Die for wall construction, using method, prefabricated stack, wall and construction method
The concrete block structure is constructed by prefabricated base plate and rectangular column formwork, and is stuck at the gap between the autoclaved aerator blocks, combined with the reinforcement of the special-shaped tie bar, the problem of poor use of the wall on the back side of the embedded fire box is solved, and the wall on the back of the embedded fire box is improved. Construction quality and structural stability reduce maintenance difficulty and cost.
Patent Information
- Application Number
- CN202411566861.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-05
- Publication Date
- 2025-01-10
AI Technical Summary
The wall on the back side of the existing embedded fire-fighting box has poor durability and stability, which is prone to structural damage caused by collisions, and is difficult to repair in the later stage, especially in a narrow environment, resulting in poor use effect.
The wall construction mold is adopted that includes a prefabricated base plate, a first rectangular column formwork and a second rectangular column formwork. The prefabricated concrete block structure is clamped at the gap between the autoclaved aerator blocks to form a stable rectangular box installation groove, combined with special shapes Reinforce the bonding ribs to simplify the construction process and improve structural strength.
It improves the construction quality and structural strength of the wall, reduces maintenance costs and material costs, simplifies construction processes, reduces comprehensive construction costs, is suitable for a variety of building scenarios, and meets the requirements of green and environmentally friendly and civilized construction sites.
Smart Images

Figure CN119288195A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of civil engineering construction, and in particular to a mold for wall construction and a use method thereof, a prefabricated pile, a wall, and a construction method. Background Art
[0002] Fire extinguisher boxes for residential buildings, complexes, industrial plants and other projects are usually designed to be concealed in the wall. The conventional practice is to reserve holes for the box size when building the wall. For example, for an embedded fire extinguisher box with a size of 1800×700×160, after the wall is built and the 25×50 keel is installed, the fireproof board is laid, and then the mesh is hung and plastered to complete the construction of the back wall of the conventional embedded fire extinguisher box.
[0003] However, the practice of reserving a hole for the installation of the fire extinguisher box when building the wall and conventionally sealing the hole behind the fire extinguisher box has poor durability and is not structurally stable. For example, during cross-operation, the structure is easily damaged by collision with blunt instruments, and the plastered surface is also prone to cracking and falling off. In addition, it is difficult to repair in the later stage, especially in the concealed installation of pipe wells with small spaces. After repair, the plastered surface is also prone to cracking and falling off, resulting in poor use effect of the back wall of the embedded fire extinguisher box.
[0004] Therefore, there is an urgent need for a wall construction mold and a use method, a prefabricated stack, a wall, and a construction method to solve the problem of poor use effect of the back wall of the existing embedded fire extinguishing box. Summary of the invention
[0005] In view of the deficiencies in the prior art, the present invention provides a wall construction mold and a use method, a prefabricated stack, a wall, and a construction method to solve the problem of poor use effect of the back wall of the existing embedded fire extinguishing box.
[0006] To achieve the above object, the present invention adopts the following technical solutions: A mold for wall construction, characterized in that it includes a prefabricated base plate, a first rectangular column template and a second rectangular column template, the first rectangular column template is installed on the upper end of the prefabricated base plate, the upper end surface of the first rectangular column template is an opening, the second rectangular column template is detachably mounted on the side of either side of the first rectangular column template, the upper end surface of the second rectangular column template is an opening, the height of the second rectangular column template is higher than the first rectangular column template, and the side lengths on the left and right sides are smaller than the side lengths on the left and right sides of the first rectangular column template, and the bottom of the second rectangular column template is provided with an opening connected to the first rectangular column template.
[0007] To optimize the above technical solutions, the specific measures taken also include: Furthermore, the height of the second rectangular column formwork is consistent with the width of the wall.
[0008] Furthermore, the height difference between the second rectangular column template and the first rectangular column template is consistent with the width of the embedded fire extinguishing box.
[0009] Furthermore, the end of the second rectangular column formwork is flush with the front side of the first rectangular column formwork, and the side lengths on the left and right sides of the second rectangular column formwork are half of the side lengths on the left and right sides of the first rectangular column formwork, and are consistent with the vertical height of the autoclaved aerated blocks used for staggered stacking to construct the wall.
