Multifunctional drilling and hoisting integrated operation vehicle

By designing a multi-function drilling and crane integrated operation vehicle and integrating drilling and hoisting functions, the problem of low mechanization of operations during distribution network construction is solved, and efficient and safe multi-functional operation is achieved.

CN119409085APending Publication Date: 2025-02-11HUBEI SAN LING SPECIAL PURPOSE VEHICLE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411562783.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-05
Publication Date
2025-02-11

AI Technical Summary

Technical Problem

During the construction of the distribution network, there are large manpower and material investments, low mechanization, low efficiency and safety in the excavation of foundation pits, erecting poles, high altitude operations, and heavy objects lifting.

Method used

Design a multi-functional drilling and crane integrated operation vehicle, integrating drilling and hoisting functions, adopting a wheeled tractor chassis, equipped with basic arm components, telescopic arms, variable boom cylinders, spiral anchor components, hooks and control components, to achieve a variety of Automation and precision of operations.

Benefits of technology

It realizes rapid switching between different job tasks, reduces the time and cost of equipment replacement, improves the efficiency and safety of jobs, and meets the multi-functional needs of complex jobs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119409085A_ABST
    Figure CN119409085A_ABST
Patent Text Reader

Abstract

The invention discloses a multifunctional drilling and hoisting integrated operation vehicle which comprises an operation vehicle chassis, a basic arm assembly, a telescopic arm, a variable-amplitude oil cylinder, a spiral anchor assembly, a lifting hook and a control assembly. The bottom of the basic arm assembly is rotationally connected with the working vehicle chassis in the horizontal direction, and the top of the basic arm assembly is rotationally connected with the telescopic arm in the vertical direction. The variable-amplitude oil cylinder is telescopically connected with one end, close to the basic arm assembly, of the telescopic arm to drive the telescopic arm to rotate back and forth in the vertical direction by taking the end, connected with the basic arm assembly, of the telescopic arm as a circle center; the spiral anchor assembly is arranged in the middle of the telescopic arm, and the drilling depth of the spiral anchor assembly is adjusted when the telescopic arm rotates in the vertical direction. The lifting hook is fixedly arranged at the bottom of one end of the telescopic arm away from the basic arm assembly; the control assembly is electrically connected with the variable-amplitude oil cylinder and the base arm assembly, controls the base arm assembly to rotate in the horizontal direction and controls the top of the variable-amplitude oil cylinder to reciprocate in the vertical direction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of electric power equipment, and in particular to a multifunctional drilling and crane integrated operation vehicle. Background Art

[0002] In recent years, with the substantial increase in the number of electricity users in my country, the speed of power grid construction has been accelerating, and the requirements for mechanization of distribution network construction have become increasingly higher. For a long time, the labor input in the construction of distribution network projects has been large, the research and development and investment in construction machinery have been insufficient, and there is a lack of high-efficiency and specialized construction machinery. With the rapid development of my country's social economy, information, technology, artificial intelligence and other fields are changing with each passing day, social productivity has greatly improved, and social production capacity has significantly increased. In order to meet the needs of increasing electricity load and power supply reliability, power grid construction faces new opportunities and challenges. In order to adapt to the new situation and new changes, the traditional power grid production method urgently needs to be transformed and upgraded, and mechanized construction of the entire process is imminent. Summary of the invention

[0003] The purpose of the embodiment of the present invention is to provide a multifunctional drilling and lifting integrated operation vehicle, which is used to solve the problems of large manpower and material resources input, low degree of mechanization, low efficiency and safety in operations such as foundation pit excavation, pole erection, aerial operations, and heavy object lifting in distribution network construction. The vehicle adopts a wheeled tractor chassis, the whole vehicle has stronger climbing and off-road capabilities, can adapt to various terrains, the whole vehicle is fully equipped with safety detection functions, and can fully record the operation process of the whole vehicle.

