Management method, system and device for self-service sales request point and self-service entry and exit of subway construction
By introducing self-service request points and self-service entry and exit management methods in subway construction, and using technical means such as live facial recognition, the problems of low efficiency and high cost of subway construction management have been solved, and construction safety and efficiency have been improved.
Patent Information
- Application Number
- CN202411333775.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-24
- Publication Date
- 2025-02-11
AI Technical Summary
For subway construction, please turn off points and end door management rely on manual labor. The existing intelligent access control technology cannot meet the comprehensive safety requirements of subway construction, resulting in low management efficiency and high cost.
The management methods of self-service request and self-service entry and exit are adopted, and through technical means such as live facial recognition certification, request information review, and positioning verification, automatic management of construction information and intelligent control of end doors are realized.
It improves the safety and efficiency of construction management, reduces management costs, and realizes an intelligent upgrade of subway construction and end door management.
Smart Images

Figure CN119417379A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of construction information management, and in particular to a management method, system and device for self-service check-in and check-out points and self-service entry and exit points of subway construction. Background Art
[0002] During subway operation, construction projects are diverse and complex, involving a large number of construction workers and collaboration between multiple departments. To ensure the safety and efficiency of construction, construction work must strictly comply with the regulations on entry and exit points, and construction workers must enter and exit the track area through specific end doors. Entry and exit point management and end door entry and exit management are important links in subway construction safety management, including construction safety management, identity verification, tool inspection, and strict control of entry and exit time.
[0003] At present, these management processes mainly rely on local stations to set up special personnel for manual operation and management. Although this method can ensure the implementation of safety management regulations, it inevitably has the problems of low management efficiency and high labor costs. With the development of technology, although smart access control technologies such as Bluetooth, fingerprint, password and card swiping have been widely used in other fields such as office buildings, communities, hospitals, etc., these technologies, when directly applied to subway construction scenarios, still cannot meet the specific requirements of subway construction for safety and comprehensive management, such as safety management of construction operations, multiple authentication of personnel identities, accurate verification of terminal door positions, and strict restrictions on entry and exit times.
[0004] In addition, some subway station door ends still use traditional mechanical locks, which is limited by the fact that it cannot be directly combined with modern intelligent access control technology, thus hindering the intelligent upgrade of subway construction entry and exit points and door end management. Therefore, how to improve the efficiency of subway construction entry and exit points and reduce management costs while ensuring safety has become an urgent problem to be solved in the current subway operation management. Summary of the invention
[0005] 1. Technical issues to be resolved
[0006] In view of the above-mentioned shortcomings and deficiencies of the prior art, the present invention provides a management method, system and device for self-service check-in and check-out points and self-service entry and exit of subway construction, which solves the technical problems that the management of check-in and check-out points and end door entry and exit of subway construction relies on manual labor, and the existing intelligent access control technology cannot meet the comprehensive safety requirements of subway construction, resulting in low management efficiency and high cost.
[0007] (II) Technical solution
[0008] In order to achieve the above object, the main technical solutions adopted by the present invention include:
[0009] In a first aspect, an embodiment of the present invention provides a method for managing self-service check-in and check-out points and self-service entry and exit points for subway construction, including:
[0010] According to the received click information and click request, the click management work including live facial recognition authentication, click information review and location verification is carried out, and the click information is submitted to the construction server or the construction mobile terminal of the designated personnel for review;
[0011] Receive and display the approved click information for the construction personnel to confirm and review;
[0012] According to the approved request information, guide the construction personnel to enter the site to carry out construction work, and record the construction information in real time;
[0013] After the construction is completed, the received sales point information and sales point request will be sent to the construction server or the designated personnel's construction mobile terminal for review. After receiving the feedback message that the sales point information has been reviewed and approved, the sales point management work is completed.
[0014] Optionally, based on the received click information and click request, click management including live facial recognition authentication, click information review and location verification is performed, and the click information is submitted to the construction server or the construction mobile terminal of the designated personnel for review, including:
[0015] Receive the click information and click request input by the person in charge of the construction work or the contact person, and perform the following click management work based on the click information and click request:
[0016] Receive the location verification request initiated by the construction work supervisor or contact person, and control the positioning module display screen of the control box deployed at the end door to display the updated QR code for scanning to complete the location verification;
[0017] Perform live facial recognition on construction workers by calling the facial recognition module, and receive and verify live facial recognition data submitted by the construction workers;
[0018] If the positioning verification exceeds the preset positioning verification time, the live facial recognition data verification exceeds the preset facial recognition time, or when re-login is required, the positioning verification and live facial recognition of the construction personnel will be re-performed;
[0019] If the location verification does not exceed the preset location verification time, the live facial recognition data verification does not exceed the preset facial recognition time, or the user logs in again, and the location verification and the live facial recognition authentication of the construction personnel are passed, the information is submitted to the construction server or the designated personnel's construction mobile terminal for approval;
[0020] Among them, the information you click includes construction work content, time, number of people, end door entry and exit information, real-time photos and tool information.
[0021] Optionally, management tasks may also include:
[0022] Perform live facial recognition on construction supervisors by calling the facial recognition module;
[0023] Receive and verify live facial recognition data submitted by construction supervisors;
[0024] If the construction supervisor passes the live facial recognition authentication, the "Please click" information will be displayed to the construction supervisor;
[0025] Receive the review results of the construction supervisor on the requested information;
[0026] According to the review results of the construction work supervisor, the click information is updated and stored.
