Large-opening type water immersion test platform and test method

By designing a large open water immersion test platform, the automatic immersion and movement of the test parts in water is achieved using a synchronous control system and electric hoist, the problems of operation troubles, safety hazards and lifting difficulties in the existing technology are solved, and the operation efficiency and Security.

CN119413399APending Publication Date: 2025-02-11CHINA SHIP SCIENTIFIC RESEARCH CENTER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411693636.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-25
Publication Date
2025-02-11

AI Technical Summary

Technical Problem

The existing pool test method is troublesome to operate, requires the cooperation of multiple personnel, the work reliability is poor, and there are safety risks, especially the difficulty in lifting when handling special-shaped test pieces.

Method used

A large open water immersion test platform is designed, including a large pool, track, walking mechanism, workbench, lifting platform and synchronization control system. Through the synchronous control of electric hoist and walking mechanism, the automatic immersion of the test parts and the water is realized. sports.

Benefits of technology

It significantly reduces the working intensity of the operator, improves the safety and efficiency of the operation, and adapts to various sizes and shapes of test pieces, making the operation more convenient and flexible.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119413399A_ABST
    Figure CN119413399A_ABST
Patent Text Reader

Abstract

The invention relates to a large-opening type water immersion test platform and a test method, the large-opening type water immersion test platform comprises a large water pool, tracks are respectively fixed on two sides of the top surface of the large water pool, the large-opening type water immersion test platform also comprises a workbench, four walking mechanisms are arranged at the bottom of the workbench, the walking mechanisms are matched with the tracks, and the workbench slides along the tracks through the walking mechanisms; a square opening is formed in the middle of the workbench, a supporting frame is fixed to the portion, around the square opening, of the workbench, two sets of electric hoists are installed on the two sides of the supporting frame respectively, lifting platforms are installed on the electric hoists through cables, and the size of the lifting platforms is matched with that of the square opening. A synchronous control system is further fixed to the workbench and controls synchronous operation of the four sets of electric hoists and the walking mechanisms. The test piece can be soaked in water and move in water conveniently, the working intensity of operators is remarkably reduced, and the operation safety and the operation efficiency are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of water immersion test platforms, in particular to a large-opening water immersion test platform and a test method. Background Art

[0002] In the process of ship research, it is often necessary to conduct tank tests on test pieces to examine their working conditions in the water. Since the test pieces have different shapes and are usually large, the existing technology usually uses a crane to directly lift them into the tank for testing. Since the test pieces also need to move in the tank, the operation is cumbersome and requires the cooperation of multiple test personnel. The overall work reliability is poor and there are certain safety hazards. If you encounter a special-shaped test piece, there will be problems such as difficulty in lifting. Summary of the invention

[0003] In view of the shortcomings of the above-mentioned existing production technology, the applicant provides a large-opening water immersion test platform and test method, which can conveniently complete the immersion of test pieces in water and their movement in water, which will significantly reduce the workload of operators and improve operation safety and efficiency.

[0004] The technical solution adopted by the present invention is as follows:

[0005] A large-opening water immersion test platform comprises a large water pool, tracks are fixed on both sides of the top surface of the large water pool, and a workbench. Four walking mechanisms are arranged at the bottom of the workbench, the walking mechanisms match the tracks, and the workbench slides along the tracks through the walking mechanisms; a square opening is arranged in the middle of the workbench, a supporting frame is fixed on the workbench around the square opening, two groups of electric hoists are installed on each side of the supporting frame, the electric hoists are installed with a lifting platform through cables, and the size of the lifting platform matches the square opening; a synchronous control system is also fixed on the workbench, and the synchronous control system controls the synchronous operation of the four groups of electric hoists and the walking mechanisms.

[0006] Its further technical solution is:

[0007] The lifting platform adopts an integrated structure.

[0008] The lifting platform is formed by welding steel structures.

[0009] The lifting platform is provided with a plurality of groups of evenly distributed rectangular holes.

[0010] Connecting seats are respectively fixed at the four corners of the top surface of the lifting platform, and the connecting seats are fixed to the cables.

[0011] The connecting seat is in a trapezoidal structure.

[0012] The large pool and the workbench are both equipped with fences.

