Building construction quality supervision system and method based on big data

By collecting and analyzing data at the current time point of construction, combining laser scanners and big data technology, intelligent evaluation and dynamic feedback of building construction quality are achieved, and the problem of phased intelligent evaluation and accurate visualization in building construction quality management is solved. Improve the efficiency and reliability of construction quality supervision.

CN119313208AInactive Publication Date: 2025-01-14HUBEI TIANYUE ENG MANAGEMENT CO LTD

Patent Information

Application Number
CN202411349329.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-26
Publication Date
2025-01-14
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Current construction quality management cannot conduct phased intelligent evaluation and accurate visual feedback according to the project construction plan, which reduces the efficiency and reliability of construction quality supervision.

Method used

By collecting the current construction time point data and the time point data of quality supervision at different stages for analysis, the quality supervision operation action analysis data is generated, and the modeling and abnormal analysis of the building main body model is combined with laser scanner and big data technology to achieve intelligent Evaluation and dynamic feedback.

Benefits of technology

It improves the scientificity and reliability of construction quality supervision, realizes accurate supervision and online visual feedback at different construction stages, and improves the accuracy and applicability of construction quality management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119313208A_ABST
    Figure CN119313208A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of quality management, and discloses a building construction quality supervision system and method based on big data, and the system comprises a construction quality supervision action management module, a construction quality problem evaluation module, and a construction quality problem feedback module. Building main body design entity model parameters in different construction stages are stored on the basis of big data, and precise retrieval of building main body theoretical design entity models in different construction stages is carried out in combination with an intelligent search algorithm and current construction time point parameters; building main body entity model feature abnormal image parameters in the current construction stage are accurately collected through screenshot software, and construction quality problem types of a building main body in the current construction stage are analyzed in combination with an intelligent recognition algorithm and different types of building construction quality problem image parameters; the specific quality problem types of building construction in different construction stages are scientifically and intelligently evaluated, and the reliability of building construction quality supervision is improved.
Need to check novelty before this filing date? Find Prior Art

Citation Information

Patent Citations

  • Construction quality supervision method and system for building construction

    CN118411067A

Cited By

  • Wire and cable product quality inspection data analysis system and method based on data analysis

    CN119831986A

  • Engineering supervision method and device based on BIM, equipment, product and medium

    CN121010338A