[0027] Optionally, after performing click management work including live facial recognition authentication, click information review and location verification based on the received click information and click request, and submitting the click information to the construction server or the construction mobile terminal of the designated person for review, it also includes:
[0028] In response to the received approval request information, an entry reminder is sent to the person in charge of the construction work or the contact person, and the end door entry information is displayed;
[0029] Open the end door according to the confirmation information of the end door entry received from the construction work supervisor or contact person;
[0030] According to the end door type, directly release the electronic lock access control or automatically open the key box of the mechanical lock;
[0031] After all construction personnel and tools and equipment have entered the site, close the end door and display the end door closure information for confirmation by the person in charge of the construction work or the contact person;
[0032] Based on the confirmation information received from the person in charge of the construction work or the contact person regarding the closing information of the end door, the video module is called to check whether the key is returned. If the key is not returned, an alarm is issued;
[0033] Based on the pre-set entry limit time, if the entry is not completed within the entry limit time, an alarm reminder will be given directly or through the linkage with the end door control box.
[0034] Optionally, after the construction is completed and the site is exited, the received sales point information and sales point request are sent to the construction server or the construction mobile terminal of the designated personnel for review. After receiving the feedback message that the sales point information has been reviewed and approved, the sales point management work is completed, including:
[0035] Receive sales point information and sales point requests initiated by the person in charge of construction work or the contact person;
[0036] Send the sales point information to the construction server or the designated personnel's construction mobile terminal for review;
[0037] When the feedback message that the sales point information has been reviewed and approved is received, the sales point management work is completed, marking the end of the construction.
[0038] Optionally, after the construction is completed and the worker leaves the site, the received sales point information and sales point request are sent to the construction server or the construction mobile terminal of the designated personnel for review. After receiving the feedback message that the sales point information has been reviewed and approved, before the sales point management work is completed, the following steps are also included:
[0039] In response to an exit request from a construction worker or a contact person, the facial recognition module is called to perform live facial recognition on the construction worker, and live facial recognition data submitted by the construction worker is received and verified;
[0040] Receive the location verification request initiated by the construction work supervisor or contact person, and control the positioning module display screen of the control box deployed at the end door to display the updated QR code for scanning to complete the location verification;
[0041] If the location verification exceeds the preset location verification time, the live facial recognition data verification exceeds the preset facial recognition time, or when logging in again, the location verification and live facial authentication will be performed again;
[0042] If the location verification does not exceed the preset location verification time, the live facial recognition data verification does not exceed the preset facial recognition time, or the user logs in again, and the location verification and the live facial recognition authentication of the construction personnel are passed, the door is opened;
[0043] After all construction personnel and tools and equipment have left the site, close the end door and display the end door closure information for confirmation by the person in charge of the construction work or the contact person.
[0044] Optionally include:
[0045] During the construction process, when a delay request is received from a construction worker, the delay request is sent to the construction server or the construction mobile terminal of the designated person for approval;
[0046] During the approval process, the approval status is displayed in real time for construction personnel to review;
[0047] If the extension request is approved, the construction plan will be updated and relevant personnel will be notified to adjust their work arrangements. At the same time, the construction information during the extension period will continue to be recorded;
[0048] The request for extension includes: the extension time, reason and necessary supporting materials such as on-site photos or videos.
[0049] In a second aspect, an embodiment of the present invention provides a method for managing self-service check-in and check-out points and self-service entry and exit points for subway construction, including:
[0050] The click management module is used to perform click management work including live facial recognition authentication, click information review and location verification according to the received click information and click request, and submit the click information to the construction server or the construction mobile terminal of the designated personnel for review;
[0051] The receiving and display module is used to receive and display the approved request information for the construction personnel to confirm and review;
[0052] The construction guidance and recording module is used to guide construction personnel to enter the site to carry out construction work according to the approved request information, and record the construction information in real time;
[0053] The sales point management module is used to send the received sales point information and sales point request to the construction server or the designated personnel's construction mobile terminal for review after the construction is completed. After receiving the feedback message that the sales point information has been reviewed and approved, the sales point management work is completed.
[0054] In a third aspect, an embodiment of the present invention provides a management device for a self-service check-in and check-out point and a self-service entry and exit point for subway construction, comprising:
[0055] A construction mobile terminal, used to execute the method as described above;
[0056] Construction server, interacts with the construction mobile terminal;
[0057] The control box is deployed at the end door and interacts with the construction mobile terminal and the construction server respectively.
[0058] Optionally, the control box includes:
[0059] A positioning module, including a QR code display screen, which is used to receive personnel positioning information and update the positioning QR code;
[0060] The door opening control module includes an IoT door opening controller, which is used to receive and process door opening instructions and control the opening and closing of the end door electric lock and the control box electric lock;
[0061] The control box electric lock is connected to the IoT door opening controller and is used to open the lock device after receiving the door opening command. It is also equipped with a spare mechanical key hole to support opening from the outside with a mechanical key.
[0062] The terminal door key management module includes a key storage box and a built-in camera. The key box is used to store the terminal door keys, and the built-in camera is used to collect information about whether the keys are in the returned state.