[0013] A test method for a large-opening water immersion test platform includes the following operation procedures:

[0014] Step 1: Start the synchronous control system, control the operation of the electric hoist, and lift the lifting platform to the highest position. At this time, the lifting platform is flush with the square opening;

[0015] Step 2: Hoist the test piece onto the lifting platform and fix it to complete the test preparation;

[0016] Step 3: Control the electric hoist to lower the lifting platform to the predetermined depth;

[0017] Step 4: Control the walking mechanism to move along the track at a constant speed, driving the test piece to move in the water;

[0018] Step 5: Complete the experiment;

[0019] Step 6: Raise the lifting platform to the highest position again;

[0020] Step 7: Remove the test piece;

[0021] Step 8: Wait for the next experiment.

[0022] The beneficial effects of the present invention are as follows:

[0023] The present invention has a compact and reasonable structure and is easy to operate. Through the cooperation between the supporting frame, electric hoist, workbench, lifting platform and other components, the test piece can be easily immersed in water and moved in water, which will significantly reduce the work intensity of operators and improve operation safety and efficiency.

[0024] The present invention fixes the test piece on a lifting platform. After completing the test preparation work, the lifting platform is lowered by four sets of electric hoists. The depth of immersion of the test piece in water is controlled by controlling the lowering depth; the walking mechanism drives the test platform as a whole to move on the track, so that the test piece can move in the water, so as to facilitate the underwater test work. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a structural schematic diagram of the present invention.

[0026] Figure 2 for Figure 1 Partial view of.

[0027] Figure 3 for Figure 2 A partial enlarged view of part A in the middle.

[0028] Figure 4 This is a working state diagram of the present invention (the lifting platform is at the highest position).

[0029] Figure 5 for Figure 4 A partial view of the .

[0030] Among them: 1. Large water tank; 2. Track; 3. Walking mechanism; 4. Support frame; 5. Electric hoist; 6. Workbench; 7. Lifting platform; 8. Synchronous control system; 9. Cable; 10. Connecting seat; 11. Fence. DETAILED DESCRIPTION

[0031] The specific implementation of the present invention will be described below in conjunction with the accompanying drawings.

[0032] like Figure 1-Figure 5 As shown, the large-opening water immersion test platform of this embodiment includes a large water pool 1, with tracks 2 fixed on both sides of the top surface of the large water pool 1, and also includes a workbench 6. Four walking mechanisms 3 are arranged at the bottom of the workbench 6, and the walking mechanisms 3 match the tracks 2. The workbench 6 slides along the tracks 2 through the walking mechanisms 3; a square opening is arranged in the middle of the workbench 6, and a supporting frame 4 is fixed on the workbench 6 around the square opening. Two groups of electric hoists 5 are installed on both sides of the supporting frame 4, and the electric hoists 5 are installed with a lifting platform 7 through cables 9, and the size of the lifting platform 7 is consistent with the square opening; a synchronous control system 8 is also fixed on the workbench 6, and the synchronous control system 8 controls the synchronous operation of the four groups of electric hoists 5 and the walking mechanisms 3.

[0033] The lifting platform 7 adopts an integrated structure.

[0034] The lifting platform 7 is formed by welding a steel structure.

[0035] The lifting platform 7 is provided with a plurality of evenly distributed rectangular holes.

[0036] Connecting seats 10 are fixed to the four corners of the top surface of the lifting platform 7 , respectively, and the connecting seats 10 are fixed to the cables 9 .

[0037] The connecting seat 10 has a trapezoidal structure.

[0038] Fences 11 are installed on the large pool 1 and the workbench 6 .

[0039] The test method of the large-opening water immersion test platform of this embodiment includes the following operation procedures:

[0040] Step 1: Start the synchronous control system 8, control the electric hoist 5 to operate, and lift the lifting platform 7 to the highest position, at which time the lifting platform 7 is flush with the square opening;

[0041] Step 2: hoist the test piece onto the lifting platform 7 and fix it to complete the test preparation;

[0042] Step 3: Control the electric hoist 5 to lower the lifting platform 7 to a predetermined depth position;

[0043] Step 4: Control the walking mechanism 3 to move along the track 2 at a constant speed, driving the test piece to move in the water;

[0044] Step 5: Complete the experiment;

[0045] Step 6: Raise the lifting platform 7 to the highest position again;

[0046] Step 7: Remove the test piece;

[0047] Step 8: Wait for the next experiment.

[0048] The specific structure and function of the large-opening water immersion test platform described in the present invention are as follows:

[0049] It mainly includes components such as track 2, walking mechanism 3, supporting frame 4, electric hoist 5, workbench 6, lifting platform 7 and synchronous control system 8.