[0004] In order to solve the above technical problems, the embodiment of the present invention provides a multifunctional drilling and crane integrated operation vehicle, including: an operation vehicle chassis, a basic arm assembly, a telescopic arm, a variable amplitude cylinder, a spiral anchor assembly, a hook and a control assembly;

[0005] The bottom of the basic arm assembly is connected to the chassis of the working vehicle in a horizontal direction, and the top of the basic arm assembly is connected to the telescopic arm in a vertical direction;

[0006] The luffing cylinder is telescopically connected to one end of the telescopic arm close to the base arm assembly, driving the telescopic arm to reciprocate in a vertical direction with the connecting end of the telescopic arm and the base arm assembly as the center;

[0007] The spiral anchor assembly is arranged at the middle position of the telescopic arm, and the drilling depth of the spiral anchor assembly is adjusted when the telescopic arm rotates in the vertical direction;

[0008] The hook is fixedly arranged at the bottom of one end of the telescopic arm away from the base arm assembly;

[0009] The control assembly is electrically connected to the luffing oil cylinder and the base arm assembly respectively, controls the base arm assembly to rotate in the horizontal direction, and controls the top of the luffing oil cylinder to reciprocate in the vertical direction.

[0010] Furthermore, the multifunctional drilling and crane integrated operation vehicle further includes: a subframe;

[0011] The auxiliary frame is fixedly mounted on the bottom of the chassis of the working vehicle;

[0012] The base arm is fixed to the top of one end of the auxiliary frame located at the rear of the chassis of the working vehicle through a slewing bearing;

[0013] The control component is electrically connected to the boom rotation motor at the bottom of the slewing bearing, and controls the boom rotation motor to drive the base arm to rotate in the horizontal direction.

[0014] Furthermore, the multifunctional drilling and crane integrated operation vehicle further comprises: a boom landing gear;

[0015] The boom landing gear is arranged at one end of the sub-frame in the vertical direction toward the front of the chassis of the working vehicle;

[0016] When the telescopic arm is in a non-working state, one end thereof away from the base arm abuts against the top of the boom landing gear.

[0017] Furthermore, the length of the sub-frame is greater than the length of the chassis of the working vehicle.

[0018] Further, the helical anchor assembly comprises: a helical anchor and a hydraulic motor;

[0019] The top of the spiral anchor is connected to the middle position of the telescopic arm through the hydraulic motor;

[0020] The control assembly is electrically connected to the hydraulic motor, and the hydraulic motor drives the spiral anchor to rotate along its axial direction;

[0021] The control assembly drives the telescopic arm to rotate in the vertical direction through the variable amplitude oil cylinder to adjust the drilling depth of the spiral anchor.

[0022] Further, the hydraulic motor is rotationally connected to the telescopic arm;

[0023] When in working state, the control component drives the spiral anchor to rotate in the vertical direction through the hydraulic motor, so that the working end of the spiral anchor is vertically downward;

[0024] When not in operation, the control assembly drives the spiral anchor to rotate in a vertical direction through the hydraulic motor, so that the axial direction of the spiral anchor is consistent with the axial direction of the telescopic arm.

[0025] Furthermore, the multifunctional drilling and crane integrated operation vehicle further comprises: a front H-shaped outrigger, a rear H-shaped outrigger and a tail support outrigger;

[0026] The front end H-shaped leg, the rear end H-shaped leg and the top of the tail support leg are respectively fixedly connected to the subframe;

[0027] The control component is electrically connected to the front H-shaped leg, the rear H-shaped leg and the tail support leg respectively, and controls the bottom of the front H-shaped leg, the rear H-shaped leg and the tail support leg to move downward in the vertical direction and abut against the ground when in working state.

[0028] Furthermore, the multifunctional drilling and crane integrated operation vehicle further includes: an operating chair;

[0029] The operating chair is located at one side of the top end of the base arm, and the control component is arranged at a corresponding position of the operating chair;

[0030] The bottom of the operating chair is connected to the ladder frame.

[0031] Furthermore, the multifunctional drilling and crane integrated operation vehicle further comprises: a manned working bucket;

[0032] The manned working bucket is fixedly arranged on the top of one end of the telescopic arm away from the basic arm assembly.

[0033] Furthermore, the working vehicle chassis is a tractor chassis.

