Assembling equipment for hoisting curtain wall glass through riding beam and using method of assembling equipment

By installing lifting components on the top of the glass curtain wall lifting device, including supporting steel pipes, winches, counterweights and fixing components, the problems of unstable lifting and inconvenient operation in the prior art are solved, and the safety, stability and efficiency of the glass curtain wall are achieved. Install.

CN119409054APending Publication Date: 2025-02-11CHINA CONSTR EIGHTH BUREAU NORTHWEST CONSTR CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411608692.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-12
Publication Date
2025-02-11

AI Technical Summary

Technical Problem

When the existing glass curtain wall hoisting device is lifted with a larger glass curtain wall, the support arm structure is insufficient, which makes it easy to be unstable to lift. The weight of the hanging basket used is limited, which is inconvenient to operate and is difficult to ensure safety.

Method used

An assembly equipment for lifting curtain wall glass on the beam was designed. By setting up lifting components on the top, including supporting steel pipes, winches, counterweights and fixing components, the stability and lifting efficiency of the device were improved.

Benefits of technology

Through the cooperation of counterweight blocks and hoisting, the stability and efficiency of lifting are improved, ensuring the safe, stable and efficient installation of the glass curtain wall.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119409054A_ABST
    Figure CN119409054A_ABST
Patent Text Reader

Abstract

The invention discloses assembling equipment for riding beam hoisting curtain wall glass and a using method thereof, and relates to the technical field of curtain wall hoisting, the assembling equipment comprises a wall body, a steel beam frame and channel steel, the channel steel is fixedly installed on the ground, a pair of fixing plates is fixedly installed on the surface of the wall body, a plurality of expansion bolts are fixedly installed between each fixing plate and the wall body, and the steel beam frame is fixedly installed on the surface of the wall body. A plurality of groups of balancing weights I and winches are fixedly mounted on the surface of the channel steel respectively; the hoisting device further comprises a hoisting assembly and a fixing assembly; the effect of stably and efficiently hoisting the glass curtain wall is achieved, and the problems that in the prior art, when the glass curtain wall is hoisted, the structural strength of a supporting arm is poor, the phenomenon of unstable hoisting is likely to occur when a large glass curtain wall is hoisted, and when an existing hanging basket is used for installation, the weight is limited, operation is inconvenient, and safety is difficult to guarantee are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of curtain wall hoisting, and in particular to an assembly device for hanging curtain wall glass on a beam and a use method thereof. Background Art

[0002] The glass curtain wall lifting device is a mechanical device specially used to safely and accurately lift the glass curtain wall components into place during the construction process. The device usually includes components such as hangers, clamping mechanisms, lifting and moving mechanisms, etc. It can adapt to glass curtain wall units of different sizes and weights to ensure stability and safety during high-altitude operations.

[0003] The patent document with publication number CN218507425U discloses a hoisting device suitable for hoisting large-size curtain wall panels / glass, including a suspension frame and a base. The base is detachably fixed by holding a flower rack beam, and the lower end of the suspension frame is detachably connected to the base. The base is connected to an anti-roll structure located on the top surface of the flower rack beam. A detachable assembled connection is adopted between the main suspension frame and the base of the device, which can be disassembled and moved at any time. When moving, the components are light in weight and easy to carry. The base is installed and fixed by holding the flower rack beam, so that the entire device can be disassembled and used at any time, and the same device can be used for hoisting in multiple places.

[0004] However, the above invention has the following shortcomings: when the glass curtain wall is hoisted in the above patent, the structural strength of the support arm is poor, and when a larger glass curtain wall is hoisted, the hoisting is easily unstable. The existing installation method using a hanging basket has limited weight, inconvenient operation, and difficult to ensure safety, so there are certain limitations. Summary of the invention

[0005] The object of the present invention is to provide an assembly device for hanging curtain wall glass on a beam and a method of using the same, so as to solve the problems raised in the above-mentioned background technology. By arranging a hanging assembly on the top, the stability of the hanging device can be improved by counterweight blocks 1 and 2, thereby improving the hanging efficiency of the glass.

[0006] The technical solution of the present invention is: an assembly device for hanging curtain wall glass on a beam, comprising a wall, a steel beam frame and a channel steel, wherein the channel steel is fixedly installed on the ground, a pair of fixing plates are fixedly installed on the surface of the wall, a plurality of expansion bolts are fixedly installed between each fixing plate and the wall, a plurality of groups of counterweights and winches are respectively fixedly installed on the surface of the channel steel, and also comprises a hanging assembly and a fixing assembly.

