Anti-liquefaction device and method for comprehensive pipe gallery joint
By designing a fixed steel frame and replaceable shear-resistant steel beams at the pipe gallery joints, the problem of insufficient joint stiffness in the existing technology is solved, the liquefaction resistance and integrity of the pipe gallery are improved, and the formation is reduced Destruction of structure by liquefaction.
Patent Information
- Application Number
- CN202411593028.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-08
- Publication Date
- 2025-01-17
AI Technical Summary
The stiffness of the joints of the existing pipeline structure is poor, which leads to prone to deformation during seismic liquefaction, resulting in serious damage to the pipeline structure of the pipeline liquefaction.
Design a liquefaction device for integrated pipe gallery joints, including a fixed steel frame and replaceable shear-resistant steel beam. The clamping of the steel beam is achieved through the limiting device and the vertical columns of the steel frame, which enhances the shear resistance of the joints, and Improve connection stability and flexibility through rubber pads and positioning support.
It effectively improves the liquefaction resistance of pipe corridor joints, weakens the impact of liquefied formations on the structure, enhances integrity and shear resistance, and is easy to maintain and replace.
Smart Images

Figure CN119321142A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of underground structure engineering, specifically relates to the field of integrated pipe gallery, and in particular to an anti-liquefaction device and method for integrated pipe gallery joints. Background Art
[0002] When an earthquake occurs, the underground structure will interact dynamically with the surrounding soil due to the constraints of the soil. The form of the interaction is related to the nature of the soil layer. When the earthquake wave arrives, the liquefied soil layer at the joint will change in nature, causing the structure to move and deform, resulting in the formation of liquefied strata in part of the soil, which will cause the structure to float. When the soil layer properties change within the joint range of the pipeline corridor, it will have an adverse effect on the joint of the structure, and the displacement caused by earthquake liquefaction will damage the pipeline corridor structure.
[0003] At present, due to the low stiffness of the joints of the corridor structure, the joints are a weak link in the seismic design of the corridor structure. The low stiffness of the joints causes the integrity of the corridors at both ends to be poor. When an earthquake liquefaction causes flotation, the joints of the corridor structure are prone to deformation, causing serious damage to the corridor structure due to liquefaction of the stratum.
[0004] It can be seen that the existing structural design of the corridor structure joints has poor rigidity. When earthquake liquefaction causes flotation, the corridor structure joints are easily deformed, resulting in serious damage to the corridor structure caused by stratum liquefaction. Summary of the invention
[0005] The present invention provides an anti-liquefaction device and method for an integrated pipe gallery joint, so as to solve the technical problem that the existing pipe gallery structure joint has a poor structural design and is easily deformed when floating due to earthquake liquefaction, resulting in serious damage to the pipe gallery structure caused by stratum liquefaction.
[0006] In order to achieve the above object, the present invention adopts the following technical contents: An anti-liquefaction device for an integrated pipe gallery joint, the anti-liquefaction device is connected between two adjacent pipe galleries and includes a fixed steel frame; The fixed steel frame comprises two frame bodies of the same structure; the frame bodies comprise connected steel frame vertical columns and a first steel frame cross beam; the two steel frame vertical columns and the two first steel frame cross beams are symmetrically arranged; The first frame body is arranged around the inner wall of the pipe gallery and connected to the inner wall of the pipe gallery; the second frame body is connected to the first frame body through a replaceable shear-resistant connecting steel beam; Two second steel frame cross beams are arranged between the two first steel frame cross beams of the second frame body, respectively located at the top and bottom of the second frame body, and a placement groove is formed between the first steel frame cross beam and the second steel frame cross beam; One end of the replaceable shear-resistant connecting steel beam is inserted into the placement groove, and the clamping of one end of the replaceable shear-resistant connecting steel beam is achieved through the cooperation of the limiting device and the steel frame vertical column; The other end of the replaceable shear-resistant connecting steel beam is connected to the first steel frame cross beam via a positioning support; The two first steel frame cross beams of the second frame body are respectively provided with fixed supports for connecting adjacent pipe galleries.
[0007] Furthermore, the replaceable shear-resistant connecting steel beam includes a steel beam body, one end of the steel beam body is inserted into the placement groove, and the other end is bolted to the first steel frame crossbeam through the positioning support.
[0008] Furthermore, a level gauge for surveying the settlement and deformation of the pipeline gallery is provided in the middle of the steel beam body.
