A construction test device for coal mine digging and anchoring machine
By designing a construction test device for coal mine anchor integrated machine, the hydraulic cylinder and driving rack system automatically clamp the rock samples, the problem of unstable sample fixation in the prior art is solved, and more accurate test data and more efficient construction test process are achieved.
Patent Information
- Application Number
- CN202411822865.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-12
- Publication Date
- 2025-03-04
- Estimated Expiration
- 2044-12-12
AI Technical Summary
The cutting part of the existing anchor synchronous machine cannot effectively fix the sample when cutting rock samples, resulting in unstable cutting tests and inaccurate data.
A construction testing device for coal mine anchor integrated machine is designed, and a hydraulic cylinder is used to drive the moving plate to drive the cutting tool downward. By meshing with the gear ring, the two-way screw rotation is controlled with the driving member to make the clamps approach each other, realizing automatic clamping and fixing of rock samples.
The rock sample is more stable and fixed during the cutting test process, which improves the accuracy of the test data and the efficiency of construction tests. At the same time, dust and particulate matter on the surface of the rock sample are removed through jet and spray functions, further promoting the sample fixation effect.
Smart Images

Figure CN119290648B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of mining, and in particular to a construction testing device for a coal mine digging and anchoring integrated machine. Background Art
[0002] In recent years, with the development of my country's coal industry and the improvement of the technological level of mining equipment, the synchronous digging and anchoring machine has been widely used in the field of coal mining. During the excavation process of the synchronous digging and anchoring machine, the cutting part is one of the most important parts of the synchronous digging and anchoring machine. Its cutting performance directly affects the reliability, economy and speed of coal mining. It is very important to study the cutting performance test device of the cutting part of the synchronous digging and anchoring machine.
[0003] After searching, the Chinese patent publication number CN208125545U discloses a cutting performance test device for the cutting part of a synchronous integrated drilling and anchoring machine. The base of the rock and soil bin of the device is installed on the guide rail pair and connected to the longitudinal cylinder, which realizes the feeding movement of the rock and soil bin in the longitudinal direction; the rock and soil bin is placed on the base of the rock and soil bin, and the rock sample is placed in the rock and soil bin; the rock and soil bin is connected to the transverse cylinder, which is fixed on the base of the rock and soil bin to realize the feeding movement of the rock and soil bin in the transverse direction; vertical columns are arranged on both sides of the rock and soil bin, the lower ends of the columns are connected by the base, and a top beam is fixed on the top of the columns to form a gantry structure; a vertical cylinder is fixed on the top beam to realize the feeding movement of the cutting part in the vertical direction; the torque sensor is installed between the power source hydraulic motor and the cutting part, the cutting part is connected between the double-sided detachable brackets under the cutting part mounting seat, the hydraulic motor is fixed at the other end of the cutting part mounting seat, and the coupling is used to coaxially connect the cutting part and the hydraulic motor. The above patent has the following deficiencies: when testing the cutting performance of rock samples, it does not have the function of fixing the rock samples. The rock samples are prone to shifting when being cut, resulting in inaccurate cutting test data and affecting the efficiency of construction testing. Summary of the invention
[0004] The purpose of the present invention is to solve the problem in the prior art that the tool cannot fix the rock sample when cutting the rock sample, resulting in an unstable construction cutting test process and inaccurate data, and to propose a construction test device for a coal mine drilling and anchoring machine.
[0005] In order to achieve the above-mentioned purpose, the present invention adopts the following technical scheme: a construction and testing device of a coal mine excavator and anchoring machine, comprising a base and a cutting tool arranged above the base, a rock sample placing table is slidably arranged above the base, a movable plate is slidably arranged on the base, a cavity is opened inside the rock sample placing table, and the device also comprises a driving rack fixedly arranged on one side of the movable plate, a bidirectional screw is rotatably connected inside the rock sample placing table, two groups of clamps corresponding to the rock samples are threadedly connected on the bidirectional screw, one end of the bidirectional screw is sleeved with a gear ring meshing with the driving rack, a mutually linked driving member is arranged between the gear ring and the bidirectional screw, and a sliding hole corresponding to the clamp is opened on the rock sample placing table.
[0006] Preferably, a stand is fixedly installed on the top of the base, a hydraulic cylinder is fixedly installed on the top of the stand, an output end of the hydraulic cylinder is fixedly connected to the movable plate, a first guide rod is fixedly connected to the base, and the movable plate is slidably connected to the first guide rod.
