Aluminum alloy oxygen generator frame welding device

By using the first fixed fixing assembly and the second fixed fixing assembly in the aluminum alloy oxygen-making frame welding device, the rapid and accurate positioning and welding of the inner frame rod and the outer frame are achieved, and the welding structure deviation in the prior art is solved and the problem of rework improves welding accuracy and equipment stability.

CN119387983AInactive Publication Date: 2025-02-07GUANGXI XINYU RUILIN MEDICAL TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411590053.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-08
Publication Date
2025-02-07
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the prior art, during the welding process of aluminum alloy base frame of medical oxygen generator equipment, due to manual operation errors and uncontrollability, it is difficult to accurately position the inner frame rod in the outer frame, resulting in deviations in welding structure, affecting the stability of the equipment. Installation, increase rework and material waste.

Method used

An aluminum alloy oxygen-making frame welding device is designed, using the cooperation of the first fixed fixing assembly and the second fixed fixing assembly to achieve rapid and precise positioning and welding of the inner frame rod and the outer frame through rubber blocks and hydraulic systems, simplifying operation process to improve production efficiency.

Benefits of technology

It realizes rapid and precise welding positioning of the inner frame rod in the outer frame, improves welding accuracy, reduces welding defects and rework, improves the stability and safety of the overall structure, and improves the quality pass rate of finished products.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure FT_1
    Figure FT_1
  • Figure FT_2
    Figure FT_2
  • Figure FT_3
    Figure FT_3
Patent Text Reader

Abstract

The invention discloses a welding device for an aluminum alloy oxygen making machine frame, and belongs to the technical field of welding equipment. An aluminum alloy oxygen generator frame welding device comprises a workbench, baffles are fixed to the top face of the workbench, a containing groove is formed in the gap between the two opposite baffles, a first fixing assembly is arranged in the containing groove, an outer frame is placed on the top face of the workbench, and a second fixing assembly is arranged at the top end of the workbench. A welding mechanical arm is arranged on one side of the workbench, and a discharging assembly is arranged at the bottom of the discharging assembly. Through cooperation of the first fixing assembly and the second fixing assembly, rapid and accurate welding positioning of the inner frame rods in the outer frame is achieved, the welding accuracy is improved, the operation of clamping and welding the inner frame rods one by one is omitted, the welding machining efficiency is effectively improved, and the welding cost is reduced. The base rack workpiece can be rapidly unloaded through the arranged unloading assembly, the operation that a worker takes the welded workpiece from a workbench manually is omitted, the working intensity is reduced, and the welding machining operation safety is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of welding equipment, in particular to a welding device for an aluminum alloy oxygen making machine frame. Background Art

[0002] With the rapid development of medical technology, medical oxygen concentrator equipment has become an indispensable medical equipment for major medical institutions. It can provide patients with a stable and efficient oxygen supply, which is of great significance for ensuring the life safety of patients and improving the quality of medical care. Oxygen concentrator equipment is a device for producing oxygen, which includes oxygen liquefaction oxygen concentrators and molecular sieve oxygen concentrators. For example, the working principle of oxygen liquefaction oxygen concentrators is to use air separation technology, first using a compressor as a power to compress the input air to produce high-pressure gas, and then perform gas-liquid separation and distillation to obtain oxygen; the working principle of molecular sieve oxygen concentrators is to use air separation technology, first using a compressor as a power to compress the input air to produce high-pressure gas, and then use gas molecular sieves to make oxygen molecules pass through and obtain high-concentration oxygen. The bottom of large medical oxygen concentrator equipment is usually provided with an aluminum alloy base frame. The base frame is the bottom support structure of large medical oxygen concentrator equipment. Aluminum alloy has the characteristics of high strength, light weight, and corrosion resistance. It can not only meet the strength requirements, but also effectively reduce the overall weight of the equipment, which is convenient for transportation and installation.

[0003] The aluminum alloy base frame at the bottom of the medical oxygen concentrator equipment is usually a flat frame structure, which is composed of an outer frame and multiple inner frame rods that are cross-distributed horizontally and vertically inside the outer frame. The multiple inner frame rods are welded inside the outer frame. During the welding process of the base frame, the prior art usually uses manual spot welding of multiple inner frame rods to the outer frame one by one, which is cumbersome and time-consuming. During welding, the outer frame is reserved with inner frame rod installation position marks to facilitate the welding and installation of the inner frame rods. However, due to the large error and uncontrollability of manual operation, it is difficult to accurately position the inner frame rods in the outer frame, resulting in a large deviation in the structure of the base frame after welding, affecting the stable installation of the equipment. It is easy to cause a lot of rework and material waste due to inaccurate welding position. Therefore, it is of great significance to design a welding device with a relatively simple structure, easy to use, and auxiliary positioning welding of the inner frame rods.

