House building wall crack repairing device
By designing a crack repair device for building a building wall, the support mechanism, scraping mechanism and stabilizing mechanism are used to solve the problem of unstable repair operations at high places, safe and stable repair and waste collection at high places, and simplifying the operation process.
Patent Information
- Application Number
- CN202411532564.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-30
- Publication Date
- 2025-01-10
AI Technical Summary
When repairing the facade walls of taller buildings, manual lifting operations are prone to shake due to the long ropes, resulting in unsafe and stable repair operations.
A crack repair device for building a building wall is designed, including a hanging basket, a rubber injection box, a support mechanism, a scraping mechanism, a collection mechanism and a stabilizing mechanism. Through the cooperation of the support rod and the rotor, the scraper and the top spring, the function of the scraper and the top spring is The design of the collection box and buffer spring, as well as the adjustment of the bidirectional screw and oblique rod, ensures the stability and operational convenience of the hanging basket during lifting.
The stability and safety of wall repair operations at high altitudes are achieved. The hanging basket is kept away from the wall through support and adjustment mechanisms, which is easy to repair and can automatically collect waste, ensuring the repair effect and simplicity of operation.
Smart Images

Figure CN119288242A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of wall crack repairing, and in particular to a building wall crack repairing device. Background Art
[0002] Construction refers to the production activities in the implementation stage of engineering construction. It is the construction process of various buildings. It can also be said to be the process of turning various lines on the design drawings into physical objects at designated locations. It includes foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction, etc. Construction is a production activity carried out by people using various building materials and mechanical equipment in a certain space and time according to a specific design blueprint to build various building products. It includes the entire production process from construction preparation, groundbreaking to project completion acceptance. The walls of its construction will crack after long-term use. There are many factors that cause wall cracks, which are generally divided into temperature cracks, settlement cracks, structural cracks, surface latex paint cracks, cracks at joints, etc. Therefore, the wall gap filling device is one of the commonly used tools in construction machines.
[0003] At present, when repairing the facade wall of a tall building, it is generally necessary to manually hoist it from top to bottom to perform the wall repair operation. During this operation, due to the long hoisting rope, it is easy to cause shaking, resulting in unsafe and stable repair operation. Therefore, we propose a building wall crack repair device. Summary of the invention
[0004] The purpose of the present invention is to solve the problem that when repairing the facade walls of taller buildings, it is generally necessary to manually hoist them down from top to bottom to carry out the wall repair operation. During this operation, due to the long hoisting rope, it is easy to cause shaking, resulting in unsafe and unstable repair operations. A building wall crack repair device is proposed to solve the problem that when repairing the facade walls of taller buildings, it is generally necessary to manually hoist them down from top to bottom to carry out the wall repair operation. During the hoisting operation, due to the long hoisting rope, it is easy to cause shaking, thereby causing unsafe and stable repair operations.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions:
[0006] A building wall crack repairing device, comprising:
[0007] hanging basket;
[0008] A glue injection box is installed on the bottom inner wall of the glue injection box, an opening is opened on one side of the hanging basket, four symmetrically arranged supporting legs are fixedly installed on the bottom of the hanging basket, a mounting plate is fixedly installed on the front side of the hanging basket, a mounting block is slidably connected to the front side of the mounting plate, a cylinder is installed on the mounting block, a fixed block is installed on the piston of the cylinder, a mounting seat is fixed on the top of the fixed block, a glue injection gun is installed on the mounting seat, a hose is installed at one end of the glue injection gun, and one end of the hose is connected to the glue injection box, four symmetrically arranged load-bearing ropes are installed on the top of the hanging basket, a fixing frame is provided between the four load-bearing ropes, two adjusting ropes are installed on the top of the fixing frame, and an ultrasonic detector is installed on the front side of the hanging basket;
[0009] The support mechanism is installed on both sides of the hanging basket, and two symmetrically arranged fixing seats are fixedly installed at the bottom of the hanging basket. A same screw rod is rotatably connected between the two fixing seats, a push plate is threadedly connected to the screw rod, and the push plate is transmission-connected to the support mechanism. A second motor is fixedly installed on one of the two fixing seats, and an output shaft of the second motor is fixedly connected to the screw rod;
[0010] The scraping mechanism is installed on the mounting seat and cooperates with the glue injection gun;
[0011] A collecting mechanism is installed at the bottom of the fixing block and cooperates with the glue injection gun;
[0012] The stabilizing mechanism is installed on the fixing frame and cooperates with the four load-bearing ropes.
