Intelligent drawing method and system for disassembly drawings of construction machinery and equipment

By combining CAD secondary development technology and machine learning algorithms, intelligent drawing of construction machinery equipment disassembly drawings is achieved, and the problems of low efficiency and error-prone traditional methods are solved, which significantly improves the efficiency and accuracy of drawings, and improves the progress and safety of construction.

CN119272358BActive Publication Date: 2025-03-04SHANGHAI CONSTRUCTION FOURTH CONSTRUCTION GROUP CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411813018.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-12-11
Publication Date
2025-03-04
Estimated Expiration
2044-12-11

AI Technical Summary

Technical Problem

The traditional construction machinery equipment disassembly drawing method relies on manual operation, is inefficient and prone to errors, and is difficult to meet the needs of improving construction efficiency and safety.

Method used

Using CAD secondary development technology and machine learning algorithms, we realize intelligent drawing frame drawing, drawing recognition, automatic drawing and labeling functions. Through steps such as data acquisition and preprocessing, model training, intelligent drawing and automatic cutting, etc., we can improve the efficiency and accuracy of drawing.

Benefits of technology

It significantly improves the efficiency and accuracy of drawing disassembly drawings of construction machinery equipment, reduces the time and energy of manual operation, reduces the error rate, and improves the progress and safety of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119272358B_ABST
    Figure CN119272358B_ABST
Patent Text Reader

Abstract

The present invention discloses a method and system for intelligently drawing disassembly drawings of construction machinery and equipment, and belongs to the field of computer-aided design. The method for intelligently drawing disassembly drawings of construction machinery and equipment provided by the present invention can automatically generate a general plan layout frame, a disassembly plan frame, and a facade drawing frame, and call in a general plan layout in the general plan layout frame, divide the general plan layout into disassembly areas according to the construction elevator, and then display the divided disassembly areas in the disassembly plan frame respectively, and place the blocks of the disassembly equipment to form a disassembly plan with the elevator as the center, and then set the elevation of the construction elevator in the elevation drawing frame, and form multiple elevations corresponding to the disassembly process of the construction elevator by deleting the blocks of the construction elevator step by step, which significantly improves the efficiency and accuracy of drawing.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a method and system for intelligently drawing disassembly drawings of construction machinery and equipment, and belongs to the field of computer-aided design. Background Art

[0002] With the continuous advancement of science and technology, the construction industry is undergoing a transformation from traditional construction methods to digital and intelligent construction. The core of this transformation is to improve construction efficiency, reduce costs, and improve project quality and safety.

[0003] The installation and disassembly of construction machinery and equipment is an important part of construction, which directly affects the progress and safety of the project. The traditional method of drawing disassembly drawings of construction elevators mainly relies on manual operation. Technicians use CAD software to manually draw drawings according to construction requirements and equipment characteristics. This method relies on the experience and skills of technicians, manually drawing basic graphics, adding dimensions, annotations and layer information, and making detailed adjustments and corrections to ensure the accuracy and compliance of the drawings. It takes a lot of time and effort to complete, and the efficiency is low. It usually takes hours or even days to draw a drawing, especially in complex construction environments, and it is prone to errors.

[0004] Therefore, it is necessary to propose an intelligent drawing method and system for disassembly drawings of construction machinery and equipment. Summary of the invention

[0005] In view of the problems existing in the installation and disassembly of existing construction machinery and equipment, the present invention provides a method and system for intelligent drawing of disassembly drawings of construction machinery and equipment, which utilizes CAD secondary development technology and combines it with machine learning algorithms to realize functions such as intelligent frame drawing, drawing recognition, automatic drawing cropping and annotation, etc. Through data collection and preprocessing, model training, intelligent drawing, automatic cropping and optimization, as well as output and review process steps, the efficiency and accuracy of drawing drawing are significantly improved.