[0004] Therefore, it is necessary to provide an aluminum alloy oxygen making machine frame welding device to solve the above technical problems. Summary of the invention

[0005] The purpose of the present invention is to provide an aluminum alloy oxygen making machine frame welding device to solve the problems raised in the above background technology.

[0006] To achieve the above purpose, the present invention solves the above technical problems as follows:

[0007] An aluminum alloy oxygen generator frame welding device comprises a workbench, a baffle plate arranged along the distribution shape of an inner frame rod to be welded is fixed on the top surface of the workbench, a gap between two opposite baffle plates is set as a placement groove, a first fixing component for elastically clamping the inner frame rod to be welded is arranged in the placement groove, an outer frame is placed on the top surface of the workbench, a second fixing component for positioning the outer frame is arranged on the top of the workbench, a welding robot arm for welding the outer frame and the inner frame rod is arranged on one side of the workbench, and a discharging component for discharging a welded base frame workpiece is arranged at the bottom of the discharging component.

[0008] As a further solution of the present invention, the first fixing component includes a plurality of rubber blocks arranged in a plurality of placement grooves, the rubber blocks are fixed to the inner side surfaces of the baffle plates and a cavity is provided inside the rubber blocks, the top ends of the plurality of rubber blocks are fixed with liquid tubes connected to the inside of the rubber blocks, an upper plate is arranged above the rubber blocks, a first cavity is provided inside the upper plate, and the top ends of the plurality of liquid tubes are connected to the first cavity.

[0009] As a further solution of the present invention, a first external liquid cylinder connected to the first cavity is fixed on the top surface of the upper plate, a nut sleeve is fixed inside the top end of the first external liquid cylinder, the inner thread of the nut sleeve is connected with a first threaded rod inserted into the first external liquid cylinder, a first piston plate tightly matched with the inner side wall of the first external liquid cylinder is fixed to one end of the first threaded rod located inside the first external liquid cylinder, a handle rod is fixed to the top end of the first threaded rod, and a rubber sleeve is fitted on the surface of the handle rod.

[0010] As a further solution of the present invention, the second fixing component includes a plurality of symmetrically distributed protrusions fixed on the top surface of the workbench, a top jacket is fixed on the side surfaces of the plurality of protrusions, a second cavity is opened inside the top jacket, a connecting pipe is connected between two adjacent top jackets, and both ends of the connecting pipe are respectively connected to the second cavities inside the two top jackets.

[0011] As a further solution of the present invention, one of the top jackets is made of a hard material, and the other three top jackets are made of an elastic material. A second external liquid cylinder communicating with a second cavity inside the top jacket is fixed to the outer side wall of the top jacket made of hard material, and a second threaded rod is connected to an inner thread of one end of the second external liquid cylinder away from the top jacket, and a second piston plate tightly fitting with an inner side wall of the second external liquid cylinder is fixed to the end of the second threaded rod located inside the second external liquid cylinder.

[0012] As a further solution of the present invention, a terminal plate is fixed to one end of the second threaded rod located outside the second external liquid-connecting cylinder, and a plurality of convex ribs distributed in an annular shape are arranged on the side surface of the terminal plate.

[0013] As a further solution of the present invention, a drop-out slot is provided on the top surface of the workbench to allow the welded base frame workpiece to fall out from the top of the workbench, and the unloading assembly includes a top connecting plate arranged at the bottom of the workbench, and a protrusion that fits the drop-out slot is fixed on the top surface of the top connecting plate.

[0014] As a further solution of the present invention, a plurality of symmetrically distributed support rods are fixed to the bottom surface of the workbench, and a bottom plate is commonly fixed to the bottom ends of the plurality of support rods, an outer column sleeve is fixed to the top surface of the bottom plate, a column rod is slidably connected in the outer column sleeve, the top connecting plate is fixed to the top end of the column rod, a rack plate arranged along the length direction of the column rod is fixed to the side surface of the column rod, a guide groove slidably matched with the rack plate is provided on the side surface of the outer column sleeve, a servo motor is fixed to the top end of the bottom plate, and a gear meshing with the rack plate is fixed to the output end of the servo motor.