[0013] Furthermore, the supporting mechanism includes two positioning columns, which are fixedly mounted on both sides of the hanging basket, and the positioning columns are slidably connected to support rods.
[0014] Furthermore, a rotating plate is rotatably connected to one side of the support rod, six fixing ribs are fixedly installed on the rotating plate, and two rotating wheels are rotatably connected to the fixing ribs.
[0015] Furthermore, the push plate is rotatably connected to two symmetrically arranged push rods, a fixed shaft is fixedly mounted on the push rods, and the fixed shaft is rotatably connected to the corresponding support rods.
[0016] Furthermore, the scraping mechanism includes a scraper, a mounting seat is slidably connected to a push rod, the scraper is fixedly mounted on one end of the push rod, a push spring is sleeved on the push rod, the push spring is located between the scraper and the mounting seat, and a baffle is fixedly mounted on the other end of the push rod.
[0017] Furthermore, the collecting mechanism includes a collecting box, which is slidably mounted on the bottom of the fixed block, one side of the collecting box is provided with an inclined surface, and a feed port is provided on the top of the collecting box. The setting of the collecting box can facilitate the collection of waste generated during crack repair, and at the same time, through the action of the buffer spring and the connecting block, the collecting box can be buffered and pushed, thereby maintaining the contact with the wall.
[0018] Furthermore, a buffer groove is provided at the bottom of the fixed block, a sliding rod is fixedly installed on the inner wall of the buffer groove, a connecting block is slidably connected to the sliding rod, the connecting block is fixedly connected to the collection box, a buffer spring is fixedly installed on one side of the connecting block, and one end of the buffer spring is fixedly connected to the inner wall of the buffer groove.
[0019] Furthermore, a movable groove is provided on the front side of the mounting plate, a threaded rod is rotatably connected to the inner wall of the movable groove, the mounting block is slidably connected to the inner wall of the movable groove, the threaded rod is threadedly connected to the mounting block, a first motor is fixedly installed on one side of the mounting plate, the output shaft of the first motor is fixedly connected to the threaded rod, the output shaft of the first motor drives the threaded rod to rotate, the threaded rod is threadedly connected to the mounting block, thereby driving the mounting block to move, and then driving the glue injection gun to move its position, so that the cracks in the wall can be automatically repaired and glued.
[0020] Furthermore, the stabilizing mechanism includes four oblique rods, which are slidably mounted on both sides of the fixing frame, and one end of the four oblique rods is fixedly mounted with a fixing ring, and the load-bearing rope is located in the fixing ring.
[0021] Material toggling mechanism, its both sides respectively have a cylinder pressure, and the cylinder pressure bar connects swing arm, and the swing arm end face has hook portion, and a bar passes position between the end of two swing arms and the hook portion.
[0022] Compared with the prior art, the advantages of the present invention are:
[0023] (1) In this solution, since a sliding connection is provided between the support rod and the positioning column, and the rotating wheels are provided on the six fixed ribs, the hanging basket can be supported by the support rod and the rotating wheels, so that the hanging basket can be moved away from the wall, thereby facilitating the wall repair operation;
[0024] (2) In this solution, since a push rod and a scraper are provided, and the action of a push spring enables the scraper to push and scrape the cracks on the wall after repair, so that the cracks can be placed flat;
[0025] (3) In this solution, since a collection box is provided, and the buffer groove and the buffer spring act on the collection box, the collection box can be attached to the wall, and the excess materials when the cracks are repaired can be collected and placed;
[0026] (4) In this scheme, since a threaded connection between a bidirectional screw and two connecting seats is provided, and the fixing ring on the inclined rod cooperates with the load-bearing rope, the rotating bidirectional screw can adjust the distance between the four load-bearing ropes, and thus can adjust the load-bearing ropes for stable lifting of the hanging basket.
