Crawler-type roadway drilling machine

By introducing a robotic arm into a crawler tunnel drilling rig for automatic jointing and combining the lower support assembly for precise adjustment, the problems of poor drilling angle adaptability and insufficient stable support in the prior art are solved, and drilling efficiency and stability are improved.

CN119411947AInactive Publication Date: 2025-02-11SHANXI TIEFULAI GAS GOVERNANCE EQUIPMENT MANUFACTURING CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202510024958.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-08
Publication Date
2025-02-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing tunnel drilling rigs have poor adaptability to drilling angles, difficulty in manual rod handling, and difficulty in providing stable support in complex tunnels, resulting in a ripping rod or a biased hole.

Method used

A crawler tunnel drilling rig is designed, using a robotic arm to perform automatic rod joint operation, combining the lower support assembly and the crawler walking assembly to achieve precise adjustment and stable support of the drilling rig in complex tunnels.

Benefits of technology

It improves the efficiency and safety of drilling at large upturn angles or high hole positions, enhances the adaptability and stability in complex tunnels, and expands the scope of application of drilling rigs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119411947A_ABST
    Figure CN119411947A_ABST
Patent Text Reader

Abstract

The crawler-type roadway drilling machine comprises a main bearing frame, a crawler walking assembly is fixedly arranged on the lower portion of the main bearing frame, a lower supporting assembly is fixedly arranged on the outer side of the bottom of the main bearing frame, a power box is fixedly arranged on the upper portion of the main bearing frame, and an operation control table is fixedly arranged on one side of the power box. A horizontal rotator is fixedly arranged at one end of the upper portion of the main bearing frame, an upper supporting assembly is fixedly connected to the upper portion of the horizontal rotator, a lifting adjusting assembly is slidably connected to the outer portion of the upper supporting assembly, a rotating disc assembly is fixedly arranged on one side of the lifting adjusting assembly, and a drilling bearing frame is connected to the top end of the rotating disc assembly through a shaft. By arranging the mechanical arm and the lower supporting assembly, automatic rod connecting and accurate adjustment of the horizontal position of the drilling machine can be achieved when the drilling machine conducts drilling at a large pitching angle or a high hole site, and the safety and environmental adaptability of the drilling machine are effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of tunnel drilling rigs, and more particularly to a crawler type tunnel drilling rig. Background Art

[0002] Drilling rigs play an important role in the mining industry as important tools for drilling holes in coal mining, tunnel excavation construction and deep-water drilling. Existing tunnel drilling rigs, especially small and medium-sized tunnel drilling rigs, have relatively fixed drilling angles, poor adaptability to the drilling environment, and mostly use manual rod connection operations. When drilling at large elevation angles or higher hole positions, manual rod connection is difficult, which seriously affects the drilling efficiency of the drilling rig. Existing tunnel drilling rigs mostly use crawler travel devices, which can be used in most complex tunnel operating environments. However, due to the limitations of their own structure, crawler drilling rigs are difficult to accurately adjust the horizontal position, especially in some tunnels with small spaces and complex support surfaces. Crawler drilling rigs are also difficult to provide stable and reliable support for drilling operations, which can easily cause the drilling rig to produce rod movement or deviated holes during the drilling process. Summary of the invention

[0003] In view of this situation, we propose a crawler tunnel drilling rig to overcome the above problems.

[0004] 1. Technical solution

[0005] A crawler tunnel drilling rig comprises a main carrier frame, a crawler walking assembly is fixedly arranged at the lower part of the main carrier frame, a lower support assembly is fixedly arranged at the outer side of the lower part of the main carrier frame, a power box is fixedly arranged at the upper part of the main carrier frame, an operation console is fixedly arranged at one side of the power box, a horizontal rotator is fixedly arranged at the front end of the upper part of the main carrier frame, an upper support assembly is fixedly arranged at the upper part of the horizontal rotator, a lifting and lowering adjustment assembly is slidably connected to the outside of the upper support assembly, a rotating disk assembly is fixedly arranged at one side of the lifting and lowering adjustment assembly, the top shaft of the rotating disk assembly is connected to the drilling carrier frame, and the hydraulic shaft at the bottom of the drilling carrier frame is connected to a mechanical arm.