[0015] As a further solution of the present invention, a third cavity is provided inside the protrusion, and a blowing hole connected to the third cavity is provided on the top surface of the protrusion, and the blowing holes are provided in plurality and are equidistantly distributed, an air pump is fixed on the top of the base plate, an air supply pipe is fixed on the output end of the air pump, and the end of the air supply pipe away from the air pump is connected to the third cavity.

[0016] As a further solution of the present invention, the plurality of blowing holes are all arranged at an inclination and the inclination directions of the plurality of blowing holes are the same.

[0017] Compared with the prior art, the present invention has the following beneficial effects:

[0018] 1. Through the cooperation of the first fixing component and the second fixing component, the inner frame rod can be quickly and accurately welded and positioned in the outer frame, so that the end of the inner frame rod can be accurately positioned at the predetermined welding position on the base frame, ensuring accurate positioning before welding, improving welding accuracy, and effectively reducing welding defects caused by inaccurate positioning, thereby improving the stability and safety of the overall structure, reducing rework and material waste caused by inaccurate welding position, and improving the quality pass rate of finished products. At the same time, it saves the tedious and repeated calibration operations of the inner frame rod in the outer frame.

[0019] 2. Through the first fixing component, multiple inner frame rods can be welded to the outer frame at one time, eliminating the operation of clamping and welding the inner frame rods one by one, effectively simplifying the welding operation process, greatly improving production efficiency, and making the welding process of the inner frame rods smoother and more efficient. The first fixing component and the second fixing component respectively elastically clamp the inner frame rods and the outer frame, while ensuring a firm clamping, avoid causing crushing to the surface of the inner frame rods and the outer frame, thereby improving the quality of the finished frame after welding.

[0020] 3. The base frame workpiece can be quickly unloaded through the set unloading assembly, avoiding delays and errors in manual operation, and eliminating the need to manually take the welded frame from the workbench, effectively reducing work intensity. At the same time, it can avoid safety hazards caused by human factors and improve the safety of welding processing operations. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The present invention is further described below in conjunction with the accompanying drawings and embodiments:

[0022] Figure 1 The overall structure of the present invention is three-dimensional Figure 1 ;

[0023] Figure 2 The overall structure of the present invention is three-dimensional Figure 2 ;

[0024] Figure 3 The first fixing component of the present invention is a partial structure diagram Figure 1 ;

[0025] Figure 4 The first fixing component of the present invention is a partial structure diagram Figure 2 ;

[0026] Figure 5 is a schematic cross-sectional structural diagram of a second fixing component of the present invention;

[0027] Figure 6 for Figure 5 A magnified view of the structure at center;

[0028] Figure 7 The local structure of the unloading assembly of the present invention is shown in FIG. Figure 1 ;

[0029] Figure 8 The local structure of the unloading assembly of the present invention is shown in FIG. Figure 2 ;

[0030] Fig. 9 It is a cross-sectional structural schematic diagram of the discharge assembly of the present invention;

[0031] Fig.10 The local structure of the unloading assembly of the present invention is shown in FIG. Figure 3 .

[0032] In the accompanying drawings, the components represented by the reference numerals are listed as follows:

[0033] 1. First fixing assembly; 101. Rubber block; 102. Liquid passage tube; 103. Upper plate; 104. First cavity; 105. First external liquid cylinder; 106. First piston plate; 107. First threaded rod; 108. Handle rod; 109. Nut sleeve; 2. Second fixing assembly; 201. Top clamp; 202. Boss; 203. Second cavity; 204. Second external liquid cylinder; 205. Second piston plate; 206. Second threaded rod; 207. End plate; 208 , convex rib; 209, connecting pipe; 3, unloading assembly; 301, top plate; 302, bump; 303, blowing hole; 304, third cavity; 305, rack plate; 306, column; 307, air duct; 308, gear; 309, outer column sleeve; 310, guide groove; 311, servo motor; 312, air pump; 4, workbench; 5, welding robot arm; 6, support rod; 7, bottom plate; 8, outer frame; 11, baffle; 12, placement groove; 13, drop-out notch. DETAILED DESCRIPTION

[0034] The present invention will be further described below in conjunction with the embodiments.