[0010] Furthermore, the spacing between the left and right sides of the second rectangular column template is consistent with the lateral spacing between the two adjacent upper and lower offset and stacked autoclaved aerated blocks.
[0011] Furthermore, a method for using a mold for wall construction is characterized by comprising the following steps: The second rectangular column formwork is detachably fitted on the side of either side of the first rectangular column formwork to obtain a left prefabricated stack mold with the second rectangular column formwork on the left and a right prefabricated stack mold with the second rectangular column formwork on the right; special-shaped tie bars consistent with their structures are placed in the left prefabricated stack mold and the right prefabricated stack mold respectively, and the first rectangular column formwork and the second rectangular column formwork are cast, and vibrated as they are cast; after coating and curing, the second rectangular column formwork, or the first rectangular column formwork and the second rectangular column formwork are removed as a whole to obtain a prefabricated prefabricated stack.
[0012] Furthermore, a prefabricated stack prefabricated by a method for using a mold for wall construction is characterized in that the special-shaped tie bars located inside the prefabricated stack include: special-shaped steel bars and connecting steel bars, the special-shaped steel bars include a first special-shaped steel bar and a second special-shaped steel bar, the first special-shaped steel bar and the second special-shaped steel bar are both "L"-shaped, one end of the first special-shaped steel bar is connected to one end of the second special-shaped steel bar, and the plane where the first special-shaped steel bar is located is perpendicular to the plane where the second special-shaped steel bar is located, and the end of the second special-shaped steel bar that is not connected to the first special-shaped steel bar is arranged in a direction away from the first special-shaped steel bar; the first special-shaped steel bar is used to be arranged in a first rectangular column formwork, and penetrate into the second rectangular column formwork to be connected to the second special-shaped steel bar located in the second rectangular column formwork; a plurality of special-shaped steel bars of different sizes are connected by a plurality of connecting steel bars.
[0013] Furthermore, a hook structure is provided at the end of the first special-shaped steel bar that is not connected to the second special-shaped steel bar.
[0014] Furthermore, a wall constructed with the prefabricated stacks is characterized in that it includes sintered porous bricks, autoclaved aerated blocks, prefabricated stacks and concrete lintels, several layers of the sintered porous bricks serve as the bottom, and autoclaved aerated blocks are built on the sintered porous bricks as the main body of the wall. The prefabricated stacks are respectively clamped in the gaps between the autoclaved aerated blocks that are staggered and stacked on the left and right sides through a structure constructed by a second rectangular column template, and several prefabricated stacks are stacked on each other through a structure constructed by a first rectangular column template to form a rectangular box installation groove that is concave on the surface of the wall main body constructed by the autoclaved aerated blocks, and the upper end of the box installation groove is installed with a concrete lintel stacked with the autoclaved aerated blocks on the left and right sides, and the upper end of the concrete lintel is also built with autoclaved aerated blocks.
[0015] Furthermore, a wall construction method is characterized by comprising the following steps: Several layers of sintered porous bricks are laid as a base, and the precast stacks are constructed and laid together with the autoclaved aerated blocks. The autoclaved aerated blocks are staggered and stacked to construct the main body of the wall. The sides of the two precast stacks that are not constructed by the second rectangular column formwork are fitted together and laid as a group. The array of precast stacks are stacked on each other through the structure constructed by the first rectangular column formwork, and form a rectangular box installation groove that is concave on the surface of the wall main body constructed by the autoclaved aerated blocks. The array of precast stacks are respectively connected by the structure constructed by the second rectangular column formwork and laid in the gaps between the autoclaved aerated blocks on the left and right sides that are staggered and stacked. A concrete lintel stacked with the autoclaved aerated blocks on the left and right sides of the box installation groove is installed at the upper end of the box installation groove, and the upper end of the concrete lintel continues to be laid with autoclaved aerated blocks for keeping the bottom of the wall main body flush.