[0006] In order to solve the above technical problems, the present invention includes the following technical solutions:

[0007] A method for intelligently drawing disassembly drawings of construction machinery and equipment comprises the following steps:

[0008] S1. Obtain project information, construction lifting equipment information and disassembly equipment information, and automatically generate adapted general layout drawing frames, disassembly plan drawing frames and elevation drawing frames according to pre-designed drawing frame styles;

[0009] S2. The master plan layout is loaded into the master plan layout frame, and the model of the construction elevator in the master plan layout is identified by using machine deep learning technology, and the base point coordinates of the construction elevator are obtained, and the master plan layout is divided into multiple disassembly areas according to the base point coordinates of the construction elevator;

[0010] S3. The disassembly areas divided by the general plan layout are respectively set in the disassembly plan frame, the preset disassembly equipment blocks are retrieved and placed around the elevator, and the linear dimensions of the disassembly equipment and construction elevator blocks are marked according to the base point coordinates of the disassembly equipment blocks and the base point coordinates of the construction elevator;

[0011] S4. In the elevation drawing frame, call in the elevation drawings of the building structure and the construction elevator, preset several vertical nodes, delete the components of the construction elevator above a vertical node each time, and draw the corresponding elevation drawings after each deletion in sequence.

[0012] Further, the general plan layout is divided into a plurality of disassembly areas according to the coordinates of the construction hoist base points, which specifically includes the following steps:

[0013] S21. Calculate the Euclidean distance between the base points of each pair of lifts d ; d =( x 2- x 1) 2 +( y 2- y 1) 2 ,in( x 1, y 1) ( x 2, y 2) are the coordinates of the two lift base points;

[0014] S22. Convert each point of the CAD drawing of the general layout plan into pixel coordinates according to the scale, and then use the clustering algorithm to iteratively calculate the distance between each two points and adjust the cluster center, and assign these points to the nearest cluster center until the cluster center is stable or the preset number of iterations is reached, and finally determine each cluster center as the base point position of the demolition area to ensure that each area contains only one construction elevator;

[0015] S23. Obtain the coordinates of the boundary points of each disassembly area, fit the boundary points and create a clipping boundary polygon to divide the general plan layout into multiple disassembly areas.

[0016] Further, in step S3, a disassembly equipment positioning module is used to retrieve preset disassembly equipment tiles. A database is established in the disassembly equipment positioning module and tiles of various types of disassembly equipment are pre-stored. The disassembly equipment positioning module can retrieve the corresponding disassembly equipment tiles according to the disassembly equipment information obtained in step S1.

[0017] Furthermore, the preset plurality of vertical nodes in step S4 specifically sets the vertical nodes to the vertical coordinates of the top of the facade structure of the building and the vertical coordinates of the bottom of the wall frame;

[0018] The components of the construction elevator above a vertical node are deleted each time, and the corresponding elevation drawings after each deletion are drawn in sequence, which specifically includes the following steps:

[0019] S41. Delete the components of the construction elevator whose vertical coordinates are greater than the vertical coordinates of the top of the facade structure and form a new facade drawing;

[0020] S42. Delete the top wall-mounted frame and the track frame standard section block whose vertical coordinate is greater than the top wall-mounted frame and form a new elevation drawing;

[0021] S43. Delete the second wall-mounted frame and the track frame standard section block whose vertical coordinate is greater than the second wall-mounted frame and form a new elevation drawing;

[0022] S44. Remove the wall-mounted frames and the corresponding standard section blocks of the track frames one by one from top to bottom until only N standard section blocks of the track frames remain, forming a new elevation drawing, where N is a preset value.

[0023] Furthermore, a construction elevator retrieval module is used to identify the model of the construction elevator in the general layout drawing. The construction elevator retrieval module has a built-in machine learning model, which collects a large amount of relevant information on the general layout drawings and construction elevator parameters in advance, extracts the features of the construction elevator after image preprocessing of the general layout drawing, and trains the machine learning model; after the training, the construction elevator retrieval module can automatically identify the model of the construction elevator on the new general layout drawing.