[0007] The hoisting assembly includes supporting steel pipes fixedly installed on both sides of the steel beam frame.

[0008] The fixing assembly comprises a U-shaped ring fixedly mounted on the surface of the fixing plate.

[0009] Preferably, a pair of connecting steel pipes are commonly fixedly installed at the bottom of the pair of supporting steel pipes, a fixing bolt is commonly threadedly connected between the supporting steel pipes and the connecting steel pipes, and a supporting rod is commonly fixedly installed at the ends of the pair of supporting steel pipes.

[0010] Preferably, a reinforcing rod is fixedly installed between the support rod and one of the support steel pipes, and two fixing bolts are respectively connected to the support rod and the support steel pipe at both ends of the reinforcing rod through threads.

[0011] Preferably, a lifting rod is fixedly installed at the bottom of the support rod, a fixed pulley is rotatably installed at the bottom of the lifting rod, a manual hoist is provided at the bottom of the fixed pulley, a steel wire rope is clamped at the end of the manual hoist, the other end of the steel wire rope is fixedly installed on the winch, and the steel wire rope is slidably connected to the surface of the fixed pulley.

[0012] Preferably, a lifting ear is fixedly mounted on the bottom of the manual hoist, a lifting rope is clamped on the lifting ear, a suction cup is clamped and fixed on the bottom of the lifting rope, and a plurality of suction cups are fixedly mounted on the bottom of the suction cup.

[0013] Preferably, a connecting ring is provided on one side of the U-shaped ring, and threaded connecting rods are connected to both ends of the connecting ring through threads, and the two threaded connecting rods are respectively connected to the U-shaped ring and the channel steel with a steel wire tie rope, and a plurality of buckles are fixedly installed on both ends of the steel wire tie rope.

[0014] Preferably, a reinforcement plate is slidably installed on the outer side of the support rod, and a counterweight block 2 is slidably installed on one end of the reinforcement plate. Fixed plug rods are respectively clamped between the reinforcement plate and the support rod and the lifting rod, and the support rod and the lifting rod are provided with slots that are compatible with the fixed plug rods.

[0015] A method for using an assembly device for hanging curtain wall glass on a beam, comprising the following steps:

[0016] Step 1: Use the construction elevator to transport the installation structure components to the corresponding floor of the roof flower rack beam.

[0017] Step 2: The personnel stand in the hanging basket to fix the support rod, support steel pipe and connecting steel pipe part of the lifting equipment, and use the fixing bolts to fasten and install them, which can be fixed to the upper part of the steel frame beam. A lifting rod is fixedly installed at the end of the support rod, and the fixed pulley is installed on the lifting rod. The reinforcement plate is slidably installed on the support rod and fixed by plugging and fixing it between the support rod and the lifting rod.

[0018] Step 3: Fix the winch and counterweight 1, pass the lifting wire rope through the fixed pulley, connect one end to the winch, and fix the other end to the manual hoist. To prevent the rear end counterweight 1 from slipping, fix the wire rope between the counterweight 1 and the wall structure.

[0019] Step 4: Use the suction nozzle to fix the glass, start the winch, use the wire rope to drive the lifting rope, use the lifting rope to pull the suction cup, and lift the glass to the corresponding floor. Workers can ride in the hanging basket to cooperate with the auxiliary installation, so as to realize the quick and safe installation of the glass.

[0020] The present invention provides an assembly device for beam-mounted curtain wall glass and a method for using the same, which has the following improvements and advantages compared with the prior art:

[0021] First, the present invention facilitates simple hoisting of the glass curtain wall by means of the manual hoist, and then the glass curtain wall can be hoisted with the steel wire rope by means of the hoisting machine, and hoisted to the corresponding position according to the installation floor. The stability of the lifting device can be improved by means of the counterweight block 1 and the counterweight block 2, and the overall stability of the device can be further improved by means of the fixed assembly, thereby ensuring stable hoisting process.

[0022] Secondly, the present invention adopts a combined installation method, which is not only highly operable, but also can be increased or decreased according to the actual situation on site, and is easy to install. At the same time, the materials can be turned over, it is green and environmentally friendly, and has a high safety factor, making the glass curtain wall installation process more stable and safe, easy to operate, saving manpower, and significantly improving the lifting efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0024] Figure 1 A schematic diagram of the overall first-view structure provided by the present invention;

[0025] Figure 2 A schematic diagram of the structure of the hoisting assembly provided by the present invention;

[0026] Figure 3 A schematic diagram of the structure of the fixing assembly provided by the present invention;

[0027] Figure 4 A schematic diagram of the support rod structure provided by the present invention;

[0028] Figure 5 A schematic diagram of the reinforcement plate structure provided by the present invention;

[0029] Figure 6 This is a schematic diagram of the suction cup and suction nozzle structure provided by the present invention.