[0034] The above technical solution of the embodiment of the present invention has the following beneficial technical effects:

[0035] 1. Integrate drilling and lifting functions into one, reducing the time and cost of switching equipment between different tasks;

[0036] 2. The driving effect of the luffing cylinder on the telescopic arm allows the work vehicle to accurately adjust the drilling depth of the spiral anchor assembly and the height of the hook in the vertical direction. Whether it is drilling at different depths or lifting objects at different heights, precise operation can be achieved to meet various complex operation requirements;

[0037] 3. The spiral anchor assembly is set in the middle position of the telescopic arm, which makes the work vehicle more stable during drilling operations. The spiral anchor assembly will generate downward pressure and torque when working. Setting it in the middle position of the telescopic arm can better balance these forces, reduce the shaking and deformation of the telescopic arm, and improve the accuracy and stability of drilling. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] Figure 1 It is a right side view of the multifunctional drilling and crane integrated operation vehicle provided by an embodiment of the present invention in a parked state;

[0039] Figure 2 This is a front view of the multifunctional drilling and crane integrated operation vehicle provided by an embodiment of the present invention in a parked state;

[0040] Figure 3 It is a right side view of the boom body of the multifunctional drilling and crane integrated operation vehicle provided by an embodiment of the present invention;

[0041] Figure 4 It is a right view of the boom body in the excavation state of the multifunctional drilling and crane integrated operation vehicle provided by an embodiment of the present invention.

[0042] Reference numerals:

[0043] 1. Work vehicle chassis, 2. Basic arm, 3. Telescopic arm, 4. Screw anchor, 5. Screw anchor hydraulic motor, 6. Manned work bucket, 7. Hook, 8. Boom cylinder, 9. Tail support leg, 10. Slewing bearing, 11. Ladder frame, 12. Tail H-type leg, 13. Operating chair, 14. Front H-type leg, 15. Subframe, 16. Boom rotation motor, 17. Boom landing gear. DETAILED DESCRIPTION

[0044] In order to make the purpose, technical scheme and advantages of the present invention clearer, the present invention is further described in detail below in conjunction with specific embodiments and with reference to the accompanying drawings. It should be understood that these descriptions are only exemplary and are not intended to limit the scope of the present invention. In addition, in the following description, the description of well-known structures and technologies is omitted to avoid unnecessary confusion of the concept of the present invention.

[0045] Please refer to Figure 1 and Figure 2 The embodiment of the present invention provides a multifunctional drilling and lifting integrated working vehicle, including: a working vehicle chassis 1, a basic arm assembly, a telescopic arm 3, a luffing cylinder 8, a spiral anchor assembly, a hook 7 and a control assembly; the bottom of the basic arm assembly is connected to the working vehicle chassis 1 for rotation in the horizontal direction, and the top of the basic arm assembly is connected to the telescopic arm 3 for rotation in the vertical direction; the luffing cylinder 8 is telescopically connected to one end of the telescopic arm 3 close to the basic arm assembly, driving the telescopic arm 3 to reciprocate in the vertical direction with its connection end with the basic arm assembly as the center; the spiral anchor assembly is arranged at the middle position of the telescopic arm 3, and the drilling depth of the spiral anchor assembly is adjusted when the telescopic arm 3 rotates in the vertical direction; the hook 7 is fixed at the bottom of one end of the telescopic arm 3 away from the basic arm assembly; the control assembly is electrically connected to the luffing cylinder 8 and the basic arm assembly respectively, controls the basic arm assembly to rotate in the horizontal direction, and controls the top of the luffing cylinder 8 to reciprocate in the vertical direction.

[0046] The multifunctional drilling and lifting vehicle integrates drilling and lifting functions to meet different operation requirements; the variable-length oil cylinder 8 drives the telescopic arm 3 to rotate to adjust the drilling depth of the spiral anchor assembly to adapt to different drilling requirements; the spiral anchor assembly is arranged in the middle position of the telescopic arm 3, with a reasonable layout and easy operation.