[0024] Accordingly, the present invention also provides a construction machinery and equipment disassembly drawing intelligent drawing system, including an intelligent drawing frame generation system, a general plan layout system, a disassembly plan drawing system and an elevation drawing system;

[0025] The intelligent drawing frame generation system includes an information collection module and a drawing frame adaptive generation module; the information collection module is used to collect project information, construction lifting equipment information and disassembly equipment information; the drawing frame adaptive generation module is preset with a CAD drawing frame style, and can automatically generate an adapted general plan layout drawing frame, a disassembly plan drawing frame and an elevation drawing drawing frame according to the pre-designed CAD drawing frame style;

[0026] The general layout system can set the general layout drawing in the general layout drawing frame, identify the model and base point coordinates of the construction elevator in the general layout drawing, and divide the general layout drawing into multiple disassembly areas according to the base point coordinates of the construction elevator;

[0027] The disassembly plan drawing system can respectively set the disassembly areas divided by the general plan layout in the disassembly plan drawing frame, retrieve the preset disassembly equipment blocks and place them around the elevator, and mark the linear dimensions of the disassembly equipment and construction elevator blocks according to the base point coordinates of the disassembly equipment blocks and the base point coordinates of the construction elevator;

[0028] The elevation drawing system can call up the elevation drawings of the building structure and the construction elevator in the elevation drawing frame, delete the components of the construction elevator above each vertical node from top to bottom in sequence according to a number of preset vertical nodes, and draw the corresponding elevation drawings after each deletion in sequence.

[0029] Due to the adoption of the above technical scheme, the present invention has the following advantages and positive effects compared with the prior art: the intelligent drawing method for disassembly drawings of construction machinery and equipment provided by the present invention can automatically generate a general layout drawing frame, a disassembly plan drawing frame and a facade drawing frame, and call the general layout drawing into the general layout drawing frame, divide the general layout drawing into disassembly areas according to the construction elevator, and then display the divided disassembly areas in the disassembly plan drawing frame respectively, and place the blocks of the disassembly equipment to form a disassembly plan drawing centered on the elevator, and then set the elevation drawing of the construction elevator in the elevation drawing frame, and form multiple elevation drawings corresponding to the disassembly process of the construction elevator by deleting the blocks of the construction elevator step by step, thereby significantly improving the efficiency and accuracy of drawing drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is a flow chart of a method for intelligently drawing disassembly drawings of construction machinery and equipment in one embodiment of the present invention;

[0031] Figure 2 It is a general plan layout diagram and a drawing frame in one embodiment of the present invention;

[0032] Figure 3 It is a disassembly plan view and a frame in one embodiment of the present invention;

[0033] Figure 4 It is a disassembled elevation view and a frame in one embodiment of the present invention;

[0034] Figure 5 It is a structural block diagram of a system for intelligently drawing disassembly drawings of construction machinery and equipment in one embodiment of the present invention.

[0035] The numbers in the figure are as follows:

[0036] 1- General layout drawing frame; 2- Disassembly plan drawing frame; 3- Elevation drawing frame; 4- General layout drawing; 5- Building structure; 6- Construction hoist; 7- Disassembly equipment; 8- Attached wall frame. DETAILED DESCRIPTION

[0037] The following is a further detailed description of a construction machinery and equipment disassembly drawing intelligent drawing method and system provided by the present invention in conjunction with the accompanying drawings and specific embodiments. The advantages and features of the present invention will become clearer in conjunction with the following description. It should be noted that the accompanying drawings are all in a very simplified form and are not in precise proportions, and are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention.

[0038] Embodiment 1

[0039] The intelligent drawing method for disassembly drawings of construction machinery and equipment provided in this embodiment utilizes the secondary development function of CAD software and combines it with machine learning algorithms to realize intelligent drawing frame drawing, drawing recognition, automatic drawing cutting and annotation, and other functions, and automatically draws the disassembly plan and disassembly elevation drawings of the construction hoist, so as to improve the efficiency and accuracy of drawing disassembly drawings of the construction hoist. Figures 1 to 4 As shown, the method comprises the following steps:

[0040] S1. Obtain project information, construction lifting equipment information and disassembly equipment information, and automatically generate adapted general layout drawing frame 1, disassembly plan drawing frame 2 and elevation drawing frame 3 according to the pre-designed drawing frame style;

[0041] S2. Import the master plan layout into the master plan layout frame 1 Figure 4 , using machine deep learning technology to identify the overall layout Figure 4 The model of the construction elevator 6 is obtained, the base point coordinates of the construction elevator 6 are obtained, and the general plan layout is arranged according to the base point coordinates of the construction elevator Figure 4 Divided into multiple disassembly areas;