[0030] Reference numerals:

[0031] 1. Wall; 2. Steel beam frame; 3. Channel steel; 4. Counterweight block 1; 5. Winch; 6. Wire rope; 7. Support steel pipe; 8. Connecting steel pipe; 9. Fixing bolt 1; 10. Support rod; 11. Reinforcement rod; 12. Fixing bolt 2; 13. Lifting rod; 14. Fixed pulley; 15. Manual hoist; 16. Suction cup; 17. Suction nozzle; 18. Reinforcement plate; 19. Lifting ear; 20. Lifting rope; 21. Fixing plate; 22. Expansion bolt; 23. U-shaped ring; 24. Buckle; 25. Connecting ring; 26. Threaded connecting rod; 27. Wire tie rope; 28. Fixed plug rod; 29. ​​Counterweight block 2. DETAILED DESCRIPTION

[0032] The present invention is described in detail below, and the technical solutions in the embodiments of the present invention are clearly and completely described. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0033] The present invention provides an assembly device for beam-mounted curtain wall glass and a method for using the same through improvement. The technical solution of the present invention is:

[0034] Embodiment 1

[0035] like Figures 1 to 6 As shown, an embodiment of the present invention provides an assembly device for beam-riding hoisting curtain wall glass, comprising a wall 1, a steel beam frame 2 and a channel steel 3, wherein the channel steel 3 is fixedly installed on the ground, and is characterized in that: a pair of fixing plates 21 are fixedly installed on the surface of the wall 1, a plurality of expansion bolts 22 are fixedly installed between each fixing plate 21 and the wall 1, a plurality of groups of counterweight blocks 4 and a winch 5 are respectively fixedly installed on the surface of the channel steel 3, and further comprises a hoisting component and a fixing component, wherein the steel beam frame 2 can provide support for the hoisting component, and the winch 5 can achieve stable hoisting.

[0036] The hoisting assembly includes support steel pipes 7 fixedly installed on both sides of the steel beam frame 2. The support steel pipes 7 can provide an installation foundation for the hoisting assembly.

[0037] The fixing component includes a U-shaped ring 23 fixedly mounted on the surface of the fixing plate 21. The U-shaped ring 23 can provide a mounting node for the fixing component, thereby ensuring that the fixing component can be stably installed and improving the stability of the device installation.

[0038] Furthermore, a pair of connecting steel pipes 8 are commonly fixedly installed at the bottom of the pair of supporting steel pipes 7, and a fixing bolt 9 is commonly connected between the supporting steel pipe 7 and the connecting steel pipe 8 through threads, and a supporting rod 10 is commonly fixedly installed at the ends of the pair of supporting steel pipes 7. The connecting steel pipe 8 can improve the stability of the connection between the supporting steel pipe 7 and the connecting steel pipe 8 by using the fixing bolt 9, and the supporting rod 10 can provide support for the installation of the lifting device.

[0039] Furthermore, a reinforcing rod 11 is fixedly installed between the support rod 10 and one of the supporting steel pipes 7. The two ends of the reinforcing rod 11 are respectively connected to the support rod 10 and the supporting steel pipe 7 by threaded fixing bolts 12. The structural stability of the device can be improved by setting the reinforcing rod 11, and the convenience and stability of the installation of the reinforcing rod 11 can be improved by using the fixing bolts 12.

[0040] Furthermore, a lifting rod 13 is fixedly installed at the bottom of the support rod 10, and a fixed pulley 14 is rotatably installed at the bottom of the lifting rod 13. A manual hoist 15 is provided at the bottom of the fixed pulley 14. The end of the manual hoist 15 is clamped with a steel wire rope 6, and the other end of the steel wire rope 6 is fixedly installed on the winch 5. The steel wire rope 6 is slidably connected to the surface of the fixed pulley 14. The provided lifting rod 13 can provide support for the installation of the fixed pulley 14, and the manual hoist 15 can realize temporary lifting of the glass curtain wall, and then the glass curtain wall is lifted by the winch 5 using the steel wire rope 6.

