow geothermal energy through tunnel piles installed in underground projects, and then transfer the heat to the road surface through pipes, thereby achieving the purpose of snow melting and ice prevention.

[0003] Although the prior art uses manual removal, mechanical removal, chemical melting and thermal melting methods to melt snow and prevent ice on the road surface, the use of chloride salt de-icing agents has the problem of corrosive effect on the road surface, resulting in great harm to the road surface after long-term use. Therefore, those skilled in the art provide an energy pile de-icing device based on geothermal energy and energy storage to solve the problems raised in the above background technology. Summary of the invention

[0004] 1. Technical issues to be resolved

[0005] In view of the shortcomings of the prior art, the present invention provides an energy pile snow melting and ice prevention device based on geothermal energy and energy storage, which solves the problem of reducing operating costs by collecting geothermal energy to perform snow melting and ice prevention operations.

[0006] (II) Technical solution

[0007] To achieve the above objectives, the present invention is implemented through the following technical solutions: an energy pile snow melting and ice prevention device based on geothermal energy and energy storage, comprising a geothermal collection device, an energy storage device and an antifreeze device, the geothermal collection device is arranged at the front end of the energy storage device, the antifreeze device is arranged at the top of the energy storage device, the geothermal collection device comprises a heat exchange tube, the inner wall of the heat exchange tube is fixedly connected with a serpentine coil, one end of the serpentine coil is fixedly connected with a steam compressor, the bottom end of the steam compressor is fixedly connected with a steam exhaust pipe, the other end of the steam exhaust pipe is fixedly connected with an energy pile, the upper position of the side wall of the energy pile is fixedly connected with a vacuum pump, the other end of the serpentine coil is fixedly connected with a refrigerant storage tank, the middle part of the bottom end of the refrigerant storage tank is fixedly connected with a refrigerant addition pipe, and the inner wall of the heat exchange tube is filled with hot medium.

[0008] Preferably: the energy storage device includes a support platform, a fixed frame is fixedly connected to the middle part of the top of the support platform, the middle part of the inner side wall of the fixed frame is rotatably connected to the first pulley, the middle parts of both sides of the fixed frame are respectively rotatably connected to turntables, the two turntable side walls are respectively rotatably connected to two connecting rods, and the other ends of the four connecting rods are respectively fixedly connected to pistons, the front end and the rear end of both sides of the fixed frame are respectively rotatably connected to piston sleeves, the front end and the rear end of the inner side walls of the fixed frame are respectively rotatably connected to rotating blocks, the front end and the rear end of the fixed frame are respectively fixedly connected to connecting pipes, the bottom ends of the two connecting pipes are fixedly connected to connecting pipes, the middle part of the top end of the connecting pipe located at the front end of the fixed frame is fixedly connected to a safety valve, and two steam pipes are fixedly connected to the front side of the bottom end of the connecting pipe located at the front end of the fixed frame, and the two steam pipes are both connected to the inside of the heat exchange pipe.

[0009] Preferably: the antifreeze device includes a mounting frame, an inner side wall of the mounting frame is rotatably connected to a second pulley, one side of the mounting frame is fixedly connected to a fixing plate, the front top of the fixing plate is fixedly connected to a generator, the rear top of the fixing plate is fixedly connected to a battery, one side of the battery is fixedly connected to a cable, the other ends of the two cables are fixedly connected to antifreeze plates, and the bottom end of the mounting frame is fixedly connected to both sides of the middle of the top of the fixing frame.

[0010] Preferably, the energy pile comprises a concrete pile, an inner wall of the concrete pile is fixedly connected to a heat collection tube, and one end of the vacuum pump passes through the concrete pile and is connected to the inside of the heat collection tube.

[0011] Preferably: the other end of the refrigerant addition pipe penetrates the side wall of the concrete pile and is connected with the inner wall of the heat energy collection pipe, the serpentine coil penetrates the inner wall of the heat exchange tube, the other end of the serpentine coil is connected with the inside of the refrigerant storage tank, one end of the refrigerant addition pipe is connected with the inner wall of the refrigerant storage tank, and the bottom end of the energy pile is a conical structure.

[0012] Preferably: the four rotating blocks respectively penetrate the inner wall of the fixed frame and are rotatably connected to the side wall of the piston sleeve, the two ends of the two connecting pipes respectively penetrate the inner wall of the fixed frame and are connected to the inner walls of the four piston sleeves, the four pistons are respectively slidably connected to the inner walls of the four piston sleeves, and the two ends of the first pulley respectively penetrate the inner wall of the fixed frame and are fixedly connected to the middle part of the two turntable side walls.