[0016] The beneficial effects of the present invention are: The present invention can prefabricate structures such as concrete blocks constructed by the first rectangular column formwork and the second rectangular column formwork, namely the prefabricated stack hereinafter, through the arrangement of a prefabricated base plate, a first rectangular column formwork and a second rectangular column formwork. The prefabricated stack can be respectively clamped in the gaps between the autoclaved aerated blocks for masonry of the wall body which are located on the left and right sides and are staggered and stacked, and the concrete block structures constructed by the first rectangular column formwork are stacked on each other to form a rectangular box installation groove which is concave in the surface of the wall body constructed by the autoclaved aerated blocks. In this way, a concrete block structure for stably cooperating with the autoclaved aerated blocks which are staggered and stacked to form a box installation groove which can be embedded in the box can be constructed through the mold. The concrete block structure prefabricated by the mold can effectively ensure the stability of the wall after masonry, etc., and solves the problem of poor use effect of the back wall of the existing embedded fire extinguishing box.
[0017] When the wall of the present invention is built, prefabricated concrete stacks are used for installation, which are constructed together with the wall. After the building is completed, plastering is performed so that the plastered surface is the same as the usual masonry wall, the base treatment effect is good, and the plastering is performed in layers. By constructing according to this method, the construction quality and structural strength of the wall are improved, the reliability of the structure is increased, the maintenance cost and material cost of the part are reduced, and the expected goal of innovation and optimization is achieved.
[0018] The present invention can effectively improve the common problems of cracking and poor durability of plastering on the wall with holes. The mold is easy to construct, quick to use, simple in construction process, short in construction period, reasonable in comprehensive cost, and can reasonably utilize the concrete surplus and the short steel bar structure to reduce costs and increase efficiency. The present invention is suitable for the use of fire extinguishing boxes embedded in the wall, electric meter boxes embedded in the wall, and strong and weak current boxes in residential buildings in construction projects, etc. It can effectively ensure the construction quality, be green and environmentally friendly, save the cost of later maintenance, meet the requirements of civilized construction sites, and be energy-saving and efficient. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is a schematic diagram of the structure of the wall proposed by the present invention; Figure 2 A schematic diagram of the use of the mold proposed by the present invention; Figure 3 This is a schematic diagram of the structure of the special-shaped tie bar proposed in the present invention; Figure 4 It is a structural schematic diagram of the special-shaped steel bar proposed by the present invention; Figure 5 This is a schematic structural diagram of the left prefabricated stack mold proposed by the present invention; Figure 6 This is a schematic structural diagram of the right prefabricated stack mold proposed by the present invention.
[0020] Figure markings: 1. sintered porous brick, 2. autoclaved aerated block, 3. precast stack, 31. precast base plate, 32. first rectangular column formwork, 33. second rectangular column formwork, 34. special-shaped tie bars, 341. special-shaped steel bars, 3411. first special-shaped steel bars, 3412. second special-shaped steel bars, 342. connecting steel bars, 4. concrete lintel, 5. oblique bricks at the bottom of the beam, 6. fire water intake, 7. box installation groove, 301. left precast stack mold, 302. right precast stack mold. DETAILED DESCRIPTION
[0021] The present invention will now be described in further detail with reference to the accompanying drawings.
[0022] As attached Figure 2 , Attachment Figure 5 and attached Figure 6As shown, a mold for wall construction according to an embodiment of the present invention includes a prefabricated base plate 31, a first rectangular column formwork 32 and a second rectangular column formwork 33. The first rectangular column formwork 32 is installed on the upper end of the prefabricated base plate 31, and the upper end surface of the first rectangular column formwork 32 is an opening. The second rectangular column formwork 33 is detachably mounted on the side of any left or right side of the first rectangular column formwork 32. The upper end surface of the second rectangular column formwork 33 is an opening. The height of the second rectangular column formwork 33 is higher than that of the first rectangular column formwork 32, and the side lengths of the left and right sides of the second rectangular column formwork 33 are smaller than the side lengths of the left and right sides of the first rectangular column formwork 32. The bottom of the second rectangular column formwork 33 is provided with an opening which is the same height as and connected to the first rectangular column formwork 32.