[0041] Furthermore, a lifting ear 19 is fixedly installed at the bottom of the manual hoist 15, a lifting rope 20 is clamped on the lifting ear 19, a suction cup 16 is clamped and fixed at the bottom of the lifting rope 20, and a plurality of suction cups 16 are fixedly installed at the bottom of the suction cup 16. The provided lifting ear 19 and lifting rope 20 facilitate the installation of the suction cup 16, and the provided suction nozzle 17 can achieve stable adsorption installation of the glass curtain wall, thereby facilitating the subsequent lifting process to proceed smoothly.

[0042] As a further solution of the present invention, a connecting ring 25 is provided on one side of the U-shaped ring 23, and threaded connecting rods 26 are connected to both ends of the connecting ring 25 through threads. The two threaded connecting rods 26 are respectively connected to the U-shaped ring 23 and the channel steel 3 with a steel wire tie rope 27. Both ends of the steel wire tie rope 27 are fixedly installed with multiple buckles 24. The provided connecting ring 25 and threaded connecting rod 26 can facilitate the use of the steel wire tie rope 27 to achieve a fixing effect. The provided buckles 24 can achieve a fixing effect on both ends of the steel wire tie rope 27, thereby ensuring the stability of the tie fixing effect.

[0043] Furthermore, a reinforcement plate 18 is slidably installed on the outer side of the support rod 10, and a counterweight block 29 is slidably installed on one end of the reinforcement plate 18. A fixed plug rod 28 is clamped between the reinforcement plate 18 and the support rod 10 and the lifting rod 13 respectively. The support rod 10 and the lifting rod 13 are provided with a slot that is compatible with the fixed plug rod 28. The reinforcement plate 18 can be used to improve the reinforcement effect of the support rod 10, and the counterweight block 29 can be used to improve the stability of the lifting assembly during the lifting process.

[0044] Embodiment 2

[0045] This embodiment provides a method for using an assembly device for beam-mounted curtain wall glass, comprising the following steps:

[0046] Step 1: Use the construction elevator to transport the installation structure components to the corresponding floor of the roof flower rack beam.

[0047] Step 2: A person standing in the hanging basket fixes the support rod 10, the support steel pipe 7 and the connecting steel pipe 8 of the lifting equipment, and fastens and installs them with fixing bolts 9, which can be fixed to the upper part of the steel frame beam 2. A lifting rod 13 is fixedly installed at the end of the support rod 10, and the fixed pulley 14 is installed on the lifting rod 13. The reinforcement plate 18 is slidably installed on the support rod 10 and fixed by plugging and fixing it between the support rod 10 and the lifting rod 13 through the fixed plug rod 28.

[0048] Step three, fix the winch 5 and the counterweight 4, pass the lifting wire rope 6 through the fixed pulley 14, connect one end to the winch 5, and fix the other end to the manual hoist 15. To prevent the rear end counterweight 4 from slipping, fix the steel wire tie rope 27 between the counterweight 4 and the wall 1 structure.

[0049] Step 4: Use the suction nozzle 17 to fix the glass, start the winch 5, the wire rope 6 drives the lifting rope 20, the lifting rope 20 pulls the suction cup 16, and the glass is hoisted to the corresponding floor. Workers can sit in the hanging basket to cooperate with the auxiliary installation, so as to realize the quick and safe installation operation of the glass.

[0050] Specific working principle: After the device is installed, the device is stably fixed by the set fixing components, counterweight block 4 and reinforcement plate 18 to ensure stable and efficient lifting. The glass curtain wall is adsorbed and fixed by the set suction cup 16 and suction nozzle 17, and temporarily lifted by the manual hoist 15. After confirming that the glass curtain wall is fixed, the manual hoist 15 and the glass curtain wall are lifted by controlling the winch 5, and the wire rope 6 and the fixed pulley 14 are used to lift them according to the installation floor. The reinforcement plate 18 can improve the reinforcement of the lifting components. The fixed plug rod 28 not only facilitates the fixed installation of the reinforcement plate 18 and the support rod 10, but also can provide a certain supporting effect on the support rod 10, thereby ensuring that the support rod 10 will not shake or be crushed when lifting a larger glass curtain wall, thereby improving the stability and efficiency of the lifting.

[0051] The above description enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. An assembly device for beam-mounted curtain wall glass, comprising a wall (1), a steel beam frame (2) and a channel steel (3), wherein the channel steel (3) is fixedly installed on the ground, and is characterized in that: A pair of fixing plates (21) are fixedly mounted on the surface of the wall (1), a plurality of expansion bolts (22) are fixedly mounted between each fixing plate (21) and the wall (1), a plurality of sets of counterweight blocks (4) and winches (5) are respectively fixedly mounted on the surface of the channel steel (3), and further comprising: A hoisting assembly, the hoisting assembly comprising supporting steel pipes (7) fixedly mounted on both sides of the steel beam frame (2); A fixing assembly comprises a U-shaped ring (23) fixedly mounted on the surface of a fixing plate (21).