[0063] The alarm module is configured to send out an alarm reminder when the key is not returned and the end door is opened for more than a set time.
[0064] (III) Beneficial effects
[0065] The beneficial effects of the present invention are:
[0066] First, by receiving the check-in information and request, the present invention can execute the check-in management process including live facial recognition authentication, check-in information review and location verification. This not only significantly improves the accuracy and security of construction personnel identity authentication, but also ensures the authenticity and validity of the check-in information, thereby effectively preventing unauthorized personnel from entering the construction area, further ensuring the safety of subway construction.
[0067] Secondly, the present invention can receive and display the approved request information for the construction personnel to confirm and check. This function provides a convenient way for the construction personnel to obtain information, so that they can understand their request status in time, reduce the misoperation or delay caused by poor information communication, and improve the construction efficiency.
[0068] Furthermore, by guiding construction personnel to enter the site to carry out construction work according to the approved request information and recording construction information in real time, the present invention realizes refined management and monitoring of the construction process. This can not only help managers to grasp the construction progress and personnel dynamics in real time, but also provide detailed data support for subsequent construction quality assessment and problem analysis.
[0069] Finally, after the construction is completed, the present invention can send the received sales point information and request to the construction server or the construction mobile terminal of the designated personnel for review, and complete the sales point management after receiving the feedback message that the sales point information has been reviewed and approved. This process ensures the standardization and timeliness of sales point operations, effectively avoids safety hazards and liability disputes caused by poor sales point management, and also provides a strong guarantee for the smooth settlement of construction projects.
[0070] Therefore, the management method proposed in the present invention realizes self-service management of subway construction check-in and check-out points and entry and exit through automated and intelligent technical means, which not only improves the safety and efficiency of construction management, but also reduces management costs, providing strong support for the sustainable and healthy development of the subway construction industry. BRIEF DESCRIPTION OF THE DRAWINGS
[0071] Figure 1 A flow chart of a method for managing self-service check-in and check-out points and self-service entry and exit points for subway construction provided by an embodiment of the present invention;
[0072] Figure 2 A schematic diagram of specific steps of step S1 of a method for managing self-service check-in and check-out points and self-service entry and exit for subway construction provided by an embodiment of the present invention;
[0073] Figure 3 A flowchart of a self-service check-in point for construction of a method for managing a self-service check-in and check-out point and a self-service entry and exit point for subway construction provided by an embodiment of the present invention;
[0074] Figure 4 A schematic diagram of specific steps after step S1 of a method for managing self-service check-in and check-out points and self-service entry and exit of subway construction provided by an embodiment of the present invention;
[0075] Figure 5 A schematic diagram of a process flow of self-service entry into a construction site of a method for managing self-service check-in and check-out points and self-service entry and exit of a subway construction provided by an embodiment of the present invention;
[0076] Figure 6 A flowchart of a construction process extension point of a method for managing a self-service check-in and check-out point and self-service entry and exit for subway construction provided by an embodiment of the present invention;
[0077] Figure 7 A schematic diagram of specific steps of step S4 of a method for managing self-service check-in and check-out points and self-service entry and exit for subway construction provided by an embodiment of the present invention;
[0078] Figure 8 A flowchart of a self-service sales point for construction of a method for managing a self-service sales point and self-service entry and exit for subway construction provided by an embodiment of the present invention;
[0079] Fig. 9 A schematic diagram of specific steps before step S4 of a method for managing self-service check-in and check-out points and self-service entry and exit for subway construction provided by an embodiment of the present invention;
[0080] Fig.10 A schematic diagram of a process flow of self-service exit of a subway construction project provided by an embodiment of the present invention;
[0081] Fig.11 A schematic diagram of the interaction between a self-service check-in and check-out point and a self-service entry and exit management device for subway construction provided by an embodiment of the present invention;
[0082] Fig.12 An appearance diagram of a control box device of a self-service check-in and check-out point and self-service entry and exit management device for subway construction provided by an embodiment of the present invention;
[0083] Fig.13An internal schematic diagram of a control box device of a subway construction self-service check-in and check-out point and self-service entry and exit management device provided by an embodiment of the present invention; Fig.14 A complete construction operation process of a management method for a self-service check-in and check-out point and self-service entry and exit for subway construction provided by an embodiment of the present invention; Fig.15 A simplified construction operation process of a method for managing self-service check-in and check-out points and self-service entry and exit points for subway construction provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0084] In order to better explain the present invention and facilitate understanding, the present invention is described in detail below through specific implementation modes in conjunction with the accompanying drawings.
[0085] Prior to this, in order to facilitate understanding of the technical solution provided by the present invention, some concepts are first introduced below.
[0086] Please click on construction: refers to the procedure of applying to the relevant construction management department to start construction before construction, and construction can only begin after approval by the approval department.
[0087] Construction exit point: refers to the procedure of reporting the completion of construction to the construction management department and applying for the termination of construction status after the construction is completed, the equipment is checked to be normal, and the construction site personnel and tools have left the site.
[0088] Edge control technology: refers to the technology that realizes data processing, control and management in edge computing or edge network environment.