[0047] Below, the multifunctional drilling and crane integrated working vehicle in the present invention is described by taking the working vehicle chassis 1 as a tractor chassis as an example. Of course, the working vehicle chassis 1 can also be other vehicle chassis with corresponding functions, and the present invention is not limited thereto.

[0048] The multifunctional drilling and crane integrated working vehicle further includes: a sub-frame 15; the sub-frame 15 is fixedly mounted at the bottom of the working vehicle chassis 1; the base arm 2 is fixedly mounted at the top of one end of the sub-frame 15 located at the rear of the working vehicle chassis 1 through a slewing bearing 10; the control component is electrically connected to the arm rotation motor 16 at the bottom of the slewing bearing 10, and controls the arm rotation motor 16 to drive the base arm 2 to rotate in the horizontal direction. Optionally, the length of the sub-frame 15 is greater than the length of the working vehicle chassis 1.

[0049] The multifunctional drilling and crane integrated operation vehicle adds a subframe 15 on the basis of the original structure. The subframe 15 is fixedly arranged at the bottom of the operation vehicle chassis 1, and the length of the subframe 15 is greater than the length of the operation vehicle chassis 1, thereby enhancing the structural stability and providing a larger space for the horizontal rotation of the base arm 2, thereby improving the operation flexibility and precision, and facilitating modification and upgrading to adapt to different operation requirements, thereby further improving the performance and reliability of the operation vehicle.

[0050] Specifically, the subframe 15 is fixed to the bottom of the working vehicle chassis 1 by bolt connection and welding, and is made of high-strength structural steel as a whole, which greatly improves the frame strength. The subframe 15 runs through the bottom of the working vehicle chassis 1 as a whole, and its total length is greater than the length of the working vehicle chassis 1.

[0051] The base arm 2 is fixedly connected to the outer ring of the slewing bearing 10 by bolts, and the inner ring of the slewing bearing 10 is fixedly connected to the rear end of the subframe 15. The slewing bearing 10 provides rotational power to the base arm 2 through the boom rotation motor 16, thereby driving the base arm 2 to perform a rotational motion.

[0052] The rear end of the telescopic arm 3 is connected to the base arm 2 through a rotating shaft, and the two ends of the variable-length oil cylinder 8 are respectively connected to the sub-frame 15 and the telescopic arm 3 through a pin shaft. The rotation angle of the telescopic arm 3 can be controlled by adjusting the telescopic amount of the variable-length oil cylinder 8. The telescopic arm 3 is generally 4-6 sections, and the telescopic amount of the arm is controlled by the internal oil cylinder and pulley device. When hoisting, it is advisable to keep the angle between the boom and the horizontal plane at 45°-78°.

[0053] Furthermore, the multifunctional drilling and crane integrated operation vehicle further includes: a boom landing gear 17; the boom landing gear 17 is arranged at one end of the sub-frame 15 in the vertical direction toward the front of the operation vehicle chassis 1; when the telescopic arm 3 is in a non-working state, one end thereof away from the base arm 2 abuts against the top of the boom landing gear 17. The bottom of the boom landing gear 17 is fixedly connected to the sub-frame 15 by welding, and a proximity switch is installed at the upper end of the boom landing gear 17. When the telescopic arm 3 is lowered to the specified position, the proximity switch is powered off, and the telescopic arm 3 stops in place, which can prevent the boom from having a large swing amplitude during transportation and causing damage to the main body of the telescopic arm 3.

[0054] By adding a boom landing gear 17, which is arranged at one end of the subframe 15 in the vertical direction toward the front of the work vehicle chassis 1. When the telescopic arm 3 is in a non-working state, its end away from the base arm 2 abuts against the top of the boom landing gear 17. The bottom of the boom landing gear 17 is fixedly connected to the subframe 15 by welding, and a proximity switch is installed on the upper end. When the telescopic arm 3 drops to the specified position, the proximity switch is powered off, and the telescopic arm 3 stops in place; this can prevent the boom from having a large swing during transportation, avoiding damage to the main body of the telescopic arm 3.