[0035] See also Figure 1-10The present invention provides an aluminum alloy oxygen-making machine frame welding device, comprising a workbench 4, a baffle 11 arranged along the distribution shape of the inner frame rod to be welded is fixed on the top surface of the workbench 4, a gap between two opposing baffles 11 is set as a placement groove 12, a first fixing component 1 for elastically clamping the inner frame rod to be welded is arranged in the placement groove 12, an outer frame 8 is placed on the top surface of the workbench 4, a second fixing component 2 for positioning the outer frame 8 is arranged on the top of the workbench 4, a welding robot arm 5 for welding the outer frame 8 and the inner frame rod is arranged on one side of the workbench 4, and a discharging component 3 is arranged at the bottom of the discharging component 3 for discharging the welded base frame workpiece When in use, first place the outer frame 8 to be welded on the top side of the workbench 4, and place it inside the second fixing component 2, and use the second fixing component 2 to clamp the outer frame 8 and position it more accurately. After the outer frame 8 is clamped and positioned, place multiple inner frame rods in the corresponding placement grooves 12 respectively, so that the multiple inner frame rods are preliminarily positioned through the placement grooves 12, and then rotate the input end of the first fixing component 1 to make the first fixing component 1 expand to a certain extent, so that the multiple inner frame rods are synchronously clamped and fixed through the expanded first fixing component 1, and the ends of the inner frame rods are precisely positioned. The inner frame rods are accurately positioned at the welding position on the outer frame 8, the clamping and positioning of the inner frame rods are completed, and then the welding robot arm 5 is used to spot weld the ends of the inner frame rods and the side connections of the outer frame 8, so that multiple inner frame rods can be quickly positioned and connected to the outer frame 8, effectively improving the welding position accuracy of the inner frame rods, thereby realizing the fast and accurate welding positioning of the inner frame rods in the outer frame 8 through the cooperation of the first fixing component 1 and the second fixing component 2, so that the ends of the inner frame rods can be accurately positioned at the predetermined welding positions on the base frame, ensuring accurate positioning before welding, improving welding accuracy, and effectively reducing welding defects caused by inaccurate positioning, thereby improving the stability of the overall structure. The advantages of the invention are that the quality of the inner frame rod is improved, the rework and material waste caused by inaccurate welding position are reduced, and the qualified rate of finished products is improved. At the same time, the tedious and repeated calibration operation of the inner frame rod in the outer frame 8 is eliminated, and multiple inner frame rods can be welded to the outer frame 8 at one time, eliminating the operation of clamping and welding the inner frame rods one by one, effectively simplifying the welding operation process, greatly improving the production efficiency, and making the welding process of the inner frame rod smoother and more efficient. The first fixing component 1 and the second fixing component 2 respectively elastically clamp the inner frame rod and the outer frame 8, while ensuring the clamping is firm, avoiding the inner frame rod and the outer frame 8 surface from being crushed, and improving the quality of the finished product of the welded frame;After the spot welding connection of the inner frame rod and the outer frame 8 is completed, the inner frame rod and the outer frame 8 constitute the base frame workpiece, and the base frame workpiece can be quickly unloaded through the unloading assembly 3, avoiding the delay and error of manual operation, and eliminating the operation of manually taking the welded frame from the workbench 4, effectively reducing the work intensity, and at the same time avoiding the potential safety hazards caused by human factors, and improving the safety of welding processing operations. ;

[0036] Further Figure 1 , Figure 3 and Figure 4 As shown, it is worth specifically explaining that the first fixing component 1 includes a plurality of rubber blocks 101 arranged in a plurality of placement grooves 12, the rubber blocks 101 are fixed to the inner side surfaces of the baffle plates 11 and a cavity is provided inside the rubber blocks 101, and the top ends of the plurality of rubber blocks 101 are fixed with liquid pipes 102 connected to the inside of the rubber blocks 101, an upper plate 103 is provided above the rubber blocks 101, a first cavity 104 is provided in the upper plate 103, and the top ends of the plurality of liquid pipes 102 are connected to the first cavity 104; the first external liquid cylinder 105, the first cavity 104 and the cavity inside the rubber block 101 are all filled with a certain amount of liquid, and the liquid can be water or hydraulic oil, etc., and the plurality of inner frame rods are respectively placed in the corresponding placement grooves 12, so that the plurality of inner frame rods are adjusted by the placement grooves 12 After preliminary positioning, the first threaded rod 107 is screwed down, and the first threaded rod 107 drives the first piston plate 106 to move downward in the first external liquid cylinder 105, so that the liquid in the first external liquid cylinder 105 and the first cavity 104 is synchronously squeezed into the plurality of rubber blocks 101 through the liquid pipe 102 through the first piston plate 106, so that the plurality of rubber blocks 101 synchronously expand to a certain extent, so that the plurality of inner frame rods are synchronously clamped and fixed by the plurality of expanded rubber blocks 101, and at the same time, the ends of the inner frame rods are accurately positioned to the welding positions on the outer frame 8, and the clamping and positioning of the inner frame rods are completed, and then the ends of the inner frame rods and the side connections of the outer frame 8 are spot-welded by the welding robot arm 5, so that the plurality of inner frame rods are quickly positioned and connected to the outer frame 8, and the welding position accuracy of the inner frame rods is effectively improved.