[0089] like Figure 1 As shown, an embodiment of the present invention proposes a management method for self-service check-in and check-out points and self-service entry and exit of subway construction, including: based on the received check-in information and check-in request, performing check-in management work including live facial recognition authentication, check-in information review and positioning verification, and submitting the check-in information to the construction server or the construction mobile terminal of the designated personnel for review; receiving and displaying the approved check-in information for the construction personnel to confirm and review; based on the approved check-in information, guiding the construction personnel to enter the site to carry out construction work, and recording the construction information in real time; after the construction is completed and exits the site, sending the received check-in information and check-in request to the construction server or the construction mobile terminal of the designated personnel for review, and completing the check-in management work after receiving the feedback message that the check-in information has been reviewed and approved.
[0090] First, by receiving the check-in information and request, the present invention can execute the check-in management process including live facial recognition authentication, check-in information review and location verification. This not only significantly improves the accuracy and security of construction personnel identity authentication, but also ensures the authenticity and validity of the check-in information, thereby effectively preventing unauthorized personnel from entering the construction area, further ensuring the safety of subway construction.
[0091] Secondly, the present invention can receive and display the approved request information for the construction personnel to confirm and check. This function provides a convenient way for the construction personnel to obtain information, so that they can understand their request status in time, reduce the misoperation or delay caused by poor information communication, and improve the construction efficiency.
[0092] Furthermore, by guiding construction personnel to enter the site to carry out construction work according to the approved request information and recording construction information in real time, the present invention realizes refined management and monitoring of the construction process. This can not only help managers to grasp the construction progress and personnel dynamics in real time, but also provide detailed data support for subsequent construction quality assessment and problem analysis.
[0093] Finally, after the construction is completed, the present invention can send the received sales point information and request to the construction server or the construction mobile terminal of the designated personnel for review, and complete the sales point management after receiving the feedback message that the sales point information has been reviewed and approved. This process ensures the standardization and timeliness of sales point operations, effectively avoids safety hazards and liability disputes caused by poor sales point management, and also provides a strong guarantee for the smooth settlement of construction projects.
[0094] Therefore, the management method proposed in the present invention realizes self-service management of subway construction check-in and check-out points and entry and exit through automated and intelligent technical means, which not only improves the safety and efficiency of construction management, but also reduces management costs, providing strong support for the sustainable and healthy development of the subway construction industry.
[0095] In order to better understand the above technical solution, exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided to enable a clearer and more thorough understanding of the present invention and to fully convey the scope of the present invention to those skilled in the art.
[0096] Specifically, an embodiment of the present invention provides a method for managing self-service check-in and check-out points and self-service entry and exit points in subway construction, which includes:
[0097] S1. According to the received click information and click request, the click management work including live facial recognition authentication, click information review and positioning verification is carried out, and the click information is submitted to the construction server or the designated personnel's construction mobile terminal for review.
[0098] Furthermore, if Figure 2 As shown, step S1 includes:
[0099] S11. Receive the click information and click request input by the person in charge of the construction work or the contact person, and perform the following click management work based on the click information and click request.
[0100] S12, receiving a positioning verification request initiated by the person in charge of the construction work or the contact person, and controlling the positioning module display screen of the control box deployed at the end door to display an updated QR code for scanning to complete the positioning verification.
[0101] S13. Perform live facial recognition on the construction workers by calling the facial recognition module, and receive and verify the live facial recognition data submitted by the construction workers.
[0102] S14a, if the positioning verification exceeds the preset positioning verification time, the live facial recognition data verification exceeds the preset facial recognition time or when re-login is required, the positioning verification and live facial authentication of the construction personnel are performed again.
[0103] S14b. If the positioning verification does not exceed the preset positioning verification time, the live facial recognition data verification does not exceed the preset facial recognition time or the re-login occurs, and the positioning verification and the live facial recognition authentication of the construction personnel are passed, submit the click information to the construction server or the designated personnel's construction mobile terminal for approval.
[0104] Furthermore, step S1 also includes: performing live facial recognition on the construction work supervisor by calling the facial recognition module; receiving and verifying the live facial recognition data submitted by the construction work supervisor; if the live facial recognition authentication of the construction work supervisor is passed, displaying the click information to the construction work supervisor; receiving the review results of the construction work supervisor on the click information, including but not limited to confirmation or modification opinions on the accuracy and completeness of the information content; updating and storing the click information according to the review results of the construction work supervisor.
[0105] In a specific embodiment, reference Figure 3 The specific process of self-service construction is as follows:
[0106] First, the request information edited by the person in charge or contact person of the construction work is received, and the request process is initiated. The request information includes the specific content, time, number of construction workers, and entry and exit door information of the construction work. At the same time, real-time photos of all construction workers and information on tools entering the site are received and stored; for the request information already included in the construction plan, it is automatically filled in the request information.
[0107] Secondly, if there is a construction supervisor, he / she will be authenticated through live facial recognition technology, and after the authentication is passed, he / she will be allowed to review the information.
[0108] Next, the positioning verification request initiated by the person in charge of the construction work or the contact person is received, and the positioning module display screen of the control box at the construction entry door is controlled to update the QR code for scanning to complete the positioning verification.
[0109] Furthermore, after the positioning verification is passed, facial recognition authentication is performed on all construction workers in turn.