2. The assembly equipment for hanging curtain wall glass on a beam according to claim 1, characterized in that: A pair of connecting steel pipes (8) are fixedly mounted at the bottom of the pair of supporting steel pipes (7), a fixing bolt (9) is threadedly connected between the supporting steel pipes (7) and the connecting steel pipes (8), and a supporting rod (10) is fixedly mounted at the ends of the pair of supporting steel pipes (7).

3. The assembly equipment for hanging curtain wall glass on a beam according to claim 2 is characterized in that: A reinforcing rod (11) is fixedly installed between the support rod (10) and one of the support steel pipes (7), and two fixing bolts (12) are respectively connected to the support rod (10) and the support steel pipe (7) via threads at both ends of the reinforcing rod (11).

4. The assembly equipment for hanging curtain wall glass on a beam according to claim 2 is characterized in that: A hoisting rod (13) is fixedly mounted at the bottom of the support rod (10), a fixed pulley (14) is rotatably mounted at the bottom of the hoisting rod (13), a manual hoist (15) is arranged at the bottom of the fixed pulley (14), a steel wire rope (6) is clamped at the end of the manual hoist (15), the other end of the steel wire rope (6) is fixedly mounted on the winch (5), and the steel wire rope (6) is slidably connected to the surface of the fixed pulley (14).

5. The assembly equipment for hanging curtain wall glass on a beam according to claim 4 is characterized in that: A lifting lug (19) is fixedly mounted on the bottom of the manual hoist (15), a lifting rope (20) is clamped on the lifting lug (19), a suction cup (16) is clamped and fixed on the bottom of the lifting rope (20), and a plurality of suction cups (17) are fixedly mounted on the bottom of the suction cup (16).

6. The assembly equipment for hanging curtain wall glass on a beam according to claim 1, characterized in that: A connecting ring (25) is provided on one side of the U-shaped ring (23), and threaded connecting rods (26) are connected to the two ends of the connecting ring (25) through threads. The two threaded connecting rods (26) are respectively connected to the U-shaped ring (23) and the channel steel (3) by a steel wire tie rope (27), and a plurality of buckles (24) are fixedly installed on both ends of the steel wire tie rope (27).

7. The assembly equipment for hanging curtain wall glass on a beam according to claim 2 is characterized in that: A reinforcing plate (18) is slidably mounted on the outer side of the support rod (10), and a counterweight block (29) is slidably mounted on one end of the reinforcing plate (18). A fixed plug rod (28) is clamped between the reinforcing plate (18) and the support rod (10) and the hanging rod (13), respectively. A clamping groove adapted to the fixed plug rod (28) is provided on the support rod (10) and the hanging rod (13).

8. A method for using an assembly device for hanging curtain wall glass on a beam, which is applied to the assembly device for hanging curtain wall glass on a beam as claimed in any one of claims 1 to 7, characterized in that: The steps include: Step 1: Use the construction elevator to transport the device structural components to the corresponding floor of the roof flower rack beam; Step 2: A person stands in the hanging basket to fix the support rod (10), the support steel pipe (7) and the connecting steel pipe (8) of the hanging equipment, and uses a fixing bolt (9) to fasten and install them, and can be fixed to the upper part of the steel frame beam (2). A hanging rod (13) is fixedly installed at the end of the support rod (10), and a fixed pulley (14) is installed on the hanging rod (13). A reinforcing plate (18) is slidably installed on the support rod (10) and is inserted and fixed between the support rod (10) and the hanging rod (13) through a fixed plug rod (28); Step 3, fix the hoist (5) and the counterweight block 1 (4), pass the hoisting wire rope (6) through the fixed pulley (14), connect one end to the hoist (5), and fix the other end to the manual hoist (15). To prevent the rear end counterweight block 1 (4) from slipping, fix the counterweight block 1 (4) to the wall (1) structure with a steel wire tie rope (27); Step 4: Use the suction nozzle (17) to fix the glass, start the winch (5), and use the steel wire rope (6) to pull the suction cup (16) through the suspension rope (20) to lift the glass to the corresponding floor. Workers can sit in the hanging basket to assist in the installation, so as to achieve a quick and safe installation operation of the glass.

Citation Information

Patent Citations

  • Hoisting device suitable for hoisting large-size curtain wall plate / glass

    CN218507425U