[0023] The present invention can prefabricate structures such as concrete blocks constructed by the first rectangular column formwork 32 and the second rectangular column formwork 33, namely the prefabricated stack 3 hereinafter, by setting a prefabricated base plate 31, a first rectangular column formwork 32 and a second rectangular column formwork 33. The concrete block structure constructed by the second rectangular column formwork 33 can be respectively clamped in the gaps between the autoclaved aerated blocks 2 for masonry of the wall body located on the left and right sides and arranged in an offset manner. The concrete block structures constructed by the first rectangular column formwork 32 are stacked on each other to form a rectangular box mounting groove 7 recessed in the surface of the wall body constructed by the autoclaved aerated blocks 2. In this way, a concrete block structure for stably cooperating with the autoclaved aerated blocks 2 arranged in an offset manner to form a box mounting groove 7 that can be embedded in a box can be constructed by the mold. The concrete block structure prefabricated by the mold can effectively ensure the stability of the wall after masonry, etc., and solves the problem of poor use effect of the back wall of the existing embedded fire extinguishing box.
[0024] In this solution, casting can be performed through the upper opening of the first rectangular column formwork 32 and the upper opening of the second rectangular column formwork 33. Casting can be performed separately as needed, or a cover plate can be added as needed to perform casting simultaneously.
[0025] In this embodiment, the second rectangular column template 33 can be detachably mounted on the side of any left or right side of the first rectangular column template 32 by presetting a groove or other structure for the lower end of the second rectangular column template 33 to be inserted in the prefabricated bottom plate 31; or, the first rectangular column template 32 and the second rectangular column template 33 can be detachably connected and fixed directly by manual or rivet structures. In this embodiment, the first rectangular column template 32 can also be detachably mounted on the prefabricated bottom plate 31 by means of a groove or other structure for insertion, so as to facilitate demoulding of the prefabricated parts after prefabrication.
[0026] In one specific embodiment, the height of the second rectangular column template 33 is consistent with the width of the wall, so as to prevent the concrete block structure constructed by the second rectangular column template 33 from protruding from the wall surface.
[0027] In a specific embodiment, the height difference between the second rectangular column template 33 and the first rectangular column template 32 is consistent with the width of the embedded fire extinguishing box, so as to avoid the fire extinguishing box to be installed protruding from the wall surface.
[0028] Among them, in a specific embodiment, the end of the second rectangular column template 33 is flush with the front side of the first rectangular column template 32, and the side lengths of the left and right sides of the second rectangular column template 33 are half of the side lengths of the left and right sides of the first rectangular column template 32, and are consistent with the vertical height of the autoclaved aerated blocks 2 used for staggered stacking to construct the wall. In this way, when building the wall, the concrete block constructed by the second rectangular column template 33 can be effectively clamped in the gap between the autoclaved aerated blocks 2 on the left and right sides and staggered stacked. At the same time, the side of the concrete block constructed by the first rectangular column template 32 can just fit the autoclaved aerated block 2 located below the concrete block constructed by the second rectangular column template 33, thereby ensuring the tightness and reliability of the structure.
[0029] In a further specific embodiment, the spacing between the left and right sides of the second rectangular column template 33 is consistent with the lateral spacing between the two adjacent upper and lower offset stacked autoclaved aerated blocks 2. In this way, the tightness and reliability of the second rectangular column template 33 set at the gap of the autoclaved aerated blocks 2 are guaranteed.
[0030] As attached Figure 3 As shown, a method for using a mold for wall construction according to an embodiment of the present invention comprises the following steps: The second rectangular column formwork 33 is detachably fitted on the side of either side of the first rectangular column formwork 32, to obtain a left prefabricated stack mold 301 with the second rectangular column formwork 33 on the left side and a right prefabricated stack mold 302 with the second rectangular column formwork 33 on the right side; before pouring, the left prefabricated stack mold 301 and the right prefabricated stack mold 302 are sprinkled with water or coated with a release agent, and then, special-shaped tie bars 34 consistent with their structures are placed in the left prefabricated stack mold 301 and the right prefabricated stack mold 302 respectively, and the first rectangular column formwork 32 and the second rectangular column formwork 33 are poured, and vibrated as the pouring proceeds; after 7 days of film curing, the second rectangular column formwork 33, or the first rectangular column formwork 32 and the second rectangular column formwork 33 are removed as a whole to obtain a prefabricated prefabricated stack 3.