[0013] Preferably, the antifreeze plate comprises a concrete foundation, an inner wall of the concrete foundation is fixedly connected with an electric heating pipe, a top of the concrete foundation is fixedly connected with an asphalt pavement, and the electric heating pipe is electrically connected to two cables respectively.

[0014] Preferably: the generator output end passes through one side of the mounting frame and is fixedly connected to the middle of the second pulley, the second pulley is connected to the side wall of the first pulley through a belt, and the two cables and the generator are electrically connected to the battery respectively.

[0015] Working principle: The energy pile 105 is buried in the reserved foundation pit in advance, and the concrete pile 1051 is poured on the upper side of the side wall of the heat collection pipe 1052, and the refrigerant needed to absorb the geothermal layer is added to the refrigerant storage tank 108. During the working process, the air in the heat collection pipe 1052 is extracted through the vacuum pump 104 to make it a vacuum state, and the refrigerant is added to the heat collection pipe 1052 through the refrigerant storage tank 108. The refrigerant gradually changes into a steam state under the influence of geothermal heat. The steam is compressed by the steam compressor 102 to become high-temperature and high-pressure steam that enters the serpentine coil 101, and the heat medium 109 in the heat exchange tube 106 is heated. The heat generated will enter the energy storage device 2 through the steam pipe 212, and at the same time The steam generated by the heat medium 109 is injected into the two connecting pipes 2011 by using two connecting pipes 208. At this time, the high-temperature steam is injected into the four piston sleeves 206, so as to push the four pistons 203 to slide in the piston sleeves 206, so that the two turntables 207 rotate, thereby driving the turntables 207 to rotate. Driven by the belt, the second pulley 301 rotates, and the generator 303 is used to generate electricity, and the electric energy is stored by the battery 305. In winter and rainy and snowy weather, the battery 305 discharges, and the electric energy is transmitted to the electric heating pipe 3073 by using the cable 306. As the temperature of the electric heating pipe 3073 increases, the asphalt pavement 3071 can be heated, and the snow or frozen road surface can be thawed.

[0016] (III) Beneficial effects

[0017] The present invention provides an energy pile snow melting and ice prevention device based on geothermal energy and energy storage.

[0018] Beneficial effects:

[0019] 1. By setting up a geothermal collection device, the energy pile is buried in the reserved foundation pit in advance, and concrete piles are poured on the upper side of the side wall of the heat collection pipe. The refrigerant needed to absorb the geothermal layer is added to the refrigerant storage tank. During the working process, the air in the heat collection pipe is extracted by a vacuum pump to make it a vacuum state. Refrigerant is added to the heat collection pipe through the refrigerant storage tank. The refrigerant gradually changes into a steam state under the influence of geothermal heat. The steam is compressed by a steam compressor to become high-temperature and high-pressure steam that enters the serpentine coil to heat the heat medium in the heat exchange tube. The generated heat will enter the energy storage device through the steam pipe. Concrete piles are set on the side wall of the heat collection pipe, which can provide good support. At the same time, the heat collection pipe is used to collect geothermal energy and the collected heat is preliminarily converted, effectively improving the utilization rate of resources.

[0020] 2. By setting up an energy storage device, the steam generated by the heat medium is injected into the two connecting pipes through two connecting pipes. At this time, the high-temperature steam is injected into the four piston sleeves, thereby pushing the four pistons to slide in the piston sleeves, so that the two turntables rotate, thereby driving the turntable to rotate, and the collected heat is converted between the piston and the piston sleeve, which can preliminarily convert thermal energy into mechanical energy, providing convenience for energy storage.

[0021] 3. By setting up an antifreeze device, the second pulley rotates under the drive of the belt, and the generator is used to generate electricity, and the electric energy is stored in the battery. In winter and rainy and snowy weather, the battery is discharged, and the electric energy is transmitted to the electric heating tube by cable. As the temperature of the electric heating tube rises, the asphalt road surface can be heated, and the snow or frozen road surface can be melted. After the mechanical energy is converted into electrical energy for storage, snow melting and anti-icing operations can be carried out in time in rainy and snowy weather, effectively reducing the operating cost of road snow removal in winter. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a schematic diagram of the structure of the present invention;

[0023] Figure 2 It is a structural schematic diagram of the energy storage device of the present invention;

[0024] Figure 3 It is a structural schematic diagram of the antifreeze device of the present invention;

[0025] Figure 4 It is a schematic cross-sectional structure diagram of the heat exchange tube of the present invention;

[0026] Figure 5 It is a schematic cross-sectional view of the energy pile of the present invention;

[0027] Figure 6 It is a front view structural schematic diagram of the energy storage device of the present invention;

[0028] Figure 7 It is a front view structural schematic diagram of the antifreeze device of the present invention.