[0110] In addition, due to the security requirements for construction worker identity verification, if there is a timeout during the positioning verification and construction worker's facial verification (the timeout period is configurable) or if the construction mobile terminal is detected to have re-logged in, re-positioning verification and facial authentication will be required to avoid management risk loopholes.
[0111] Furthermore, after completing the above registration and verification of the requested points, the construction management service / personnel will review and approve the requested point information based on the conflict detection rules.
[0112] Furthermore, after step S1, Figure 4 As shown, it also includes:
[0113] A11. In response to the received approval request information, an entry reminder is sent to the person in charge of the construction work or the contact person, and the end door entry information is displayed.
[0114] A12. Open the end door according to the confirmation information received from the construction manager or contact person on the end door entry information.
[0115] A13. Depending on the door type, directly release the electronic lock access control or automatically open the key box of the mechanical lock.
[0116] A14. After all construction personnel and tools and equipment have entered the site, close the end door and display the end door closure information for confirmation by the person in charge of the construction work or the contact person.
[0117] A15. Based on the confirmation information received from the person in charge of the construction work or the contact person regarding the closing information of the end door, the video module is called to check whether the key is returned. If the key is not returned, an alarm is issued.
[0118] A16. Based on the pre-set entry limit time, when the entry is not completed within the entry limit time, an alarm reminder will be given directly or through the linkage with the end door control box.
[0119] In another specific embodiment, referring to Figure 5 , construction personnel can enter the site only after approval. The specific process of self-service construction entry is as follows:
[0120] First, receive and confirm the approval notification to activate the entry management process.
[0121] Secondly, send entry instructions to the person in charge / contact person of the construction work and display the specific end door information for their confirmation.
[0122] Next, receive the entry door information confirmed by the construction work manager / contact person through the construction mobile terminal and verify its accuracy.
[0123] Then, different operations are performed according to the type of terminal door: If the terminal door is equipped with an electronic lock, the terminal door access control is remotely released through the construction mobile terminal to allow construction personnel to enter. If the terminal door is a mechanical lock, the construction work supervisor / contact person is guided to the configured key box location. After receiving the operation of the construction work supervisor / contact person through the construction mobile terminal, the key box is automatically opened so that he can take out the key to open the terminal door.
[0124] Then, after all the construction personnel and tools have entered and confirmed the end door is closed through the construction mobile terminal, the video analysis is used to check whether the key has been returned. If the key is not returned, the alarm sound of the key box is triggered.
[0125] Furthermore, the entry time is monitored to ensure that the construction personnel complete the entry within the specified time. If the entry is not completed within the time limit, an alarm reminder will be issued through the construction mobile terminal and the end door control box.
[0126] At the same time, all data and operation logs related to the site entry are recorded and stored, including the site entry time, personnel information, terminal door status, etc., for subsequent query and audit. During the entire site entry process, real-time status updates and problem feedback functions are provided to ensure that the person in charge / contact of the construction work can keep track of the site entry progress and handle any emergencies at any time.
[0127] S2. Receive and display the approved click information for construction personnel to confirm and review.
[0128] In this step, the construction mobile terminal receives and displays the approved request information, including detailed data such as construction content, time, location, number of people, and required tools, for construction personnel to review and confirm.
[0129] S3. Based on the approved request information, guide the construction personnel to enter the site to carry out construction work and record the construction information in real time.
[0130] In this step, the construction mobile terminal guides the construction personnel to the designated construction site according to the requested information, and provides navigation or positioning assistance functions to ensure that the construction personnel arrive accurately and enter the site to carry out construction work. During the construction process, the construction mobile terminal records the construction progress, personnel dynamics and tool usage in real time, and can collect on-site data by taking photos, recording videos or writing. The construction mobile terminal provides the function of querying construction specifications and safety standards to ensure that construction personnel are aware of and follow relevant regulations at any time to ensure construction safety.
[0131] In addition, during the construction process, Figure 6 As shown in the figure, when a delay request is received from a construction worker, the delay request is sent to the construction server or the construction mobile terminal of the designated person for approval; during the approval process, the approval status is displayed in real time for the construction worker to review; if the delay request is approved, the construction plan will be updated, and the relevant personnel will be notified to adjust the work schedule, and the construction information during the delay period will continue to be recorded. The delay request includes: the request contains the extended time, reason, and necessary on-site photos or videos and other supporting materials.
[0132] It is important to understand that if there is a situation during the construction process where the construction time needs to be extended, the construction mobile terminal supports initiating an extension operation. The extension operation includes: the construction mobile terminal receives the extension request initiated by the construction personnel, and the request includes the extended time, reason, and necessary supporting materials such as on-site photos or videos. The construction mobile terminal sends the extension request to the construction management service or relevant responsible personnel for approval. During the approval process, the construction mobile terminal can display the approval status in real time for construction personnel to review. If the extension request is approved, the construction mobile terminal will update the construction plan and notify relevant personnel to adjust the work arrangements. At the same time, the construction mobile terminal will continue to record the construction progress and data during the extension period. After the construction is completed, the construction mobile terminal supports construction personnel to fill out the construction completion report, including information such as construction results, problems encountered and solutions, to provide a reference for subsequent work summary and improvement.