[0037] Further Figure 2 , Figure 3 and Figure 4As shown, it is worth specifically explaining that a first external liquid cylinder 105 communicating with the first cavity 104 is fixed on the top surface of the upper plate 103, a nut sleeve 109 is fixed in the top end of the first external liquid cylinder 105, and the nut sleeve 109 is internally threaded with a first threaded rod 107 inserted in the first external liquid cylinder 105. A first piston plate 106 that closely matches the inner side wall of the first external liquid cylinder 105 is fixed on one end of the first threaded rod 107 located inside the first external liquid cylinder 105, and a handle rod 108 is fixed on the top end of the first threaded rod 107, and a rubber sleeve is fitted on the surface of the handle rod 108; during specific work, by rotating the first threaded rod 107, the position of the first piston plate 106 in the first external liquid cylinder 105 can be adjusted, and the rubber block 101 is controlled to expand, thereby controlling the elastic clamping of the inner frame rod by the adjustment rubber block 101, so that inner frame rods of different thicknesses within a certain range can be placed in the placement groove 12 for welding to the outer frame 8.

[0038] Further Figure 3 , Figure 5 and Figure 6 As shown, it is worth specifically explaining that the second fixing component 2 includes a plurality of symmetrically distributed protrusions 202 fixed on the top surface of the workbench 4, and a top jacket 201 is fixed on the side surfaces of the plurality of protrusions 202. A second cavity 203 is opened inside the top jacket 201, and a connecting pipe 209 is connected between two adjacent top jackets 201. The two ends of the connecting pipe 209 are respectively connected to the second cavities 203 inside the two top jackets 201, one of the top jackets 201 is made of hard material, and the other three top jackets 201 are made of elastic material. A second external liquid cylinder 204 communicating with the second cavity 203 inside the top jacket 201 is fixed on the outer side wall of the top jacket 201 made of hard material, and a second external liquid cylinder 204 communicating with the second cavity 203 inside the top jacket 201 is internally threadedly connected to a second threaded rod 206 at one end of the second external liquid cylinder 204 away from the top jacket 201. The second threaded rod 206 is located at the second external liquid cylinder 20 A second piston plate 205 is fixed on one end of the interior of the second external liquid cylinder 204, which is tightly matched with the inner wall of the second external liquid cylinder 204; a certain amount of liquid is arranged inside the second external liquid cylinder 204 and the top jacket 201, and the liquid can be water or hydraulic oil, etc. The outer frame 8 to be welded is placed on the top side of the workbench 4 and placed between the multiple top jackets 201. By rotating the second threaded rod 206, the second threaded rod 206 drives the second piston plate 205 to move in the second external liquid cylinder 204, so that the liquid in the second external liquid cylinder 204 is synchronously pressed into the multiple top jackets 201 through the connecting pipe 209 through the second piston plate 205, so that the top jacket 201 has hydraulic pressure, so that the multiple top jackets 201 expand synchronously, and then the outer frame 8 is clamped by the multiple top jackets 201 while the outer frame 8 is more accurately positioned.