[0042] S3. The disassembly areas divided by the general plan layout are respectively set in the disassembly plan frame 2, the preset disassembly equipment blocks are retrieved and placed around the elevator, and the linear dimensions of the disassembly equipment and construction elevator blocks are marked according to the base point coordinates of the disassembly equipment blocks and the base point coordinates of the construction elevator;

[0043] S4. In the elevation drawing frame 3, the elevation drawings of the building structure 5 and the construction elevator 6 are loaded, a number of vertical nodes are preset, the components of the construction elevator above a vertical node are deleted each time, and the corresponding elevation drawings after each deletion are drawn in sequence.

[0044] Project information includes project name, construction unit, design unit, equipment disassembly unit, drawing information, etc. It can be collected by manual input, and of course it can also be identified from existing files through text recognition.

[0045] Construction hoisting equipment information includes the construction hoist model and construction hoist parameters. Construction hoist is a vertical transportation equipment, mainly used for vertical transportation of materials and personnel in construction. It is a temporary, movable, vertically operating transportation machinery, usually including a cage (car), a guide rail frame, a wall frame and a power mechanism. The bottom of the guide rail frame is fixed to the bottom foundation by anchor bolts. The guide rail frame includes several standard sections spliced ​​up and down in sequence. The guide rail frame is fixedly connected to the building structure through several layers of wall frames. The cage can move up and down along the guide rail frame through the power mechanism.

[0046] In order to use machine deep learning technology to identify the model of the construction elevator in the general layout drawing, a construction elevator retrieval module can be set up first and a convolutional neural network or other machine learning model algorithm can be built in. A large amount of relevant information on the general layout drawings and construction elevator parameters can be collected in advance, and the general layout drawings can be preprocessed, such as grayscale, binarization, and noise removal. After that, the features of the construction elevator (shape, size, and label text) are extracted, and the model is trained. After the training is completed, the construction elevator retrieval module can automatically identify the construction elevator model on the new general layout drawing. After the construction elevator model is determined, the composition structure of the construction elevator, including which components, can be obtained, and the blocks of the corresponding components can be retrieved, so that when it is subsequently dismantled, it can be deleted according to the block as the minimum deletion unit. For example, when the guide frame is dismantled, one or several standard section blocks are deleted each time.

[0047] When the general layout drawing is in the CAD primitive format, the base point coordinates of the construction elevator can be obtained by collecting the coordinate values ​​in the CAD drawing. When the general layout drawing is in the image format, the pixel coordinates of the construction elevator can be obtained by collecting pixel points. Based on the proportional relationship between the pixel coordinates and the CAD coordinates, the pixel coordinates are converted into base point coordinates.

[0048] The intelligent drawing method for disassembly drawings of construction machinery and equipment provided in this embodiment can automatically generate a general layout drawing frame, a disassembly plan drawing frame and a facade drawing frame, and call the general layout drawing into the general layout drawing frame, divide the general layout drawing into disassembly areas according to the construction elevator, and then display the divided disassembly areas in the disassembly plan drawing frame respectively, and place the blocks of the disassembly equipment to form a disassembly plan drawing centered on the elevator, and then set the elevation drawing of the construction elevator in the elevation drawing frame, and draw multiple elevation drawings corresponding to the dismantling process of the construction elevator by deleting the blocks of the construction elevator step by step, thereby significantly improving the efficiency and accuracy of drawing drawings.

[0049] In a specific embodiment, the general plan layout is divided into a plurality of disassembly areas according to the coordinates of the construction elevator base points, and the specific steps are as follows:

[0050] S21. Calculate the Euclidean distance between the base points of each pair of lifts d ; d =( x 2- x 1) 2 +( y 2- y 1) 2 ,in( x 1, y 1) ( x 2, y 2) are the coordinates of the two lift base points;