[0133] Through the above steps, the construction mobile terminal plays an important auxiliary and monitoring role in the construction execution process, ensuring that the construction proceeds as planned and supporting flexible extension operations when necessary to adapt to actual on-site needs.
[0134] S4. After the construction is completed, the received sales point information and sales point request will be sent to the construction server or the designated personnel's construction mobile terminal for review. After receiving the feedback message that the sales point information has been reviewed and approved, the sales point management work is completed.
[0135] Furthermore, if Figure 7 As shown, step S4 includes:
[0136] S41. Receive sales point information and sales point request initiated by the construction work manager or contact person.
[0137] S42. Send the sales point information to the construction server or the construction mobile terminal of the designated personnel for review.
[0138] S43. When the feedback message that the sales point information has been reviewed and approved is received, the sales point management work is completed, marking the end of the construction.
[0139] like Figure 8As shown in the figure, the specific process of self-service sales of construction points is as follows: after the construction is completed, the person in charge / contact person of the construction work initiates the sales of the construction points; the construction mobile terminal receives this sales request and reviews the sales information. If there is no error, the sales is successful and the construction is completed. If an abnormal situation is encountered during the sales process, such as failure to upload the sales information, delayed review feedback or failure to pass the review, the construction mobile terminal takes corresponding measures to handle it, including but not limited to re-uploading the sales information, contacting the reviewer or operating according to the preset abnormal handling process.
[0140] Furthermore, before step S4, Fig. 9 As shown, it also includes:
[0141] A41. In response to the exit request issued by the person in charge of the construction work or the contact person, the facial recognition module is called to perform live facial recognition on the construction personnel, and the live facial recognition data submitted by the construction personnel is received and verified.
[0142] A42, receives the positioning verification request initiated by the person in charge of the construction work or the contact person, and controls the positioning module display screen of the control box deployed at the end door to display the updated QR code for scanning to complete the positioning verification.
[0143] A43a. If the positioning verification exceeds the preset positioning verification time, the live facial recognition data verification exceeds the preset facial recognition time, or when re-login is required, the positioning verification and live facial authentication will be performed again.
[0144] A43b. If the positioning verification does not exceed the preset positioning verification time, the live facial recognition data verification does not exceed the preset facial recognition time, or the user logs in again, and the positioning verification and the live facial recognition authentication of the construction personnel are passed, the end door is opened.
[0145] A44. After all construction personnel and tools and equipment have left the site, close the end door and display the end door closure information for confirmation by the person in charge of the construction work or the contact person.
[0146] In another specific embodiment, after the construction work is completed, the construction workers can exit the site by themselves. Fig.10 As shown in the figure, the specific process of self-service construction exit is as follows:
[0147] First, when the operator leaves the site, all construction personnel are required to undergo facial recognition and positioning verification at the same time, using the same positioning method as when entering the site.
[0148] Next, out of consideration for the safety requirements of all personnel who have left the site and to avoid management risk loopholes, if the location verification and facial authentication of all construction personnel time out (configurable time) or re-login to the construction mobile terminal, the location verification and facial authentication will need to be performed again;
[0149] Furthermore, the information of the door closing confirmation completed by the construction work manager / contact person is received, and the end door status is obtained to confirm the end door status. If the door is not closed, the door closing cannot be confirmed.
[0150] In addition, an embodiment of the present invention provides a method for managing self-service check-in and check-out points and self-service entry and exit points for subway construction, including:
[0151] The click management module is used to perform click management work including live facial recognition authentication, click information review and positioning verification based on the received click information and click requests, and submit the click information to the construction server or the designated personnel's construction mobile terminal for review.
[0152] The receiving and display module is used to receive and display the approved click information for construction personnel to confirm and review.
[0153] The construction guidance and recording module is used to guide construction personnel to enter the site to carry out construction work according to the approved request information, and record the construction information in real time.
[0154] The sales point management module is used to send the received sales point information and sales point request to the construction server or the designated personnel's construction mobile terminal for review after the construction is completed. After receiving the feedback message that the sales point information has been reviewed and approved, the sales point management work is completed.
[0155] Furthermore, the embodiment of the present invention provides a management device for self-service check-in and check-out points and self-service entry and exit points of subway construction, such as Fig.11 As shown, it includes: a construction mobile terminal, which is used to execute the above method; a construction server, which interacts with the construction mobile terminal; and a control box, which is deployed at the end door and interacts with the construction mobile terminal and the construction server respectively.
[0156] refer to Fig.12 and Fig.13 The control box includes: a positioning module, including a QR code display screen, which is used to receive personnel positioning information and update the positioning QR code; a door opening control module, including an IoT door opening controller, which is used to receive and process door opening commands, and control the opening and closing of the end door electric lock and the control box electric lock; the control box electric lock is connected to the IoT door opening controller, which is used to open the lock device after receiving the door opening command, and is also equipped with a spare mechanical keyhole to support mechanical key opening from the outside; the end door key management module is an optional device for the mechanical lock end door, including a key storage box and a built-in camera, the key box is used to store the end door key, and the built-in camera is used to collect whether the key is in the return state; the alarm module is configured to issue an alarm reminder when the key is not returned and the end door is opened for more than the set time.