[0039] Further Figure 3 , Figure 7 , Figure 8 , Fig. 9 and Fig.10 As shown, it is worth specifically explaining that a drop-out notch 13 is provided on the top surface of the workbench 4 so that the welded base frame workpiece can fall out from the top of the workbench 4. The unloading assembly 3 includes a top connecting plate 301 arranged at the bottom of the workbench 4, and a convex block 302 that fits the drop-out notch 13 is fixed on the top surface of the top connecting plate 301. A plurality of symmetrically distributed support rods 6 are fixed to the bottom surface of the workbench 4, and a bottom plate 7 is fixed to the bottom ends of the plurality of support rods 6. An outer column sleeve 309 is fixed to the top surface of the bottom plate 7, and a sliding connection is formed inside the outer column sleeve 309. There is a column 306, a top plate 301 is fixed to the top of the column 306, a rack plate 305 arranged along the length direction of the column 306 is fixed on the side of the column 306, a guide groove 310 slidably adapted to the rack plate 305 is opened on the side of the outer column sleeve 309, a servo motor 311 is fixed on the top of the bottom plate 7, and a gear 308 meshingly connected to the rack plate 305 is fixed on the output end of the servo motor 311; the inner diameter of the falling notch 13 is larger than the outer diameter of the base frame workpiece, and the bump 302 is stuck during welding. The outer frame 8 and the inner frame rod placed on the top surface of the workbench 4 are supported by the convex block 302 to facilitate welding. After the welding of the base frame workpiece is completed, the output end of the servo motor 311 drives the gear 308 to rotate, thereby driving the column rod 306 to move down and retract into the outer column sleeve 309 through the cooperation of the gear 308 and the rack plate 305, that is, driving the top connecting plate 301 to move down. At this time, the top connecting plate 301 drives the convex block 302 from The base frame workpiece that has been welded can be automatically dropped out through the drop-out slot 13 to the top of the top connecting plate 301 and slide out from the top of the top connecting plate 301, so that the base frame workpiece can be quickly unloaded, avoiding delays and errors in manual operation, and eliminating the need to manually take the welded frame from the workbench 4, effectively reducing the work intensity, and at the same time avoiding safety hazards caused by human factors, thereby improving the safety of welding processing operations.

[0040] Further Figure 8 and Fig. 9As shown, it is worth specifically explaining that a third cavity 304 is provided inside the protrusion 302, and a blowing hole 303 connected to the third cavity 304 is provided on the top surface of the protrusion 302, and a plurality of blowing holes 303 are provided and the plurality of blowing holes 303 are equidistantly distributed, an air pump 312 is fixed on the top of the bottom plate 7, and an air supply pipe 307 is fixed on the output end of the air pump 312, and the end of the air supply pipe 307 away from the air pump 312 is connected to the third cavity 304; during the unloading process of the base frame workpiece, the air pump 312 is started to work, the air pump 312 sucks air from the external environment and compresses and transports it to the air supply pipe 307, and the air pressure airflow is transported to the inside of the third cavity 304 through the air supply pipe 307, so that it is evenly sprayed onto the base frame workpiece through the plurality of blowing holes 303, so that the base frame workpiece is pushed to automatically slide down and unload on the top of the top connecting plate 301 with the assistance of the airflow.

[0041] This scheme has the following working process: first, the outer frame 8 to be welded is placed on the top side of the workbench 4 and placed between multiple top jackets 201, and the second threaded rod 206 is rotated to drive the second piston plate 205 to move in the second external liquid cylinder 204, so that the liquid in the second external liquid cylinder 204 is synchronously pressed into the multiple top jackets 201 through the connecting pipe 209 through the second piston plate 205, so that the top jacket 201 has hydraulic pressure, so that the multiple top jackets 201 expand synchronously, and then the outer frame 8 is clamped by the multiple top jackets 201 and the outer frame 8 is positioned at the same time; then the multiple inner frame rods are placed in the corresponding placement grooves 12 respectively, so that The plurality of inner frame rods are preliminarily positioned through the placement groove 12, and then the first threaded rod 107 is screwed down, and the first threaded rod 107 drives the first piston plate 106 to move downward in the first external liquid cylinder 105, so that the liquid in the first external liquid cylinder 105 and the first cavity 104 is synchronously squeezed into the plurality of rubber blocks 101 through the liquid pipe 102 through the first piston plate 106, so that the plurality of rubber blocks 101 are synchronously expanded to a certain extent, so that the plurality of inner frame rods are synchronously clamped and fixed by the plurality of expanded rubber blocks 101, and at the same time, the ends of the inner frame rods are accurately positioned to the welding positions on the outer frame 8, and the clamping and positioning of the inner frame rods are completed, and then the ends of the inner frame rods and the side connections of the outer frame 8 are spot welded by the welding robot arm 5;