[0051] S22. Convert each point of the CAD drawing of the general layout plan into pixel coordinates according to the scale. For example, if the coordinates of a point on the drawing are (100, 200), and the scale is set to 1 unit = 10 pixels, then the pixel coordinates of the point are (1000, 2000); then use a clustering algorithm (such as a K-means algorithm) to iteratively calculate the distances between each two points and adjust the cluster centers, and assign these points to the nearest cluster center until the cluster center is stable or the preset number of iterations is reached, and finally determine each cluster center as the base point position of the disassembly area, ensuring that each area contains only one construction elevator, thereby providing a clear area division for the disassembly of the construction elevator;

[0052] S23. Obtain the coordinates of the boundary points of each disassembly area, use the boundary points fitted by the least squares method to create a regular clipping boundary polygon, call the CLIP command, and complete the disassembly area division of the general plan layout drawing, ensuring that each disassembly area is centered on the elevator base point and that each area is relatively independent.

[0053] In a specific embodiment, a disassembly equipment positioning module is provided, and a database is established in the disassembly equipment positioning module using MySQL technology to store graphic primitive modules of different models of disassembly equipment. Disassembly equipment is a series of tools and machinery used to disassemble construction elevators. These equipment are used to safely and efficiently dismantle the various components of the construction elevators after the construction is completed or when the equipment needs to be transferred to other construction sites. The disassembly equipment generally includes components such as booms and lifting equipment. According to the obtained disassembly equipment model, the disassembly equipment positioning module can automatically retrieve the graphic primitive module of the corresponding model of disassembly equipment and draw it in the disassembly plan in CAD.

[0054] In a specific embodiment, each time the components of the construction elevator above a vertical node are removed, the components of the construction elevator mainly include a track frame 9 and a wall frame 8. For example, the vertical node is set to the vertical coordinate of the top of the facade structure of the building and the vertical coordinate of the bottom of the wall frame. Figure 4As shown, the parts of the construction elevator above a vertical node are deleted each time, and the corresponding elevation drawings after each deletion are drawn in sequence, which specifically includes the following steps:

[0055] S41. Delete the components of the construction elevator whose vertical coordinates are greater than the vertical coordinates of the top of the facade structure, mainly the top head frame of the construction elevator and the standard section blocks of the top track frame;

[0056] S42. Delete the top wall frame and the standard section block of the track frame whose vertical coordinate is greater than the top wall frame; in actual construction, use the lifting rod of the lift to dismantle the top wall frame, use the lifting rod of the dismantling equipment to lift the standard section section by section, and dismantle the guide rail frame and the wall frame section by section from top to bottom;

[0057] S43. Delete the second wall-mounted frame and the standard section block of the track frame whose vertical coordinate is greater than that of the second wall-mounted frame; in actual construction, use the lifting rod of the lift itself to dismantle the second wall-mounted frame, use the lifting rod of the dismantling equipment to lift the standard section section by section, and dismantle the guide rail frame and the second wall-mounted frame section by section from top to bottom;

[0058] S43. Remove the wall-mounted brackets and the corresponding track rack standard section blocks one by one from top to bottom until only 3 to 4 track rack standard section blocks remain.

[0059] Embodiment 2

[0060] The intelligent drawing system for disassembly drawings of construction machinery and equipment provided in this embodiment is as follows: Figures 1 to 5 As shown, the intelligent drawing system for disassembly drawings of construction machinery and equipment is further described. The intelligent drawing system for disassembly drawings of construction machinery and equipment includes an intelligent drawing frame generation system, a general plan layout system, a disassembly plan drawing system and a elevation drawing system.

[0061] The intelligent frame generation system includes an information collection module and a frame adaptive generation module; the information collection module is used to collect project information, construction lifting equipment information and disassembly equipment information; the frame adaptive generation module is preset with a CAD frame style, and can automatically generate an adaptive general plan layout frame, a disassembly plan frame and a elevation drawing frame according to the pre-designed CAD frame style.

[0062] The master plan layout system can call up the master plan layout in the master plan layout frame. The master plan layout can be a CAD file, which can be inserted into the drawing area of ​​the master plan layout frame at a suitable scale. The master plan layout can also be a captured image file, and the image file is inserted into the drawing area of ​​the master plan layout frame at a suitable scale. The master plan layout system includes a construction elevator retrieval module and a disassembly area division module. The construction elevator retrieval module is preset with a trained machine learning model, which can identify the construction elevator in the master plan layout and obtain several coordinates of the construction elevator. The disassembly area division module can divide the master plan layout into multiple disassembly areas according to the coordinates of the construction elevator base point.