[0009] Furthermore, the steel beam body adopts an I-beam structure.
[0010] Furthermore, the limiting device adopts a concave steel plate, the first side plate of the concave steel plate is connected to the first steel frame cross beam, the second side plate is connected to the second steel frame cross beam, and the third side plate is closely arranged to one end of the replaceable shear-resistant connecting steel beam.
[0011] Furthermore, the third side plate of the concave steel plate is provided with a rubber pad, and the rubber pad is closely arranged on one end of the replaceable shear-resistant connecting steel beam.
[0012] Furthermore, the fixed support includes a first extending section and a first overlapping section, the first extending section is used to connect to an adjacent pipe gallery, and the first overlapping section overlaps with the first steel frame cross beam; and is connected to the fixed steel frame and the pipe gallery by bolts.
[0013] Furthermore, the positioning support includes a second extending section and a second overlapping section, the second extending section is connected to the first steel frame cross beam by bolts, and the overlapping section is connected to the steel beam body and the first steel frame cross beam by bolts.
[0014] Furthermore, the second steel frame cross beam is connected to the steel frame vertical column via a connecting plate; the connecting plate is an L-shaped steel plate, the vertical end of the L-shaped steel plate is connected to the steel frame vertical column, and the horizontal end is connected to the second steel frame cross beam.
[0015] A construction method of an anti-liquefaction device for an integrated pipe gallery joint, based on the above-mentioned anti-liquefaction device for an integrated pipe gallery joint, comprises: Splice and install two sets of steel frame vertical columns and the first steel frame crossbeam to form two frame bodies; One of the frame bodies is connected to the inner wall of the pipe gallery, and a second steel frame cross beam is installed on the other frame body, so that the first steel frame cross beam and the second steel frame cross beam form a placement groove; A limit device is installed in the placement groove, and the two ends of the replaceable shear-resistant connecting steel beam are fixed by the limit device and the positioning support to realize the connection between the two frame bodies; Adjacent pipe galleries are connected using fixed supports at the bottom and top of the first steel frame crossbeam.
[0016] Compared with the prior art, the present invention has the following beneficial effects: The present invention provides an anti-liquefaction device for an integrated pipe gallery joint. The anti-liquefaction device is connected between two adjacent pipe galleries and comprises a fixed steel frame; two frame bodies with the same structure of the fixed steel frame are connected by a replaceable shear-resistant connecting steel beam, and the replaceable shear-resistant connecting steel beam enables the integrated pipe gallery joint to have a certain shear resistance and the characteristic of being easy to replace; the steel support frame structure of the frame body provides a good stiffness supplement for the integrated pipe gallery joint, and the replaceable shear-resistant connecting steel beam is inserted and connected in a placement groove formed by a first steel frame cross beam and a second steel frame cross beam, and the clamping of the replaceable shear-resistant connecting steel beam is realized by the cooperation of a limiting device and a steel frame vertical column, which can reduce the influence of deformation of the pipe gallery structure joint; the replaceable shear-resistant connecting beam is arranged on the upper part of the pipe gallery joint, so as to enhance the continuity of the two sections of the pipe gallery, maintain the integrity of the structure when the structure is liquefied and floated, and improve the anti-liquefaction ability of the pipe gallery; the use of the device can effectively prevent the liquefied stratum caused by the change of soil properties at the joint from damaging the pipe gallery structure joint, and improve the pipe gallery structure as a whole.
[0017] Preferably, in the present invention, the replaceable shear-resistant connecting steel beam includes a steel beam body, one end of which is clamped in a placement groove, and the other end is fixed to the first steel frame crossbeam by bolts through a positioning support, so that the connection is more firm and reliable, and at the same time easy to disassemble and replace, thereby improving the maintainability and flexibility of the device.
[0018] Further preferably, in the present invention, a spirit level is arranged in the middle of the steel beam body, so as to monitor the settlement and deformation of the pipeline corridor in real time, provide data support for the safe operation of the pipeline corridor, and timely discover and deal with potential safety hazards.
[0019] Preferably, in the present invention, an I-beam structure is used as the steel beam body, which improves the strength and stability of the steel beam, while reducing the overall weight of the device and lowering the material cost.
[0020] Preferably, in the present invention, the concave steel plate is used as a limiting device to achieve effective clamping and fixing of the replaceable shear-resistant connecting steel beam, thereby improving the connection strength and stability of the device.