[0031] In this way, the required prefabricated stack 3 can be conveniently prefabricated through the above-mentioned mold, and the prefabricated prefabricated stack 3 structure can be reinforced by the special-shaped tie bars 34; when pouring, the deviation of the special-shaped tie bars 34 is within the allowable range.
[0032] As attached Figure 4As shown, a prefabricated stack prefabricated by a method for using a mold for wall construction according to an embodiment of the present invention, wherein the special-shaped tie bars 34 located inside the prefabricated stack 3 include: special-shaped steel bars 341 and connecting steel bars 342, the special-shaped steel bars 341 include a first special-shaped steel bar 4311 and a second special-shaped steel bar 3412, the first special-shaped steel bar 4311 and the second special-shaped steel bar 3412 are both "L"-shaped, one end of the first special-shaped steel bar 4311 is connected to one end of the second special-shaped steel bar 3412, and the plane where the first special-shaped steel bar 4311 is located is perpendicular to the plane where the second special-shaped steel bar 3412 is located, and the second special-shaped steel bar 3412 is located. The end of 412 that is not connected to the first special-shaped steel bar 4311 is set in a direction away from the first special-shaped steel bar 4311; the first special-shaped steel bar 4311 is used to be set in the first rectangular column template 32, and penetrates into the second rectangular column template 33 to be connected with the second special-shaped steel bar 3412 located in the second rectangular column template 33; several special-shaped steel bars 341 of different sizes are connected by several connecting steel bars 342 for connecting several special-shaped steel bars 341, and the structure matching the left prefabricated stack mold 301 and the right prefabricated stack mold 302 can be constructed respectively by setting the direction of the first special-shaped steel bar 4311, etc.
[0033] In this way, the first special-shaped steel bar 4311 and the second special-shaped steel bar 3412 can be matched with the special-shaped structure of the above-mentioned mold, so as to reinforce the prefabricated prefabricated stack 3 structure and ensure the reliability of the structure of the prefabricated stack 3.
[0034] In a further specific embodiment, a hook structure is further provided at the end of the first special-shaped steel bar 4311 that is not connected to the second special-shaped steel bar 3412. Thus, the reliability of the structure can be further enhanced through the hook structure.
[0035] As attached Figure 1 As shown, a wall constructed with the above-mentioned prefabricated stacks according to an embodiment of the present invention comprises sintered porous bricks 1, autoclaved aerated blocks 2, prefabricated stacks 3 and concrete lintels 4, several layers of sintered porous bricks 1 are used as the bottom, and autoclaved aerated blocks 2 are built on the sintered porous bricks 1 as the main body of the wall, and the prefabricated stacks 3 are respectively clamped in the gaps between the autoclaved aerated blocks 2 arranged in an offset manner on the left and right sides through a concrete block structure constructed by a second rectangular column formwork 33, and several prefabricated stacks 3 are stacked on each other through a concrete block structure constructed by a first rectangular column formwork 32, and a rectangular box mounting groove 7 is formed which is concave in the surface of the wall main body constructed by the autoclaved aerated blocks 2, and a concrete lintel 4 stacked with the autoclaved aerated blocks 2 on the left and right sides is installed at the upper end of the box mounting groove 7, and an autoclaved aerated block 2 is also built on the upper end of the concrete lintel 4.
[0036] In this way, the stability and reliability of the overall wall structure are ensured by using sintered porous bricks 1 as the base, autoclaved aerated blocks 2 and prefabricated stacks 3 to build the wall body and the rectangular box installation groove 7, and the concrete lintel 4 as the reinforcement.