[0027] The invention has a simple structure and is easy to operate, and can be convenient for high-place hoisting repair of cracks in facade walls, while also being convenient for stable support, thereby making the repair operation more convenient and convenient for people to use. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 This is a schematic structural diagram of a building wall crack repairing device proposed by the present invention;
[0029] Figure 2 This is a rear structural schematic diagram of a building wall crack repairing device proposed by the present invention;
[0030] Figure 3 This is a schematic diagram of the structure of a building wall crack repairing device proposed by the present invention from a bottom view;
[0031] Figure 4 This is a schematic diagram of the support rod and fixed rib structure of a building wall crack repair device proposed by the present invention;
[0032] Figure 5 A schematic diagram of the transmission structure of a push plate and a support rod of a building wall crack repair device proposed by the present invention;
[0033] Figure 6 This is a schematic diagram of the mounting plate and fixing block of a building wall crack repair device and its component structure proposed by the present invention;
[0034] Figure 7 This is a schematic diagram of the front view structure of a mounting plate of a building wall crack repairing device proposed by the present invention;
[0035] Figure 8 This is a schematic diagram of the structure of a fixing block and a collecting box of a building wall crack repair device proposed by the present invention;
[0036] Fig. 9 This is a schematic diagram of the bottom view structure of a fixed block of a building wall crack repairing device proposed by the present invention;
[0037] Fig.10 This is a schematic diagram of the structure of a fixing frame of a building wall crack repairing device proposed by the present invention;
[0038] Fig.11 This is a schematic diagram of the structure of a fixing frame of a building wall crack repairing device proposed by the present invention when viewed from above;
[0039] Fig.12 A schematic diagram of a hanging basket structure of a building wall crack repairing device proposed by the present invention;
[0040] Fig.13 This is a schematic diagram of the top view of the structure of a collection box of a building wall crack repair device proposed by the present invention;
[0041] Fig.14 A building wall crack repair device proposed by the present invention Figure 2 Schematic diagram of the structure of part A;
[0042] Fig.15 The present invention is a schematic diagram of a scraper structure of a building wall crack repairing device.
[0043] In the figure: 1. hanging basket; 2. glue injection box; 3. opening; 4. mounting plate; 5. mounting block; 6. cylinder; 7. fixing block; 8. mounting seat; 9. glue injection gun; 10. hose; 11. collecting box; 12. buffer groove; 13. slide bar; 14. connecting block; 15. buffer spring; 16. moving groove; 17. threaded rod; 18. first motor; 19. feeding port; 20. ejector rod; 21. scraper; 22. ejector spring; 23. baffle; 24. support leg; 25. positioning column; 26. Support rod; 27. Turntable; 28. Fixed rib; 29. Rotating wheel; 30. Fixed seat; 31. Screw; 32. Second motor; 33. Push plate; 34. Push rod; 35. Fixed shaft; 36. Load-bearing rope; 37. Fixed frame; 38. Diagonal rod; 39. Fixed ring; 40. Bidirectional screw; 41. Turning block; 42. Moving rod; 43. Movable block; 44. Adjusting rope; 45. Connecting seat; 46. Positioning seat; 47. Bolt; 48. Lifting ring; 49. Ultrasonic detector. DETAILED DESCRIPTION
[0044] The technical solution of this embodiment will be clearly and completely described below in conjunction with the drawings in this embodiment. Obviously, the described embodiment is only a part of this embodiment, rather than all of the embodiments.
[0045] Embodiment 1
[0046] Reference Figure 1-Figure 15 , a building wall crack repair device, comprising:
[0047] Hanging basket 1;
[0048] The glue injection box 2 is installed on the bottom inner wall of the glue injection box 2. An opening 3 is provided on one side of the hanging basket 1. Four symmetrically arranged supporting legs 24 are fixedly installed on the bottom of the hanging basket 1. A mounting plate 4 is fixedly installed on the front side of the hanging basket 1. A mounting block 5 is slidably connected to the front side of the mounting plate 4. A cylinder 6 is installed on the mounting block 5. A fixed block 7 is installed on the piston of the cylinder 6. A mounting seat 8 is fixed on the top of the fixed block 7. A glue injection gun 9 is installed on the mounting seat 8. A hose 10 is installed at one end of the glue injection gun 9. One end of the hose 10 is connected to the glue injection box 2. Four symmetrically arranged load-bearing ropes 36 are installed on the top of the hanging basket 1. A fixing frame 37 is provided between the four load-bearing ropes 36. Two adjusting ropes 44 are installed on the top of the fixing frame 37. An ultrasonic detector 49 is installed on the front side of the hanging basket 1;
[0049] The support mechanism is installed on both sides of the hanging basket 1. Two symmetrically arranged fixed seats 30 are fixedly installed at the bottom of the hanging basket 1. The same screw rod 31 is rotatably connected between the two fixed seats 30. A push plate 33 is threadedly connected to the screw rod 31. The push plate 33 is transmission-connected to the support mechanism. A second motor 32 is fixedly installed on one of the two fixed seats 30. The output shaft of the second motor 32 is fixedly connected to the screw rod 31.