[0055] Please refer to Figure 3 and Figure 4 The spiral anchor assembly includes: a spiral anchor 4 and a hydraulic motor 5; the top of the spiral anchor 4 is connected to the middle position of the telescopic arm 3 through the hydraulic motor 5; the control assembly is electrically connected to the hydraulic motor 5, and the spiral anchor 4 is driven to rotate along its axial direction through the hydraulic motor 5; the control assembly drives the telescopic arm 3 to rotate in the vertical direction through the variable amplitude cylinder 8 to adjust the drilling depth of the spiral anchor 4.

[0056] The spiral anchor 4 is installed at the telescopic joint of the telescopic arm 3 and can be extended and retracted together with the telescopic arm 3. The spiral anchor 4 is connected to the telescopic arm 3 through a hydraulic motor 5. When the elevation angle of the telescopic arm 3 changes, the drilling depth of the spiral anchor 4 can be adjusted. The hydraulic motor 5 can provide torsional force for the spiral anchor 4, thereby driving the spiral anchor 4 to perform foundation pit excavation operations. The drill bit of the spiral anchor 4 is made of high-speed alloy steel and has the function of drilling soil and breaking rocks, which can meet the requirements of foundation pit excavation in mountainous areas and areas with more rock layers.

[0057] Furthermore, the hydraulic motor 5 is rotationally connected to the telescopic arm 3; in the working state, the control component drives the spiral anchor 4 to rotate in the vertical direction through the hydraulic motor 5, so that the working end of the spiral anchor 4 is vertically downward; in the non-working state, the control component drives the spiral anchor 4 to rotate in the vertical direction through the hydraulic motor 5, so that the axial direction of the spiral anchor 4 is consistent with the axial direction of the telescopic arm 3.

[0058] Furthermore, the multifunctional drilling and lifting integrated operation vehicle also includes: a front H-shaped leg 14, a rear H-shaped leg and a tail supporting leg 9; the tops of the front H-shaped leg 14, the rear H-shaped leg and the tail supporting leg 9 are respectively fixedly connected to the sub-frame 15; the control component is electrically connected to the front H-shaped leg 14, the rear H-shaped leg and the tail supporting leg 9, respectively, and controls the bottoms of the front H-shaped leg 14, the rear H-shaped leg and the tail supporting leg 9 to move downward in the vertical direction and abut against the ground when in working state.

[0059] The rear support leg 9 is fixedly mounted at the rear center of the sub-frame 15 and can be extended backward for a distance. The rear H-shaped support leg 12 is fixedly mounted on both sides of the rear of the sub-frame 15 and can be extended to both sides of the vehicle body. The front H-shaped support leg 14 is fixedly mounted on both sides of the front end of the sub-frame 15 and extends to both sides of the vehicle body. The rear support leg 9, the rear H-shaped support leg 12 and the front H-shaped support leg 14 can be extended and reset together through a one-button leveling device to provide stable support for the operation of the entire vehicle.

[0060] Furthermore, the multifunctional drilling and lifting integrated operation vehicle further includes: an operating chair 13; the operating chair 13 is located at one side of the top of the base arm 2, and the control assembly is arranged at the corresponding position of the operating chair 13; the bottom of the operating chair 13 is connected to the ladder frame 11. The operating chair 13 is fixed to the side of the base arm 2 by bolt connection or welding, providing an operating space for the operator, and the bottom of the ladder frame 11 is fixed to the rear end of the sub-frame 15 by bolt connection or welding, providing a foothold for the operator, and the ladder frame 11 and the operating chair 13 will rotate together with the base arm 2 to ensure the operating comfort of the operator and the convenience of reaching the operating position.

[0061] Furthermore, the multifunctional drilling and lifting vehicle further includes: a manned working bucket 6; the manned working bucket 6 is fixedly mounted on the top of the telescopic arm 3 away from the base arm assembly. The manned working bucket 6 is mounted on the top of the telescopic arm 3 and has an automatic leveling function, which can always keep the manned working bucket 6 in a horizontal position to protect the safety of high-altitude workers. The hook 7 is mounted on the bottom of the top of the telescopic arm 3, below the manned working bucket 6, and can be used for heavy lifting. The working height and working range of the manned working bucket 6 are adjusted by the telescopic arm 3, and the use functions of the hook 7 and the manned working bucket 6 do not interfere with each other.