[0029] Among them, 1. Geothermal collection device; 101. Serpentine coil; 102. Steam compressor; 103. Steam exhaust pipe; 104. Vacuum pump; 105. Energy pile; 1051. Concrete pile; 1052. Heat collection pipe; 106. Heat exchange pipe; 107. Refrigerant addition pipe; 108. Refrigerant storage tank; 109. Heat medium; 2. Energy storage device; 201. Support platform; 202. Connecting rod; 203. Piston; 204. Fixed frame; 205. Rotating block; 206, piston sleeve; 207, turntable; 208, connecting pipe; 209, first pulley; 2010, safety valve; 2011, connecting pipe; 2012, steam pipe; 3, antifreeze device; 301, second pulley; 302, mounting frame; 303, generator; 304, fixing plate; 305, battery; 306, cable; 307, antifreeze plate; 3071, asphalt pavement; 3072, concrete foundation; 3073, electric heating pipe. DETAILED DESCRIPTION

[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0031] Embodiment 1:

[0032] like Figure 1-7As shown, an embodiment of the present invention provides an energy pile snow melting and ice prevention device based on geothermal energy and energy storage, comprising a geothermal collection device 1, an energy storage device 2 and an antifreeze device 3, wherein the geothermal collection device 1 is arranged at the front end of the energy storage device 2, and the antifreeze device 3 is arranged at the top of the energy storage device 2, the geothermal collection device 1 comprises a heat exchange tube 106, the inner wall of the heat exchange tube 106 is fixedly connected with a serpentine coil 101, one end of the serpentine coil 101 is fixedly connected with a steam compressor 102, the bottom end of the steam compressor 102 is fixedly connected with a steam exhaust pipe 103, the other end of the steam exhaust pipe 103 is fixedly connected with an energy pile 105, the side wall of the energy pile 105 is fixedly connected with a vacuum pump 104 at an upper position, the other end of the serpentine coil 101 is fixedly connected with a refrigerant storage tank 108, the middle part of the bottom end of the refrigerant storage tank 108 is fixedly connected with a refrigerant adding pipe 107, the inner wall of the heat exchange tube 106 is filled with a heat medium 109, and by setting the geothermal collection device 1, the energy pile 105 is pre-buried The heat collecting pipe 1052 is poured into the reserved foundation pit, and concrete piles 1051 are poured on the upper side of the side wall of the heat collecting pipe 1052. The refrigerant needed to absorb the geothermal layer is added to the refrigerant storage tank 108. During the operation, the air in the heat collecting pipe 1052 is extracted by the vacuum pump 104 to make it a vacuum state. The refrigerant is added to the heat collecting pipe 1052 through the refrigerant storage tank 108. The refrigerant gradually changes into a steam state under the influence of geothermal heat. The steam is compressed by the steam compressor 102 to become high-temperature and high-pressure steam that enters the serpentine coil 101, and the heat medium 109 in the heat exchange tube 106 is heated. The generated heat will enter the energy storage device 2 through the steam pipe 2012. Concrete piles 1051 are arranged on the side wall of the heat collecting pipe 1052, which can provide good support. At the same time, the heat collecting pipe 1052 is used to collect geothermal energy and perform preliminary conversion on the collected heat, effectively improving the utilization rate of resources.

[0033] The energy storage device 2 includes a support platform 201, a fixed frame 204 is fixedly connected to the middle of the top of the support platform 201, a first pulley 209 is rotatably connected to the middle of the inner wall of the fixed frame 204, a turntable 207 is rotatably connected to the middle of both sides of the fixed frame 204, two connecting rods 202 are rotatably connected to the side walls of the two turntables 207, and the other ends of the four connecting rods 202 are respectively fixedly connected to pistons 203, and the front end and the rear end of both sides of the fixed frame 204 are respectively rotatably connected to piston sleeves 206, and the front end and the rear end of the inner wall of the fixed frame 204 are respectively rotatably connected to rotating blocks 205, and the front end and the rear end of the fixed frame 204 are respectively fixedly connected to connecting pipes 2011, and the bottom ends of the two connecting pipes 2011 are fixedly connected to connecting pipes 208. A safety valve 2010 is fixedly connected to the middle of the top of the connecting pipe 2011, and two steam pipes 2012 are fixedly connected to the front side of the bottom of the connecting pipe 2011 located at the front end of the fixed frame 204. The two steam pipes 2012 are both connected to the inside of the heat exchange tube 106. By setting up an energy storage device 2, the steam generated by the heat medium 109 is injected into the two connecting pipes 2011 using two connecting pipes 208. At this time, high-temperature steam is injected into the four piston sleeves 206, so as to push the four pistons 203 to slide in the piston sleeves 206, so that the two turntables 207 rotate, thereby driving the turntable 207 to rotate, and the collected heat is used for conversion between the piston 203 and the piston sleeve 206, so that the thermal energy can be preliminarily converted into mechanical energy, which provides convenience for energy storage.