[0007] Preferably, two groups of bearing plates are fixedly connected to the bottom of the movable plate, the cutting tool is rotatably connected to the two groups of bearing plates, a torque sensor is fixedly installed on one end of the cutting tool, a support frame corresponding to the torque sensor is fixedly connected to the bottom of the movable plate, a mounting plate is fixedly connected to the bottom of the movable plate, a first motor is fixedly installed on the mounting plate, and the end of the torque sensor away from the cutting tool is fixedly connected to the output end of the first motor.
[0008] Preferably, multiple groups of three-axis force sensors are fixedly installed on the cutting tool, the bottom of the movable plate is fixedly connected to a connecting plate, a second motor is fixedly installed on the connecting plate, the output end of the second motor is fixedly connected to a threaded rod, the bearing plate, support frame and mounting plate are all threadedly connected to the threaded rod, the bottom of the movable plate is fixedly connected to a fixed plate, a second guide rod is fixedly connected on the fixed plate, and the bearing plate, support frame and mounting plate are all slidably connected to the second guide rod.
[0009] Preferably, four telescopic guide rods are fixedly connected to the top of the base, a fixed platform is fixedly connected to the top of the four telescopic guide rods, the rock sample placement table is fixedly connected to the fixed platform, and a cylinder is fixedly installed between the bottom of the fixed platform and the base.
[0010] Preferably, the driving member includes a plurality of first strip plates fixedly connected to the bidirectional screw, a plurality of second strip plates are hinged on the inner wall of the gear ring, a torsion spring is fixedly connected between the second strip plates and the inner wall of the gear ring, a plurality of baffles for rotationally limiting the second strip plates are fixedly connected to the inner wall of the gear ring, a support limiting ring is fixedly connected to one side of the rock sample placement table, a rotation groove is opened on one side of the gear ring, and the support limiting ring is rotatably connected in the rotation groove of the gear ring.
[0011] Preferably, one side of the base and the stand is fixedly connected with a mounting ear, the two mounting ears are rotatably connected with a rotating rod, the rotating rod is provided with a spiral groove, a sliding rod corresponding to the spiral groove is fixedly connected to a movable plate close to the rotating rod, a vertical groove corresponding to the sliding rod is provided on the stand, and a protrusion is fixedly connected to the top of the rotating rod.
[0012] Preferably, a connecting strip is fixedly connected to the stand, a gas collecting barrel is fixedly connected to the connecting strip, a piston plate is slidably connected to the inside of the gas collecting barrel, a push rod is fixedly connected to the piston plate, the push rod is slidably connected to the gas collecting barrel, and a spring is sleeved on the push rod.
[0013] Preferably, the two ends of the spring are fixedly connected to the push rod and the air collecting barrel respectively, the end of the push rod away from the piston plate is against the protrusion, the interior of the air collecting barrel is divided into a first chamber and a second chamber by the piston plate, the first chamber is fixedly connected with an intake pipe and an exhaust hose, and the end of the exhaust hose away from the first chamber is fixedly installed with a connected jet plate.
[0014] Preferably, a water suction pipe and a water outlet pipe are fixedly connected to the second chamber respectively, one end of the water outlet pipe away from the second chamber is fixedly connected to a spray plate, a mounting seat is fixedly connected to the base, a water bucket is placed on the mounting seat, and one end of the water suction pipe away from the second chamber is connected to the water bucket.