[0021] Further preferably, in the present invention, a rubber pad is provided on the third side plate of the concave steel plate to enhance the friction between the replaceable shear-resistant connecting steel beam and the limiting device, thereby further reducing the influence of deformation of the joints of the pipe gallery structure.
[0022] Preferably, in the present invention, the fixed support adopts a design of an extended section and an overlapping section, so that the device can be firmly connected to adjacent pipe galleries, and at the same time, it is easy to install and disassemble by bolt connection, thereby improving the applicability and flexibility of the device.
[0023] Preferably, in the present invention, the positioning support adopts a design of an extended section and an overlapping section, thereby achieving a firm connection between the replaceable shear-resistant connecting steel beam and the first steel frame crossbeam, while ensuring the stability and reliability of the connection.
[0024] Preferably, in the present invention, the second steel frame cross beam is connected to the steel frame vertical column by using a connecting plate of an L-shaped steel plate, thereby improving the overall stability and bearing capacity of the frame body, simplifying the installation process, and improving the construction efficiency.
[0025] The present invention also provides an implementation method of an anti-liquefaction device for an integrated pipe gallery joint. Based on the above-mentioned anti-liquefaction device for an integrated pipe gallery joint, this method first installs a frame body, then installs a limiting device in a placement groove to connect the two frame bodies, and finally connects the two adjacent pipe galleries through a first steel frame crossbeam, thereby ensuring that the integrated pipe gallery joint has strong shear resistance and anti-liquefaction ability; the use of this method can effectively ensure the installation quality and efficiency of the device, effectively supplement the stiffness of the integrated pipe gallery joint, and improve the shear resistance and anti-liquefaction ability of the pipe gallery joint. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 A schematic structural diagram of an anti-liquefaction device for an integrated pipe gallery joint provided in an embodiment of the present invention; Figure 2 for Figure 1 A partial enlarged view of the middle A; Figure 3 for Figure 1 A partial enlarged view of point B in the middle; Figure 4 for Figure 1 A partial enlarged view of point C in the middle; Figure 5 for Figure 1 A partial enlarged view of point D in the middle; Figure 6 for Figure 1 A partial enlarged view of point E in the middle; Figure 7 A schematic diagram of a structure of a steel frame fixed with an anti-liquefaction device for a joint of an integrated pipe gallery provided in an embodiment of the present invention; Figure 8A schematic diagram of a structure of a replaceable shear-resistant connecting steel beam for an anti-liquefaction device for an integrated pipe gallery joint provided by an embodiment of the present invention; Fig. 9 A side view of a fixed support of an anti-liquefaction device for an integrated pipe gallery joint provided by an embodiment of the present invention; Fig.10 A schematic diagram of the structure of a limit device for an anti-liquefaction device for an integrated pipe gallery joint provided in an embodiment of the present invention; Fig.11 A schematic structural diagram of a positioning support for an anti-liquefaction device for an integrated pipe gallery joint provided in an embodiment of the present invention; Fig.12 A schematic diagram of the connection of a fixed support for an anti-liquefaction device for an integrated pipe gallery joint provided in an embodiment of the present invention.
[0027] Reference numerals: Fixed steel frame-1; steel frame vertical column-1-1; first steel frame crossbeam-1-2; second steel frame crossbeam-1-3; placement groove-1-4; replaceable shear-resistant connecting steel beam-2; steel beam body-2-1; level-2-2; fixed support-3; positioning support-4; limit device-5; rubber pad-6; connecting plate-7; pipe gallery-8. DETAILED DESCRIPTION
[0028] In order to make the technical problems, technical solutions and beneficial effects solved by the present invention more clearly understood, the present invention is further described in detail in the following specific embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0029] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.
[0030] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0031] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0032] In the description of the embodiments of the present invention, it should be noted that if the terms "upper", "lower", "horizontal", "inner", etc. indicate an orientation or positional relationship based on the orientation or positional relationship shown in the drawings, or the orientation or positional relationship in which the product of the invention is usually placed when in use, it is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first", "second", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.
[0033] In addition, if the term "horizontal" appears, it does not mean that the component must be absolutely horizontal, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", which does not mean that the structure must be completely horizontal, but can be slightly tilted.
[0034] In the description of the embodiments of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal connection of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0035] Example As mentioned in the background technology, currently, due to the low stiffness of the joints of the corridor structure, the joints are a weak link in the seismic design of the corridor structure. Due to the low stiffness of the joints, the integrity of the corridors at both ends is poor. When an earthquake liquefaction causes flotation, the joints of the corridor structure are easily deformed, causing the liquefaction of the stratum to cause serious damage to the corridor structure.