[0042] After the spot welding of the base frame workpiece is completed, the output end of the servo motor 311 drives the gear 308 to rotate, thereby driving the column rod 306 to move down and retract into the outer column sleeve 309 through the cooperation of the gear 308 and the rack plate 305, that is, driving the top plate 301 to move down. At this time, the top plate 301 drives the protrusion 302 to escape from the drop-out notch 13, so that the drop-out notch 13 is in an open state, and the base frame workpiece after the welding process automatically falls out through the drop-out notch 13. The top of the top connecting plate 301 sucks air from the external environment through the air pump 312 and compresses and delivers it to the air supply pipe 307. The air supply pipe 307 delivers the pressurized airflow to the inside of the third cavity 304, and then evenly sprays it onto the base frame workpiece through multiple blowing holes 303. The base frame workpiece is pushed to automatically slide down and unload on the top of the top connecting plate 301 with the assistance of the airflow. After the spot-welded base frame workpiece is unloaded, the base frame workpiece is further fully welded.

[0043] Further Fig. 9 As shown, it is worth explaining in detail that the multiple blowing holes 303 are all inclined and the inclination direction of the multiple blowing holes 303 is the same; during specific operation, the airflow blown obliquely through the inclined blowing holes 303 pushes the base frame workpiece to improve the unloading effect.

[0044] Further Figure 6 As shown, it is worth specifically explaining that an end plate 207 is fixed to the second threaded rod 206 located outside the second external liquid-connecting cylinder 204, and a plurality of annularly distributed convex ribs 208 are arranged on the side of the end plate 207; during specific work, the second threaded rod 206 can be conveniently rotated by the end plate 207, which is convenient for operation.

[0045] In summary: through the cooperation of the first fixing component 1 and the second fixing component 2, the inner frame rod can be quickly and accurately welded and positioned in the outer frame 8, so that the end of the inner frame rod can be accurately positioned at the predetermined welding position on the base frame, ensuring accurate positioning before welding, improving welding accuracy, and effectively reducing welding defects caused by inaccurate positioning, thereby improving the stability and safety of the overall structure, reducing rework and material waste caused by inaccurate welding position, and improving the quality pass rate of finished products. At the same time, the tedious and repeated manual calibration operations of the inner frame rod in the outer frame 8 are eliminated, and multiple inner frame rods can be welded to the outer frame 8 at one time, eliminating the operation of clamping and welding the inner frame rods one by one, effectively simplifying the welding operation process, and greatly The production efficiency is improved, and the welding process of the inner frame rod is made smoother and more efficient. The inner frame rod and the outer frame 8 are elastically clamped by the first fixing component 1 and the second fixing component 2 respectively, which ensures that the clamping is firm while avoiding crushing on the surface of the inner frame rod and the outer frame 8, thereby improving the quality of the finished product of the welded frame; after the spot welding connection of the inner frame rod and the outer frame 8 is completed, the inner frame rod and the outer frame 8 constitute the base frame workpiece, and the base frame workpiece can be quickly unloaded through the set unloading component 3, thereby avoiding delays and errors in manual operation, and eliminating the operation of manually taking the welded frame from the workbench 4, thereby effectively reducing the work intensity, and at the same time being able to avoid safety hazards caused by human factors, thereby improving the safety of welding processing operations.

[0046] The servo motor 311 and the air pump 312 can be purchased on the market. The servo motor 311 and the air pump 312 are equipped with a power supply, which is a mature technology in this field and has been fully disclosed, so they are not repeated in the specification.

Claims

1. An aluminum alloy oxygen generator frame welding device, comprising a workbench (4), characterized in that: A baffle (11) arranged along the distribution shape of the inner frame rods to be welded is fixed on the top surface of the workbench (4); a gap between two opposing baffles (11) is set as a placement groove (12); a first fixing component (1) for elastically clamping the inner frame rods to be welded is arranged in the placement groove (12); an outer frame (8) is placed on the top surface of the workbench (4); a second fixing component (2) for positioning the outer frame (8) is arranged on the top of the workbench (4); a welding robot arm (5) for welding the outer frame (8) and the inner frame rods is arranged on one side of the workbench (4); and a discharging component (3) for discharging a welded base frame workpiece is arranged at the bottom of the discharging component (3).

2. The aluminum alloy oxygen generator frame welding device according to claim 1 is characterized in that: The first fixing component (1) comprises a plurality of rubber blocks (101) arranged in a plurality of placement grooves (12); the rubber blocks (101) are fixed to the inner side surface of the baffle (11) and a cavity is provided inside the rubber blocks (101); the top ends of the plurality of rubber blocks (101) are fixed with liquid passages (102) connected to the inside of the rubber blocks (101); an upper plate (103) is arranged above the rubber blocks (101); a first cavity (104) is provided inside the upper plate (103); and the top ends of the plurality of liquid passages (102) are connected to the first cavity (104).