[0015] Compared with the prior art, the present invention provides a construction test device for a coal mine anchoring machine, which has the following beneficial effects: the construction test device for a coal mine anchoring machine drives the moving plate to drive the cutting tool to move downward by means of a hydraulic cylinder, and the driving rack is engaged with the gear ring, and the driving member controls the rotation of the bidirectional screw to make the two clamping plates approach each other, so that the rock sample can be automatically clamped and fixed, so that the rock sample is more stable during the cutting test process, which helps to make the final test data more accurate and improve the efficiency of the construction test of the anchoring machine. At the same time, the driving member can facilitate the free control of the cutting depth of the rock sample by the cutting tool, and will not affect the fixing effect of the rock sample. In addition, when the cutting tool is on its way downward, The sliding rod is also used to control the rotation of the rotating rod, so that the protruding part of the cam repeatedly conflicts with the push rod, causing the first chamber and the second chamber in the air collecting barrel to respectively spray and spray, thereby removing dust and particulate matter on the surface of the rock sample that has not yet been fixed in advance. At the same time, the spray plate suppresses the flying of dust, so that the fixation effect of the rock sample during the cutting process is further promoted. Compared with the traditional uniform wind speed dust removal, the wind force on the rock sample placement table and the rock sample surface can be gradually increased by the jet plate, and the effect is better. In addition, when the moving plate drives the cutting tool to reset upward, the jet plate and the spray plate will automatically remove the dust generated after cutting on the rock sample placement table, which is convenient for the cutting test of the next rock sample without the need for manual processing by the staff. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a front structural schematic diagram of a construction test device for a coal mine anchoring machine proposed by the present invention; Figure 2 The present invention proposes Figure 1 The structural diagram of part A in the figure; Figure 3 This is a schematic diagram of the side structure of a construction test device for a coal mine anchoring machine proposed by the present invention; Figure 4 The present invention proposes Figure 3 The structural diagram of part B; Figure 5 The present invention proposes Figure 3 Schematic diagram of the structure of part C; Figure 6 This is a front view structural schematic diagram of a construction test device for a coal mine anchoring machine proposed by the present invention; Figure 7 The present invention proposes Figure 6 The structural diagram of the D part; Figure 8 The present invention proposes Figure 6 The structural diagram of the E part; Fig. 9 This is a schematic diagram of the back structure of a construction test device for a coal mine anchoring machine proposed by the present invention; Fig.10 This is a schematic structural diagram of a bidirectional screw and a clamping plate in a construction test device for a coal mine anchoring machine proposed by the present invention.
[0017] In the figure: 1, base; 2, cutting tool; 3, rock sample placement table; 4, moving plate; 5, driving rack; 6, bidirectional screw; 7, clamping plate; 8, gear ring; 9, driving member; 901, first strip plate; 902, second strip plate; 903, torsion spring; 904, baffle; 905, support limit ring; 10, stand; 11, hydraulic cylinder; 12, first guide rod; 13, bearing plate; 14, torque sensor; 15, support frame; 16, mounting plate; 17, first motor; 18, three-axis force sensor; 19, connecting plate; 20, second Motor; 21. Threaded rod; 22. Fixed plate; 23. Second guide rod; 24. Telescopic guide rod; 25. Fixed platform; 26. Cylinder; 27. Mounting ear; 28. Turn bar; 29. Spiral slide; 30. Slide bar; 31. Bump; 32. Connecting strip; 33. Air collecting barrel; 3301. First chamber; 3302. Second chamber; 34. Piston plate; 35. Push rod; 36. Spring; 37. Intake pipe; 38. Exhaust hose; 39. Jet plate; 40. Water suction pipe; 41. Water outlet pipe; 42. Spray plate; 43. Mounting seat; 44. Bucket. DETAILED DESCRIPTION
[0018] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0019] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0020] Example 1: Reference Figure 1-Figure 10 A construction and testing device for a coal mine anchoring machine comprises a base 1 and a cutting tool 2 arranged above the base 1, a rock sample placing table 3 is slidably arranged above the base 1, a movable plate 4 is slidably arranged on the base 1, a cavity is opened inside the rock sample placing table 3, and further comprises: a driving rack 5 fixedly arranged on one side of the movable plate 4, a bidirectional screw 6 is rotatably connected inside the rock sample placing table 3, two groups of clamping plates 7 corresponding to the rock samples are threadedly connected on the bidirectional screw 6, one end of the bidirectional screw 6 is sleeved with a gear ring 8 meshing with the driving rack 5, a mutually linked driving member 9 is arranged between the gear ring 8 and the bidirectional screw 6, and a sliding hole corresponding to the clamping plate 7 is opened on the rock sample placing table 3.
[0021] In the present invention, when a cutting test is performed on a rock sample, the rock sample is first placed on the rock sample placement table 3, and then the rack 5 is driven to move downward and engage with the gear ring 8 to rotate the gear ring 8. As the rack 5 is driven to continuously engage with the gear ring 8, the gear ring 8 is linked with the bidirectional screw 6 through the driving member 9 to rotate the bidirectional screw 6, and the two clamping plates 7 are controlled to approach each other to clamp and fix the rock sample on the rock sample placement table 3. Then, the cutting test is performed on the rock sample through the cutting tool 2, so that after the rock sample is placed, the rock sample can be automatically fixed in advance during the movement of the cutting tool 2, so that the rock sample is more stable during the cutting test, which helps to make the final test data more accurate and improve the efficiency of the construction test of the drilling and anchoring machine.