[0036] In order to solve the above problems, the present embodiment provides an anti-liquefaction device for an integrated pipeline corridor joint. The anti-liquefaction device can effectively improve the joint stiffness and the integrity of the pipeline corridor structure. The anti-liquefaction device connects the pipeline corridors at both ends of the joint. When buoyancy caused by earthquake liquefaction occurs, it can enhance the integrity of the structure and reduce the damage of the pipeline corridor structure to the liquefied formation. like Figure 1 As shown, this embodiment provides an anti-liquefaction device for an integrated pipe gallery joint, which is applied to an underground pipe gallery and is specifically arranged at the connection between two pipe galleries; the specific structure and connection relationship are as follows: The anti-liquefaction device for the joint of the integrated pipe gallery comprises a fixed steel frame 1, a replaceable shear-resistant connecting steel beam 2, and a fixed support 3. The replaceable shear-resistant connecting steel beam 2 is arranged on the fixed steel frame 1, and the fixed support 3 connects and fixes the fixed steel frame 1 to the inner wall of the pipe gallery 8; The fixed steel frame 1 includes a steel frame column 1-1, a first steel frame beam 1-2; a second steel frame beam 1-3, and a placement groove 1-4; the steel frame column 1-1 and the first steel frame beam 1-2 are welded to form a square frame (i.e., a frame body) connected to the inner wall of the pipe gallery, and the second steel frame beam 1-3 is installed at the same time and connected to the steel frame column 1-1. The placement groove 1-4 is formed by the composed frame to ensure that the use of the pipe gallery is not restricted.
[0037] like Figure 7 As shown, the space formed by the steel frame column 1-1, the first steel frame beam 1-2; and the second steel frame beam 1-3 includes a placement groove 1-4. The steel frame column 1-1 and the first steel frame beam 1-2 are welded to form a square frame that is close to the inner wall of the pipe gallery 8, ensuring the integrity of the structure. The steel frame column 1-1, the first steel frame beam 1-2, and the second steel frame beam 1-3 form a cavity for placing channel pipelines. The first steel frame beam 1-2; the second steel frame beam 1-3 form a placement groove 1-4 for placing a shear device; as shown Figure 5 As shown, the second steel frame cross beam 1-3 is connected to the steel frame column 1-1 through a connecting plate 7, and the connecting plate 7 adopts an L-shaped steel plate structure to improve the shear resistance; Figure 3 As shown, there is no second steel frame cross beam 1-3 on the other side, and the replaceable shear-resistant connecting steel beam 2 is fixed by the positioning support 4. The different configurations on both sides can reduce the influence of the replaceable shear-resistant connecting steel beam on the deformation joint. Figure 6 and Figure 8 As shown, in this embodiment, the steel frame vertical column 1-1 is engraved with scale lines, and combined with the spirit level 2-2, the settlement and deformation of the pipeline corridor can be effectively surveyed. The replaceable shear-resistant connecting steel beam 2 includes a steel beam body 2-1 and a spirit level 2-2. The spirit level 2-2 is embedded in the middle part of the steel beam body 2-1, which can effectively monitor the relative inclination of the two sides of the pipeline corridor 8 and the deformation of the steel beam body 2-1. One side of the steel beam body 2-1 is connected to the first steel frame cross beam 1-2 through a positioning support 4, and the other side is fixed in the placement groove 1-4 through a set of limit devices 5, which can release the longitudinal expansion and contraction deformation of the pipeline corridor.
[0038] In this embodiment, the level meter 2-2 preferably adopts an electronic level meter to monitor the inclination direction and angle of the corridor 8. When uneven settlement occurs in the corridor 8, the longitudinal displacement of the corridor 8 can be detected to monitor and warn of structural damage to the corridor 8.
[0039] In this embodiment, the fixed steel frame 1 is provided with a reserved pipeline channel, and the position of the limiting device 5 can be changed according to the position of the pipeline inside the pipe gallery 8. The limiting device 5 and bolts are placed on the fixed steel frame 1 to eliminate the influence of the limiting device 5 on the pipeline.