[0006] Furthermore, the drilling support frame includes a guide rail frame beam, a cross beam is fixedly provided at one end of the guide rail frame beam, a suspended clamp is fixedly provided at the other end of the guide rail frame beam, a drilling gyro is slidably provided in the middle part of the guide rail frame beam and is connected to a circulating water tail device by sliding between the drilling gyro and the cross beam at one end of the guide rail frame beam.

[0007] Furthermore, a fixed short beam is fixedly arranged on the side of the guide rail frame beam, and a II# fixed plate is fixedly connected to the side of the fixed short beam, a drilling hydraulic machine is fixedly arranged on the inner side of the cross beam, and the top shaft of the drilling hydraulic machine is connected to the drilling gyro, and a distance adjusting hydraulic machine is fixedly arranged between the drilling gyro and the circulating water tail unit, and the top shaft of the distance adjusting hydraulic machine is connected to the circulating water tail unit, and the base end of the distance adjusting hydraulic machine is fixedly connected to the drilling gyro.

[0008] Furthermore, the robotic arm includes a main boom, one end of the main boom is axially connected to a main hydraulic press and an auxiliary hydraulic press, the top seats of the main hydraulic press and the auxiliary hydraulic press are fixedly connected to a fixed short beam, the other end of the main boom is fixedly provided with a rotating shaft, one end of the rotating shaft is axially connected to a straight arm, the top of the straight arm is fixedly connected to a U-shaped frame, the top of the U-shaped frame is axially connected to a mechanical gripper, the mechanical grippers are a group of two, and a driving shaft arm is axially connected between the mechanical grippers.

[0009] Furthermore, a drive box is fixedly arranged in the middle of the drive shaft arm, an I# drive motor is fixedly arranged on one side of the top end of the main arm frame, the drive end shaft of the I# drive motor is connected to the rotating shaft, and a II# drive motor is fixedly arranged in the middle of the U-shaped frame, and the drive end shaft of the II# drive motor is connected to the drive box.

[0010] Furthermore, the lower support assembly includes a support frame, the four corners of the support frame are fixedly provided with support hydraulic presses, a sliding beam is fixedly provided inside the support frame, there are two sliding beams in total, the outer axis of the sliding beam is connected to a sliding sleeve, one side of the sliding sleeve is fixedly provided with a short cross beam, the upper part of the sliding sleeve is fixedly provided with an I# fixing plate, the I# fixing plate is bolted to the main load-bearing frame, one side axis of the short cross beam is connected to a transverse hydraulic press, and the base end of the transverse hydraulic press is fixedly connected to the inner side of the support frame.

[0011] Furthermore, the lifting and adjusting assembly includes a lifting frame, a bottom shaft of the lifting frame is connected to a lifting hydraulic device, a sliding hole is opened in the middle of the lifting frame, and the lifting frame is slidably connected to the upper support assembly through the sliding hole.

[0012] Furthermore, the rotating disk assembly includes a base disk, the bottom of the base disk is fixedly connected to the lifting frame, the top axis of the base disk is connected to the rotating disk, and a fixing seat is fixedly provided on the top of the rotating disk, and the fixing seat is bolted to the II# fixing disk.

[0013] Furthermore, an operating seat is fixedly provided on one side of the operating console on the upper part of the main carrier frame.

[0014] 2. Beneficial effects

[0015] Compared with the prior art, the present invention has the following beneficial effects: (1) The present invention provides a mechanical arm on the lower side of the drilling support frame, so that the drilling rig can realize automatic rod connection operation when drilling at a large elevation angle or at a higher hole position, thereby improving the safety of the rod connection work and the drilling efficiency of the drilling rig; (2) The present invention can accurately adjust the horizontal position of the drilling rig in a narrow and complex tunnel through the cooperation of the lower support assembly and the crawler walking assembly, adjust the drilling rig to the optimal drilling position, and enable the drilling rig to adapt to complex drilling environments; (3) The present invention provides an upper support assembly and a lower support assembly, so that the main body of the drilling rig can be stably and reliably supported in a complex mine tunnel operating environment, thereby ensuring the stability of the drilling rig during the drilling process and improving the application scope of the drilling rig and the complex working environment. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 This is a schematic diagram of the structure of the present invention after the drilling support frame is removed; Figure 3 It is a schematic diagram of the lower support structure of the present invention; Figure 4 It is a schematic diagram of the upper support structure of the present invention; Figure 5 It is a schematic diagram of the structure of the mechanical arm of the present invention; Figure 6 It is a schematic diagram of the structure of the drilling support frame of the present invention.