[0063] The disassembly plan drawing system can set the disassembly areas divided by the general layout drawing in the disassembly plan drawing frame respectively. The disassembly plan drawing system includes a disassembly equipment positioning module and a distance marking module. The disassembly equipment positioning module is provided with a database established by MySQL technology to store blocks of different types of disassembly equipment. According to the collected information of the disassembly equipment, the disassembly equipment blocks are inserted into CAD, and the base point coordinates of the disassembly equipment blocks are transmitted to the distance marking module. The distance marking module performs linear dimension marking on the disassembly equipment and construction elevator blocks according to the base point coordinates of the disassembly equipment blocks and the base point coordinates of the construction elevator.

[0064] The elevation drawing system can draw elevation drawings corresponding to the steps of dismantling the construction elevator in the elevation drawing frame according to the preset steps of dismantling the construction elevator. The elevation drawing system includes an elevation drawing parsing module and a dismantling step drawing module. The elevation drawing parsing module is used to identify the components in the elevation drawing of the construction elevator and the top and bottom coordinates of the standard section. Several vertical nodes are preset in the dismantling step drawing module, and the components of the construction elevator above the corresponding vertical nodes are deleted from top to bottom in sequence, and the corresponding elevation drawings are drawn after each deletion.

[0065] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0066] The above-mentioned embodiments only express several implementation modes of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the invention. It should be pointed out that, for a person of ordinary skill in the art, several modifications and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the attached claims.

Claims

1. A method for intelligently drawing disassembly drawings of construction machinery and equipment, characterized in that: The steps include: S1. Obtain project information, construction lifting equipment information and disassembly equipment information, and automatically generate adapted general layout drawing frames, disassembly plan drawing frames and elevation drawing frames according to pre-designed drawing frame styles; S2. The master plan layout is loaded into the master plan layout frame, and the model of the construction elevator in the master plan layout is identified by using machine deep learning technology, and the base point coordinates of the construction elevator are obtained, and the master plan layout is divided into multiple disassembly areas according to the base point coordinates of the construction elevator; S3. The disassembly areas divided by the general plan layout are respectively set in the disassembly plan frame, the preset disassembly equipment blocks are retrieved and placed around the elevator, and the linear dimensions of the disassembly equipment and construction elevator blocks are marked according to the base point coordinates of the disassembly equipment blocks and the base point coordinates of the construction elevator; S4. In the elevation drawing frame, call in the elevation of the building structure and the construction elevator, preset several vertical nodes, delete the components of the construction elevator above a vertical node each time, and draw the corresponding elevation after each deletion in sequence; The general plan layout is divided into multiple disassembly areas according to the coordinates of the construction elevator base point, which specifically includes the following steps: S21. Calculate the Euclidean distance between the base points of each pair of lifts d ; d =( x 2- x 1) 2 +( y 2- y 1) 2 ,in( x 1, y 1) ( x 2, y 2) are the coordinates of the base points of the two elevators; S22. Convert each point of the CAD drawing of the general layout plan into pixel coordinates according to the scale, and then use the clustering algorithm to iteratively calculate the distance between each two points and adjust the cluster center, and assign these points to the nearest cluster center until the cluster center is stable or the preset number of iterations is reached, and finally determine each cluster center as the base point position of the demolition area to ensure that each area contains only one construction elevator; S23. Obtain the coordinates of the boundary points of each disassembly area, fit the boundary points and create a clipping boundary polygon to divide the general plan layout into multiple disassembly areas.

2. The intelligent drawing method for disassembly drawings of construction machinery and equipment according to claim 1, characterized in that: In step S3, a disassembly equipment positioning module is used to retrieve preset disassembly equipment tiles. A database is established in the disassembly equipment positioning module and tiles of various types of disassembly equipment are pre-stored. The disassembly equipment positioning module can retrieve the corresponding disassembly equipment tiles according to the disassembly equipment information obtained in step S1.