[0157] In summary, the embodiments of the present invention provide a method, system and device for managing self-service check-in and check-out points and self-service entry and exit points for subway construction. The design ideas of this method, system and device are aimed at comprehensively optimizing the subway construction process and ensuring construction safety and efficiency.
[0158] Specifically, for construction situations that require on-site entry, the present invention implements a complete set of construction operation processes, which covers multiple key steps such as construction request, on-site entry, execution (which may include extension links), exit and exit, such as Fig.14 At the same time, for construction scenarios that do not require on-site construction, the present invention also provides a simplified construction operation process, including construction request, execution (which may involve delays) and cancellation, such as Fig.15 It is worth noting that the method proposed in the present invention is not only applicable to construction situations that require on-site access, but can also be flexibly applied to construction scenarios that do not require on-site access.
[0159] In view of the current technical status and the problems existing in actual construction, the present invention realizes the self-service management of subway construction check-in and check-out points and the self-service opening and closing control of terminal doors by integrating advanced management methods and intelligent devices. This innovative measure further improves the self-service and unmanned level of construction management on the basis of meeting the safety management regulations such as subway construction check-in and check-out point management, personnel identity authentication, terminal door positioning verification and entry and exit time restrictions.
[0160] In addition, the method and device provided by the present invention have wide applicability and are compatible with various types of end doors controlled by electronic locks and mechanical locks. Through practical application, the present invention can realize the self-service registration of construction personnel and unmanned management of entry and exit of end doors, thereby effectively reducing the management cost of construction operations and improving overall construction efficiency and safety.
[0161] Since the system / device described in the above embodiments of the present invention is a system / device used to implement the method of the above embodiments of the present invention, a person skilled in the art can understand the specific structure and deformation of the system / device based on the method described in the above embodiments of the present invention, and thus will not be described in detail here. All systems / devices used in the method of the above embodiments of the present invention belong to the scope of protection of the present invention.
[0162] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as methods, systems or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Furthermore, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0163] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems) and computer program products according to embodiments of the present invention. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions.
[0164] It should be noted that in the claims, any reference numerals placed between brackets shall not be construed as limiting the claims. The word "comprising" does not exclude the presence of components or steps not listed in the claims. The word "a" or "an" preceding a component does not exclude the presence of a plurality of such components. The invention may be implemented by means of hardware comprising several different components and by means of a suitably programmed computer. In the claims enumerating several means, several of these means may be embodied by the same hardware. The use of the words first, second, third, etc., is for convenience of expression only and does not indicate any order. These words may be understood as part of the component name.
[0165] In addition, it should be noted that, in the description of this specification, the description of the terms "one embodiment", "some embodiments", "embodiment", "example", "specific example" or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, unless they are contradictory.
[0166] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments after knowing the basic creative concept. Therefore, the claims should be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the present invention.
[0167] Obviously, those skilled in the art can make various modifications and variations to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention should also include these modifications and variations.
Claims
1. A method for managing self-service check-in and check-out points and self-service entry and exit points for subway construction, characterized in that: include: According to the received click information and click request, the click management work including live facial recognition authentication, click information review and location verification is carried out, and the click information is submitted to the construction server or the construction mobile terminal of the designated personnel for review; Receive and display the approved click information for the construction personnel to confirm and review; According to the approved request information, guide the construction personnel to enter the site to carry out construction work, and record the construction information in real time; After the construction is completed, the received sales point information and sales point request will be sent to the construction server or the designated personnel's construction mobile terminal for review. After receiving the feedback message that the sales point information has been reviewed and approved, the sales point management work is completed.
2. The method for managing self-service check-in and check-out points and self-service entry and exit points for subway construction as claimed in claim 1, characterized in that: According to the received click information and click request, click management work including live facial recognition authentication, click information review and location verification is carried out, and the click information is submitted to the construction server or the construction mobile terminal of the designated personnel for review, including: Receive the click information and click request input by the person in charge of the construction work or the contact person, and perform the following click management work based on the click information and click request: Receive the location verification request initiated by the construction work supervisor or contact person, and control the positioning module display screen of the control box deployed at the end door to display the updated QR code for scanning to complete the location verification; Perform live facial recognition on construction workers by calling the facial recognition module, and receive and verify live facial recognition data submitted by the construction workers; If the positioning verification exceeds the preset positioning verification time, the live facial recognition data verification exceeds the preset facial recognition time, or when re-login is required, the positioning verification and live facial recognition of the construction personnel will be re-performed; If the location verification does not exceed the preset location verification time, the live facial recognition data verification does not exceed the preset facial recognition time, or the user logs in again, and the location verification and the live facial recognition authentication of the construction personnel are passed, the information is submitted to the construction server or the designated personnel's construction mobile terminal for approval; Among them, the information you click includes construction work content, time, number of people, end door entry and exit information, real-time photos and tool information.
3. The method for managing self-service check-in and check-out points and self-service entry and exit points for subway construction as claimed in claim 2, characterized in that: Please click Management work also includes: Perform live facial recognition on construction supervisors by calling the facial recognition module; Receive and verify live facial recognition data submitted by construction supervisors; If the construction supervisor passes the live facial recognition authentication, the "Please click" information will be displayed to the construction supervisor; Receive the review results of the construction supervisor on the requested information; According to the review results of the construction work supervisor, the click information is updated and stored.