[0050] The scraping mechanism is mounted on the mounting seat 8 and cooperates with the glue injection gun 9;
[0051] The collecting mechanism is installed at the bottom of the fixed block 7 and cooperates with the glue injection gun 9;
[0052] The stabilizing mechanism is mounted on the fixing frame 37 and cooperates with the four load-bearing ropes 36 .
[0053] In this embodiment, the supporting mechanism includes two positioning columns 25, which are fixedly installed on both sides of the hanging basket 1. A support rod 26 is slidably connected to the positioning columns 25, and a rotating plate 27 is rotatably connected to one side of the support rod 26. Six fixing ribs 28 are fixedly installed on the rotating plate 27, and two rotating wheels 29 are rotatably connected to the fixing ribs 28. Two symmetrically arranged push rods 34 are rotatably connected to the push plate 33, and a fixed shaft 35 is fixedly installed on the push rod 34. The fixed shaft 35 is rotatably connected to the corresponding support rod 26. The positioning columns 25 support the hanging basket 1 through the support rod 26 and the rotating plate 27, and through the arrangement of the six fixing ribs 28 and the rotating wheel 29, it can be convenient to move smoothly when passing through the step position. At the same time, the moving push plate 33 drives the two push rods 34 to move, and the push rod 34 is connected to the support rod 26 through rotation, so as to push the support rod 26 to move, thereby adjusting the support distance.
[0054] In this embodiment, the scraping mechanism includes a scraper 21, and a top rod 20 is slidably connected to the mounting seat 8. The scraper 21 is fixedly installed at one end of the top rod 20. A top spring 22 is sleeved on the top rod 20. The top spring 22 is located between the scraper 21 and the mounting seat 8, and a baffle 23 is fixedly installed on the other end of the top rod 20. The mounting seat 8 drives the scraper 21 to act on the wall through the top rod 20, and under the action of the top spring 22, the scraper 21 contacts the wall, so that the cracks in the wall can be scraped flat.
[0055] In this embodiment, the collecting mechanism includes a collecting box 11, which is slidably installed at the bottom of the fixed block 7. One side of the collecting box 11 is arranged as an inclined surface, and a feed port 19 is provided at the top of the collecting box 11. A buffer groove 12 is provided at the bottom of the fixed block 7. A sliding rod 13 is fixedly installed on the inner wall of the buffer groove 12. A connecting block 14 is slidably connected to the sliding rod 13. The connecting block 14 is fixedly connected to the collecting box 11. A buffer spring 15 is fixedly installed on one side of the connecting block 14. One end of the buffer spring 15 is fixedly connected to the inner wall of the buffer groove 12. The setting of the collecting box 11 can facilitate the collection of waste generated during crack repair. At the same time, through the action of the buffer spring 15 and the connecting block 14, the collecting box 11 can be buffered and pushed, thereby maintaining the effect of contact with the wall.
[0056] In this embodiment, a movable groove 16 is opened on the front side of the mounting plate 4, and a threaded rod 17 is rotatably connected to the inner wall of the movable groove 16. The mounting block 5 is slidably connected to the inner wall of the movable groove 16, and the threaded rod 17 is threadedly connected to the mounting block 5. A first motor 18 is fixedly installed on one side of the mounting plate 4, and the output shaft of the first motor 18 is fixedly connected to the threaded rod 17. The output shaft of the first motor 18 drives the threaded rod 17 to rotate. The threaded rod 17 is threadedly connected to the mounting block 5, thereby driving the mounting block 5 to move, and then driving the glue injection gun 9 to move its position, so that the cracks in the wall can be automatically repaired and injected with glue.
[0057] In this embodiment, the stabilizing mechanism includes four inclined rods 38, which are slidably mounted on both sides of the fixed frame 37, and one end of each of the four inclined rods 38 is fixedly mounted with a fixed ring 39, and the load-bearing rope 36 is located in the fixed ring 39. The top of the fixed frame 37 is slidably connected to two moving rods 42, and the moving rods 42 are slidably connected to two movable blocks 43, and the movable blocks 43 are rotatably connected to the corresponding inclined rods 38, and the bottom of the moving rods 42 is fixedly mounted with a connecting seat 45, and the inner side of the fixed frame 37 is rotatably connected to a bidirectional screw 40, and the bidirectional screw 40 is A rotating block 41 is fixedly installed at one end, and the bidirectional screw 40 is threadedly connected to two connecting seats 45. The rotating rotating block 41 drives the bidirectional screw 40 to rotate. The bidirectional screw 40 is threadedly connected to the two connecting seats 45, thereby driving the two moving rods 42 to move in opposite directions. The moving rod 42 drives the inclined rod 38 to move through the movable block 43, thereby driving the four load-bearing ropes 36 to move away from each other, thereby increasing the angle between the load-bearing rope 36 and the hanging basket 1, and then making the force of the load-bearing rope 36 outward, so that the hanging basket 1 is more stable during hoisting.