[0037] In this embodiment, through holes such as the fire water intake 6 can be drilled on the concrete block structure constructed by the first rectangular column formwork 32 of several prefabricated stacks 3 as needed.
[0038] A construction method of the wall according to an embodiment of the present invention comprises the following steps: Several layers of sintered porous bricks 1 are laid for base laying, and the precast stacks 3 are constructed and laid together with the autoclaved aerated blocks 2. The autoclaved aerated blocks 2 are staggered and stacked to construct the main body of the wall. The sides of the two precast stacks 3 that are not constructed by the second rectangular column formwork 33 are fitted together and laid as a group. The array of precast stacks 3 are stacked on each other through the concrete block structure constructed by the first rectangular column formwork 32, and form a rectangular box installation groove 7 that is concave in the surface of the wall main body constructed by the autoclaved aerated blocks 2. The array of precast stacks 3 is respectively clamped and laid in the gaps between the autoclaved aerated blocks 2 on the left and right sides that are staggered and stacked through the concrete block structure constructed by the second rectangular column formwork 33. A concrete lintel 4 stacked with the autoclaved aerated blocks 2 on the left and right sides of the box installation groove 7 is installed at the upper end of the box installation groove 7, and the upper end of the concrete lintel 4 continues to be laid with the autoclaved aerated blocks 2 for keeping the bottom of the wall main body flush.
[0039] A specific implementation of the present invention is as follows: The above-mentioned mold for prefabricating the prefabricated pile 3 is designed using BIMMAKE software, and the mold processing diagram is designed. The template design should take into account the later installation of the fire hood. The prefabricated pile 3 can use a hanging mold. Under the condition of meeting the design requirements, considering the convenience during construction, the mold is divided into a left prefabricated pile mold 301 and a right prefabricated pile mold 302. The mold size is required to be accurate, the template joints are tightly fitted, no slurry is leaked, and the steel bars are fully tied to meet the use requirements. According to the structure of the left prefabricated pile mold 301 and the right prefabricated pile mold 302, the corresponding processed special-shaped tie bars 34 are tied, and they are required to be fully tied. Before pouring, the left prefabricated pile mold 301 and the right prefabricated pile mold 302 are sprinkled with water or coated with a release agent, and poured manually, vibrated as the pouring progresses, and covered with a film for 7 days of curing.
[0040] Before construction, check the layout dimensions, and check whether the actual axis, size, position, and elevation are consistent with the design; after the structure is accepted, clean up the slurry residue on the masonry base floor. The position of the pre-embedded reinforcement for the masonry and reinforced concrete frame columns should be accurate, and should be specifically reserved according to the total height and planned structural position. The length of the masonry in the wall should meet the design requirements.
[0041] During masonry, a 200-meter-high sintered porous brick 1 is set at the bottom of the pre-installed box position for foundation. The prefabricated stack 3 is installed together with the wall masonry. The vertical spacing meets the specifications and the modulus requirements of the masonry. The tie bars should be straight. The mortar fullness of the horizontal mortar joints in the tie bar section should be greater than 85%. Expansion bolts shall not be used to fix and weld the tie bars. The position of the tie pre-embedded bars between the masonry and the structure or structural column should be accurate, and the length of the tie in the wall should meet the design requirements. The depth of the drilled holes such as the fire water intake 6 must meet the design requirements. The cleaning of the holes requires the use of a special electric hair dryer to ensure the dust cleaning effect. Masonry can only be carried out after the wall tie bar anti-pulling test is qualified.
[0042] The mortar joints should be grouted as the masonry is laid. After each layer of blocks is laid and corrected in place, the vertical joints are filled with mortar, and then the mortar joints are tightened to a depth of 3 to 5 mm. The double-sided grouted joints of the inner and outer masonry walls make the connection between the upper, lower, left and right masonry block materials more solid, prevent wind and rain from invading the interior of the wall, and make the wall clean, neat and beautiful. A Ф6 tie wall bar is set every 600 height of the wall masonry, and a tie wall bar is set along the length of the prefabricated stack board, so that the mortar joints are full and dense. The concrete lintel 4 is installed after the prefabricated stack 3 and the autoclaved aerated block 2 are installed, and the length of the extension into the wall is not less than 250 mm.
