Avoidance handling method for simultaneous arrival of bidirectional large passenger flow trains

Through the automatic train monitoring system, the arrival of two-way large passenger flow trains is monitored and handled, and the handling strategy is generated and implemented, and the passenger flow interweaving and operational efficiency problems caused by the two-way large passenger flow trains arrive at the station at the same time is solved, achieving safe and efficient operation.

CN119408589AActive Publication Date: 2025-02-11NANJING NRIET IND CORP
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411635154.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-15
Publication Date
2025-02-11
Estimated Expiration
2044-11-15

AI Technical Summary

Technical Problem

In the urban rail transit system, a two-way large passenger flow train arrives at the station at the same time, which will lead to passenger flow interweaving, forming congestion and safety hazards, and affecting operational efficiency.

Method used

Passenger flow information is obtained through the automatic train monitoring system, large passenger flow platforms are located, and periodically monitor whether there are two-way trains entering the station at the same time or stopping overlap. According to the platform type and train location, a strategy set is generated, and the handling strategy is automatically pushed to the dispatcher for confirmation, and comprehensive regulation is automatically carried out.

Benefits of technology

It effectively avoids the situation where two-way large passenger flow trains arrive at the station at the same time, eliminates the hidden dangers of passengers' movements on the platform and ensures the normal operation of the train, reduces passenger waiting time, and reduces the lag of manual intervention.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119408589A_ABST
    Figure CN119408589A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of urban rail transit, and discloses an evasion handling method for simultaneous arrival of two-way large-passenger-flow trains. After an automatic train monitoring system obtains passenger flow information of a station according to taking passenger flow information of a platform, whether two-way trains enter the station at the same time or not or whether the stop time of the station is overlapped or not is periodically monitored, if yes, the trains are comprehensively dispatched according to the handling method, and if not, the passenger flow information of the station is obtained. Therefore, the purpose of avoiding simultaneous arrival of the two-way trains with the load factor exceeding the threshold value is achieved, and the problems of station congestion, difficulty in personnel evacuation and a series of safety problems caused by excessive number of people detained on the station suddenly at the station are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention mainly relates to the technical field of urban rail transit, and in particular to a method for avoiding the simultaneous arrival of bidirectional large passenger flow trains at a station. Background Art

[0002] Avoiding the simultaneous arrival of large passenger flow trains in both directions is an important measure to improve the operational efficiency of the rail transit system and ensure the safety of passengers. In the urban rail transit system, holidays, large-scale events, morning and evening rush hours, natural disasters or traffic accidents are all high-incidence periods for large passenger flow in both directions. At transfer stations and comprehensive transportation hubs, passenger flows from different directions and lines are also prone to interweaving, forming large passenger flows in both directions. In this case, for the sake of safety and operational efficiency, it is necessary to avoid the simultaneous arrival of large passenger flow trains in both directions with full load rates exceeding the threshold. Summary of the invention

[0003] The purpose of the present invention is to provide a method for avoiding the simultaneous arrival of bidirectional large passenger flow trains at a station, so as to provide technical support for the field of rail transit intelligent dispatching system from the aspects of improving operation efficiency and ensuring passenger safety.

[0004] To achieve the above object, the present invention provides a method for avoiding simultaneous arrival of bidirectional large passenger flow trains, comprising the following steps: Step 1: The train automatic monitoring system obtains the passenger flow information of the station. When the passenger flow of the station is greater than the set threshold, the platform with large passenger flow is located. , ; Step 2: Periodically monitor the platforms with large passenger flow to see if there are trains in both directions entering the station at the same time or if there are overlapping stop times. If so, mark the up and down trains as , ; Step 3: Detect platforms with large passenger flow , Type; Step 4: If a platform with large passenger flow is detected , If the platform is an island platform and there are trains from both directions entering the station at the same time or the stop times overlap, the strategy set is generated based on the positions of the trains from both directions to determine whether they enter the avoidance area. Step 5: According to the location of the train, select the corresponding disposal strategy from the strategy set, and automatically push the disposal strategy to the dispatcher for confirmation; Step 6: After the dispatcher confirms, the train automatic monitoring system automatically controls the train according to the handling strategy.