[0022] Example 2: Reference Figure 1-Figure 10 , which is basically the same as the first embodiment, and further, a stand 10 is fixedly installed on the top of the base 1, a hydraulic cylinder 11 is fixedly installed on the top of the stand 10, an output end of the hydraulic cylinder 11 is fixedly connected to the movable plate 4, a first guide rod 12 is fixedly connected to the base 1, and the movable plate 4 is slidably connected to the first guide rod 12.
[0023] In the present invention, the movable plate 4 can be driven to move downward by starting the hydraulic cylinder 11, and the first guide rod 12 can guide the movable plate 4 to slide up and down, so that the movable plate 4 can slide up and down stably.
[0024] Two groups of bearing plates 13 are fixedly connected to the bottom of the movable plate 4, and the cutting tool 2 is rotatably connected to the two groups of bearing plates 13. A torque sensor 14 is fixedly installed at one end of the cutting tool 2. A support frame 15 corresponding to the torque sensor 14 is fixedly connected to the bottom of the movable plate 4. A mounting plate 16 is fixedly connected to the bottom of the movable plate 4, and a first motor 17 is fixedly installed on the mounting plate 16. One end of the torque sensor 14 away from the cutting tool 2 is fixedly connected to the output end of the first motor 17.
[0025] In the present invention, after the hydraulic cylinder 11 drives the movable plate 4 downward to approach the rock sample, the first motor 17 is started to drive the torque sensor 14 and the cutting tool 2 to rotate, so as to perform a cutting test on the fixed rock sample.
[0026] A plurality of three-axis force sensors 18 are fixedly installed on the cutting tool 2, a connecting plate 19 is fixedly connected to the bottom of the movable plate 4, a second motor 20 is fixedly installed on the connecting plate 19, a threaded rod 21 is fixedly connected to the output end of the second motor 20, the bearing plate 13, the support frame 15, and the mounting plate 16 are all threadedly connected to the threaded rod 21, a fixing plate 22 is fixedly connected to the bottom of the movable plate 4, a second guide rod 23 is fixedly connected to the fixing plate 22, and the bearing plate 13, the support frame 15, and the mounting plate 16 are all slidably connected to the second guide rod 23.
[0027] In the present invention, the load change of the cutting tool 2 can be recorded by the torque sensor 14, and the force change of the cutting tool 2 can be recorded by the three-axis force sensor 18 and the dynamic strain gauge. The torque sensor 14, the three-axis force sensor 18 and the dynamic strain gauge are all existing technologies; by starting the second motor 20 to drive the threaded rod 21 to rotate, under the action of the second guide rod 23, the lateral position of the cutting tool 2 can be controlled, and cutting tests at different lateral positions of the rock sample can be carried out.
[0028] Four telescopic guide rods 24 are fixedly connected to the top of the base 1 , a fixed platform 25 is fixedly connected to the top of the four telescopic guide rods 24 , the rock sample placement table 3 is fixedly connected to the fixed platform 25 , and a cylinder 26 is fixedly installed between the bottom of the fixed platform 25 and the base 1 .
[0029] In the present invention, the fixing platform 25 and the rock sample placing platform 3 can be driven to move up and down by starting the air cylinder 26 to adjust the position of the rock sample, and the fixing platform 25 is guided to slide by the four telescopic guide rods 24 .
[0030] The driving member 9 includes a plurality of first strip plates 901 fixedly connected to the bidirectional screw 6, a plurality of second strip plates 902 are hinged on the inner wall of the gear ring 8, a torsion spring 903 is fixedly connected between the second strip plates 902 and the inner wall of the gear ring 8, a plurality of baffles 904 for limiting the rotation of the second strip plates 902 are fixedly connected to the inner wall of the gear ring 8, a support limiting ring 905 is fixedly connected to one side of the rock sample placement table 3, a rotation groove is opened on one side of the gear ring 8, and the support limiting ring 905 is rotatably connected in the rotation groove of the gear ring 8.