[0043] The top wall is built close to the bottom of the beam and slab, leaving a certain gap. After an interval of 14 days, use matching bricks on both sides to lay 45°-60° oblique bricks at the bottom of the beam to fill and squeeze it tightly. The mortar joints are full and dense, and triangular concrete matching blocks are set in the middle to ensure that the masonry mortar is dense and avoid shrinkage cracks on the top of the masonry to complete the final wall construction.
[0044] When the wall of the present invention is built, prefabricated concrete precast piles 3 are used for installation, which are constructed together with the wall. After the building is completed, plastering is performed so that the plastered surface is the same as the usual masonry wall, the base treatment effect is good, and the plastering is performed in layers. By constructing according to this method, the construction quality and structural strength of the wall are improved, the reliability of the structure is increased, the maintenance cost and material cost of the part are reduced, and the expected goal of innovation and optimization is achieved.
[0045] The present invention can effectively improve the common problems of cracking and poor durability of plastering on the wall with holes. The mold is easy to construct, quick to use, simple in construction process, short in construction period, reasonable in comprehensive cost, and can reasonably utilize the concrete surplus and the short steel bar structure to reduce costs and increase efficiency. The present invention is suitable for the use of fire extinguishing boxes embedded in the wall, electric meter boxes embedded in the wall, and strong and weak current boxes in residential buildings in construction projects, etc. It can effectively ensure the construction quality, be green and environmentally friendly, save the cost of later maintenance, meet the requirements of civilized construction sites, and be energy-saving and efficient.
[0046] It should be noted that the terms such as "upper", "lower", "left", "right", "front", "back", etc. cited in the invention are only for the convenience of description and are not used to limit the scope of implementation of the present invention. Changes or adjustments in their relative relationships should be regarded as the scope of implementation of the present invention without substantially changing the technical content.
[0047] The above are only preferred embodiments of the present invention, and the protection scope of the present invention is not limited to the above embodiments. All technical solutions under the concept of the present invention belong to the protection scope of the present invention. It should be pointed out that for ordinary technicians in this technical field, some improvements and modifications without departing from the principle of the present invention should be regarded as the protection scope of the present invention.
Claims
1. A mold for wall construction, characterized in that: The invention comprises a prefabricated base plate (31), a first rectangular column template (32) and a second rectangular column template (33); the first rectangular column template (32) is installed on the upper end of the prefabricated base plate (31); the upper end surface of the first rectangular column template (32) is an opening; the second rectangular column template (33) is detachably mounted on the side of any left or right side of the first rectangular column template (32); the upper end surface of the second rectangular column template (33) is an opening; the height of the second rectangular column template (33) is higher than that of the first rectangular column template (32); the length of the sides on the left and right sides is smaller than that of the sides on the left and right sides of the first rectangular column template (32); and the bottom of the second rectangular column template (33) is provided with an opening connected to the first rectangular column template (32).
2. A wall construction mold according to claim 1, characterized in that: The height of the second rectangular column template (33) is consistent with the width of the wall.
3. A wall construction mold according to claim 1, characterized in that: The height difference between the second rectangular column template (33) and the first rectangular column template (32) is consistent with the width of the embedded fire extinguishing box.
4. A wall construction mold according to claim 1, characterized in that: The end of the second rectangular column formwork (33) is flush with the front side of the first rectangular column formwork (32), and the side lengths on the left and right sides of the second rectangular column formwork (33) are half the side lengths on the left and right sides of the first rectangular column formwork (32), and are consistent with the vertical height of the autoclaved aerated blocks (2) used for staggered stacking to construct the wall.
5. A wall construction mold according to claim 4, characterized in that: The spacing between the left and right sides of the second rectangular column template (33) is consistent with the lateral spacing between two adjacent upper and lower offset stacked autoclaved aerated blocks (2).