3. The intelligent drawing method for disassembly drawings of construction machinery and equipment according to claim 1, characterized in that: The preset plurality of vertical nodes in step S4 specifically includes setting the vertical nodes to the vertical coordinates of the top of the facade structure of the building and the vertical coordinates of the bottom of the wall frame; The components of the construction elevator above a vertical node are deleted each time, and the corresponding elevation drawings after each deletion are drawn in sequence, which specifically includes the following steps: S41. Delete the components of the construction elevator whose vertical coordinates are greater than the vertical coordinates of the top of the facade structure and form a new facade drawing; S42. Delete the top wall-mounted frame and the track frame standard section block whose vertical coordinate is greater than the top wall-mounted frame and form a new elevation drawing; S43. Delete the second wall-mounted frame and the track frame standard section block whose vertical coordinate is greater than the second wall-mounted frame and form a new elevation drawing; S44. Remove the wall-mounted frames and the corresponding standard section blocks of the track frames one by one from top to bottom until only N standard section blocks of the track frames remain, forming a new elevation drawing, where N is a preset value.

4. The intelligent drawing method for disassembly drawings of construction machinery and equipment according to claim 1, characterized in that: The construction elevator retrieval module is used to identify the model of the construction elevator in the general layout drawing. The construction elevator retrieval module has a built-in machine learning model, which collects a large amount of general layout drawings and relevant information on construction elevator parameters in advance, extracts the features of the construction elevator after image preprocessing of the general layout drawing, and trains the machine learning model; After training, the construction elevator retrieval module can automatically identify the construction elevator model on the new general layout drawing.

5. An intelligent drawing system for disassembly drawings of construction machinery and equipment, characterized in that: It includes intelligent drawing frame generation system, general layout system, demolition plan drawing system and elevation drawing system; The intelligent drawing frame generation system includes an information collection module and a drawing frame adaptive generation module; the information collection module is used to collect project information, construction lifting equipment information and disassembly equipment information; the drawing frame adaptive generation module is preset with a CAD drawing frame style, and can automatically generate an adapted general plan layout drawing frame, a disassembly plan drawing frame and an elevation drawing drawing frame according to the pre-designed CAD drawing frame style; The master plan layout system can set the master plan layout in the master plan layout frame, use machine deep learning technology to identify the model and base point coordinates of the construction elevator in the master plan layout, and divide the master plan layout into multiple disassembly areas according to the base point coordinates of the construction elevator; The disassembly plan drawing system can respectively set the disassembly areas divided by the general plan layout in the disassembly plan drawing frame, retrieve the preset disassembly equipment blocks and place them around the elevator, and mark the linear dimensions of the disassembly equipment and construction elevator blocks according to the base point coordinates of the disassembly equipment blocks and the base point coordinates of the construction elevator; The elevation drawing system can call in the elevation drawings of the building structure and the construction elevator in the elevation drawing drawing frame, delete the components of the construction elevator above each vertical node from top to bottom in sequence according to a number of preset vertical nodes, and draw the corresponding elevation drawings after each deletion in sequence; The general plan layout is divided into multiple disassembly areas according to the coordinates of the construction elevator base point, which specifically includes the following steps: S21. Calculate the Euclidean distance between the base points of each pair of lifts d ; d =( x 2- x 1) 2 +( y 2- y 1) 2 ,in( x 1, y 1) ( x 2, y 2) are the coordinates of the base points of the two elevators; S22. Convert each point of the CAD drawing of the general layout plan into pixel coordinates according to the scale, and then use the clustering algorithm to iteratively calculate the distance between each two points and adjust the cluster center, and assign these points to the nearest cluster center until the cluster center is stable or the preset number of iterations is reached, and finally determine each cluster center as the base point position of the demolition area to ensure that each area contains only one construction elevator; S23. Obtain the coordinates of the boundary points of each disassembly area, fit the boundary points and create a clipping boundary polygon to divide the general plan layout into multiple disassembly areas.

Citation Information

Patent Citations

  • Method for rapidly generating building elevation map based on CAD

    CN110210063A

  • Drawing generation method and device, electronic equipment and storage medium

    CN116363255A