[0005] Furthermore, in step 4, the range of the avoidance area can be set, and the bidirectional trains in the avoidance area are classified as follows: C1: Upward train and down trains All are located at high passenger flow platforms , Countdown phase for the stop; C2: The first up train to arrive At a high passenger flow platform During the countdown period of the stop, the down train that arrives later At a high passenger flow platform The adjacent interval ; C3: Upward train At a high passenger flow platform The adjacent interval , down train At a high passenger flow platform The adjacent interval ; C4: The first up train to arrive The platform before the platform with large passenger flow , the down train arriving later The section before the platform before the platform with large passenger flow ; C5: The first up train to arrive Except for platforms with large passenger flow, Nearby interval Other intervals outside , the down train arriving later Except for platforms with large passenger flow, Nearby interval Other intervals outside Starting station Countdown phase for the stop. ; C6: The first up train to arrive Except for platforms with large passenger flow, Nearby interval Other intervals outside , the down train arriving later Except for platforms with large passenger flow, Nearby interval Other intervals outside , ; C7: The first up train to arrive Except for platforms with large passenger flow, , the platform before the platform with large passenger flow Other platforms During the countdown period of the stop, the down train that arrives later Except for platforms with large passenger flow, , the platform before the platform with large passenger flow Other platforms The previous interval , .

[0006] Furthermore, in step 4, the policy set includes: D1: Adjust the up train and down trains The running time of the train and the stopping time at stations with large passenger flow; D2: The train is detained for a limited time. The train automatic monitoring system automatically calculates the detention time. After the detention time is over, the train automatic monitoring system automatically cancels the detention. D3: Depart immediately; D4: Set up the up train or down train Cross station.

[0007] Furthermore, in step 5, according to the position of the train, a corresponding handling strategy is selected from the strategy set to form the following processing scenario: S1: When the train position is C1 and there are no restrictions, the handling strategy is to take the first arriving up train. At a high passenger flow platform Execute the immediate departure strategy; S2: When the train position is C2 and there are no restrictions, the handling strategy is down train At a high passenger flow platform Over station; S3: When the train position is C3, and the constraint condition is to adjust the up train At a high passenger flow platform Downward train At a high passenger flow platform When the stop time of the train cannot be completely avoided and the trains arrive at the station at the same time, the handling strategy is to At a high passenger flow platform Over station; S4: When the train position is C3, and the constraint condition is to adjust the up train At a high passenger flow platform and down trains At a high passenger flow platform When the stop time of the train can completely avoid simultaneous arrival at the station, the handling strategy is to adjust the up train At a high passenger flow platform and down trains At a high passenger flow platform Stop time; S5: When the train position is C4 and there are no restrictions, the handling strategy is down train On the platform before the high-traffic platform Limited time car seizure; S6: When the train position is C5 and there are no restrictions, the handling strategy is to adjust the up train End station in section The stop time and the departure time from the platform arrive The running time of the next stop; S7: When the train position is C6 and there are no restrictions, the handling strategy is to adjust the down train End station in section The stop time and the departure time from the platform arrive The running time of the next station, adjust the up train End station in section The stop time and the departure time from the platform arrive The running time of the next stop; S8: When the train position is C7 and there are no restrictions, the handling strategy is to adjust the down train End station in section The stop time and the departure time from the platform arrive The running time of the next station.

[0008] Beneficial effects: The present invention provides a method for avoiding the simultaneous arrival of bidirectional large passenger flow trains at a station. By performing corresponding avoidance on the simultaneous arrival of bidirectional large passenger flow trains with a full load rate exceeding a threshold, the hidden dangers of chaotic passenger flow and crowded trampling on the platform are eliminated; the normal operation of bidirectional trains is ensured; the waiting time of passengers on the platform due to crowded passenger flow is reduced; the train automatic monitoring system promptly provides a strategy for avoiding the simultaneous arrival of bidirectional large passenger flow trains, and automatically adjusts the train after confirmation by the dispatcher, eliminating the lag of manual intervention. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 It is a flow chart of train dispatching based on passenger flow and train operation system analysis according to an embodiment of the present invention; Figure 2 is a station marking diagram of the avoidance area configured in the embodiment of the present invention; Figure 3is a schematic diagram of an execution avoidance handling strategy S5 involved in an embodiment of the present invention; Figure 4 is a schematic diagram of an execution avoidance handling strategy S6 involved in an embodiment of the present invention; Figure 5 It is a schematic diagram of a platform with a large passenger flow and bidirectional trains entering the station at the same time or having overlapping stop times according to an embodiment of the present invention; Figure 6 It is a schematic diagram of the non-overlapping stop times of bidirectional trains at a platform with a large passenger flow involved in an embodiment of the present invention. DETAILED DESCRIPTION

[0011] The preferred mechanism and implementation method of the present invention are further described below in conjunction with the accompanying drawings and specific implementation methods.