[0040] like Figure 4 and Fig. 9 as well as Fig.12 As shown, in this embodiment, the fixed support 3 includes an extended section and an overlapped section. Specifically, the overlapped section overlaps with the outer end of the first steel frame beam 1-2, and the bolt holes thereon overlap, and the fixed support 3 is connected to the fixed steel frame 1 and the pipe gallery 8 by bolts. The extended section is connected to the inner wall of the adjacent pipe gallery 8 by bolts, and the extended section is provided with bolt holes, so that the bolts can be screwed in.
[0041] In this embodiment, the fixed support 3 reduces the influence of the decrease in the shear stiffness of the structure caused by the excessive number of bolts through the extended section.
[0042] like Figure 2 and Fig.10 As shown, the plane side of the limit device 5 is wrapped with a rubber pad 6, and the rubber pad 6 is in direct contact with the replaceable shear-resistant connecting steel beam 2. The rubber pad 6 can increase the friction surface of the replaceable shear-resistant connecting steel beam 2 and improve the lateral stability of the replaceable shear-resistant connecting steel beam 2; that is, the constraint limit is reduced in the longitudinal direction of the pipe gallery 8, and the influence on the deformation joint of the pipe gallery 8 is reduced. The other side of the limit device 5 is arranged with two bolts to connect the first steel frame cross beam 1-2 and the second steel frame cross beam 1-3, combined with Figure 1 As shown, bolt holes are arranged on the first steel frame cross beam 1-2, the second steel frame cross beam 1-3 and the positioning support 4, and the bolt holes are aligned and screwed into the bolt holes to connect and fix the steel frame 1 and the limiting device 5. The position of the limiting device 5 can be flexibly arranged in the placement groove 1-4 according to the internal arrangement of the pipe gallery 8.
[0043] In this embodiment, the limiting device 5 adopts a concave steel plate structure, which includes a first side plate, a second side plate and a third side plate that are connected. The three preferably adopt an integrally formed structure. The first side plate and the second side plate are horizontally symmetrically arranged up and down, and are respectively connected to the first steel frame crossbeam 1-2 and the second steel frame crossbeam 1-3. The third side plate is vertically arranged, and a rubber pad 6 is installed and fixed on the end face. Through the cooperation of the steel frame vertical column 1-1, the steel beam body 2-1 is clamped and fixed.
[0044] like Figure 3 and Fig.11As shown, the positioning support 4 includes two parts, an extended section and an overlap section. Specifically, the overlap section of the positioning support 4 overlaps with the inner end of the first steel frame cross beam 1-2, and the bolt holes thereon overlap, and the steel beam body 2-1 is connected to the first steel frame cross beam 1-2 of the fixed steel frame 1 by bolts. Among them, the extended section of the positioning support 4 is connected to the fixed steel frame 1 by bolts, and the extended section is arranged with bolt holes, so that the bolts can be screwed in. Dividing it into two parts, the extended section and the overlap section, can effectively expand the fixing area and reduce the influence of the dense bolt holes on the structural rigidity of the structure.
[0045] It can be seen that the present embodiment provides an anti-liquefaction device for an integrated pipe gallery joint, which is arranged at the pipe gallery joint. When the pipe gallery is in a liquefied stratum, especially when the joint is close to the boundary between the liquefied stratum and the non-liquefied stratum, the anti-liquefaction ability of the structure can be improved by improving the integrity of the pipe gallery; the replaceable shear-resistant connecting steel beam arranged in the present device can form a function that enables the joint to dissipate seismic energy, and can improve the shear strength at the joint of the pipe gallery structure to a certain extent, so that the seismic effect is better; the replaceable shear-resistant connecting steel beam is easy to disassemble and can be reused, reducing the economic cost of the device; and the replaceable shear-resistant connecting steel beam is fixed by a rubber pad, which can greatly increase the toughness of the structure; the limiting device can change the position of the replaceable shear-resistant connecting steel beam to reduce the impact on the erection of pipelines inside the pipe gallery.
[0046] This embodiment provides a construction method for an anti-liquefaction device for an integrated pipe gallery joint, based on the above-mentioned anti-liquefaction device for an integrated pipe gallery joint, comprising the following steps: Splice and install two sets of steel frame vertical columns 1-1 and the first steel frame crossbeam 1-2 to form two frame bodies; After one of the frame bodies is connected to the inner wall of the pipe gallery 8, the second steel frame cross beam 1-3 is installed on the other frame body, so that the first steel frame cross beam 1-2 and the second steel frame cross beam 1-3 form a placement groove 1-4; A limiting device 5 is installed in the placement groove 1-4, and the two ends of the replaceable shear-resistant connecting steel beam 2 are fixed by the limiting device 5 and the positioning support 4 to realize the connection of the two frame bodies; Adjacent pipe galleries 8 are connected using the fixed supports 3 at the bottom and the fixed supports 3 at the top of the first steel frame cross beam 1 - 2 .