[0050] Among them, two tracks 2 are fixed in parallel on both sides of the large pool 1.

[0051] Among them, the workbench 6 is placed above the track 2 through four walking mechanisms 3. A square opening is set in the middle of the workbench 6, which is convenient for installing the test piece when the lifting platform 7 is at the highest position. At the same time, the square opening is relatively large and can accommodate test pieces of various sizes, regardless of the shape of the test piece, making the work convenient and flexible.

[0052] The support frame 4 is fixed around the square opening of the workbench 6 , and two sets of electric hoists 5 are installed on both sides of the support frame 4 . The electric hoists 5 are fixed to four connecting seats 10 of the lifting platform 7 through cables 9 .

[0053] The synchronous control system 8 is fixed on the workbench 6 and is used to control the synchronous operation of the four sets of electric hoists 5 and the walking mechanism 3 to achieve the smooth rising and lowering of the lifting platform 7 and the horizontal walking in the large water pool 1.

[0054] In actual working process:

[0055] First, start the synchronous control system 8 to control the operation of the electric hoist 5 to lift the lifting platform 7 to the highest position. Figure 4 and Figure 5 As shown, at this time, the lifting platform 7 is flush with the square opening.

[0056] Then, the test piece is hoisted onto the lifting platform 7 and fixed, completing the test preparation work.

[0057] Subsequently, the synchronous control system 8 controls the electric hoist 5 to lower the lifting platform 7 to a predetermined depth.

[0058] Finally, the synchronous control system 8 is used to control the walking mechanism 3 to move along the track 2 at a certain speed, thereby driving the test piece to move in the water.

[0059] The present invention realizes the immersion of the test piece in water and the movement of the test piece in water through an automated water immersion test platform, which will significantly reduce the workload of operators and improve operation safety and efficiency.

[0060] The above description is an explanation of the present invention, not a limitation of the present invention. The scope of the present invention is defined in the claims. Any form of modification may be made within the scope of protection of the present invention.

Claims

1. A large-opening water immersion test platform, characterized in that: The invention comprises a large water pool (1), wherein rails (2) are fixed on both sides of the top surface of the large water pool (1), and a workbench (6). Four walking mechanisms (3) are arranged at the bottom of the workbench (6), and the walking mechanisms (3) match the rails (2). The workbench (6) slides along the rails (2) through the walking mechanisms (3); a square opening is arranged in the middle of the workbench (6), and a supporting frame (4) is fixed on the workbench (6) around the square opening. Two groups of electric hoists (5) are respectively installed on both sides of the supporting frame (4), and the electric hoists (5) are installed with a lifting platform (7) through cables (9), and the size of the lifting platform (7) matches the square opening; a synchronous control system (8) is also fixed on the workbench (6), and the synchronous control system (8) controls the synchronous operation of the four groups of electric hoists (5) and the walking mechanisms (3).

2. A large opening water immersion test platform as claimed in claim 1, characterized in that: The lifting platform (7) adopts an integrated structure.

3. A large opening water immersion test platform as claimed in claim 1, characterized in that: The lifting platform (7) is made of welded steel structure.

4. A large opening water immersion test platform as claimed in claim 1, characterized in that: The lifting platform (7) is provided with a plurality of groups of evenly distributed rectangular holes.

5. The large-opening water immersion test platform according to claim 1, characterized in that: Connecting seats (10) are respectively fixed at the four corners of the top surface of the lifting platform (7), and the connecting seats (10) are fixed to the cables (9).

6. A large opening water immersion test platform as claimed in claim 5, characterized in that: The connecting seat (10) has a trapezoidal structure.

7. The large-opening water immersion test platform according to claim 1, characterized in that: The large water pool (1) and the workbench (6) are both equipped with fences (11).

8. A test method for a large-opening water immersion test platform as claimed in claim 1, characterized in that: The following operation procedures are included: The first step: starting the synchronous control system (8), controlling the electric hoist (5) to operate, and lifting the lifting platform (7) to the highest position, at which time the lifting platform (7) is flush with the square opening; Step 2: hoist the test piece onto the lifting platform (7) and fix it to complete the test preparation work; Step 3: Control the electric hoist (5) to lower the lifting platform (7) to a predetermined depth; Step 4: Control the walking mechanism (3) to move along the track (2) at a constant speed, driving the test piece to move in the water; Step 5: Complete the experiment; Step 6: Raise the lifting platform (7) to the highest position again; Step 7: Remove the test piece; Step 8: Wait for the next experiment.