[0031] In the present invention, while the driving rack 5 drives the gear ring 8 to rotate downward, the gear ring 8 drives the second strip plate 902 on its inner wall to rotate. The second strip plate 902, supported by the torsion spring 903 and the baffle 904, contacts the first strip plate 901, drives the first strip plate 901 and the bidirectional screw 6 to rotate, and then controls the two clamping plates 7 to approach each other to clamp the rock sample. When the rock sample with a thicker thickness is fixed, after the two clamping plates 7 clamp the rock sample, the hydraulic cylinder 11 drives the moving plate 4 to drive the cutting tool 2 to move to a suitable cutting position, and at this time the bidirectional screw 6 and the first strip plate 901 cannot Continue to rotate, at this time the gear ring 8 continues to drive the second strip plate 902 to rotate, at this time the second strip plate 902 can automatically compress and rotate toward the side with the torsion spring 903, and automatically disengage from the first strip plate 901, so that the bidirectional screw 6 will not continue to rotate, which can facilitate the hydraulic cylinder 11 to drive the cutting tool 2 to freely control the cutting depth of the rock sample, and facilitate the cutting of the rock sample layer by layer. Even if the cutting depth is deep, it will not affect the clamping force of the two clamps 7 on the rock sample, and at the same time it can also prevent the two clamps 7 from excessively clamping the rock sample; the gear ring 8 can be supported by the support limit ring 905.
[0032] Example 3: Reference Figure 1-Figure 10 , which is basically the same as the first embodiment, and further, one side of the base 1 and the stand 10 are fixedly connected with a mounting ear 27, and a rotating rod 28 is rotatably connected to the two mounting ears 27, and a spiral groove 29 is provided on the rotating rod 28, and a sliding rod 30 corresponding to the spiral groove 29 is fixedly connected to the movable plate 4 close to the rotating rod 28, and a vertical groove corresponding to the sliding rod 30 is provided on the stand 10, and a protrusion 31 is fixedly connected to the top of the rotating rod 28.
[0033] In the present invention, while the hydraulic cylinder 11 drives the movable plate 4 to move downward, it also drives the slide rod 30 to slide along the vertical groove of the stand 10 in the spiral groove 29 on the rotating rod 28, so that the rotating rod 28 continues to rotate, while driving the protrusion 31 at the top to rotate.
[0034] A connecting strip 32 is fixedly connected to the stand 10, a gas collecting barrel 33 is fixedly connected to the connecting strip 32, a piston plate 34 is slidably connected inside the gas collecting barrel 33, a push rod 35 is fixedly connected to the piston plate 34, the push rod 35 is slidably connected to the gas collecting barrel 33, and a spring 36 is sleeved on the push rod 35.
[0035] In the present invention, the spring 36 can make the push rod 35 automatically reset after entering the gas collecting barrel 33 .
[0036] The two ends of the spring 36 are fixedly connected to the push rod 35 and the air collecting barrel 33 respectively. The end of the push rod 35 away from the piston plate 34 abuts against the protrusion 31. The interior of the air collecting barrel 33 is divided into a first chamber 3301 and a second chamber 3302 by the piston plate 34. The first chamber 3301 is fixedly connected with an intake pipe 37 and an exhaust hose 38 respectively. The end of the exhaust hose 38 away from the first chamber 3301 is fixedly installed with a connected jet plate 39.
[0037] In the present invention, while the convex block 31 is continuously rotating, when the protruding portion of the convex block 31 contacts the push rod 35, the push rod 35 is driven to drive the piston plate 34 to slide toward the inner direction of the gas collecting barrel 33, and the outside air is sucked into the first chamber 3301 through the suction pipe 37 for collection. Then, when the convex portion of the convex block 31 does not contact the push rod 35, the push rod 35 automatically drives the piston plate 34 to reset through the spring 36, compresses the gas in the first chamber 3301, squeezes the gas out through the gas outlet hose 38, and finally sprays the gas through the jet plate 39, and so on. When the moving plate 4 drives the cutting tool 2 downward, the jet plate 39 sprays the dust particles on the surface of the rock sample from top to bottom, so that the dust and other particles on the surface of the rock sample are removed in advance before the two clamping plates 7 are clamped, so that the rock sample clamping effect is improved. The result is more stable, which promotes the rock sample to be more stable during the cutting test process, and the data obtained is more accurate. Compared with the traditional method of using a sealed fan and other uniform wind force, the jet plate 39 can gradually increase the wind force of the ejected gas on the rock sample placement table 3 and the surface of the rock sample from top to bottom, and the effect is better; it should be noted that a one-way valve is installed inside the intake pipe 37 and the air outlet hose 38, the purpose is to prevent the air from being sucked in from the jet plate 39 when the first chamber 3301 is inhaled, and to prevent the air from being ejected from the intake pipe 37 when the gas is ejected; at the same time, when the hydraulic cylinder 11 drives the moving plate 4 to drive the slide bar 30 to reset, the rotating rod 28 will also drive the protrusion 31 to rotate, so that the air outlet hose 38 can automatically clean up the dust and debris generated by cutting on the rock sample placement table 3, which is convenient for the staff to collect rock fragments and save the measured data later.