[0017] Description of the numbers in the figure: Main bearing frame; 2. Crawler walking assembly; 3. Lower support assembly; 4. Upper support assembly; 5. Power box; 6. Operation console; 7. Operation seat; 8. Horizontal rotator; 9. Drilling bearing frame; 10. Lifting adjustment assembly; 11. Mechanical arm; 12. Rotating disk assembly; 301. Support frame; 302. Sliding beam; 303. Short cross beam; 304. Support hydraulic machine; 305. Transverse hydraulic machine; 306. I# fixed plate; 307. Sliding bushing; 901. Guide rail frame beam; 902. Suspension clamp; 903. Drilling gyrator; 905. Circulating water tail device; 9 06. Drilling hydraulic press; 907. Fixed short beam; 908. Crossbeam; 909. Distance adjustment hydraulic press; 910. II# fixed plate; 101. Lifting frame; 102. Sliding hole; 103. Lifting hydraulic press; 1101. Main hydraulic press; 1102. Auxiliary hydraulic press; 1103. I# driving motor; 1104. U-shaped frame; 1105. Rotating shaft; 1106. Mechanical gripper; 1107. Straight arm; 1108. Main boom frame; 1109. Driving box; 1110. II# driving motor; 121. Base plate; 122. Rotating plate; 123. Fixed seat. DETAILED DESCRIPTION

[0018] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0019] Embodiment 1:

[0020] See also Figure 1-Figure 6 A crawler tunnel drilling rig comprises a main carrier frame 1, a crawler walking assembly 2 is fixedly provided at the lower portion of the main carrier frame 1, a lower support assembly 3 is fixedly provided at the outer side of the lower portion of the main carrier frame 1, a power box 5 is fixedly provided at the upper portion of the main carrier frame 1, an operation console 6 is fixedly provided at one side of the power box 5, a horizontal rotator 8 is fixedly provided at the front end of the upper portion of the main carrier frame 1, an upper support assembly 4 is fixedly provided at the upper portion of the horizontal rotator 8, a lifting and adjusting assembly 10 is slidably connected to the outside of the upper support assembly 4, a rotating disk assembly 12 is fixedly provided at one side of the lifting and adjusting assembly 10, the top shaft of the rotating disk assembly 12 is connected to a drilling carrier frame 9, and a mechanical arm 11 is connected to the hydraulic shaft at the lower portion of the drilling carrier frame 9.

[0021] The drilling support frame 9 includes a guide rail beam 901, a cross beam 908 is fixedly provided at one end of the guide rail beam 901, a suspended clamp 902 is fixedly provided at the other end of the guide rail beam 901, a drilling gyroscope 903 is slidably provided in the middle of the guide rail beam 901, and a circulating water tail device 905 is slidably provided and connected between the drilling gyroscope 903 and the cross beam 908 at one end of the guide rail beam 901.

[0022] A fixed short beam 907 is fixedly arranged on the side of the guide rail frame beam 901, and a II# fixed plate 910 is fixedly connected to the side of the fixed short beam 907. A drilling hydraulic machine 906 is fixedly arranged on the inner side of the cross beam 908. The top axis of the drilling hydraulic machine 906 is connected to the drilling gyroscope 903. A distance adjusting hydraulic machine 909 is fixedly arranged between the drilling gyroscope 903 and the circulating water tail device 905. The top axis of the distance adjusting hydraulic machine 909 is connected to the circulating water tail device 905, and the base end of the distance adjusting hydraulic machine 909 is fixedly connected to the drilling gyroscope 903.

[0023] The robotic arm 11 includes a main boom 1108, one end of which is axially connected to a main hydraulic press 1101 and an auxiliary hydraulic press 1102, the top ends of which are fixedly connected to a fixed short beam 907, and the other end of the main boom 1108 is fixedly provided with a rotating shaft 1105, one end of which is axially connected to a straight arm 1107, the top of which is fixedly connected to a U-shaped frame 1104, the top of which is axially connected to a mechanical gripper 1106, the mechanical grippers 1106 are a group of two, and a driving shaft arm 1111 is axially connected between the mechanical grippers 1106.

[0024] A driving box 1109 is fixedly installed in the middle of the driving shaft arm 1111, an I# driving motor 1103 is fixedly installed on one side of the top of the main arm frame 1108, and the driving end shaft of the I# driving motor 1103 is connected to the rotating shaft 1105. A II# driving motor 1110 is fixedly installed in the middle of the U-shaped frame 1104, and the driving end shaft of the II# driving motor 1110 is connected to the driving box 1109.