[0062] The multifunctional drilling and crane vehicle has the function of recording the whole vehicle operation, and can automatically store the whole vehicle operation record within 30 days. The above-mentioned multifunctional drilling and crane vehicle also has a variety of safety protection functions, including but not limited to: remote wireless remote control operation, lifting overload torque limit, vehicle rollover prevention detection, real-time monitoring of high-altitude operations, high-altitude operation limit protection, automatic leveling of high-altitude operation bucket, emergency power protection and emergency manual operation, one-button leveling system of outriggers and vehicle operation recording function; it has high vehicle safety and complete functions, and can independently complete various operations such as foundation pit excavation, pole erection, high-altitude operations, heavy object lifting, etc. The vehicle adopts a wheeled tractor chassis, and the whole vehicle has stronger climbing and off-road capabilities, adapts to various terrains, and can fully record the whole vehicle operation process.

[0063] The present invention is further described below with reference to several usage scenarios of a multifunctional drilling and crane integrated operation vehicle:

[0064] Scenario 1: Operation method of outdoor pole hoisting

[0065] When carrying out pole hoisting operations, it is necessary to carry out a pressure resistance test on the multifunctional drilling and hoisting station vehicle position and the road surface on the driving path. If the pressure resistance test does not meet the standards, the road surface needs to be excavated, backfilled or compacted until the ground hardness meets the mobile crane operation standards.

[0066] First, activate the one-button leveling device button of the legs, so that the rear support legs 9, the rear H-shaped legs 12 and the front H-shaped legs 14 of the vehicle are extended horizontally and stably supported on the ground. If necessary, the legs need to be reinforced. Then prepare for the lifting of the pole. First, put the lifting clamp on the cement pole and fix it. The position of the clamp should be close to the small end of the cement pole, and the distance from the small end of the cement pole is 1 / 3 of the total length of the pole. Control the slewing bearing 10 to rotate, and adjust the position of the telescopic arm 3 so that the hook 7 is directly above the clamp of the cement pole. Let the hook 7 slowly fall to the ground, connect the hook 7 to the clamp of the cement pole, and use a binding belt for auxiliary fixing. After the pole and the hook 7 are firmly fixed, slowly raise the hook 7 to lift the cement pole off the ground. The slewing bearing 10, the base arm 2 and the telescopic arm 3 are operated to rotate until the pole is hoisted to the predetermined position, the pole is slowly dropped and dumped to the ground, and finally the pole fixing device is removed. At this point, a pole hoisting operation is completed.

[0067] Scenario 2: Outdoor foundation pit excavation and pole erection operations

[0068] Before excavating the foundation pit and erecting the electric poles, the ground at the station location must be tested for pressure resistance. If the pressure resistance test does not meet the standards, the road surface must be excavated, backfilled or compacted until the ground hardness meets the mobile crane operation standards.

[0069] First, start the one-touch leveling device button of the outriggers, so that the rear support legs 9, the rear H-shaped legs 12 and the front H-shaped legs 14 of the vehicle are extended horizontally and stably supported on the ground. If necessary, the legs need to be reinforced. Before excavating the foundation pit, the telescopic arm 3 must be adjusted to a suitable position, and the spiral anchor 4 must be dropped so that its head is in contact with the ground and the spiral anchor 4 forms a 90° angle with the ground as a whole. Start the operation button to rotate the spiral anchor 4 clockwise, and at the same time adjust the elevation angle of the telescopic arm 3 so that it drives the spiral anchor 4 to gradually descend, thereby completing the excavation of the foundation pit. If the excavation site is in a mountainous area, the spiral anchor 4 can be replaced with a harder impact spiral anchor 4 to complete the geological groundbreaking and stone-breaking operations in mountainous areas.