[0047] The more specific steps are as follows: First, lay the fixed steel frame 1, determine the position of the steel frame columns 1-1 on both sides by determining the position of the pipe gallery 8 and mark them, install the first steel frame crossbeam 1-2, use bolts to fix the first steel frame crossbeam 1-2 to the pipe gallery 8, connect the first steel frame crossbeam 1-2 to the steel frame column 1-1 through the steel frame welding point, and connect the second steel frame crossbeam 1-3 to the installed fixed steel frame 1 through the connecting plate 7.
[0048] The steel beam body 2-1 of the replaceable shear-resistant connecting steel beam 2 is installed in the placement groove 1-4 reserved in the pipe gallery 8 through the limiting device 5, and the level 2-2 is installed in the middle position of the steel beam body 2-1. At this time, the limiting device 5 is fixed to the fixed support 3 with bolts, and the upper fixed steel frame 1 and the limiting device 5 are connected to the pipe gallery 8 with bolts.
[0049] In summary, the present invention provides an anti-liquefaction device and method for an integrated pipe gallery joint, which has the following advantages over the existing integrated pipe gallery joint structure: The anti-liquefaction device for the joint of the integrated pipe gallery realizes a stable connection between two adjacent pipe galleries by fixing the steel frame structure, and supplements the structural rigidity; the fixed steel frame is composed of two frame bodies with the same structure, and the frame bodies are connected by replaceable shear-resistant connecting steel beams, which not only improves the stability and strength of the connection, and thus improves the shear resistance, but also facilitates subsequent maintenance and replacement; at the same time, the placement groove formed between the second steel frame cross beam set on the second frame body and the first steel frame cross beam provides a reliable fixed position for one end of the replaceable shear-resistant connecting steel beam, and clamps through the cooperation of the limit device and the steel frame vertical column, further enhancing the firmness of the connection. In addition, the design of the replaceable shear-resistant connecting steel beam enables the device to effectively resist shear deformation and protect the safety of the pipe gallery joint when subjected to external forces such as liquefaction. The steel beam body adopts an I-beam structure, which improves the bearing capacity and stability of the steel beam. At the same time, the level meter set in the middle of the steel beam body can monitor the settlement and deformation of the pipe gallery in real time, providing important data support for the safe operation of the pipe gallery. In terms of the limiting device, a concave steel plate is used as the limiting device, and a rubber pad is used to tightly fit one end of the replaceable shear-resistant connecting steel beam, thereby increasing the friction area and enhancing the shear resistance. The design of the fixed support and the positioning support also fully considers the stability and reliability of the connection, so that the device can be firmly connected to adjacent pipe corridors, and is easy to install and disassemble by bolt connection. Finally, the second steel frame crossbeam is connected to the steel frame vertical column by an L-shaped connecting plate, which not only improves the overall stability and bearing capacity of the frame body, but also simplifies the installation process and improves construction efficiency. In summary, the anti-liquefaction device for the integrated pipe corridor joint provided by the present invention has the advantages of stable connection, high strength, convenient maintenance, and real-time monitoring of settlement deformation. It can effectively improve the anti-liquefaction ability of the pipe corridor joint and ensure the safe operation of the pipe corridor.
[0050] The above embodiment is only one of the implementation methods that can realize the technical solution of the present invention. The scope of protection claimed by the present invention is not limited only to this embodiment, but also includes changes, replacements and other implementation methods that can be easily thought of by any technician familiar with the technical field within the technical scope disclosed by the present invention.