3. The aluminum alloy oxygen generator frame welding device according to claim 2 is characterized in that: A first external liquid-connecting cylinder (105) connected to the first cavity (104) is fixed on the top surface of the upper plate (103); a nut sleeve (109) is fixed inside the top end of the first external liquid-connecting cylinder (105); the nut sleeve (109) is internally threadedly connected to a first threaded rod (107) inserted into the first external liquid-connecting cylinder (105); a first piston plate (106) tightly fitting with the inner side wall of the first external liquid-connecting cylinder (105) is fixed to one end of the first threaded rod (107) located inside the first external liquid-connecting cylinder (105); a handle rod (108) is fixed to the top end of the first threaded rod (107); and a rubber sleeve is fitted on the surface of the handle rod (108).

4. The aluminum alloy oxygen generator frame welding device according to claim 2 is characterized in that: The second fixing component (2) comprises a plurality of symmetrically distributed protrusions (202) fixed on the top surface of the workbench (4), a top jacket (201) being fixed on the side surfaces of the plurality of protrusions (202), a second cavity (203) being provided inside the top jacket (201), a connecting pipe (209) being connected between two adjacent top jackets (201), and two ends of the connecting pipe (209) being respectively connected to the second cavities (203) inside the two top jackets (201).

5. The aluminum alloy oxygen generator frame welding device according to claim 4 is characterized in that: One of the top jackets (201) is made of a hard material, and the other three top jackets (201) are made of an elastic material. A second external liquid cylinder (204) connected to a second cavity (203) inside the top jacket (201) is fixed on the outer wall of the top jacket (201) made of a hard material. The second external liquid cylinder (204) is connected to a second threaded rod (206) through an internal thread at one end away from the top jacket (201). A second piston plate (205) that fits tightly against the inner wall of the second external liquid cylinder (204) is fixed on one end of the second threaded rod (206) located inside the second external liquid cylinder (204).

6. The aluminum alloy oxygen generator frame welding device according to claim 5, characterized in that: An end plate (207) is fixed to one end of the second threaded rod (206) located outside the second external liquid-connecting cylinder (204), and a plurality of convex ribs (208) distributed in an annular shape are provided on the side surface of the end plate (207).

7. The aluminum alloy oxygen generator frame welding device according to claim 2 is characterized in that: The top surface of the workbench (4) is provided with a drop-out notch (13) for allowing a welded base frame workpiece to drop out from the top of the workbench (4); the discharge assembly (3) comprises a top connecting plate (301) arranged at the bottom of the workbench (4); a protrusion (302) that fits snugly into the drop-out notch (13) is fixed on the top surface of the top connecting plate (301).

8. The aluminum alloy oxygen generator frame welding device according to claim 7, characterized in that: A plurality of symmetrically distributed support rods (6) are fixed to the bottom surface of the workbench (4), and a bottom plate (7) is fixed to the bottom ends of the plurality of support rods (6); an outer column sleeve (309) is fixed to the top surface of the bottom plate (7); a column rod (306) is slidably connected inside the outer column sleeve (309); the top connecting plate (301) is fixed to the top end of the column rod (306); a rack plate (305) arranged along the length direction of the column rod (306) is fixed to the side surface of the column rod (306); a guide groove (310) slidably matched with the rack plate (305) is provided on the side surface of the outer column sleeve (309); a servo motor (311) is fixed to the top end of the bottom plate (7); a gear (308) meshingly connected with the rack plate (305) is fixed to the output end of the servo motor (311).

9. The aluminum alloy oxygen generator frame welding device according to claim 8, characterized in that: A third cavity (304) is provided inside the convex block (302), a blowing hole (303) connected to the third cavity (304) is provided on the top surface of the convex block (302), a plurality of blowing holes (303) are provided and the plurality of blowing holes (303) are distributed at equal intervals, an air pump (312) is fixed on the top of the bottom plate (7), an air supply pipe (307) is fixed on the output end of the air pump (312), and an end of the air supply pipe (307) away from the air pump (312) is connected to the third cavity (304).

10. The aluminum alloy oxygen generator frame welding device according to claim 9, characterized in that: The plurality of blowing holes (303) are all arranged in an inclined manner, and the inclination directions of the plurality of blowing holes (303) are the same.