[0038] The second chamber 3302 is fixedly connected with a water suction pipe 40 and a water outlet pipe 41, respectively. One end of the water outlet pipe 41 away from the second chamber 3302 is fixedly connected with a spray plate 42. A mounting seat 43 is fixedly connected to the base 1, and a water bucket 44 is placed on the mounting seat 43. One end of the water suction pipe 40 away from the second chamber 3302 is connected with the water bucket 44.
[0039] In the present invention, when the piston plate 34 repeatedly collects air in the first chamber 3301, the second chamber 3302 will repeatedly inhale water from the water bucket 44 through the water suction pipe 40, and then squeeze it out from the water outlet pipe 41, and spray mist water through the spray plate 42, so as to perform dust reduction operation on the dust raised by the jet plate 39 above the rock sample. During the cutting process, the water mist sprayed by the spray plate 42 falls on the rock sample, and can also reduce the sparks and dust generated by the cutting between the cutting tool 2 and the rock sample, and reduce the fluttering of dust. During the process of the hydraulic cylinder 11 driving the moving plate 4 and the cutting tool 2 to reset upward, the water suction pipe 40 and the water bucket 44 can be disassembled, and the spray plate 42 can be used to spray air to cooperate with the jet plate 39 to remove dust from the rock sample placement table 3 and the surface of the rock sample. It should be noted that a one-way valve is installed inside the water suction pipe 40 and the water outlet pipe 41, so as to prevent water from being sprayed out from the water suction pipe 40 when the water outlet pipe 41 sprays water.
[0040] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A construction test device for a coal mine anchoring machine, comprising: A base (1) and a cutting tool (2) arranged above the base (1); a rock sample placement table (3) is slidably arranged above the base (1); the base (1) is characterized in that a movable plate (4) is slidably arranged on the base (1); a cavity is opened inside the rock sample placement table (3); and the base (1) further comprises: a driving rack (5) fixedly arranged on one side of the movable plate (4); a bidirectional screw (6) is rotatably connected inside the rock sample placement table (3); two groups of clamping plates (7) corresponding to the rock samples are threadedly connected to the bidirectional screw (6); one end of the bidirectional screw (6) is sleeved with a gear ring (8) meshing with the driving rack (5); a mutually linked driving member (9) is arranged between the gear ring (8) and the bidirectional screw (6); The rock sample placement platform (3) is provided with a sliding hole corresponding to the clamping plate (7); the driving member (9) comprises a plurality of first strip plates (901) fixedly connected to the bidirectional screw (6); a plurality of second strip plates (902) are hingedly connected to the inner wall of the gear ring (8); a torsion spring (903) is fixedly connected between the second strip plates (902) and the inner wall of the gear ring (8); a plurality of baffles (904) for rotationally limiting the second strip plates (902) are fixedly connected to the inner wall of the gear ring (8); a support limiting ring (905) is fixedly connected to one side of the rock sample placement platform (3); a rotation groove is provided on one side of the gear ring (8); and the support limiting ring (905) is rotationally connected in the rotation groove of the gear ring (8).
2. A construction test device for a coal mine anchoring machine according to claim 1, characterized in that: A stand (10) is fixedly mounted on the top of the base (1), a hydraulic cylinder (11) is fixedly mounted on the top of the stand (10), an output end of the hydraulic cylinder (11) is fixedly connected to the movable plate (4), a first guide rod (12) is fixedly connected to the base (1), and the movable plate (4) is slidably connected to the first guide rod (12).