[0012] like Figures 1 to 6 As shown, an embodiment of the present invention discloses a technical solution for a method of avoiding the simultaneous arrival of bidirectional large passenger flow trains at a station. Example

[0013] The present invention provides a method for avoiding the simultaneous arrival of bidirectional large passenger flow trains. The train dispatching flow chart based on passenger flow and train driving system analysis is as follows: Figure 1 As shown, the following steps are included: Step 1: The train automatic monitoring system obtains the passenger flow information of the station. When the passenger flow of the station is greater than the set threshold (the threshold can be set), the platform with large passenger flow is located. , ;like Figure 2 , red marks are platforms with large passenger flow in the up and down directions; Step 2: Periodically monitor the platforms with large passenger flow to see if there are trains in both directions entering the station at the same time or if there are overlapping stop times. If so, mark the up and down trains as , ; The overlapping stop times are considered to be the key to avoid the simultaneous arrival of trains in both directions. If the stop times of two trains at the same station overlap, then there must be a period of time when both trains are at the platform at the same time. First, find out the arrival time of the two trains at the platform with large passenger flow according to the forecast. The time when the first train arrives at the platform with large passenger flow is , the time for the next train to arrive at the platform with large passenger flow is , and then find out the planned stop time of the two trains at the platform with large passenger flow according to the forecast. The planned stop time of the first train at the platform with large passenger flow is The planned stop time of the later arriving train at the platform with large passenger flow is , the basis for judging that the two trains will overlap in their stop time at a platform with large passenger flow is as follows: ,

[0014] Step 3: Detect platforms with large passenger flow , Type; Step 4: If a platform with large passenger flow is detected , If the platform is an island platform and there are trains from both directions entering the station at the same time or the stop times overlap, the strategy set is generated based on the positions of the trains from both directions to determine whether they enter the avoidance area. Step 5: According to the location of the train, select the corresponding disposal strategy from the strategy set, and automatically push the disposal strategy to the dispatcher for confirmation; Step 6: After the dispatcher confirms, the train automatic monitoring system automatically controls the train according to the handling strategy. Example

[0015] The steps of this embodiment are basically the same as those of embodiment 1, except that in step 4, the range of the avoidance area can be set. For example, if simultaneous arrival avoidance is to be performed within the range of three stations in both directions, 3 can be used as configuration information and stored in the configuration file. This can support avoidance processing for different needs.

[0016] like Figure 2 , the avoidance area settings are: (1) Upward direction: from the previous platform To the platform with large passenger flow .

[0017] (2) Downward direction: from the previous platform To the platform with large passenger flow .

[0018] When there is a large passenger flow at the platform, the trains in the avoidance area are classified as follows: C1: Upward train and down trains All are located at high passenger flow platforms , Countdown phase for the stop; C2: The first up train to arrive At a high passenger flow platform During the countdown period of the stop, the down train that arrives later At a high passenger flow platform The adjacent interval ; C3: Upward train At a high passenger flow platform The adjacent interval , down train At a high passenger flow platform The adjacent interval ; C4: The first up train to arrive The platform before the platform with large passenger flow , the down train arriving later The section before the platform before the platform with large passenger flow ; C5: The first up train to arrive Except for platforms with large passenger flow, Nearby interval Other intervals outside , the down train arriving later Except for platforms with large passenger flow, Nearby interval Other intervals outside Starting station Countdown phase for the stop. ; C6: The first up train to arrive Except for platforms with large passenger flow, Nearby interval Other intervals outside , the down train arriving later Except for platforms with large passenger flow, Nearby interval Other intervals outside , ; C7: The first up train to arrive Except for platforms with large passenger flow, , the platform before the platform with large passenger flow Other platforms During the countdown period of the stop, the down train that arrives later Except for platforms with large passenger flow, , the platform before the platform with large passenger flow Other platforms The previous interval , .