[0025] The lower support assembly 3 includes a support frame 301, and support hydraulic presses 304 are fixedly provided at the four corners of the support frame 301. A sliding beam 302 is fixedly provided inside the support frame 301. There are two sliding beams 302 in total. The outer axis of the sliding beam 302 is connected to a sliding sleeve 307. A short cross beam 303 is fixedly provided on one side of the sliding sleeve 307. An I# fixed plate 306 is fixedly provided on the upper part of the sliding sleeve 307. The I# fixed plate 306 is bolted to the main load-bearing frame 1. A transverse hydraulic press 305 is connected to one side axis of the short cross beam 303. The base end of the transverse hydraulic press 305 is fixedly connected to the inner side of the support frame 301.

[0026] The lifting adjustment assembly 10 includes a lifting frame 101 , a bottom axis of the lifting frame 101 is connected to a lifting hydraulic device 103 , a sliding hole 102 is opened in the middle of the lifting frame 101 , and the lifting frame 101 is slidably connected to the upper support assembly 4 through the sliding hole 102 .

[0027] The rotating disk assembly 12 includes a base disk 121, the bottom of the base disk 121 is fixedly connected to the lifting frame 101, the top axis of the base disk 121 is connected to the rotating disk 122, and a fixing seat 123 is fixedly provided on the top of the rotating disk 122, and the fixing seat 123 is bolted to the II# fixing disk 910.

[0028] An operating seat 7 is fixedly disposed on one side of the operating console 6 on the upper portion of the main carrier 1 .

[0029] Embodiment 2:

[0030] Based on Example 1, the working principle of a crawler tunnel drilling rig is as follows: When a crawler tunnel drilling rig is in operation, the operator controls the drilling rig through the operating console 6, the power box 5 provides driving force for the entire drilling rig, the horizontal rotator 8 rotates horizontally, and one end of the suspension clamp 903 of the drilling support frame 9 is adjusted to the direction of the hole to be drilled. The upper support assembly 4 rises to support the tunnel roof, and the support hydraulic 304 of the lower support assembly 3 descends to support the tunnel floor, providing a stable support for the entire drilling operation. According to the specific position of the hole to be drilled, the operator controls the lifting hydraulic 103 and the rotating disk assembly 12 to adjust the drilling support frame 9 to a suitable height angle. Under the support of the suspension clamp 902, the drilling gyroscope 903 firmly clamps the drill rod for rotation, and the circulating water tail 905 is threadedly connected to the tail of the drill rod to provide circulating water for the drilling operation. At the same time, under the action of the drilling hydraulic 906, the drilling gyroscope 903 moves along the guide rail frame beam 901 toward the suspension clamp 902 according to the drilling pressure and speed of the drill rod.

[0031] Embodiment 3:

[0032] On the basis of Example 1 and Example 2, after the drill rod of a crawler tunnel drilling rig is drilled, the drilling gyrator 903 stops rotating, and the suspension clamp 902 holds the drill rod tightly, and the circulating water tail device 905 automatically reverses to loosen the threaded connection between it and the drill rod, and the distance adjustment hydraulic device 909 is actuated to push the circulating water tail device 905 to move along the guide rail frame beam 901 to the cross beam 908, and the main hydraulic device 1101 and the auxiliary hydraulic device 1102 of the mechanical arm 11 start to move to lower the main boom 1108 to a suitable position, and the I# drive motor 1103 drives the main hydraulic device 1101 to move the main hydraulic device 1108 to a suitable position. The movable straight arm 1107 rotates counterclockwise to a horizontal position, and at the same time, the II# drive motor drives the mechanical gripper 1106 to loosen the tension through the drive box 1109. The driller puts a section of drill pipe into the mechanical gripper 1106, and the II# drive motor drives the drive shaft arm 1111 through the drive box 1109 to drive the mechanical gripper 1106 to grasp the drill pipe. The mechanical gripper grasps the drill pipe, and then the I# drive motor 1103 drives the straight arm 1107 to rotate clockwise to a vertical position, and the main hydraulic valve 1101 and the auxiliary hydraulic valve 1102 start to move, so that the main boom 1108 The drill pipe rises to the original position, and the I# driving motor 1103 drives the straight arm 1107 to rotate clockwise, so that the center line of the drill pipe coincides with the center line of the holding hole on the drilling gyro 903 and the circulating water tail device 905, and the drilling hydraulics 906 and the distance adjusting hydraulics 909 are actuated to make the drilling gyro 903 and the circulating water tail device 905 move toward each other. When the two ends of the drill pipe enter the holding holes of the drilling gyro 903 and the circulating water tail device 905 respectively, the distance adjusting hydraulics 909 stop actuating, and the drilling hydraulics 906 push forward. When the end of the drill pipe contacts the top of the new drill pipe, the drilling hydraulics 906 stops actuating. 906 stops, the drilling gyroscope 903 holds the new drill pipe tightly and rotates slowly to complete the threaded connection between the new drill pipe and the drilling pipe, and then the circulating water tail device 905 automatically rotates to complete the threaded connection between its own threaded mouth and the end of the new drill pipe and stops. After completing the above movements, the drilling gyroscope 903 loosens the drill pipe and moves to the circulating water tail device 905 under the coordinated action of the drilling hydraulics 906 and the distance adjustment hydraulics 909. Thereafter, the suspended clamp 902 loosens the drill pipe, and the drilling hydraulics 906 holds the drill pipe tightly and rotates to complete the drilling operation of the next section of the drill pipe.