4. The method for managing self-service check-in and check-out points and self-service entry and exit points for subway construction as claimed in claim 1, characterized in that: According to the received click information and click request, click management including live facial recognition authentication, click information review and location verification is carried out, and the click information is submitted to the construction server or the construction mobile terminal of the designated personnel for review, and it also includes: In response to the received approval request information, an entry reminder is sent to the person in charge of the construction work or the contact person, and the end door entry information is displayed; Open the end door according to the confirmation information of the end door entry received from the construction work supervisor or contact person; According to the end door type, directly release the electronic lock access control or automatically open the key box of the mechanical lock; After all construction personnel and tools and equipment have entered the site, close the end door and display the end door closure information for confirmation by the person in charge of the construction work or the contact person; Based on the confirmation information received from the person in charge of the construction work or the contact person regarding the closing information of the end door, the video module is called to check whether the key is returned. If the key is not returned, an alarm is issued; Based on the pre-set entry limit time, if the entry is not completed within the entry limit time, an alarm reminder will be given directly or through the linkage with the end door control box.
5. The method for managing self-service check-in and check-out points and self-service entry and exit points for subway construction as claimed in claim 1, characterized in that: After the construction is completed and the site is exited, the received sales point information and sales point request will be sent to the construction server or the designated personnel's construction mobile terminal for review. After receiving the feedback message that the sales point information has been reviewed and approved, the sales point management work is completed, including: Receive sales point information and sales point requests initiated by the person in charge of construction work or the contact person; Send the sales point information to the construction server or the designated personnel's construction mobile terminal for review; When the feedback message that the sales point information has been reviewed and approved is received, the sales point management work is completed, marking the end of the construction.
6. The method for managing self-service check-in and check-out points and self-service entry and exit points for subway construction as claimed in claim 1, characterized in that: After the construction is completed, the received sales point information and sales point request will be sent to the construction server or the construction mobile terminal of the designated personnel for review. After receiving the feedback message that the sales point information has been reviewed and approved, before completing the sales point management work, it also includes: In response to an exit request from a construction worker or a contact person, the facial recognition module is called to perform live facial recognition on the construction worker, and live facial recognition data submitted by the construction worker is received and verified; Receive the location verification request initiated by the construction work supervisor or contact person, and control the positioning module display screen of the control box deployed at the end door to display the updated QR code for scanning to complete the location verification; If the location verification exceeds the preset location verification time, the live face recognition data verification exceeds the preset face recognition time, or when logging in again, the location verification and live face recognition will be performed again; If the location verification does not exceed the preset location verification time, the live facial recognition data verification does not exceed the preset facial recognition time, or the user logs in again, and the location verification and the live facial recognition authentication of the construction personnel are passed, the door is opened; After all construction personnel and tools and equipment have left the site, close the end door and display the end door closure information for confirmation by the person in charge of the construction work or the contact person.
7. The method for managing self-service check-in and check-out points and self-service entry and exit points for subway construction as claimed in any one of claims 1 to 6, characterized in that: include: During the construction process, when a delay request is received from a construction worker, the delay request is sent to the construction server or the construction mobile terminal of the designated person for approval; During the approval process, the approval status is displayed in real time for construction personnel to review; If the extension request is approved, the construction plan will be updated and relevant personnel will be notified to adjust their work arrangements. At the same time, the construction information during the extension period will continue to be recorded; The request for extension includes: the extension time, reason and necessary supporting materials such as on-site photos or videos.
8. A method for managing self-service check-in and check-out points and self-service entry and exit points for subway construction, characterized in that: include: The click management module is used to perform click management work including live facial recognition authentication, click information review and location verification according to the received click information and click request, and submit the click information to the construction server or the construction mobile terminal of the designated personnel for review; The receiving and display module is used to receive and display the approved request information for the construction personnel to confirm and review; The construction guidance and recording module is used to guide construction personnel to enter the site to carry out construction work according to the approved request information, and record the construction information in real time; The sales point management module is used to send the received sales point information and sales point request to the construction server or the designated personnel's construction mobile terminal for review after the construction is completed. After receiving the feedback message that the sales point information has been reviewed and approved, the sales point management work is completed.
9. A management device for self-service check-in and check-out points and self-service entry and exit points for subway construction, characterized in that: include: A construction mobile terminal, used to execute the method according to any one of claims 1 to 8; Construction server, interacts with the construction mobile terminal; The control box is deployed at the end door and interacts with the construction mobile terminal and the construction server respectively.
10. The method for managing self-service check-in and check-out points and self-service entry and exit points for subway construction as claimed in claim 9, characterized in that: The control box includes: A positioning module, including a QR code display screen, which is used to receive personnel positioning information and update the positioning QR code; The door opening control module includes an IoT door opening controller, which is used to receive and process door opening instructions and control the opening and closing of the end door electric lock and the control box electric lock; The control box electric lock is connected to the IoT door opening controller and is used to open the lock device after receiving the door opening command. It is also equipped with a spare mechanical key hole to support opening from the outside with a mechanical key. The terminal door key management module includes a key storage box and a built-in camera. The key box is used to store the terminal door keys, and the built-in camera is used to collect information about whether the keys are in the returned state. The alarm module is configured to send out an alarm reminder when the key is not returned and the end door is opened for more than a set time.