3. A construction test device for a coal mine anchoring machine according to claim 1, characterized in that: The bottom of the movable plate (4) is fixedly connected to two groups of bearing plates (13), the cutting tool (2) is rotatably connected to the two groups of bearing plates (13), one end of the cutting tool (2) is fixedly mounted with a torque sensor (14), the bottom of the movable plate (4) is fixedly connected to a support frame (15) corresponding to the torque sensor (14), the bottom of the movable plate (4) is fixedly connected to a mounting plate (16), a first motor (17) is fixedly mounted on the mounting plate (16), and one end of the torque sensor (14) away from the cutting tool (2) is fixedly connected to an output end of the first motor (17).
4. A construction test device for a coal mine anchoring machine according to claim 3, characterized in that: A plurality of groups of three-axis force sensors (18) are fixedly mounted on the cutting tool (2); a connecting plate (19) is fixedly connected to the bottom of the movable plate (4); a second motor (20) is fixedly mounted on the connecting plate (19); a threaded rod (21) is fixedly connected to the output end of the second motor (20); the bearing plate (13), the support frame (15), and the mounting plate (16) are all threadedly connected to the threaded rod (21); a fixing plate (22) is fixedly connected to the bottom of the movable plate (4); a second guide rod (23) is fixedly connected to the fixing plate (22); and the bearing plate (13), the support frame (15), and the mounting plate (16) are all slidably connected to the second guide rod (23).
5. A construction test device for a coal mine anchoring machine according to claim 1, characterized in that: Four telescopic guide rods (24) are fixedly connected to the top of the base (1), a fixed platform (25) is fixedly connected to the top of the four telescopic guide rods (24), the rock sample placement platform (3) is fixedly connected to the fixed platform (25), and a cylinder (26) is fixedly installed between the bottom of the fixed platform (25) and the base (1).
6. A construction test device for a coal mine anchoring machine according to claim 2, characterized in that: One side of the base (1) and the stand (10) is fixedly connected with a mounting ear (27), and a rotating rod (28) is rotatably connected to the two mounting ears (27). The rotating rod (28) is provided with a spiral slide groove (29), and a sliding rod (30) corresponding to the spiral slide groove (29) is fixedly connected to the movable plate (4) close to the rotating rod (28). A vertical groove corresponding to the sliding rod (30) is provided on the stand (10), and a protrusion (31) is fixedly connected to the top of the rotating rod (28).
7. A construction test device for a coal mine anchoring machine according to claim 6, characterized in that: The stand (10) is fixedly connected to a connecting strip (32), a gas collecting barrel (33) is fixedly connected to the connecting strip (32), a piston plate (34) is slidably connected to the interior of the gas collecting barrel (33), a push rod (35) is fixedly connected to the piston plate (34), the push rod (35) is slidably connected to the gas collecting barrel (33), and a spring (36) is sleeved on the push rod (35).
8. A construction test device for a coal mine anchoring machine according to claim 7, characterized in that: The two ends of the spring (36) are respectively fixedly connected to the push rod (35) and the air collecting barrel (33); the end of the push rod (35) away from the piston plate (34) abuts against the protrusion (31); the interior of the air collecting barrel (33) is divided into a first chamber (3301) and a second chamber (3302) by the piston plate (34); the first chamber (3301) is respectively fixedly connected with an air intake pipe (37) and an air outlet hose (38); and the end of the air outlet hose (38) away from the first chamber (3301) is fixedly mounted with a connected jet plate (39).
9. A construction test device for a coal mine anchoring machine according to claim 8, characterized in that: The second chamber (3302) is respectively fixedly connected to a water suction pipe (40) and a water outlet pipe (41); one end of the water outlet pipe (41) away from the second chamber (3302) is fixedly connected to a spray plate (42); a mounting seat (43) is fixedly connected to the base (1); a water bucket (44) is placed on the mounting seat (43); and one end of the water suction pipe (40) away from the second chamber (3302) is connected to the water bucket (44).
Citation Information
Patent Citations
Synchronous all -in -one cutting part cutting ability testing arrangement of anchor digs
CN208125545U
Cutting performance testing device and testing method for cutting part of digging and anchoring synchronous integrated machine
CN107976378A
Microwave-assisted hob rock breaking test device
CN118566059A