[0034] The antifreeze device 3 includes a mounting frame 302, the inner side wall of the mounting frame 302 is rotatably connected to the second pulley 301, a fixing plate 304 is fixedly connected to one side of the mounting frame 302, a generator 303 is fixedly connected to the front side of the top of the fixing plate 304, a battery 305 is fixedly connected to the rear side of the top of the fixing plate 304, a cable 306 is fixedly connected to one side of the battery 305, and the other ends of the two cables 306 are fixedly connected to the antifreeze plate 307, the bottom end of the mounting frame 302 is fixedly connected to both sides of the middle part of the top of the fixing frame 204, and the antifreeze device 3 is provided. Under the action of the motor, the second pulley 301 rotates, the generator 303 is used to generate electricity, and the electric energy is stored in the battery 305. In winter and rainy and snowy weather, the battery 305 discharges, and the electric energy is transmitted to the electric heating tube 3073 by the cable 306. As the temperature of the electric heating tube 3073 increases, the asphalt pavement 3071 can be heated, and the snow or frozen road surface can be melted. After the mechanical energy is converted into electrical energy for storage, snow melting and anti-icing operations can be carried out in time in rainy and snowy weather, effectively reducing the operating cost of road snow removal in winter.

[0035] The energy pile 105 includes a concrete pile 1051, and the inner wall of the concrete pile 1051 is fixedly connected with a heat collection pipe 1052, one end of the vacuum pump 104 penetrates the concrete pile 1051 and is connected to the inside of the heat collection pipe 1052, the other end of the refrigerant addition pipe 107 penetrates the side wall of the concrete pile 1051 and is connected to the inner wall of the heat collection pipe 1052, the serpentine coil 101 penetrates the inner wall of the heat exchange tube 106, the other end of the serpentine coil 101 is connected to the inside of the refrigerant storage tank 108, one end of the refrigerant addition pipe 107 is connected to the inner wall of the refrigerant storage tank 108, the bottom end of the energy pile 105 is a conical structure, the four rotating blocks 205 respectively penetrate the inner wall of the fixed frame 204 and are rotatably connected to the side wall of the piston sleeve 206, and the two ends of the two connecting pipes 2011 respectively penetrate the inner wall of the fixed frame 204 and the four The inner walls of the four piston sleeves 206 are connected, and the four pistons 203 are slidably connected to the inner walls of the four piston sleeves 206 respectively. The two ends of the first pulley 209 respectively pass through the inner wall of the fixed frame 204 and are fixedly connected to the middle parts of the side walls of the two turntables 207. The antifreeze plate 307 includes a concrete foundation 3072. The inner wall of the concrete foundation 3072 is fixedly connected with an electric heating pipe 3073. The top of the concrete foundation 3072 is fixedly connected with an asphalt pavement 3071. The electric heating pipe 3073 is electrically connected to the two cables 306 respectively. The output end of the generator 303 passes through one side of the mounting frame 302 and is fixedly connected to the middle part of the second pulley 301. The second pulley 301 is connected to the side wall of the first pulley 209 by a belt. The two cables 306 and the generator 303 are electrically connected to the battery 305 respectively.

[0036] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An energy pile snow melting and ice prevention device based on geothermal energy and energy storage, comprising a geothermal collection device (1), an energy storage device (2) and an antifreeze device (3), wherein the geothermal collection device (1) is arranged at the front end of the energy storage device (2), and the antifreeze device (3) is arranged at the top end of the energy storage device (2), characterized in that: The geothermal collection device (1) comprises a heat exchange tube (106), the inner wall of the heat exchange tube (106) is fixedly connected to a serpentine coil (101), one end of the serpentine coil (101) is fixedly connected to a steam compressor (102), the bottom end of the steam compressor (102) is fixedly connected to a steam exhaust pipe (103), the other end of the steam exhaust pipe (103) is fixedly connected to an energy pile (105), the upper part of the side wall of the energy pile (105) is fixedly connected to a vacuum pump (104), the other end of the serpentine coil (101) is fixedly connected to a refrigerant storage tank (108), the middle part of the bottom end of the refrigerant storage tank (108) is fixedly connected to a refrigerant addition pipe (107), and the inner wall of the heat exchange tube (106) is filled with a heat medium (109).