[0033] Embodiment 4:

[0034] On the basis of Example 1, when a crawler tunnel drilling rig needs to shift forward or backward, the operator controls the crawler walking component 2 through the operating console 6 to make the crawler tunnel drilling rig move forward or backward. When the crawler tunnel drilling rig reaches the required working position, the operator can control the lower support component 3 to start through the operating console 6. According to the ground conditions of the crawler tunnel drilling rig, the four supporting hydraulic presses 304 can be deployed simultaneously or separately, so that the main carrier frame 1 of the crawler tunnel drilling rig is in a horizontal state, providing better horizontal support for the drilling operation.

[0035] In particular, when the drilling position is too close to the edge of the tunnel and the drill bit of a crawler tunnel drilling rig cannot complete the drilling operation, the operator controls the lower support assembly 3 to adjust the horizontal displacement through the operating console 6.

[0036] The specific process is as follows: the upper support assembly 4 is folded up, the hydraulic support 304 props up the main carrier frame 1, so that the crawler walking assembly 2 is completely off the ground, and according to the horizontal displacement direction, the transverse hydraulic press 305 is actuated to cause the end cross beam 303 to drive the I# fixed plate 306 to displace in a determined horizontal direction, and then, the hydraulic support 304 is folded up to support the crawler walking assembly 2 on the ground, and the transverse hydraulic press 305 is actuated to cause the end cross beam 303 to drive the I# fixed plate 306 to displace in a direction opposite to the determined horizontal direction, and then the above actions are repeated until a crawler tunnel drilling rig completes the adjustment of its horizontal position.

[0037] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and improved concepts of the present invention within the technical scope disclosed by the present invention, and they should be covered by the protection scope of the present invention.

Claims

1. A crawler-type tunnel drilling rig, comprising a main bearing frame (1), characterized in that: A crawler walking assembly (2) is fixedly arranged at the lower part of the main bearing frame (1), a lower support assembly (3) is fixedly arranged at the outer side of the lower part of the main bearing frame (1), a power box (5) is fixedly arranged at the upper part of the main bearing frame (1), an operation console (6) is fixedly arranged on one side of the power box (5), a horizontal rotator (8) is fixedly arranged at the front end of the upper part of the main bearing frame (1), an upper support assembly (4) is fixedly arranged on the upper part of the horizontal rotator (8), a lifting adjustment assembly (10) is slidably connected to the outside of the upper support assembly (4), a rotating disk assembly (12) is fixedly arranged on one side of the lifting adjustment assembly (10), a top shaft of the rotating disk assembly (12) is connected to a drilling bearing frame (9), and a mechanical arm (11) is connected to a hydraulic shaft at the lower part of the drilling bearing frame (9).

2. A crawler-type tunnel drilling rig according to claim 1, characterized in that: The drilling support frame (9) comprises a guide rail beam (901), a cross beam (908) is fixedly provided at one end of the guide rail beam (901), a suspension clamp (902) is fixedly provided at the other end of the guide rail beam (901), a drilling gyroscope (903) is slidably provided in the middle of the guide rail beam (901) and connected thereto, and a circulating water tail device (905) is slidably provided between the drilling gyroscope (903) and the cross beam (908) at one end of the guide rail beam (901).