[0019] The above-mentioned C1-C7 location classification radiates from the bus station with large passenger flow to both sides.

[0020] In step 4, the policy set includes: D1: Adjust the up train and down trains The running time of the train and the stopping time at stations with large passenger flow; D2: The train is detained for a limited time. The train automatic monitoring system automatically calculates the detention time. After the detention time is over, the train automatic monitoring system automatically cancels the detention. D3: Depart immediately; D4: Set up the up train or down train Cross station.

[0021] In step 5, according to the location of the train, the corresponding disposal strategy is selected from the strategy set to comprehensively regulate the train operation, forming the following processing scenarios: S1: When the train position is C1 and there are no restrictions, the handling strategy is to take the first arriving up train. At a high passenger flow platform Execute the immediate departure strategy; S2: When the train position is C2 and there are no restrictions, the handling strategy is down train At a high passenger flow platform Over station; S3: When the train position is C3, and the constraint condition is to adjust the up train At a high passenger flow platform and down trains At a high passenger flow platform When the stop time of the train cannot be completely avoided and the trains arrive at the station at the same time, the handling strategy is to At a high passenger flow platform Over station; S4: When the train position is C3, and the constraint condition is to adjust the up train At a high passenger flow platform and down trains At a high passenger flow platform When the stop time of the train can completely avoid simultaneous arrival at the station, the handling strategy is to adjust the up train At a high passenger flow platform and down trains At a high passenger flow platform Stop time; S5: When the train position is C4 and there are no restrictions, the handling strategy is down train On the platform before the high-traffic platform Limited time car seizure; S6: When the train position is C5 and there are no restrictions, the handling strategy is to adjust the up train End station in section The stop time and the departure time from the platform arrive The running time of the next stop; S7: When the train position is C6 and there are no restrictions, the handling strategy is to adjust the down train End station in section The stop time and the departure time from the platform arrive The running time of the next station, adjust the up train End station in section The stop time and the departure time from the platform arrive The running time of the next stop; S8: When the train position is C7 and there are no restrictions, the handling strategy is to adjust the down train End station in section The stop time and the departure time from the platform arrive The running time of the next station.

[0022] The above processing scenarios S1-S8 radiate from the station with large passenger flow to both sides. If scenario S1 is not satisfied, it will continue to determine whether scenario S2 occurs, and so on, until a suitable scenario is found and the train is processed accordingly.

[0023] The present invention provides an avoidance disposal method for simultaneous arrival of bidirectional large passenger flow trains at a station. By performing corresponding avoidance on simultaneous arrival of bidirectional large passenger flow trains with full load rates exceeding a threshold, hidden dangers of chaotic flow of passengers on a platform and crowded trampling of passengers are eliminated; the normal operation of bidirectional trains is ensured; and the increased waiting time of passengers on the platform due to crowded passenger flow is reduced; the train automatic monitoring system timely provides a avoidance disposal strategy for simultaneous arrival of bidirectional large passenger flow trains at a station, and automatically adjusts the train after confirmation by a dispatcher, thereby eliminating the lag of manual intervention.

[0024] Finally, it should be noted that the above are only preferred embodiments of the present invention and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. However, any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for avoiding the simultaneous arrival of bidirectional large passenger flow trains at a station, characterized in that: The following steps are involved: Step 1: The train automatic monitoring system obtains the passenger flow information of the station. When the passenger flow of the station is greater than the set threshold, the platform with large passenger flow is located. , ; Step 2: Periodically monitor the platforms with large passenger flow to see if there are trains in both directions entering the station at the same time or if there are overlapping stop times. If so, mark the up and down trains as , ; Step 3: Detect platforms with large passenger flow , Type; Step 4: If a platform with large passenger flow is detected , If the platform is an island platform and there are trains from both directions entering the station at the same time or the stop times overlap, the strategy set is generated based on the positions of the trains from both directions to determine whether they enter the avoidance area. Step 5: According to the location of the train, select the corresponding disposal strategy from the strategy set, and automatically push the disposal strategy to the dispatcher for confirmation; Step 6: After the dispatcher confirms, the train automatic monitoring system automatically controls the train according to the handling strategy.