[0070] After the excavation of the foundation pit is completed, the spiral anchor 4 is returned to its position so that it is parallel to the telescopic arm 3 and fixed. Then, the pole is prepared for lifting. The lifting clamp is put on the cement pole and fixed. The clamp position should be close to the small end of the cement pole, and the distance from the small end of the cement pole is 1 / 3 of the total length of the pole. Control the slewing bearing 10 to rotate, adjust the position of the telescopic arm 3, so that the hook 7 is directly above the clamp of the cement pole. Let the hook 7 slowly fall to the ground, connect the hook 7 with the clamp of the cement pole, and use the binding belt for auxiliary fixation. After the pole and the hook 7 are firmly fixed, slowly raise the hook 7 and lift the cement pole off the ground. Operate the slewing bearing 10, the base arm 2 and the telescopic arm 3 to rotate until the pole is lifted above the foundation pit, slowly drop the pole until the large end of the cement pole is completely placed in the foundation pit, complete the backfilling and compaction of the foundation pit, and finally remove the fixing device. At this point, the pole erection operation of the foundation pit excavator is completed.

[0071] The embodiment of the present invention is intended to protect a multifunctional drilling and lifting work vehicle, including: a work vehicle chassis, a base arm assembly, a telescopic arm, a luffing cylinder, a spiral anchor assembly, a hook and a control assembly; the bottom of the base arm assembly is connected to the work vehicle chassis for rotation in the horizontal direction, and the top of the base arm assembly is connected to the telescopic arm for rotation in the vertical direction; the luffing cylinder is telescopically connected to one end of the telescopic arm close to the base arm assembly, driving the telescopic arm to reciprocate in the vertical direction with its connection end with the base arm assembly as the center; the spiral anchor assembly is arranged in the middle position of the telescopic arm, and the drilling depth of the spiral anchor assembly is adjusted when the telescopic arm rotates in the vertical direction; the hook is fixed to the bottom of one end of the telescopic arm away from the base arm assembly; the control assembly is electrically connected to the luffing cylinder and the base arm assembly respectively, controls the base arm assembly to rotate in the horizontal direction, and controls the top of the luffing cylinder to reciprocate in the vertical direction. The above technical scheme has the following effects:

[0072] 1. Integrate drilling and lifting functions into one, reducing the time and cost of switching equipment between different tasks;

[0073] 2. The driving effect of the luffing cylinder on the telescopic arm allows the work vehicle to accurately adjust the drilling depth of the spiral anchor assembly and the height of the hook in the vertical direction. Whether it is drilling at different depths or lifting objects at different heights, precise operation can be achieved to meet various complex operation requirements;

[0074] 3. The spiral anchor assembly is set in the middle position of the telescopic arm, which makes the work vehicle more stable during drilling operations. The spiral anchor assembly will generate downward pressure and torque when working. Setting it in the middle position of the telescopic arm can better balance these forces, reduce the shaking and deformation of the telescopic arm, and improve the accuracy and stability of drilling.

[0075] It should be understood that the above specific embodiments of the present invention are only used to illustrate or explain the principles of the present invention, and do not constitute a limitation of the present invention. Therefore, any modifications, equivalent substitutions, improvements, etc. made without departing from the spirit and scope of the present invention should be included in the protection scope of the present invention. In addition, the appended claims of the present invention are intended to cover all changes and modifications that fall within the scope and boundaries of the appended claims, or the equivalent forms of such scope and boundaries.

Claims

1. A multifunctional drilling and crane integrated operation vehicle, characterized in that: include: A work vehicle chassis (1), a base arm assembly, a telescopic arm (3), a variable amplitude oil cylinder (8), a spiral anchor assembly, a hook (7) and a control assembly; The bottom of the basic arm assembly is connected to the working vehicle chassis (1) in a horizontal direction for rotation, and the top of the basic arm assembly is connected to the telescopic arm (3) in a vertical direction for rotation; The luffing oil cylinder (8) is telescopically connected to one end of the telescopic arm (3) close to the base arm assembly, driving the telescopic arm (3) to reciprocate in a vertical direction with the end connected to the base arm assembly as the center of the circle; The spiral anchor assembly is arranged at a middle position of the telescopic arm (3), and the telescopic arm (3) adjusts the drilling depth of the spiral anchor assembly when rotating in a vertical direction; The hook (7) is fixedly arranged at the bottom of one end of the telescopic arm (3) away from the base arm assembly; The control component is electrically connected to the luffing cylinder (8) and the base arm component respectively, controls the base arm component to rotate in the horizontal direction, and controls the top of the luffing cylinder (8) to reciprocate in the vertical direction.