3. A crawler-type tunnel drilling rig according to claim 2, characterized in that: A fixed short beam (907) is fixedly arranged on the side of the guide rail frame beam (901), and a II# fixed plate (910) is fixedly connected to the side of the fixed short beam (907). A drilling hydraulic machine (906) is fixedly arranged on the inner side of the cross beam (908), and the top shaft of the drilling hydraulic machine (906) is connected to the drilling gyro (903). A distance adjustment hydraulic machine (909) is fixedly arranged between the drilling gyro (903) and the circulating water tail device (905), and the top shaft of the distance adjustment hydraulic machine (909) is connected to the circulating water tail device (905), and the base end of the distance adjustment hydraulic machine (909) is fixedly connected to the drilling gyro (903).

4. The crawler type tunnel drilling rig according to claim 1, characterized in that: The mechanical arm (11) comprises a main boom (1108), one end of the main boom (1108) is axially connected to a main hydraulic machine (1101) and an auxiliary hydraulic machine (1102), the top ends of the main hydraulic machine (1101) and the auxiliary hydraulic machine (1102) are fixedly connected to a fixed short beam (907), the other end of the main boom (1108) is fixedly provided with a rotating shaft (1105), one end of the rotating shaft (1105) is axially connected to a straight arm (1107), the top end of the straight arm (1107) is fixedly connected to a U-shaped frame (1104), the top end of the U-shaped frame (1104) is axially connected to a mechanical gripper (1106), the mechanical grippers (1106) are a group of two, and a driving shaft arm (1111) is axially connected between the mechanical grippers (1106).

5. The crawler type tunnel drilling rig according to claim 4, characterized in that: A drive box (1109) is fixedly arranged in the middle of the drive shaft arm (1111), an I# drive motor (1103) is fixedly arranged on one side of the top end of the main arm frame (1108), the drive end shaft of the I# drive motor (1103) is connected to the rotating shaft (1105), and a II# drive motor (1110) is fixedly arranged in the middle of the U-shaped frame (1104), and the drive end shaft of the II# drive motor (1110) is connected to the drive box (1109).

6. The crawler type tunnel drilling rig according to claim 1, characterized in that: The lower support assembly (3) comprises a support frame (301), the four corners of the support frame (301) are fixedly provided with support hydraulic devices (304), the interior of the support frame (301) is fixedly provided with sliding beams (302), the sliding beams (302) are in a group of two, the outer side shafts of the sliding beams (302) are connected to sliding sleeves (307), one side of the sliding sleeves (307) is fixedly provided with a short cross beam (303), the upper part of the sliding sleeves (307) is fixedly provided with a No. 1 fixed plate (306), the No. 1 fixed plate (306) is bolted to the main bearing frame (1), one side of the short cross beam (303) is connected to a transverse hydraulic device (305), and the base end of the transverse hydraulic device (305) is fixedly connected to the inner side of the support frame (301).

7. The crawler type tunnel drilling rig according to claim 1, characterized in that: The lifting and adjusting assembly (10) comprises a lifting frame (101), a bottom shaft of the lifting frame (101) being connected to a lifting hydraulic device (103), a sliding hole (102) being opened in the middle of the lifting frame (101), and the lifting frame (101) being slidably connected to an upper supporting assembly (4) via the sliding hole (102).

8. The crawler type tunnel drilling rig according to claim 1, characterized in that: The rotating disk assembly (12) comprises a base disk (121), the bottom of the base disk (121) is fixedly connected to the lifting frame (101), the top of the base disk (121) is axially connected to the rotating disk (122), a fixing seat (123) is fixedly provided at the top of the rotating disk (122), and the fixing seat (123) is bolted to the II# fixing disk (910).

9. The crawler type tunnel drilling rig according to claim 1, characterized in that: An operating seat (7) is fixedly arranged on one side of the operating console (6) on the upper portion of the main bearing frame (1).

Citation Information

Patent Citations

  • Drilling machine with rotary support structure

    CN110630176A

  • Complete equipment for transverse large-diameter hole forming in soft coal seam coal pillar area and hole forming technology

    CN111140170A

  • Rear water adding device for underground drill rig and operation method

    CN118933609A

  • Steady pole machine punches

    CN207212292U

  • Clamp assembly for grabbing material bag

    CN219275860U