[0058] Working principle: during operation, the worker hoists the person in the hanging basket 1 onto the high-altitude wall through the load-bearing rope 36, and detects the cracks in the wall through the ultrasonic detector 49. When repair is needed, the output shaft of the first motor 18 drives the threaded rod 17 to rotate, and the threaded rod 17 is connected with the mounting block 5 by a thread, so that the mounting block 5 can be driven to move, and then the glue injection gun 9 can be driven to move horizontally, so that the glue injection gun 9 can be aimed at the crack, and the first cylinder 6 switch is started. The piston of the first cylinder 6 drives the glue injection gun 9 on the fixed block 7 close to the crack, so that the glue injection box 2 automatically repairs the crack in the wall through the hose 10 and the glue injection gun 9. When the hanging basket 1 is moved up and down, the hanging basket 1 is supported by the rotating wheel 29, so that the hanging basket 1 can move and walk on the outside of the wall. The setting of the six fixed ribs 28 and the rotating wheel 29 can facilitate smooth movement when passing through the step position. At the same time, the moving push plate 33 drives the two push rods 34 to move, and the push rods 34 are connected with the support rods 26. The rotating connection can push the support rod 26 to move, thereby adjusting the support distance. The mounting seat 8 drives the scraper 21 to act on the wall through the top rod 20, and under the action of the top spring 22, the scraper 21 is in contact with the wall, so that the wall cracks can be scraped flat. The setting of the collecting box 11 can facilitate the collection of waste generated during crack repair. At the same time, through the action of the buffer spring 15 and the connecting block 14, the collecting box 11 can be buffered and pushed, thereby maintaining the effect of contact with the wall. When the hoisting height is high, the rotating block 41 is rotated, and the rotating rotating block 41 drives the bidirectional screw 40 to rotate. The bidirectional screw 40 is threadedly connected to the two connecting seats 45, thereby driving the two moving rods 42 to move in the opposite direction. The moving rod 42 drives the inclined rod 38 to move through the movable block 43, thereby driving the four load-bearing ropes 36 away from each other, thereby increasing the angle between the load-bearing rope 36 and the hanging basket 1, thereby making the force of the load-bearing rope 36 outward, thereby making the hanging basket 1 more stable during hoisting.
[0059] Embodiment 2
[0060] The difference between this embodiment and the first embodiment is that two positioning seats 46 are fixedly installed on both sides of the hanging basket 1, and bolts 47 are threadedly connected to the positioning seats 46. A lifting ring 48 is fixedly installed on the top of the bolt 47. The lifting ring 48 is connected to the corresponding load-bearing rope 36. The bolt 47 is threadedly connected to the positioning seat 46, so that the load-bearing rope 36 and the hanging basket 1 can be easily disassembled, and the angle of the hanging basket 1 can be slightly adjusted. All structures in this application can be selected according to the actual usage conditions. The accompanying drawings are all schematic structural diagrams, and the specific actual dimensions can be appropriately adjusted.
[0061] The above description is only a preferred specific implementation manner of this embodiment, but the protection scope of this embodiment is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of this embodiment within the technical scope disclosed in this embodiment, and they should be covered by the protection scope of this embodiment.