6. A method for using the wall construction mold according to any one of claims 1 to 5, characterized in that: The steps include: The second rectangular column formwork (33) is detachably fitted on the side of either the left or right side of the first rectangular column formwork (32), so as to obtain a left prefabricated stack mold (301) with the second rectangular column formwork (33) on the left side and a right prefabricated stack mold (302) with the second rectangular column formwork (33) on the right side; special-shaped tie bars (34) having the same structure as the left prefabricated stack mold (301) and the right prefabricated stack mold (302) are respectively placed in the left prefabricated stack mold (301) and the right prefabricated stack mold (302), and the first rectangular column formwork (32) and the second rectangular column formwork (33) are cast, and vibrated as the casting proceeds; after film coating and curing, the second rectangular column formwork (33) or the first rectangular column formwork (32) and the second rectangular column formwork (33) are removed as a whole to obtain a prefabricated prefabricated stack (3).
7. A prefabricated stack prefabricated by the method for using the mold for wall construction according to claim 6, characterized in that: The special-shaped tie bars (34) located inside the prefabricated pile (3) include special-shaped steel bars (341) and connecting steel bars (342), wherein the special-shaped steel bars (341) include first special-shaped steel bars (4311) and second special-shaped steel bars (3412), wherein the first special-shaped steel bars (4311) and the second special-shaped steel bars (3412) are both in an "L" shape, wherein one end of the first special-shaped steel bar (4311) is connected to one end of the second special-shaped steel bar (3412), and the plane where the first special-shaped steel bar (4311) is located is parallel to the plane where the second special-shaped steel bar ( The first special-shaped steel bar (4311) is arranged in a first rectangular column formwork (32) and is inserted into a second rectangular column formwork (33) to be connected to a second special-shaped steel bar (3412) located in the second rectangular column formwork (33); and a plurality of special-shaped steel bars (341) of different sizes are connected via a plurality of connecting steel bars (342).
8. The prefabricated stack according to claim 7, characterized in that: The end of the first special-shaped steel bar (4311) not connected to the second special-shaped steel bar (3412) is also provided with a hook structure.
9. A wall constructed using the prefabricated stacks according to any one of claims 6 to 8, characterized in that: The invention comprises sintered porous bricks (1), autoclaved aerated blocks (2), prefabricated stacks (3) and concrete lintels (4); several layers of the sintered porous bricks (1) are used as the bottom; autoclaved aerated blocks (2) are built on the sintered porous bricks (1) as the main wall body; the prefabricated stacks (3) are respectively connected to the gaps between the autoclaved aerated blocks (2) arranged in a staggered manner on the left and right sides through a structure constructed by a second rectangular column template (33); several prefabricated stacks (3) are stacked on each other through a structure constructed by a first rectangular column template (32) to form a rectangular box installation groove (7) concave in the surface of the main wall body constructed by the autoclaved aerated blocks (2); a concrete lintel (4) stacked with the autoclaved aerated blocks (2) on the left and right sides is installed at the upper end of the box installation groove (7); and an autoclaved aerated block (2) is also built on the upper end of the concrete lintel (4).
10. A wall construction method as claimed in claim 9, characterized in that: The steps include: Several layers of sintered porous bricks (1) are laid as a base, and the prefabricated stacks (3) are constructed together with the autoclaved aerated blocks (2). The autoclaved aerated blocks (2) are stacked alternately to form a wall body, and two prefabricated stacks (3) are stacked together on one side of the structure not formed by the second rectangular column template (33) to form a group, and the plurality of prefabricated stacks (3) are stacked on each other through the structure formed by the first rectangular column template (32) to form a rectangular concave wall body surface formed by the autoclaved aerated blocks (2). shaped box installation groove (7), the array prefabricated stacks (3) are respectively connected by a structure constructed by a second rectangular column template (33) and built in the gaps between the autoclaved aerated blocks (2) stacked and arranged in a staggered manner on the left and right sides, a concrete lintel (4) is installed at the upper end of the box installation groove (7) and is stacked with the autoclaved aerated blocks (2) on the left and right sides of the box installation groove (7), and the upper end of the concrete lintel (4) is further built with the autoclaved aerated blocks (2) for keeping the bottom of the wall body flush.