2. The method for avoiding simultaneous arrival of bidirectional large passenger flow trains according to claim 1 is characterized in that: In step 4, the range of the avoidance area can be set, and the bidirectional trains in the avoidance area are classified as follows: C1: Upward train and down trains All are located at high passenger flow platforms , Countdown phase for the stop; C2: The first up train to arrive At a high passenger flow platform During the countdown period of the stop, the down train that arrives later At a high passenger flow platform The adjacent interval ; C3: Upward train At a high passenger flow platform The adjacent interval , down train At a high passenger flow platform The adjacent interval ; C4: The first up train to arrive The platform before the platform with large passenger flow , the down train that arrives later The section before the platform before the platform with large passenger flow ; C5: The first up train to arrive Except for platforms with large passenger flow, Nearby interval Other intervals outside , the down train that arrives later Except for platforms with large passenger flow, Nearby interval Other intervals outside Starting station Countdown phase for the stop. ; C6: The first up train to arrive Except for platforms with large passenger flow, Nearby interval Other intervals outside , the down train that arrives later Except for platforms with large passenger flow, Nearby interval Other intervals outside , ; C7: The first up train to arrive Except for platforms with large passenger flow, , the platform before the platform with large passenger flow Other platforms During the countdown period of the stop, the down train that arrives later Except for platforms with large passenger flow, , the platform before the platform with large passenger flow Other platforms The previous interval , .

3. The method for avoiding simultaneous arrival of bidirectional large passenger flow trains according to claim 2 is characterized in that: In step 4, the policy set includes: D1: Adjust the up train and down trains The running time of the train and the stopping time at stations with large passenger flow; D2: The train is detained for a limited time. The train automatic monitoring system automatically calculates the detention time. After the detention time is over, the train automatic monitoring system automatically cancels the detention. D3: Depart immediately; D4: Set up the up train or down train Cross station.

4. The method for avoiding simultaneous arrival of bidirectional large passenger flow trains according to claim 3 is characterized in that: In step 5, according to the location of the train, the corresponding disposal strategy is selected from the strategy set to form the following processing scenario: S1: When the train position is C1 and there are no restrictions, the handling strategy is to take the first arriving up train. At a high passenger flow platform Execute the immediate departure strategy; S2: When the train position is C2 and there are no restrictions, the handling strategy is down train At a high passenger flow platform Over station; S3: When the train position is C3, and the constraint condition is to adjust the up train At a high passenger flow platform Downward train At a high passenger flow platform When the stop time of the train cannot be completely avoided and the trains arrive at the station at the same time, the handling strategy is to At a high passenger flow platform Over station; S4: When the train position is C3, and the constraint condition is to adjust the up train At a high passenger flow platform Downward train At a high passenger flow platform When the stop time of the train can completely avoid simultaneous arrival at the station, the handling strategy is to adjust the up train At a high passenger flow platform Downward train At a high passenger flow platform Stop time; S5: When the train position is C4 and there are no restrictions, the handling strategy is down train On the platform before the high-traffic platform Limited time car seizure; S6: When the train position is C5 and there are no restrictions, the handling strategy is to adjust the up train End station in section The stop time and the departure time from the platform arrive The running time of the next stop; S7: When the train position is C6 and there are no restrictions, the handling strategy is to adjust the down train End station in section The stop time and the departure time from the platform arrive The running time of the next station, adjust the up train End station in section The stop time and the departure time from the platform arrive The running time of the next stop; S8: When the train position is C7 and there are no restrictions, the handling strategy is to adjust the down train End station in section The stop time and the departure time from the platform arrive The running time of the next station.

Citation Information

Patent Citations

  • Automatic adjustment method for urban rail transit trains based on real-time passenger flow

    CN111016979A

  • Automatic adjustment method for train operation

    CN112977553A

  • Intelligent passenger cleaning linkage control method in FAO system

    CN114013476A

  • Rail transit train working diagram index analysis system, method, equipment and medium

    CN118062076A

  • Subway sudden large passenger flow early warning and evacuation induction double-layer system and working method

    CN118552372A