2. The multifunctional drilling and crane integrated operation vehicle according to claim 1, characterized in that: Also includes: Subframe (15); The auxiliary frame (15) is fixedly mounted on the bottom of the working vehicle chassis (1); The base arm (2) is fixed to the top of one end of the sub-frame (15) located at the rear of the working vehicle chassis (1) through a slewing bearing (10); The control component is electrically connected to the boom rotation motor (16) at the bottom of the slewing bearing (10), and controls the boom rotation motor (16) to drive the base arm (2) to rotate in the horizontal direction.

3. The multifunctional drilling and crane integrated operation vehicle according to claim 2, characterized in that: Also includes: Boom landing gear (17); The boom landing gear (17) is arranged in a vertical direction at one end of the sub-frame (15) facing the front of the working vehicle chassis (1); When the telescopic arm (3) is in a non-working state, one end thereof away from the base arm (2) abuts against the top of the boom landing gear (17).

4. The multifunctional drilling and crane integrated operation vehicle according to claim 2, characterized in that: The length of the auxiliary frame (15) is greater than the length of the working vehicle chassis (1).

5. The multifunctional drilling and crane integrated operation vehicle according to claim 1, characterized in that: The helical anchor assembly comprises: a helical anchor (4) and a hydraulic motor (5); The top of the spiral anchor (4) is connected to the middle position of the telescopic arm (3) through the hydraulic motor (5); The control component is electrically connected to the hydraulic motor (5), and the hydraulic motor (5) drives the spiral anchor (4) to rotate along its axial direction; The control component drives the telescopic arm (3) to rotate in the vertical direction through the amplitude-changing oil cylinder (8), thereby adjusting the drilling depth of the spiral anchor (4).

6. The multifunctional drilling and crane integrated operation vehicle according to claim 5, characterized in that: The hydraulic motor (5) is rotationally connected to the telescopic arm (3); When in working state, the control component drives the spiral anchor (4) to rotate in the vertical direction through the hydraulic motor (5), so that the working end of the spiral anchor (4) is vertically downward; When in a non-working state, the control component drives the spiral anchor (4) to rotate in a vertical direction through the hydraulic motor (5), so that the axial direction of the spiral anchor (4) is consistent with the axial direction of the telescopic arm (3).

7. The multifunctional drilling and crane integrated operation vehicle according to claim 2, characterized in that: Also includes: A front H-shaped support leg (14), a rear H-shaped support leg and a tail support leg (9); The front end H-shaped support leg (14), the rear end H-shaped support leg and the top of the tail support leg (9) are respectively fixedly connected to the sub-frame (15); The control component is electrically connected to the front H-shaped leg (14), the rear H-shaped leg and the tail support leg (9) respectively, and controls the bottom of the front H-shaped leg (14), the rear H-shaped leg and the tail support leg (9) to move downward in the vertical direction and contact the ground when in working state.

8. The multifunctional drilling and crane integrated working vehicle according to any one of claims 1 to 6, characterized in that: Also includes: Operating chair (13); The operating chair (13) is located at one side of the top end of the base arm (2), and the control component is arranged at a corresponding position of the operating chair (13); The bottom of the operating chair (13) is connected to the ladder frame (11).

9. The multifunctional drilling and crane integrated working vehicle according to any one of claims 1 to 6, characterized in that: Also includes: Manned work bucket (6); The manned working bucket (6) is fixedly arranged on the top of one end of the telescopic arm (3) away from the base arm assembly.

10. The multifunctional drilling and crane integrated operation vehicle according to any one of claims 1 to 6, characterized in that: The working vehicle chassis (1) is a tractor chassis.