Claims
1. A building wall crack repair device, characterized in that: include: Basket (1); The glue injection box (2) is installed on the inner wall of the bottom of the glue injection box (2); an opening (3) is opened on one side of the hanging basket (1); four symmetrically arranged supporting legs (24) are fixedly installed on the bottom of the hanging basket (1); a mounting plate (4) is fixedly installed on the front side of the hanging basket (1); a mounting block (5) is slidably connected to the front side of the mounting plate (4); a cylinder (6) is installed on the mounting block (5); a fixing block (7) is installed on the piston of the cylinder (6); and the top of the fixing block (7) A mounting seat (8) is fixed, a glue injection gun (9) is installed on the mounting seat (8), a hose (10) is installed at one end of the glue injection gun (9), one end of the hose (10) is connected to the glue injection box (2), four symmetrically arranged load-bearing ropes (36) are installed on the top of the hanging basket (1), a fixing frame (37) is provided between the four load-bearing ropes (36), two adjustment ropes (44) are installed on the top of the fixing frame (37), and an ultrasonic detector (49) is installed on the front side of the hanging basket (1); A support mechanism is installed on both sides of the hanging basket (1), two symmetrically arranged fixing seats (30) are fixedly installed at the bottom of the hanging basket (1), a same screw rod (31) is rotatably connected between the two fixing seats (30), a push plate (33) is threadedly connected to the screw rod (31), the push plate (33) is transmission-connected to the support mechanism, a second motor (32) is fixedly installed on one of the two fixing seats (30), and an output shaft of the second motor (32) is fixedly connected to the screw rod (31); The scraping mechanism is mounted on the mounting seat (8) and cooperates with the glue injection gun (9); A collecting mechanism, mounted on the bottom of the fixing block (7) and cooperating with the glue injection gun (9); The stabilizing mechanism is installed on the fixing frame (37) and cooperates with the four load-bearing ropes (36).
2. A building wall crack repairing device according to claim 1, characterized in that: The support mechanism comprises two positioning columns (25), the two positioning columns (25) are fixedly mounted on both sides of the hanging basket (1), and a support rod (26) is slidably connected to the positioning columns (25).
3. A building wall crack repairing device according to claim 2, characterized in that: A rotating plate (27) is rotatably connected to one side of the support rod (26), six fixing ribs (28) are fixedly mounted on the rotating plate (27), and two rotating wheels (29) are rotatably connected to the fixing ribs (28).
4. A building wall crack repairing device according to claim 3, characterized in that: The push plate (33) is rotatably connected to two symmetrically arranged push rods (34), and a fixed shaft (35) is fixedly mounted on the push rod (34), and the fixed shaft (35) is rotatably connected to the corresponding support rod (26).
5. A building wall crack repairing device according to claim 1, characterized in that: The scraping mechanism comprises a scraper (21), a mounting seat (8) is slidably connected with a push rod (20), the scraper (21) is fixedly mounted on one end of the push rod (20), a push spring (22) is sleeved on the push rod (20), the push spring (22) is located between the scraper (21) and the mounting seat (8), and a baffle (23) is fixedly mounted on the other end of the push rod (20).
6. A building wall crack repairing device according to claim 1, characterized in that: The collecting mechanism comprises a collecting box (11), which is slidably mounted on the bottom of the fixed block (7), one side of the collecting box (11) is provided with an inclined surface, and a feed port (19) is provided on the top of the collecting box (11).
7. A building wall crack repairing device according to claim 6, characterized in that: A buffer groove (12) is provided at the bottom of the fixed block (7), a slide rod (13) is fixedly mounted on the inner wall of the buffer groove (12), a connecting block (14) is slidably connected to the slide rod (13), the connecting block (14) is fixedly connected to the collection box (11), a buffer spring (15) is fixedly mounted on one side of the connecting block (14), and one end of the buffer spring (15) is fixedly connected to the inner wall of the buffer groove (12).
8. A building wall crack repairing device according to claim 1, characterized in that: A movable groove (16) is provided on the front side of the mounting plate (4), a threaded rod (17) is rotatably connected to the inner wall of the movable groove (16), the mounting block (5) is slidably connected to the inner wall of the movable groove (16), the threaded rod (17) is threadedly connected to the mounting block (5), a first motor (18) is fixedly mounted on one side of the mounting plate (4), and an output shaft of the first motor (18) is fixedly connected to the threaded rod (17).
9. A building wall crack repairing device according to claim 1, characterized in that: The stabilizing mechanism comprises four oblique rods (38) which are slidably mounted on both sides of a fixing frame (37). A fixing ring (39) is fixedly mounted on one end of each of the four oblique rods (38), and a load-bearing rope (36) is located inside the fixing ring (39).
10. A building wall crack repairing device according to claim 9, characterized in that: The top of the fixed frame (37) is slidably connected to two moving rods (42), and the moving rods (42) are slidably connected to two movable blocks (43), the movable blocks (43) are rotatably connected to the corresponding inclined rods (38), and a connecting seat (45) is fixedly installed at the bottom of the moving rod (42), and a bidirectional screw (40) is rotatably connected to the inner side of the fixed frame (37), and a rotating block (41) is fixedly installed at one end of the bidirectional screw (40), and the bidirectional screw (40) is threadedly connected to the two connecting seats (45).
Citation Information
Cited By
Hoisting device for construction platform outside tower and working method
CN121202015A