2. According to claim 1, an energy pile snow melting and ice prevention device based on geothermal energy and energy storage is characterized by: The energy storage device (2) comprises a support platform (201), a fixed frame (204) is fixedly connected to the middle of the top of the support platform (201), a first pulley (209) is rotatably connected to the middle of the inner wall of the fixed frame (204), a rotating disk (207) is rotatably connected to the middle of both sides of the fixed frame (204), two connecting rods (202) are rotatably connected to the side walls of the two rotating disks (207), the other ends of the four connecting rods (202) are respectively fixedly connected to pistons (203), the front end and the rear end of both sides of the fixed frame (204) are respectively rotatably connected to piston sleeves (206), and the fixed frame ( Rotating blocks (205) are rotatably connected to the front and rear ends of the inner walls of the fixing frame (204), respectively; connecting pipes (2011) are fixedly connected to the front and rear ends of the fixing frame (204), and connecting pipes (208) are fixedly connected to the bottom ends of the two connecting pipes (2011); a safety valve (2010) is fixedly connected to the middle of the top end of the connecting pipe (2011) located at the front end of the fixing frame (204); and two steam pipes (2012) are fixedly connected to the front side of the bottom end of the connecting pipe (2011) located at the front end of the fixing frame (204), and both of the two steam pipes (2012) are connected to the inside of the heat exchange pipe (106).

3. According to claim 1, the energy pile snow melting and ice prevention device based on geothermal energy and energy storage is characterized by: The antifreeze device (3) comprises a mounting frame (302), the inner side wall of the mounting frame (302) is rotatably connected to a second pulley (301), one side of the mounting frame (302) is fixedly connected to a fixing plate (304), the top front side of the fixing plate (304) is fixedly connected to a generator (303), the top rear side of the fixing plate (304) is fixedly connected to a storage battery (305), one side of the storage battery (305) is fixedly connected to a cable (306), the other ends of the two cables (306) are fixedly connected to an antifreeze plate (307), and the bottom end of the mounting frame (302) is fixedly connected to both sides of the middle of the top of the fixing frame (204).

4. According to claim 1, the energy pile snow melting and ice prevention device based on geothermal energy and energy storage is characterized by: The energy pile (105) comprises a concrete pile (1051), the inner wall of the concrete pile (1051) is fixedly connected with a heat collection pipe (1052), and one end of the vacuum pump (104) passes through the concrete pile (1051) and is connected to the inside of the heat collection pipe (1052).

5. According to claim 1, the energy pile snow melting and ice prevention device based on geothermal energy and energy storage is characterized by: The other end of the refrigerant addition pipe (107) passes through the side wall of the concrete pile (1051) and is connected to the inner wall of the heat energy collection pipe (1052). The serpentine coil (101) passes through the inner wall of the heat exchange tube (106). The other end of the serpentine coil (101) is connected to the inside of the refrigerant storage tank (108). One end of the refrigerant addition pipe (107) is connected to the inner wall of the refrigerant storage tank (108). The bottom end of the energy pile (105) is a conical structure.

6. The energy pile snow melting and ice prevention device based on geothermal energy and energy storage according to claim 2 is characterized by: The four rotating blocks (205) respectively penetrate the inner wall of the fixed frame (204) and are rotatably connected to the side wall of the piston sleeve (206); the two ends of the two connecting pipes (2011) respectively penetrate the inner wall of the fixed frame (204) and are connected to the inner walls of the four piston sleeves (206); the four pistons (203) are respectively slidably connected to the inner walls of the four piston sleeves (206); and the two ends of the first pulley (209) respectively penetrate the inner wall of the fixed frame (204) and are fixedly connected to the middle of the side walls of the two rotating disks (207).

7. According to claim 3, the energy pile snow melting and ice protection device based on geothermal energy and energy storage is characterized by: The antifreeze plate (307) includes a concrete foundation (3072), an inner wall of the concrete foundation (3072) is fixedly connected to an electric heating pipe (3073), the top of the concrete foundation (3072) is fixedly connected to an asphalt pavement (3071), and the electric heating pipe (3073) is electrically connected to two cables (306) respectively.

8. The energy pile snow melting and ice protection device based on geothermal energy and energy storage according to claim 3 is characterized by: The output end of the generator (303) passes through one side of the mounting frame (302) and is fixedly connected to the middle of the second pulley (301); the second pulley (301) is connected to the side wall of the first pulley (209) via a belt; and the two cables (306) and the generator (303) are electrically connected to the battery (305) respectively.