Claims
1. An anti-liquefaction device for a comprehensive pipe gallery joint, characterized in that: The anti-liquefaction device is connected between two adjacent pipe galleries (8) and comprises a fixed steel frame (1); The fixed steel frame (1) comprises two frame bodies with the same structure; the frame bodies comprise connected steel frame vertical columns (1-1) and first steel frame cross beams (1-2); the two steel frame vertical columns (1-1) and the two first steel frame cross beams (1-2) are symmetrically arranged; The first frame body is arranged around the inner wall of the pipe gallery (8) and connected to the inner wall of the pipe gallery (8); the second frame body is connected to the first frame body via a replaceable shear-resistant connecting steel beam (2); Two second steel frame cross beams (1-3) are arranged between the two first steel frame cross beams (1-2) of the second frame body, and are respectively located at the top and bottom of the second frame body, and a placement groove (1-4) is formed between the first steel frame cross beam (1-2) and the second steel frame cross beam (1-3); One end of the replaceable shear-resistant connecting steel beam (2) is inserted into the placement groove (1-4), and the clamping of one end of the replaceable shear-resistant connecting steel beam (2) is achieved through the cooperation of the limiting device (5) and the steel frame vertical column (1-1); The other end of the replaceable shear-resistant connecting steel beam (2) is connected to the first steel frame cross beam (1-2) via a positioning support (4); The two first steel frame cross beams (1-2) of the second frame body are respectively provided with fixed supports (3) for connecting adjacent pipe galleries (8).
2. The anti-liquefaction device for the joint of the integrated pipe gallery according to claim 1 is characterized in that: The replaceable shear-resistant connecting steel beam (2) comprises a steel beam body (2-1), one end of the steel beam body (2-1) is inserted into the placement groove (1-4), and the other end is bolted to the first steel frame cross beam (1-2) via the positioning support (4).
3. The anti-liquefaction device for the integrated pipe gallery joint according to claim 2 is characterized in that: A level gauge (2-2) for surveying the settlement and deformation of the pipe gallery (8) is provided in the middle of the steel beam body (2-1).
4. The anti-liquefaction device for integrated pipe gallery joint according to claim 2, characterized in that: The steel beam body (2-1) adopts an I-beam structure.
5. The anti-liquefaction device for integrated pipe gallery joint according to claim 1, characterized in that: The limiting device (5) is a concave steel plate, wherein a first side plate of the concave steel plate is connected to the first steel frame cross beam (1-2), a second side plate is connected to the second steel frame cross beam (1-3), and a third side plate is closely arranged to one end of the replaceable shear-resistant connecting steel beam (2).
6. The anti-liquefaction device for integrated pipe gallery joints according to claim 5, characterized in that: The third side plate of the concave steel plate is provided with a rubber pad (6), and the rubber pad (6) is arranged in close contact with one end of the replaceable shear-resistant connecting steel beam (2).
7. The anti-liquefaction device for integrated pipe gallery joints according to claim 1, characterized in that: The fixed support (3) comprises a first extending section and a first overlapping section, the first extending section being used to connect to an adjacent pipe gallery (8), the first overlapping section overlapping with the first steel frame cross beam (1-2); and is connected to the fixed steel frame (1) and the pipe gallery (8) via bolts.
8. The anti-liquefaction device for integrated pipe gallery joints according to claim 1, characterized in that: The positioning support (4) comprises a second extending section and a second overlapping section, the second extending section is connected to the first steel frame cross beam (1-2) via bolts, and the overlapping section is connected to the steel beam body (2-1) and the first steel frame cross beam (1-2) via bolts.
9. The anti-liquefaction device for integrated pipe gallery joint according to claim 1, characterized in that: The second steel frame cross beam (1-3) is connected to the steel frame vertical column (1-1) via a connecting plate (7); the connecting plate (7) is an L-shaped steel plate, the vertical end of the L-shaped steel plate is connected to the steel frame vertical column (1-1), and the horizontal end is connected to the second steel frame cross beam (1-3).
10. A construction method for an anti-liquefaction device for a comprehensive pipe gallery joint, characterized in that: The anti-liquefaction device for the integrated pipe gallery joint according to any one of claims 1 to 9 comprises: Splicing and installing two sets of steel frame vertical columns (1-1) and the first steel frame crossbeam (1-2) to form two frame bodies; One of the frame bodies is connected to the inner wall of the pipe gallery (8), and a second steel frame cross beam (1-3) is installed on the other frame body, so that the first steel frame cross beam (1-2) and the second steel frame cross beam (1-3) form a placement groove (1-4); A limiting device (5) is installed in the placement groove (1-4), and the two ends of the replaceable shear-resistant connecting steel beam (2) are fixed by the limiting device (5) and the positioning support (4) to achieve connection between the two frame bodies; Adjacent pipe galleries (8) are connected using the fixed support (3) at the bottom and the fixed support (3) at the top of the first steel frame cross beam (1-2).